Building engineering wall surface hole filling auxiliary device

By designing an auxiliary device for wall hole patching in construction projects and using a combination of supports and fixing mechanisms, the problem of material waste and low efficiency in the hole sealing process in construction projects is solved, achieving stable support and efficient sealing, and reducing material waste. , improving construction efficiency.

CN221878954UActive Publication Date: 2024-10-22SHANDONG YANZHOU CONSTR CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420204828.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-22
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

In construction projects, during the process of sealing holes in wall panels and floor slabs after leaving holes, the existing technology requires building formwork that consumes a lot of consumables and is inefficient, resulting in serious waste of materials and the inability to reuse them.

Method used

An auxiliary device for filling holes in the wall of a construction project is designed, which includes a support plate, a fixed mechanism and an adjusting mechanism. The stability of the device is achieved through the cooperation of hinge blocks, pin bolts, movable blocks, sleeves, bolts, movable rods and stabilizing plates. Support and height adjustment; via hinged bolts, fixed Through the cooperation of the fixed frame, threaded sleeve, screw rod, knob and clamping block, the angle and fixation of the adjusting rod are adjusted; through the cooperation of the second jack, support tube, second latch, ball hinge and fitting block, the sealing is adjusted The support strength and blocking angle of the blocking plate ensure that the hole is effectively closed.

Benefits of technology

It improves the stability and practicality of the auxiliary device, reduces material waste, improves the sealing efficiency, achieves effective sealing of holes, and facilitates subsequent concrete filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878954U_ABST
    Figure CN221878954U_ABST
Patent Text Reader

Abstract

The utility model discloses a constructional engineering wall surface hole filling auxiliary device, which relates to the technical field of constructional engineering and comprises a supporting plate, a supporting mechanism is mounted at the lower end of the supporting plate, a fixing mechanism is mounted at the upper end of the supporting plate, and an adjusting rod is inserted in the middle of the fixing mechanism. According to the supporting mechanism, under the cooperation of a hinge block, a bolt pin, a movable block, a sleeve, a first plug pin, a movable rod, a first inserting hole and a stabilizing disc, the auxiliary device can be stably supported when being used, the auxiliary device is prevented from shaking, and meanwhile the height of the device can be conveniently adjusted; and meanwhile, through a fixing mechanism, under the cooperation of a hinge bolt, a fixing frame, a threaded barrel, a screw rod, a rotary knob and a clamping block, the adjusting rod can be fixed, meanwhile, the adjusting rod can swing at the opening, angle adjustment is completed, and therefore the practicability of the auxiliary device in the actual using process is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to an auxiliary device for filling holes on a wall of a construction engineering. Background Art

[0002] Construction projects refer to the engineering entities formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities.

[0003] In engineering construction, both concrete reinforced wall panels and reinforced floor slabs may need to be treated with holes to facilitate the pumping of concrete or construction, etc. In short, leaving holes is necessary, but after the construction is completed, some holes need to be sealed. Since the holes run through both sides of the wall panels or floor slabs, they cannot be directly repaired. Generally, existing operations are carried out by building templates. From actual operations, it can be seen that for the holes in the wall panels and floor slabs, on-site template construction requires more consumables, and the consumables cannot be reused, resulting in serious waste of materials. At the same time, the on-site construction of the hole-sealing template has a low construction efficiency. Utility Model Content

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0005] An auxiliary device for filling holes in the wall of a construction project comprises a support plate, a support mechanism is installed at the lower end of the support plate, a fixing mechanism is installed at the upper end of the support plate, an adjusting rod is inserted in the middle of the fixing mechanism, an adjusting mechanism is installed on the top of the adjusting rod, a blocking plate is installed on the top of the adjusting mechanism, and an opening is opened through the middle of the front side of the support plate.

[0006] Preferably: the supporting mechanism comprises an articulated block, the upper end of the articulated block is fixedly connected to the lower end surface of the supporting plate, a pin is fixedly inserted in the middle of the articulated block, a movable block is movably sleeved on the surface of the pin, a sleeve is fixedly installed on the bottom of the movable block, a first pin is movably inserted on the bottom surface of the outer end of the sleeve, a movable rod is movably sleeved inside the sleeve, a plurality of groups of first jacks are arranged at equal intervals on the surface of the movable rod, and a stabilizing disk is fixedly installed on the bottom of the movable rod.

[0007] Preferably, the bottom end of the first latch is movably connected to the inside of the first socket.

[0008] Preferably: the fixing mechanism includes a support plate, the bottom of the support plate is fixedly connected to the two side surfaces of the upper end of the support plate, the upper end of the support plate is movably plugged with a hinge bolt, the bottom of the hinge bolt is installed with a fixing frame, the front and rear ends of the fixing frame are symmetrically fixedly installed with threaded sleeves, the middle thread of the threaded sleeve is connected with a screw, the top of the screw is fixedly installed with a knob, and the bottom of the screw is rotatably connected with a clamping block.

[0009] Preferably, two outer ends of the fixing frame are fixedly connected to the bottom end of the hinge bolt, and the front side of the clamping block is movably connected to the bottom outer surface of the adjusting rod in a fitted manner.

[0010] Preferably: the adjustment mechanism includes a sleeve rod, the top of the adjustment rod is fixedly connected to the bottom end of the sleeve rod, a plurality of groups of second holes are provided on the surface of the sleeve rod at equal intervals, a support tube is movably sleeved on the outer surface of the sleeve rod, a second pin is movably inserted on the outer surface of the support tube, a spherical hinge is fixedly installed on the top of the outer end of the support tube, and an engaging block is embedded in the outer surface of the spherical hinge.

[0011] Preferably, the bottom of the second latch is movably connected to the inside of the second socket, and the front end of the engaging block is fixedly connected to the middle surface of the rear end of the blocking plate.

[0012] Preferably, the adjusting rod can pass through the opening, and a rubber layer is fixedly connected to the front side of the blocking plate.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] 1. The utility model provides an auxiliary device for filling holes in the wall of a construction project. Through a supporting mechanism, through the cooperation of an articulated block, a pin, a movable block, a sleeve, a first latch, a movable rod, a first socket, and a stabilizing plate, the auxiliary device can be stably supported when in use to prevent the auxiliary device from shaking, and it is also convenient to adjust the height of the device; at the same time, through a fixing mechanism, through the cooperation of an articulated bolt, a fixing frame, a threaded barrel, a screw, a knob, and a clamping block, the adjusting rod can be fixed, and the adjusting rod can also be swung at the opening to complete the angle adjustment, thereby improving the practicability of the auxiliary device in actual use.

[0015] 2. The utility model provides an auxiliary device for filling holes in the walls of construction projects. Through an adjustment mechanism, through the cooperation of a second plug hole, a support tube, a second pin, a ball hinge, and a fitting block, the second pin can be inserted into the second plug hole at different positions of the sleeve rod, so that the supporting strength of the blocking plate at the hole can be adjusted, thereby ensuring that the blocking plate effectively closes the hole, which is beneficial for workers to fill concrete into the hole for sealing. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the structure of the auxiliary device for filling holes in wall surfaces of construction projects of the utility model;

[0017] Figure 2 It is a structural schematic diagram of the support mechanism of the utility model;

[0018] Figure 3 It is a structural schematic diagram of the fixing mechanism of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the detail diagram of the fixing mechanism of the utility model;

[0020] Figure 5 It is a structural schematic diagram of the adjustment mechanism of the utility model.

[0021] In the figure: 1. support plate; 2. support mechanism; 3. fixing mechanism; 4. adjusting rod; 5. adjusting mechanism; 6. blocking plate; 7. opening; 21. hinged block; 22. pin; 23. movable block; 24. sleeve; 25. first latch; 26. movable rod; 27. first plug hole; 28. stabilizing disk; 31. support plate; 32. hinged bolt; 33. fixing frame; 311. threaded sleeve; 312. screw; 313. knob; 314. clamping block; 51. sleeve rod; 52. second plug hole; 53. support tube; 54. second latch; 55. ball hinge; 56. interlocking block. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the embodiments:

[0023] like Figure 1-5 As shown, the utility model provides a wall hole filling auxiliary device for construction engineering, including a support plate 1, a support mechanism 2 is installed at the lower end of the support plate 1, a fixing mechanism 3 is installed at the upper end of the support plate 1, an adjusting rod 4 is inserted in the middle of the fixing mechanism 3, an adjusting mechanism 5 is installed on the top of the adjusting rod 4, a blocking plate 6 is installed on the top of the adjusting mechanism 5, and an opening 7 is opened through the middle of the front side of the support plate 1.

[0024] The support mechanism 2 can improve the stability of the auxiliary device when in use, and the fixing mechanism 3 can fix the adjustment rod 4 and drive the adjustment rod 4 to swing.

[0025] like Figure 2As shown, the support mechanism 2 includes an articulated block 21, the upper end of the articulated block 21 is fixedly connected to the lower end surface of the support plate 1, a pin 22 is fixedly inserted in the middle of the articulated block 21, a movable block 23 is movably sleeved on the surface of the pin 22, a sleeve 24 is fixedly installed at the bottom of the movable block 23, a first pin 25 is movably inserted on the outer bottom surface of the sleeve 24, a movable rod 26 is movably sleeved inside the sleeve 24, a plurality of groups of first jacks 27 are provided on the surface of the movable rod 26 at equal intervals, and a stabilizing plate 28 is fixedly installed at the bottom of the movable rod 26.

[0026] The bottom end of the first latch pin 25 is movably connected to the inside of the first plug hole 27 .

[0027] Through the support mechanism 2, through the cooperation of the hinge block 21, the pin 22, the movable block 23, the sleeve 24, the first pin 25, the movable rod 26, the first socket 27, and the stabilizing plate 28, the auxiliary device can be stably supported when it is in use to prevent the auxiliary device from shaking, and it is also convenient to adjust the height of the device.

[0028] like Figure 3-4 As shown, the fixing mechanism 3 includes a support plate 31, the bottom of the support plate 31 is fixedly connected to the upper side surfaces of the support plate 1, the upper end of the support plate 31 is movably connected with a hinge bolt 32, the bottom of the hinge bolt 32 is installed with a fixing frame 33, the front and rear ends of the fixing frame 33 are symmetrically fixedly installed with threaded sleeves 311, the middle thread of the threaded sleeve 311 is connected with a screw rod 312, the top of the screw rod 312 is fixedly installed with a knob 313, and the bottom of the screw rod 312 is rotatably connected with a clamping block 314.

[0029] The two outer ends of the fixing frame 33 are fixedly connected to the bottom end of the hinge bolt 32 , and the front side of the clamping block 314 is movably connected to the bottom outer surface of the adjusting rod 4 in a fitted manner.

[0030] Through the fixing mechanism 3, with the cooperation of the hinge bolt 32, the fixing frame 33, the threaded barrel, the screw 312, the knob 313, and the clamping block 314, the adjusting rod 4 can be fixed, and the adjusting rod 4 can also be swung at the opening 7 to complete the angle adjustment, thereby improving the practicability of the auxiliary device in actual use.

[0031] like Figure 5 As shown, the adjustment mechanism 5 includes a sleeve rod 51, the top of the adjustment rod 4 is fixedly connected to the bottom end of the sleeve rod 51, a plurality of groups of second jacks 52 are evenly spaced on the surface of the sleeve rod 51, a support tube 53 is movably sleeved on the outer surface of the sleeve rod 51, a second latch 54 is movably inserted on the outer surface of the support tube 53, a ball hinge 55 is fixedly installed on the top of the outer end of the support tube 53, and an inserting block 56 is insertingly installed on the outer surface of the ball hinge 55.

[0032] The bottom of the second latch 54 is movably connected to the inside of the second insertion hole 52 , and the front end of the engaging block 56 is fixedly connected to the middle surface of the rear end of the blocking plate 6 .

[0033] The adjusting rod 4 can pass through the opening 7 , and a rubber layer is fixedly connected to the front side of the blocking plate 6 .

[0034] The rubber layer is provided so that when the blocking plate 6 blocks the hole on the wall or floor, it is convenient to achieve a close fit between the blocking plate 6 and the hole opening.

[0035] The working principle of the wall hole filling auxiliary device of the construction project is described in detail below.

[0036] like Figure 1-5 As shown, when the auxiliary device for filling holes in the wall of a construction project is in use, the sleeve 24 can be pulled outward to drive the movable block 23 to rotate on the pin 22, thereby completing the adjustment of the angle of the sleeve 24, and then the first latch 25 can be pulled out, and then the movable rod 26 can be pulled outward to complete the height adjustment, and then the first latch 25 is inserted back into the first plug hole 27 to limit the movable rod 26. At the same time, the three groups of stabilizing plates 28 are triangular in shape, thereby improving the stability of the auxiliary device and preventing it from shaking during operation. By inserting the bottom of the adjusting rod 4 into the fixing frame 33, the two groups of knobs 313 can be rotated to drive the screw rod 312 to rotate in the threaded sleeve 311, so that the screw rod 312 can be rotated. 312 moves toward the inside of the fixed frame 33, and relies on two groups of clamping blocks 314 to fix and clamp its adjusting rod 4. At the same time, by swinging the adjusting rod 4, the fixed frame 33 swings on the hinge bolt 32, and the adjusting rod 4 drives the blocking plate 6 to be placed horizontally or vertically. At the same time, the bottom of the adjusting rod 4 also passes through the opening 7 to improve its flexibility. By inserting the second pin 54 into the second socket 52 at different positions on the sleeve rod 51, the supporting strength of the blocking plate 6 at the hole can be adjusted. At the same time, by swinging the engaging block 56 on the spherical hinge 55, the blocking angle of the blocking plate 6 can be adjusted, thereby ensuring that the blocking plate 6 effectively closes one side of the hole, which is convenient for subsequent workers to fill concrete into the hole.

[0037] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A construction engineering wall hole filling auxiliary device, comprising a support plate (1), a support mechanism (2) being installed at the lower end of the support plate (1), characterized in that: A fixing mechanism (3) is installed at the upper end of the support plate (1), an adjusting rod (4) is inserted in the middle of the fixing mechanism (3), an adjusting mechanism (5) is installed on the top of the adjusting rod (4), a blocking plate (6) is installed on the top of the adjusting mechanism (5), and an opening (7) is provided through the middle of the front side of the support plate (1).

2. The auxiliary device for filling holes in wall of construction engineering according to claim 1, characterized in that: The support mechanism (2) comprises an articulated block (21), the upper end of the articulated block (21) is fixedly connected to the lower end surface of the support plate (1), a pin (22) is fixedly inserted in the middle of the articulated block (21), a movable block (23) is movably sleeved on the surface of the pin (22), a sleeve (24) is fixedly installed at the bottom of the movable block (23), a first latch (25) is movably inserted on the outer bottom surface of the sleeve (24), a movable rod (26) is movably sleeved inside the sleeve (24), a plurality of groups of first jacks (27) are provided on the surface of the movable rod (26) at equal intervals, and a stabilizing plate (28) is fixedly installed at the bottom of the movable rod (26).

3. The auxiliary device for filling holes in wall of construction engineering according to claim 2 is characterized by: The bottom end of the first latch pin (25) is movably connected to the inside of the first plug hole (27).

4. The auxiliary device for filling holes in wall of construction engineering according to claim 1 is characterized by: The fixing mechanism (3) comprises a support plate (31), the bottom of the support plate (31) is fixedly connected to the upper side surfaces of the support plate (1), the upper end of the support plate (31) is movably plugged with a hinge bolt (32), the bottom of the hinge bolt (32) is installed with a fixing frame (33), the front and rear ends of the fixing frame (33) are symmetrically fixedly installed with threaded sleeves (311), the middle of the threaded sleeve (311) is threadedly connected to a screw rod (312), the top of the screw rod (312) is fixedly installed with a knob (313), and the bottom of the screw rod (312) is rotatably connected with a clamping block (314).

5. The auxiliary device for filling holes in wall of construction engineering according to claim 4 is characterized by: The two outer ends of the fixing frame (33) are fixedly connected to the bottom end of the hinge bolt (32), and the front side of the clamping block (314) is movably connected to the bottom outer surface of the adjusting rod (4).

6. The auxiliary device for filling holes in wall of construction engineering according to claim 1, characterized in that: The adjusting mechanism (5) comprises a sleeve rod (51), the top of the adjusting rod (4) is fixedly connected to the bottom of the sleeve rod (51), a plurality of groups of second plug holes (52) are arranged at equal intervals on the surface of the sleeve rod (51), a support tube (53) is movably sleeved on the outer surface of the sleeve rod (51), a second latch (54) is movably inserted on the outer surface of the support tube (53), a spherical hinge (55) is fixedly installed on the top of the outer end of the support tube (53), and an inserting block (56) is insertingly installed on the outer surface of the spherical hinge (55).

7. The auxiliary device for filling holes in wall of construction engineering according to claim 6, characterized in that: The bottom of the second latch (54) is movably connected to the inside of the second plug hole (52), and the front end of the engaging block (56) is fixedly connected to the middle surface of the rear end of the blocking plate (6).

8. The auxiliary device for filling holes in wall of construction engineering according to claim 1 is characterized by: The adjusting rod (4) can pass through the opening (7), and a rubber layer is fixedly connected to the front side of the blocking plate (6).