Prefabricated wall body of fabricated diaphragm wall
By pre-embedding the inclinometer casings and pre-embedded connecting steel plates in the prefabricated wall of the prefabricated ground-connected wall, the problem of directly embedded inclinometer tubes being easily affected by tensile force is solved, and the simple installation and precise docking of the inclinometer tubes are achieved. , ensuring the smooth progress of construction and measurement accuracy.
Patent Information
- Application Number
- CN202420203940.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In the existing construction of underground diaphragm walls, the position of directly embedded inclinometer pipes is difficult to determine and is susceptible to displacement and deformation due to the influence of tension, which in turn affects the measurement accuracy and splicing accuracy.
The prefabricated wall is made of prefabricated ground-connected walls. Inclinometer casings are pre-embedded in the upper and lower wall sections, and connecting steel plates and socket-type straight pipe joints are pre-embedded in the end faces of the walls to provide convenient installation conditions and Precise docking structure ensures easy and accurate installation of the inclinometer tube.
It achieves convenient installation and precise docking of inclinometer tubes, ensures the smooth completion of prefabricated walls during construction in the slot, avoids displacement and deformation problems of directly embedded structures, and improves measurement accuracy and splicing accuracy.
Smart Images

Figure CN221878050U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ground-connected wall construction, in particular to an assembled ground-connected wall prefabricated wall body. Background Art
[0002] In recent years, urban subway projects are developing rapidly. As the primary project of the subway, the underground continuous wall is an important structure to ensure the safety of the station. At present, most of the underground continuous walls in my country adopt cast-in-place structures. In order to explore the development of prefabricated buildings, it is necessary to develop prefabricated underground continuous walls. Utility Model Content
[0003] The utility model provides an assembled ground-connected wall prefabricated wall body to solve the technical problems existing in the known technology.
[0004] The utility model adopts a technical solution to solve the technical problems existing in the known technology: an assembled prefabricated ground-connected wall, comprising an upper wall section and a lower wall section, both sides of the upper wall section and the lower wall section are provided with vertical joint structures, an inclinometer tube sleeve I is pre-embedded in the upper wall section, a wall docking structure I is pre-embedded at the lower end of the upper wall section, an inclinometer tube sleeve II docking with the inclinometer tube sleeve I is pre-embedded in the lower wall section, the inclinometer tube sleeve II is provided with a bottom cover, and a wall docking structure II matching the wall docking structure I is pre-embedded at the upper end of the lower wall section.
[0005] The wall docking structure I and the wall docking structure II are composed of pre-buried connecting steel plates, and the pre-buried connecting steel plates protrude from the wall end faces; a socket structure I is provided at the lower end of the inclinometer tube sleeve I, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer tube sleeve II; the socket structure I and the socket structure II are respectively two parts of a socket-type straight pipe joint, protruding from the wall end.
[0006] The wall docking structure I includes an embedded pipe I and a tension bolt hole I, and a hand hole I is provided above the tension bolt hole I. The wall docking structure II includes an embedded pipe II and a tension bolt hole II, and a hand hole II is provided below the tension bolt hole II. The embedded pipe I and the embedded pipe II are, one is an embedded insert pipe and the other is an embedded sleeve. The embedded sleeve is flush with the wall, the embedded insert pipe protrudes from the end face of the wall, and the embedded sleeve corresponds to the embedded insert pipe one by one; the tension bolt hole I and the tension bolt hole II correspond one by one; the bottom opening of the inclinometer tube sleeve I and the top opening of the inclinometer tube sleeve II are respectively flush with the corresponding wall.
[0007] The advantages and positive effects of the utility model are as follows: by pre-embedding the inclinometer tube sleeves in the upper and lower wall sections, convenient conditions are provided for on-site installation of the inclinometer tube, and because the inclinometer tube sleeves are pre-embedded during prefabrication, they are not affected by assembly construction; and because there is a gap between the inclinometer tube and the sleeves, the inclinometer tube is easy to install, and the installation accuracy is easy to ensure, which can ensure that the inclinometer work is successfully completed after the prefabricated wall grooving construction is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a structural schematic diagram of Example 1 of the utility model;
[0009] Figure 2 for Figure 1 A top view of
[0010] Figure 3 This is a schematic diagram of the structure of Example 2 of the utility model;
[0011] Figure 4 for Figure 3 Top view of the .
[0012] In the figure: 1-1, upper wall section; 1-2, lower wall section; 2-1, inclinometer tube casing I; 2-2, inclinometer tube casing II; 3, embedded connecting steel plate; 4, socket-type straight pipe joint; 5, inclinometer tube; 6-1, hand hole I; 6-2, hand hole II. DETAILED DESCRIPTION
[0013] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings:
[0014] See also Figure 1 to Figure 4 A prefabricated assembled ground-connected wall comprises an upper wall section 1-1 and a lower wall section 1-2, and both sides of the upper wall section 1-1 and the lower wall section 1-2 are provided with vertical joint structures.
[0015] An inclinometer casing Ⅰ2-1 is pre-buried in the upper wall section 1-1, and a wall docking structure Ⅰ is pre-buried at the lower end of the upper wall section 1-1.
[0016] An inclinometer casing II 2-2 docking with the inclinometer casing I 2-1 is pre-buried in the lower wall section 1-2, and the inclinometer casing II 2-2 is provided with a bottom seal. A wall docking structure II matching with the wall docking structure I is pre-buried at the upper end of the lower wall section 1-2.
[0017] Example 1:
[0018] See also Figure 1 and Figure 2, an assembled ground-connected prefabricated wall, the wall docking structure I and the wall docking structure II are composed of a pre-buried connecting steel plate 3, and the pre-buried connecting steel plate 3 protrudes from the wall end face; a socket structure I is provided at the lower end of the inclinometer tube sleeve I2-1, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer tube sleeve II2-2, and the socket structure I and the socket structure II are respectively two parts of a socket-type straight pipe joint 4, protruding from the wall end.
[0019] Example 2:
[0020] See also Figure 3 and Figure 4 , an assembled ground-connected prefabricated wall, the wall docking structure I includes a pre-buried pipe I and a tension bolt hole I, and a hand hole I6-1 is provided above the tension bolt hole I.
[0021] The wall docking structure II includes a pre-buried pipe II and a tension bolt hole II, and a hand hole II6-2 is provided below the tension bolt hole II.
[0022] The embedded pipe I and the embedded pipe II are, one is an embedded insert pipe 5-1, and the other is an embedded sleeve 5-2. The embedded sleeve 5-2 is flush with the wall, the embedded insert pipe 5-1 protrudes from the end face of the wall, and the embedded sleeve 5-2 corresponds one to one with the embedded insert pipe 5-1; the tension bolt hole I and the tension bolt hole II correspond one to one.
[0023] The bottom opening of the inclinometer tube casing Ⅰ2-1 and the top opening of the inclinometer tube casing Ⅱ2-2 are respectively flush with the corresponding wall.
[0024] Since the single-span assembled ground-anchored wall is heavy and difficult to hoist, the single-span prefabricated wall is prefabricated in sections and assembled into grooves.
[0025] At the construction site, when the upper and lower wall sections are joined and lowered to the set position, they are hung with a through bar, and the inclinometer tube 5 is lowered into the inclinometer tube casing Ⅰ2-1 and the inclinometer tube casing Ⅱ2-2 at one time, and buried with fine sand. Because there is a certain gap between the inclinometer tube 5 and the casing, the inclinometer tube is easy to install and the installation accuracy is easy to ensure.
[0026] If the inclinometer tube adopts a direct pre-buried structure, the following problems will occur: 1) The position of the directly pre-buried inclinometer tube is difficult to determine; 2) The prefabricated ground-connected wall is affected by the tension during the lifting process, and the directly pre-buried inclinometer tube is prone to displacement and deformation, which in turn leads to uncontrollable shape and position tolerances of the inclinometer tube, which has an adverse effect on the measurement or makes it impossible to measure; 3) When two sections of prefabricated ground-connected walls are spliced, it is difficult to completely and accurately connect the directly pre-buried inclinometer tube, which is prone to misalignment and makes it impossible to measure.
[0027] Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the scope of protection of the present invention.
Claims
1. A prefabricated ground-connected wall, characterized in that: Including the upper wall and the lower wall, Both sides of the upper wall section and the lower wall section are provided with vertical joint structures. An inclinometer casing I is pre-buried in the upper wall section, and a wall docking structure I is pre-buried at the lower end of the upper wall section. An inclinometer casing II docking with the inclinometer casing I is pre-buried in the lower wall section, and the inclinometer casing II is provided with a bottom seal. A wall docking structure II matching with the wall docking structure I is pre-buried at the upper end of the lower wall section.
2. The prefabricated ground-connected wall according to claim 1 is characterized in that: The wall docking structure I and the wall docking structure II are composed of pre-buried connecting steel plates, and the pre-buried connecting steel plates protrude from the wall end faces; a socket structure I is provided at the lower end of the inclinometer tube sleeve I, and a socket structure II matching the socket structure I is provided at the upper end of the inclinometer tube sleeve II; the socket structure I and the socket structure II are respectively two parts of a socket-type straight pipe joint, protruding from the wall end.
3. The prefabricated ground-connected wall according to claim 1 is characterized in that: The wall docking structure I comprises a pre-buried pipe I and a tension bolt hole I, and a hand hole I is provided above the tension bolt hole I. The wall docking structure II includes a pre-buried pipe II and a tension bolt hole II, and a hand hole II is provided below the tension bolt hole II. The embedded pipe I and the embedded pipe II are one embedded insert pipe and the other embedded sleeve pipe, the embedded sleeve pipe is flush with the wall, the embedded insert pipe protrudes from the end face of the wall, and the embedded sleeve pipe corresponds to the embedded insert pipe one by one; the tension bolt hole I corresponds to the tension bolt hole II one by one; The bottom opening of the inclinometer casing I and the top opening of the inclinometer casing II are flush with the corresponding wall respectively.