Aerial work platform suspended through bridge wet joint

By introducing the limit slide and motor-driven rewinding roller system on the aerial working platform, the safety and labor intensity problems of construction workers when climbing are solved, and efficient and safe construction platform operation is achieved.

CN221877791UInactive Publication Date: 2024-10-22THE FOURTH OF CHINA EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420428426.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction process of the existing aerial work platforms suspended by the wet joints of the bridge, the safety factor is not high and laborious when the construction workers climb the ladder, and the construction process requires complicated secondary tensioning, anchor sealing, and grouting. operation, affecting construction efficiency and safety.

Method used

An aerial work platform is designed that includes cover beams, I-beams, double channel steel, metal mesh cages, and auxiliary lifting mechanisms. Stable lifting is achieved through limit slides and safety lashings, and is controlled by motor-driven rewinding rollers. The steel cable can be retracted and retracted to simplify the climbing process for construction workers.

Benefits of technology

It improves the safety and work efficiency of construction personnel, reduces the labor intensity of the climbing process, and ensures the stability and safety of the construction platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877791U_ABST
    Figure CN221877791U_ABST
Patent Text Reader

Abstract

The utility model provides an aerial work platform utilizing bridge wet joint suspension, which relates to the field of aerial work platforms, and comprises a cover beam, a plurality of I-shaped beams are arranged above the cover beam, the top ends of the I-shaped beams are connected with double-spliced channel steel, and one end of the double-spliced channel steel is connected with a plurality of U-shaped clamping components. According to the aerial work platform suspended through the bridge wet joint, the limiting sliding piece stably slides relative to the vertical rod, so that the main ring on the limiting sliding piece drives a worker on the safety binding rope to stably move downwards, the worker can be assisted to stably ascend and descend, the shaking condition is effectively avoided, and the safety coefficient is high; the motor is started to enable the output end of the motor to drive the transverse shaft to rotate, drive the winding roller to rotate, control winding and unwinding of the steel cable and enable the limiting sliding piece to stably slide relative to the vertical rod, so that movement of the limiting sliding piece can be stably controlled, workers can be assisted in climbing, and the lifting process of the limiting sliding piece is more labor-saving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of aerial work platforms, in particular to an aerial work platform suspended by wet joints of a bridge. Background Art

[0002] As the height of buildings continues to rise, aerial work is becoming more and more common. For traditional scaffolding, the higher the height of the building from the ground, the more materials are used to create the aerial work platform, resulting in economic waste and poor structural stability. In order to improve the safety of aerial work on bridges and facilitate construction workers to carry out construction work on the work platform, aerial work platforms suspended from the wet joints of bridges are generally used.

[0003] The existing aerial work platform that utilizes the wet joint suspension of the bridge needs to perform secondary tensioning, anchor sealing, grouting and other construction for the cap beam to provide a safe and stable aerial construction work platform for workers. However, during construction, construction workers need to enter the construction work platform via a ladder to construct the components. When construction workers climb the ladder, the safety factor is not high and the climbing process is also relatively laborious.

[0004] Therefore, it is necessary to provide a new aerial work platform utilizing bridge wet joint suspension to solve the above technical problems. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides an aerial work platform suspended by utilizing the wet joint of a bridge.

[0006] The utility model provides an aerial work platform suspended by wet joints of a bridge, comprising: a cap beam, a plurality of I-beams are arranged above the cap beam, double-jointed channel steels are installed and connected at the top ends of the plurality of I-beams, a plurality of U-shaped clip assemblies are installed and connected at one end of the double-jointed channel steel, a plurality of tension steel bar assemblies are installed and connected on the double-jointed channel steel, a metal mesh cage is arranged at one end of the double-jointed channel steel, a ladder is installed and connected on one side of the cage of the metal mesh cage; an auxiliary lifting mechanism, the auxiliary lifting mechanism comprises a top beam frame, the top beam frame is fixedly installed on the top end of the ladder, a side plate is arranged on one side of the top beam frame, a vertical rod is fixedly connected to the side plate, the lower end of the vertical rod is fixedly connected to the ladder, a limiting slide is slidably connected to the vertical rod, and a safety lashing rope is arranged on the limiting slide.

[0007] Preferably, a main ring is fixedly connected to the limiting slide, and the main ring is connected to the safety lashing rope.

[0008] Preferably, a transverse axis is rotatably connected to the top beam frame, and one end of the transverse axis extends to the outside of the top beam frame.

[0009] Preferably, a motor is installed and connected to one side of the top beam frame, and the output end of the motor is fixedly connected to one end of the horizontal axis.

[0010] Preferably, a winding roller is fixedly connected to the transverse axis, and a steel cable is wound around the winding roller.

[0011] Preferably, a secondary ring is fixedly connected to the limiting slide, and one end of the steel cable is connected to the secondary ring.

[0012] Compared with the related art, the aerial work platform provided by the utility model using the wet joint suspension of the bridge has the following beneficial effects:

[0013] The utility model realizes the stable lifting and lowering of the auxiliary workers by the limit slide piece sliding stably relative to the vertical rod, so that the main ring on the limit slide piece drives the workers on the safety lashing rope to move down stably, thereby effectively avoiding the shaking situation and having a high safety factor;

[0014] 2. The utility model starts the motor so that its output end drives the horizontal axis to rotate, drives the winding roller to rotate accordingly, controls the retraction and release of the steel cable, and makes the limit slide slide stably relative to the vertical rod, thereby realizing stable control of the movement of the limit slide, which can assist the staff in climbing and make the lifting process more labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A structural schematic diagram of a preferred embodiment of an aerial work platform suspended by a wet joint of a bridge provided by the utility model;

[0016] Figure 2 for Figure 1 The structural schematic diagram of A shown;

[0017] Figure 3 for Figure 2 Schematic diagram of the structure at B shown.

[0018] Numbers in the figure: 1. Cap beam; 2. I-beam; 3. Double-jointed channel steel; 31. U-shaped clamp assembly; 4. Tension steel bar assembly; 5. Metal mesh cage; 6. Ladder; 7. Top beam frame; 71. Vertical rod; 72. Limit slide; 721. Main ring; 722. Auxiliary ring; 73. Safety lashing rope; 8. Horizontal axis; 81. Motor; 82. Winding roller; 83. Steel cable. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0020] Please refer to Figures 1 to 3A high-altitude work platform suspended by wet joints of a bridge comprises: a cap beam 1, a plurality of I-beams 2 are arranged above the cap beam 1, double-jointed channel steels 3 are installed and connected at the top ends of the plurality of I-beams 2, a plurality of U-shaped card assemblies 31 are installed and connected at one end of the double-jointed channel steel 3, a plurality of tension steel bar assemblies 4 are installed and connected on the double-jointed channel steel 3, a metal mesh cage 5 is arranged at one end of the double-jointed channel steel 3, a ladder 6 is installed and connected on one side of the cage of the metal mesh cage 5; an auxiliary lifting mechanism, the auxiliary lifting mechanism comprises a top beam frame 7, the top beam frame 7 is fixedly installed on the top end of the ladder 6, a side plate is arranged on one side of the top beam frame 7, a vertical rod 71 is fixedly connected to the side plate, the lower end of the vertical rod 71 is fixedly connected to the ladder 6, a limiting slide 72 is slidably connected to the vertical rod 71, and a safety lashing rope 73 is arranged on the limiting slide 72.

[0021] In the specific implementation process, Figure 2 and Figure 3 As shown, a main ring 721 is fixedly connected to the limiting slide 72 , and the main ring 721 is connected to the safety lashing rope 73 .

[0022] It should be noted that the limiting slide 72 slides stably relative to the vertical rod 71, and the main ring 721 on the limiting slide 72 drives the safety lashing rope 73 to drive the worker to move down stably, thereby assisting the worker to move up and down safely and stably.

[0023] refer to Figure 1 and Figure 2 As shown, a transverse shaft 8 is rotatably connected to the top beam frame 7 , and one end of the transverse shaft 8 extends to the outside of the top beam frame 7 .

[0024] refer to Figure 2 and Figure 3 As shown, a motor 81 is installed and connected to one side of the top beam frame 7 , and an output end of the motor 81 is fixedly connected to one end of the horizontal shaft 8 .

[0025] It should be noted that the output end of the motor 81 drives the horizontal shaft 8 to rotate, and the horizontal shaft 8 drives the winding roller 82 to rotate accordingly.

[0026] refer to Figure 2 As shown, a winding roller 82 is fixedly connected to the transverse shaft 8 , and a steel cable 83 is wound around the winding roller 82 .

[0027] It should be noted that the rotation of the horizontal shaft 8 drives the winding roller 82 to rotate, so as to control the retraction and extension of the steel cable 83 .

[0028] refer to Figure 1 and Figure 3 As shown, a secondary ring 722 is fixedly connected to the limiting slide 72 , and one end of the steel cable 83 is connected to the secondary ring 722 .

[0029] It should be noted that the retraction and extension of the steel cable 83 utilizes the secondary ring 722 to control the sliding of the limiting slide 72 relative to the vertical rod 71 .

[0030] The utility model provides an aerial work platform utilizing wet joint suspension of a bridge, and the working principle is as follows: after the construction personnel wear the safety lashing rope 73, they enter the ladder 6, start the motor 81 so that its output end drives the horizontal shaft 8 to rotate, drives the winding roller 82 to rotate accordingly, controls the retraction and release of the steel cable 83, and makes the limiting slide 72 slide stably relative to the vertical rod 71, and the main ring 721 on the limiting slide 72 drives the safety lashing rope 73 to drive the workers to move down stably, thereby assisting the workers to rise and fall safely and stably, with a higher safety factor and more labor-saving.

[0031] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An aerial work platform suspended by wet joints of a bridge, characterized in that: include: A cap beam (1), wherein a plurality of I-beams (2) are arranged above the cap beam (1), a double-jointed channel steel (3) is installed and connected at the top ends of the plurality of I-beams (2), a plurality of U-shaped clamp assemblies (31) are installed and connected at one end of the double-jointed channel steel (3), a plurality of tension steel bar assemblies (4) are installed and connected on the double-jointed channel steel (3), a metal mesh cage (5) is arranged at one end of the double-jointed channel steel (3), and a ladder (6) is installed and connected on one side of the cage of the metal mesh cage (5); An auxiliary lifting mechanism, the auxiliary lifting mechanism comprising a top beam frame (7), the top beam frame (7) being fixedly mounted on the top end of a ladder (6), a side plate being provided on one side of the top beam frame (7), a vertical rod (71) being fixedly connected to the side plate, the lower end of the vertical rod (71) being fixedly connected to the ladder (6), a limit slide (72) being slidably connected to the vertical rod (71), and a safety lashing rope (73) being provided on the limit slide (72).

2. The aerial work platform utilizing bridge wet joint suspension according to claim 1, characterized in that: A main ring (721) is fixedly connected to the position-limiting slide (72), and the main ring (721) is connected to the safety lashing rope (73).

3. The aerial work platform utilizing bridge wet joint suspension according to claim 1, characterized in that: A transverse shaft (8) is rotatably connected to the top beam frame (7), and one end of the transverse shaft (8) extends to the outside of the top beam frame (7).

4. The aerial work platform utilizing bridge wet joint suspension according to claim 3, characterized in that: A motor (81) is installed and connected to one side of the top beam frame (7), and an output end of the motor (81) is fixedly connected to one end of the horizontal shaft (8).

5. The aerial work platform utilizing bridge wet joint suspension according to claim 3, characterized in that: A winding roller (82) is fixedly connected to the transverse shaft (8), and a steel cable (83) is wound around the winding roller (82).

6. The aerial work platform utilizing bridge wet joint suspension according to claim 5, characterized in that: A secondary ring (722) is fixedly connected to the limiting sliding member (72), and one end of the steel cable (83) is connected to the secondary ring (722).