Coal mine carbon dioxide phase change fracturing pressure relief system

By arranging carbon dioxide cracking devices and cracking holes on the roof of the coal mine working face to cut off the pressure transmission path, the problem of roof subsidence and mine pressure caused by the superposition of multiple pressures is solved, ensuring the safe mining of the working face and the stability of the tunnel.

CN221879382UInactive Publication Date: 2024-10-22SHANXI JINXING ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420575151.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the superposition of multiple pressures, the working face of the Xiaojiawa Coal Mine has led to roof sinking, frequent coal cannon sounds, two coal gangs moving closer, severe bottom drum, anchor cable and anchor failure and other mine pressure phenomena. There are safety hazards and seriously affect the safety of the working face. Recovery.

Method used

A coal mine carbon dioxide phase change fracturing pressure relief system is adopted, including a carbon dioxide fracturing device and a roof fracturing structure. Fracturing holes and guide holes are arranged on the roof through the carbon dioxide fracturing device. The carbon dioxide fracturing device is used to perform physical fracturing and cut off the roof. pressure transmission path to reduce tunnel stress and ensure safe mining on the working face.

Benefits of technology

It can effectively reduce tunnel deformation problems such as roof sinking, two gangs moving closer, and floor bulging along the trough, ensure safe mining of the working face, actively control the stability of the surrounding rock in the tunnel, and reduce the risk of mine pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879382U_ABST
    Figure CN221879382U_ABST
Patent Text Reader

Abstract

The utility model discloses a coal mine carbon dioxide phase change fracturing pressure relief system which comprises a carbon dioxide fracturing device and a top plate fracturing structure, the carbon dioxide fracturing device comprises a main pipe, a heating device and a release pipe, the heating device is located at the first end of the main pipe, and the release pipe is located at the second end of the main pipe. The releasing pipe is located at the second end of the main pipe, a constant-pressure shearing piece is arranged between the releasing pipe and the main pipe, the filling valve is located at the first end of the main pipe so as to convey liquid carbon dioxide into the main pipe, and the roof fracturing structure comprises a plurality of fracturing holes and a plurality of guide holes. The cracking holes and the guide holes are evenly formed in the direct roof and the basic roof of a roof in the roadway direction, and the cracking holes and the guide holes are used for containing the main pipe and the release pipe of the carbon dioxide cracking device. The coal mine carbon dioxide phase change fracturing pressure relief system has the advantages of being sufficient in roof pressure relief and safe in recovery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of underground fracturing, in particular to a coal mine carbon dioxide phase change fracturing pressure relief system. Background Art

[0002] The material chute of the 221303 working face of Xiaojiawa Coal Mine is affected by multiple pressure superposition factors, such as the vertical pressure of the goaf of the overlying 8# coal 120803 working face, the lateral support pressure of the goaf of the adjacent 221301 working face, and the advance pressure of the mining of this working face. The mine pressure is severe, with roof sinking, frequent coal cannon sounds, the two sides moving closer, serious bottom drum, failure of anchor cables and anchor rods, etc., which lead to safety hazards in the roof and seriously affect the safe mining of the working face. Utility Model Content

[0003] The utility model aims to solve one of the technical problems in the related art at least to a certain extent. To this end, the embodiment of the utility model proposes a coal mine carbon dioxide phase change fracturing pressure relief system, which has the advantage of ensuring safe mining of the working face.

[0004] According to the coal mine carbon dioxide phase change fracturing pressure relief system of the utility model embodiment, the coal mine carbon dioxide phase change fracturing pressure relief system includes a carbon dioxide fracturing device and a roof fracturing structure, the carbon dioxide fracturing device includes a main pipe, a heating device and a release pipe, the heating device is located at the first end of the main pipe, the release pipe is located at the second end of the main pipe, a constant pressure shear plate is arranged between the release pipe and the main pipe, a filling valve is located at the first end of the main pipe to transport liquid carbon dioxide into the main pipe, the roof fracturing structure includes a plurality of fracturing holes and a plurality of guide holes, the fracturing holes and the guide holes are evenly arranged at the direct top and the basic top of the roof along the direction of the roadway, the fracturing holes and the guide holes are used to accommodate the main pipe and the release pipe of the carbon dioxide fracturing device.

[0005] The coal mine carbon dioxide phase change fracturing pressure relief system according to the embodiment of the utility model has the advantages of sufficient roof pressure relief and safe mining. The application ensures safe mining of the working face, uses physical fracturing pressure relief to cut off the pressure transmission path of the roof mine, reduces the stress on the roadway, and actively controls the stability of the roadway surrounding rock. It effectively reduces the roadway deformation problems such as the sinking of the chute roof, the movement of the two sides, and the bulging of the bottom plate, and ensures the safe mining of the working face.

[0006] In some embodiments, the fracturing holes include vertical holes and inclined holes, the vertical holes and the guide holes are staggered along the direction of the tunnel, the vertical holes are adjacent to one side of the protective coal pillar, and the inclined holes are a preset distance away from the non-mining wall and arranged along the direction of the tunnel.

[0007] In some embodiments, the angle between the inclined hole and the axis of the longitudinal groove is 45°, and the angle between the inclined hole and the bottom plate of the tunnel is 75°.

[0008] In some embodiments, the spacing between the vertical hole and any adjacent vertical hole is 2 mm, and the spacing between the guide hole and any adjacent guide hole is 4 mm.

[0009] In some embodiments, the distance between the inclined hole and any adjacent inclined hole is 6m.

[0010] In some embodiments, the vertical hole and the guide hole are both 1 m away from the side wall of the coal pillar, the axial directions of the vertical hole and the guide hole are perpendicular to the roof, and the average depth of the vertical hole and the guide hole is 40 m.

[0011] In some embodiments, the vertical holes and the guide holes have the same diameter.

[0012] In some embodiments, the hole deviation of the vertical hole and the guide hole is less than or equal to ±50 mm.

[0013] In some embodiments, the inclined hole is 1.5 m away from the side wall of the coal pillar, and the average depth of the inclined hole is 13.8 m.

[0014] In some embodiments, the number of the fracturing devices in the vertical holes is greater than or equal to the number of the fracturing devices in the inclined holes. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic top view of material fracturing along the groove according to an embodiment of the utility model.

[0016] Figure 2 yes Figure 1 Cross-sectional view of the working face in the advancement direction.

[0017] Figure 3 yes Figure 1 Sectional view perpendicular to the direction of advancement of the working face.

[0018] Figure 4 It is a top view of the development of the fracture holes and fracture fissures in the embodiment of the utility model.

[0019] Figure 5 It is a cross-sectional view of the development of crack holes and cracks in the embodiment of the utility model.

[0020] Reference numerals: 1, vertical hole; 2, guide hole; 3, inclined hole. DETAILED DESCRIPTION

[0021] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but cannot be understood as limiting the present invention.

[0022] According to the coal mine carbon dioxide phase change fracturing pressure relief system of the utility model, Figures 1 to 5 As shown, the coal mine carbon dioxide phase change fracturing pressure relief system includes a carbon dioxide fracturing device and a roof fracturing structure. The carbon dioxide fracturing device includes a main pipe, a heating device and a release pipe. The heating device is located at the first end of the main pipe, and the release pipe is located at the second end of the main pipe. A constant pressure shear plate is arranged between the release pipe and the main pipe. The filling valve is located at the first end of the main pipe to transport liquid carbon dioxide into the main pipe. The roof fracturing structure includes a plurality of fracturing holes and a plurality of guide holes 2. The fracturing holes and the guide holes 2 are evenly arranged on the direct top and the basic top of the roof along the direction of the roadway. The fracturing holes and the guide holes 2 are used to accommodate the main pipe and the release pipe of the carbon dioxide fracturing device. The fracturing holes and the guide holes 2 penetrate the direct top and the basic top to artificially create rock formation cracks and cut off the pressure transmission path. The carbon dioxide fracturing device is sent into the fracturing hole and fixed firmly, and then physical fracturing is performed to cause cracks in the drill hole. The hole profile of the fracturing hole is irregularly fractured.

[0023] It can be understood that physical fracturing is carried out with the help of carbon dioxide fracturing equipment to form a cut in the roof on the side of the coal pillar in the chute. The cut cuts off the mechanical connection between the overlying rock stratum of the chute of the working face and the roof rock mass on the goaf side, so that the roof of the goaf area in the upper corner can be quickly cut off after the working face is pushed through, which greatly reduces the influence of the combined effect of the residual supporting pressure formed by the long-arm cantilever in the goaf area of ​​the working face, effectively reduces the deformation problems of the tunnel such as the sinking of the roof of the chute, the movement of the two sides closer, and the bulging of the bottom plate, and ensures the safe recovery of the working face.

[0024] The coal mine carbon dioxide phase change fracturing pressure relief system according to the embodiment of the utility model has the advantages brought by the independent claims.

[0025] In some embodiments, the fracturing holes include vertical holes 1 and inclined holes 3. The vertical holes 1 and the guide holes 2 are staggered along the direction of the tunnel. The vertical holes 1 are adjacent to one side of the protective coal pillar, and the inclined holes 3 are at a preset distance from the non-mining wall and are arranged along the direction of the tunnel.

[0026] Specifically, the fracturing holes include holes in two directions, which can realize radial crack extension in different directions. The cracks between adjacent fracturing holes are connected to generate directional tension cracks. The vertical hole 1 is adjacent to one side of the protective coal pillar and is constructed perpendicular to the roof along the direction of the tunnel. The spacing between the vertical hole 1 and the inclined hole 3 can be adjusted according to the actual situation on site.

[0027] In some embodiments, the angle between the inclined hole 3 and the axis of the longitudinal groove is 45°, and the angle between the inclined hole 3 and the bottom plate of the tunnel is 75°.

[0028] Specifically, the inclined hole 3 is opened to the direct top, and the inclined hole 3 and the adjacent inclined holes 3 form directional cracks that can destroy the integrity of the end hanging top, causing it to collapse and preventing the hanging top area from exceeding the limit.

[0029] In some embodiments, the spacing between a vertical hole 1 and any adjacent vertical hole 1 is 2 mm, and the spacing between a guide hole 2 and any adjacent guide hole 2 is 4 mm.

[0030] Specifically, the vertical holes 1 are arranged at intervals of two meters, and fracturing can be performed once every other hole. The guide holes 2 are holes in the vertical holes 1 that are not fractured, and the vertical holes 1 and the guide holes 2 are arranged alternately.

[0031] In some embodiments, the distance between the inclined hole 3 and any adjacent inclined hole 3 is 6 m.

[0032] Specifically, the intervals between the inclined holes 3 are large, and the terminal holes of the inclined holes 3 face the goaf. When the intervals between the inclined holes 3 in the tunnel direction are 6 m, the fracturing effect is good.

[0033] In some embodiments, the vertical hole 1 and the guide hole 2 are both 1 m away from the side wall of the coal pillar, the axial directions of the vertical hole 1 and the guide hole 2 are perpendicular to the roof, and the average depth of the vertical hole 1 and the guide hole 2 is 40 m.

[0034] Specifically, the vertical hole 1 and the guide hole 2 require the same parameters during drilling operations. The depths of the vertical hole 1 and the guide hole 2 must cover the direct roof and the basic roof. The hole depth is based on secondary coal exposure, and the average hole depth should be around 40m.

[0035] In some embodiments, the vertical hole 1 and the guide hole 2 have the same diameter.

[0036] Specifically, the diameters of the vertical hole 1 and the guide hole 2 can be 75 mm, and the diameter of the inclined hole 3 can also be 75 mm, so that the same drilling equipment can complete the drilling operation.

[0037] In some embodiments, the hole deviation of the vertical hole 1 and the guide hole 2 is less than or equal to ±50 mm.

[0038] Specifically, the engineering line should be drawn in advance when drilling to ensure that the vertical hole 1 and the guide hole 2 of the crack-inducing hole are on the same straight line, and the hole deviation is controlled within the range of ±50mm to ensure that the radial crack extensions after physical fracturing can penetrate each other.

[0039] In some embodiments, the inclined hole 3 is 1.5 m away from the side wall of the coal pillar, and the average depth of the inclined hole 3 is 13.8 m.

[0040] Specifically, the inclined hole 3 is only opened to the immediate top, and its length is shorter than that of the vertical hole 1. The inclined hole 3 is constructed along the direction of the tunnel toward the old pond side, and the inclined hole 3 is 1.5m away from the non-mining wall.

[0041] In some embodiments, the number of the fracturing devices in the vertical hole 1 is greater than or equal to the number of the fracturing devices in the inclined hole 3 .

[0042] Specifically, the length of the vertical hole 1 is greater than that of the inclined hole 3, and the number of fracturing devices required in the vertical hole 1 should be greater than that in the inclined hole 3. Optionally, 10 carbon dioxide fracturing devices are installed in the vertical hole 1, and 4 carbon dioxide fracturing devices are installed in the inclined hole 3. The hole mouth is wedged with a wooden wedge, and the gap is filled with polyurethane. The long axis of the fracturing device or the connecting rod should be ensured to be in the same horizontal line, and it should be tightened clockwise to prevent the fracturing device and the connecting rod pushed into the drilled hole from loosening.

[0043] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0044] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0045] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0047] In the present utility model, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0048] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A coal mine carbon dioxide phase change fracturing pressure relief system, characterized in that: include: A carbon dioxide fracturing device, comprising a main pipe, a heating device and a release pipe, wherein the heating device is located at a first end of the main pipe, the release pipe is located at a second end of the main pipe, a constant pressure shearing piece is arranged between the release pipe and the main pipe, and a filling valve is located at the first end of the main pipe to transport liquid carbon dioxide into the main pipe; A roof fracturing structure, comprising a plurality of fracturing holes and a plurality of guide holes, wherein the fracturing holes and the guide holes are evenly arranged at the direct top and the basic top of the roof along the tunnel direction, and the fracturing holes and the guide holes are used to accommodate the main pipe and the release pipe of the carbon dioxide fracturing device.

2. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 1, characterized in that: The fracturing holes include vertical holes and inclined holes. The vertical holes and the guide holes are arranged alternately along the direction of the roadway. The vertical holes are adjacent to one side of the protective coal pillar, and the inclined holes are at a preset distance from the non-mining wall and are arranged along the direction of the roadway.

3. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The included angle between the inclined hole and the axis of the longitudinal groove is 45°, and the included angle between the inclined hole and the bottom plate of the tunnel is 75°.

4. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The distance between the vertical hole and any adjacent vertical hole is 2 mm, and the distance between the guide hole and any adjacent guide hole is 4 mm.

5. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The distance between the inclined hole and any adjacent inclined hole is 6m.

6. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The vertical hole and the guide hole are both 1 m away from the side wall of the coal pillar, the axial directions of the vertical hole and the guide hole are perpendicular to the roof, and the average depths of the vertical hole and the guide hole are 40 m.

7. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The vertical hole and the guide hole have the same aperture.

8. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The hole deviation of the vertical hole and the guide hole is less than or equal to ±50mm.

9. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The inclined hole is 1.5 m away from the side wall of the coal pillar, and the average depth of the inclined hole is 13.8 m.

10. The coal mine carbon dioxide phase change fracturing pressure relief system according to claim 2, characterized in that: The number of the fracturing devices in the vertical holes is greater than or equal to the number of the fracturing devices in the inclined holes.