Underground water permeation structure of roadbed

By setting up an inclined water-conducting layer and water collection well system in the groundwater seepage structure of the road bed, the problem of difficulty in dredging water seepage when the road bed is wide is solved, rapid accumulation and effective diversion of rainwater are achieved, and the stability of the road bed is ensured. and prevent damage to the original soil layer.

CN221877582UActive Publication Date: 2024-10-22湖北宇升建筑工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420464893.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-10-22
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

When the width of the road bed is large, it is difficult for the existing road bed groundwater seepage structure to quickly and comprehensively clear the seepage water. Especially in the rainy season or when rainfall is heavy, it cannot effectively evacuate the water flow in the embankment layer and the seepage layer, which may affect the original soil layer of the road bed. stability.

Method used

The embankment layer, the seepage layer and the original soil layer of the road bed are used in order from top to bottom. In the permeable layer, transverse blind trenches and water collection wells extending along the width of the road are set up, and between the permeable layer and the original soil layer of the road bed. Sloping water-conducting layer, the water-conducting layer consists of anti- Made of water material, the water collection well is connected to the municipal pipe network. The water conductive layer includes a waterproof concrete layer and an asphalt layer. The water collection well is connected to the water collection tank. The filter element is used to filter the water flow. The transverse blind ditch is connected to the water collection tank to ensure that the water flow gathers quickly. to the water collection well.

Benefits of technology

It achieves comprehensive collection and diversion of rainwater in the embankment layer, reduces the water content of the embankment layer, ensures the stability of the road bed, and prevents rainwater from infiltrating into the original soil layer of the road bed, reducing the amount of water in the original soil layer of the road bed. risk of layer damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877582U_ABST
    Figure CN221877582U_ABST
Patent Text Reader

Abstract

The roadbed underground water permeation structure comprises an embankment layer, a water seepage layer and a roadbed original soil layer which are sequentially arranged from top to bottom, a plurality of transverse blind ditches extending in the width direction of a road are formed in the water seepage layer, a plurality of water collecting wells arranged in the extending direction of the road are arranged in the roadbed original soil layer, and the water collecting wells communicate with a municipal pipe network. Two water guide layers which are obliquely arranged in the width direction of the road and made of waterproof materials are arranged between the water seepage layer and the roadbed original soil layer, the two water guide layers are arranged on the two sides of the water collecting well, the ends, close to the water collecting well, of the water guide layers are lower than the ends deviating from the water collecting well, and one ends of the transverse blind ditches extend to the upper portion of the water collecting well. Seeped water in the water seepage layer is comprehensively converged into the corresponding water collecting wells by means of the inclined surfaces of the water guide layers, and rainwater converged in the water collecting wells flows into a municipal pipe network, so that rainwater infiltrated downwards in the water seepage layer can be comprehensively and effectively collected and guided, the water content in the embankment layer can be greatly reduced, and the stability of a roadbed is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of road construction, and in particular to a roadbed groundwater infiltration structure. Background Art

[0002] In the current road construction process, groundwater is prone to cause sand flow. Sand flow can cause a large amount of soil to flow during construction, resulting in surface collapse or damage to the foundation of buildings, which can bring great difficulties to construction or directly affect the stability of construction projects and nearby buildings. In the design and construction, it is necessary to consider the use of necessary drainage or water isolation measures to avoid or reduce the harm of water to roadbed construction and use.

[0003] In the related art, a Chinese patent with publication number CN210395567U proposes a roadbed groundwater infiltration structure, which includes an embankment layer, a seepage layer and a roadbed original soil layer from top to bottom. A longitudinal blind ditch extending along the length of the road and a plurality of transverse blind ditches extending along the width of the road are provided in the seepage layer. The plurality of transverse blind ditches are evenly distributed on opposite sides of the longitudinal blind ditch and connected to the longitudinal blind ditch. A plurality of water collection wells connected to the longitudinal blind ditch are provided in the roadbed original soil layer. The plurality of water collection wells are connected to the external municipal pipe network through pipes. The utility model can reduce the water content in the embankment layer and collect and utilize the infiltrated groundwater.

[0004] The above-mentioned related technologies have the following defects: when the roadbed width is large, the seepage situation in the seepage layer is complicated and the water flow is obviously multi-directional. The setting of longitudinal blind ditches and transverse blind ditches can only reduce the water content of the embankment layer to a certain extent. In the rainy season or when the rainfall is heavy, it is not enough to evacuate the seepage water in the embankment layer and the seepage layer in time, and may also have a certain impact on the original soil layer of the roadbed. Utility Model Content

[0005] In order to improve the problem that it is difficult for the infiltration structure to quickly and completely clear the seepage water when the roadbed width is large, the present application provides a roadbed groundwater infiltration structure.

[0006] The present application provides a roadbed groundwater infiltration structure that adopts the following technical solution:

[0007] A roadbed groundwater infiltration structure comprises a embankment layer, a seepage layer and an original soil layer of the roadbed arranged in sequence from top to bottom, the seepage layer is provided with a plurality of transverse blind ditches extending in the width direction of the road, the original soil layer of the roadbed is provided with a plurality of water collection wells arranged in the extending direction of the road, the water collection wells are connected to a municipal pipe network, a water guide layer made of waterproof material is arranged obliquely in the width direction of the road between the seepage layer and the original soil layer of the roadbed, two water guide layers are provided and are arranged on both sides of the water collection well, one end of the water guide layer close to the water collection well is lower than the other end away from the water collection well, and one end of the transverse blind ditch extends to the upper part of the water collection well.

[0008] Furthermore, a water collecting trough is arranged on the upper part of the water collecting well along the extension direction of the road, the water collecting well is connected with the bottom of the water collecting trough, and the upper edge of the water collecting trough is not higher than the lower end of the water conducting layer.

[0009] Furthermore, a filter is provided between the water collecting well and the connecting portion of the water collecting tank.

[0010] Furthermore, the water-conducting layer includes a waterproof concrete layer arranged on the original soil layer of the roadbed.

[0011] Furthermore, it also includes an asphalt layer arranged on the waterproof concrete layer.

[0012] Furthermore, one end of the transverse blind ditch close to the water collection well is lower than one end away from the water collection well, and one end of the transverse blind ditch close to the water collection well is connected to the water collection trough.

[0013] Furthermore, the cross section of the water collecting trough is set to be arc-shaped.

[0014] In summary, the beneficial technical effects of this application are:

[0015] When the rainwater in the embankment layer infiltrates into the seepage layer, a small part of the seepage water is quickly diverted to the water collection well through the transverse blind ditch, and the other part passes through the seepage layer and gathers on the water-conducting layer between the original soil layer of the roadbed and the seepage layer, and finally converges into the corresponding water collection well with the help of the inclined surface of the water-conducting layer. The rainwater gathered in the water collection well flows into the municipal pipe network, so that the rainwater infiltrating from the seepage layer can be comprehensively and effectively collected and diverted, which can greatly reduce the water content in the embankment layer and ensure the stability of the roadbed. In addition, the water-conducting layer can further isolate the rainwater from infiltrating into the original soil layer of the roadbed, effectively avoiding the possibility of the original soil layer of the roadbed being damaged during drainage. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a cross-sectional view of the overall structure of an embodiment of the present application;

[0017] Figure 2 yes Figure 1 A partial enlarged schematic diagram of part A.

[0018] Description of reference numerals:

[0019] 1. Embankment layer;

[0020] 2. Seepage layer; 21. Horizontal blind ditch;

[0021] 3. Original soil layer of roadbed;

[0022] 41. water collection well; 42. water collection tank; 43. filter element;

[0023] 5. Water-conducting layer; 51. Waterproof concrete layer; 52. Asphalt layer;

[0024] 6. Municipal pipeline network. DETAILED DESCRIPTION

[0025] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0026] The present application embodiment discloses a roadbed groundwater infiltration structure. Figure 1 and Figure 2 A roadbed groundwater infiltration structure includes an embankment layer 1, a water seepage layer 2 and a roadbed original soil layer 3 arranged in sequence from top to bottom. The water seepage layer 2 is paved with sand, gravel or construction waste. A plurality of transverse blind ditches 21 extending along the width direction of the road are arranged in the water seepage layer 2. A plurality of water collection wells 41 arranged along the extension direction of the road are arranged in the original soil layer 3 of the roadbed. The water collection wells 41 are connected to the municipal pipe network 6. A water guide layer 5 made of waterproof material is arranged obliquely along the width direction of the road between the water seepage layer 2 and the original soil layer 3 of the roadbed. Two water guide layers 5 are arranged on both sides of the water collection well 41. One end of the water guide layer 5 close to the water collection well 41 is lower than the end away from the water collection well 41. One end of the transverse blind ditch 21 extends to the upper part of the adjacent water collection well 41.

[0027] After such arrangement, when the rainwater in the embankment layer 1 infiltrates into the seepage layer 2, a small part of the seepage water is quickly diverted to the water collection well 41 through the transverse blind ditch 21, and the other part passes through the seepage layer and converges on the water-conducting layer 5 between the original soil layer 3 of the roadbed and the seepage layer 2, and finally converges to the corresponding water collection well 41 with the help of the inclined surface of the water-conducting layer 5. The rainwater gathered in the water collection well 41 flows into the municipal pipe network 6, so that the rainwater infiltrating from the seepage layer 2 can be comprehensively and effectively collected and diverted, which can greatly reduce the water content in the embankment layer 1 and ensure the stability of the roadbed. In addition, the water-conducting layer 5 can further isolate the rainwater from infiltrating into the original soil layer 3 of the roadbed, effectively avoiding the possibility of the original soil layer 3 of the roadbed being damaged during drainage.

[0028] Specifically, refer to Figure 1 and Figure 2 A water collecting tank 42 is arranged along the extension direction of the road on the upper part of the water collecting well 41. The water collecting well 41 is connected to the bottom of the water collecting tank 42. The upper edge of the water collecting tank 42 is not higher than the lower end of the water conducting layer 5. A filter 43 is arranged between the connecting part of the water collecting well 41 and the water collecting tank 42. The filter 43 can be a geotextile, a water filter grid, etc., and in actual setting, the cross section of the water collecting tank 42 is set to be arc-shaped.

[0029] In this way, rainwater infiltrating the water filter layer can be fully converged into the water collection tank 42 through the slope of the water guide layer 5, filtered through the filter element 43 on the water collection tank 42, and then converged into the water collection well 41. Therefore, no matter where the seepage water in the embankment layer 1 infiltrates into the seepage layer 2, the seepage water in the seepage layer 2 will eventually converge into the water collection tank 42 and flow to the water collection well 41 for discharge, which can ensure the efficiency of water drainage and reduce the impact on the original soil layer 3 of the roadbed. Moreover, the cross section of the water collection tank 42 is set to an arc shape, which can reduce the space occupied by the water filter layer in the water collection tank 42 while ensuring the effect of collecting the seepage water collected by the water guide layer 5, so as to ensure the bearing capacity of the corresponding part of the water collection tank 42 as much as possible.

[0030] Further, see Figure 1 The end of the transverse blind ditch 21 close to the water collection well 41 is lower than the end away from the water collection well 41, and the end of the transverse blind ditch 21 close to the water collection well 41 is connected to the water collection tank 42. This can greatly increase the speed at which the seepage water that infiltrates the transverse blind ditch 21 flows into the water collection tank 42, thereby improving the hydrophobic performance of the permeable structure of the present application.

[0031] In addition, refer to Figure 1 and Figure 2 The above-mentioned water-conducting layer 5 includes a waterproof concrete layer 51 disposed on the original soil layer 3 of the roadbed, and an asphalt layer 52 disposed on the waterproof concrete layer 51, and the asphalt layer 52 is coated on the waterproof concrete layer 51. In this way, the waterproof concrete layer 51 can effectively level the original soil layer 3 of the roadbed, and play a certain water-proofing effect to prevent water from seeping into the original soil layer 3 of the roadbed; and after the asphalt layer 52 is disposed on the waterproof concrete layer 51, the water-proofing effect of the water-conducting layer 5 can be further enhanced, and the waterproof concrete layer 51 can provide effective bearing for the asphalt layer 52, which helps to ensure the long-term and effective water-proofing and water-conducting effects of the water-conducting layer 5.

[0032] The implementation principle of a roadbed groundwater infiltration structure in the embodiment of the present application is:

[0033] When the rainwater in the embankment layer 1 penetrates into the seepage layer 2, a small part of the seepage water is quickly diverted to the water collection well 41 through the transverse blind ditch 21, and the other part passes through the seepage layer and converges on the water-conducting layer 5 between the original soil layer 3 of the roadbed and the seepage layer 2, and finally converges to the corresponding water collection well 41 with the help of the inclined surface of the water-conducting layer 5. The rainwater gathered in the water collection well 41 flows into the municipal pipe network 6, so that the rainwater infiltrating from the seepage layer 2 can be comprehensively and effectively collected and diverted, which can greatly reduce the water content in the embankment layer 1 and ensure the stability of the roadbed. In addition, the water-conducting layer 5 can further isolate the rainwater from infiltrating into the original soil layer 3 of the roadbed, effectively avoiding the possibility of the original soil layer 3 of the roadbed being damaged during drainage.

[0034] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0035] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A roadbed groundwater infiltration structure, comprising a road embankment layer (1), a water seepage layer (2) and a roadbed original soil layer (3) arranged in sequence from top to bottom, wherein the water seepage layer (2) is provided with a plurality of transverse blind ditches (21) extending in the width direction of the road, and the roadbed original soil layer (3) is provided with a plurality of water collection wells (41) arranged in the extending direction of the road, wherein the water collection wells (41) are connected to a municipal pipe network (6), characterized in that: A water-conducting layer (5) made of waterproof material is arranged between the water-seepage layer (2) and the original soil layer (3) of the roadbed and is arranged obliquely along the width direction of the road. Two water-conducting layers (5) are provided and are arranged on both sides of the water-collecting well (41). One end of the water-conducting layer (5) close to the water-collecting well (41) is lower than the other end away from the water-collecting well (41). One end of the transverse blind ditch (21) extends to the upper part of the water-collecting well (41).

2. A roadbed groundwater infiltration structure according to claim 1, characterized in that: A water collecting trough (42) is arranged on the upper part of the water collecting well (41) and is arranged along the extension direction of the road. The water collecting well (41) is connected to the bottom of the water collecting trough (42). The upper edge of the water collecting trough (42) is not higher than the lower end of the water conducting layer (5).

3. A roadbed groundwater infiltration structure according to claim 2, characterized in that: A filter (43) is provided between the connecting portion between the water collecting well (41) and the water collecting tank (42).

4. The roadbed groundwater infiltration structure according to claim 1, characterized in that: The water-conducting layer (5) comprises a waterproof concrete layer (51) provided on the original soil layer (3) of the roadbed.

5. A roadbed groundwater infiltration structure according to claim 4, characterized in that: It also includes an asphalt layer (52) arranged on the waterproof concrete layer (51).

6. The roadbed groundwater infiltration structure according to claim 2, characterized in that: An end of the transverse blind ditch (21) close to the water collection well (41) is lower than an end away from the water collection well (41), and an end of the transverse blind ditch (21) close to the water collection well (41) is butted against the water collection trough (42).

7. The roadbed groundwater infiltration structure according to claim 2, characterized in that: The cross section of the water collecting tank (42) is configured to be arc-shaped.