Rigid reinforced skeleton structure outside water erosion cavity of karst shallow-buried section of extra-long tunnel
By adopting the primary support and secondary lining structure outside the water erosion cavity in the shallow buried section of the extra-long tunnel, combined with the support of the arch anchor integrated machine and the steel arch frame, the problem of scale and shape uncertainty in the treatment of the solution cavity is solved, and the support is ensured. It improves the stability of the protective structure and operational safety, and reduces costs and environmental impact.
Patent Information
- Application Number
- CN202420619108.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-28
AI Technical Summary
In the external treatment of water erosion cavities in the shallow buried section of karst tunnels, existing technology cannot accurately predict the size and shape of the cavity, resulting in high treatment costs and major safety hazards. There is also a lack of unified comprehensive assessment standards and specifications, which affects the construction effect and the environment. Protect.
Adopt a rigid reinforced skeleton structure including primary supports and secondary linings. Use an integrated arch and anchor machine to install arch protection and install steel arch frames at the tunnel arch waist. Changes in primary supports and surrounding rocks can be monitored in real time to ensure the stability of the support structure and prevent falling blocks. The released stress is too large, shortening the initial support intrusion limit processing time.
It achieves the stability of the tunnel support structure, reduces costs and ensures the safety of workers, ensures safety risks in later operations, and improves construction efficiency and environmental protection effects.
Smart Images

Figure CN221879412U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel karst cavity construction, in particular to an external rigidity-enhanced skeleton structure of a water-eroded cavity in a karst shallow buried section of an extra-long tunnel. Background Art
[0002] There are two main directions for the treatment of larger cavities: 1. Through relatively accurate advanced geological prediction, the scale of the cavities ahead can be discovered before the face is damaged and the forward excavation is carried out. Then, pipelines are buried according to the detected cavities on the current face, and pre-grouting (for small cavities) and pre-concrete injection (for larger cavities that are not connected to other cavities in the surrounding area) are carried out. The disadvantage of this treatment method is that the existing commonly used geological radar cannot accurately predict the scale and development of the cavities, and the direction of the cavities and whether they are connected to the surrounding cavities cannot be accurately measured, resulting in the inability to estimate the volume of advance concrete injection or grouting, which is easy to cause a lot of waste and fail to achieve the treatment effect; 2. After the excavation of the face is completed and the cavities are exposed, the measures of advancing one by one and filling the arch and surrounding areas with concrete backfill and blowing light materials are taken for treatment after the initial support is completed. The shortcoming of this treatment method is that, during the process of advancing the arch frame one by one after the dissolution cavity is exposed, although an arch-anchor integrated machine is used to erect the arch frame, the height of some water-eroded channels above the dissolution cavity cannot be detected, posing a safety hazard.
[0003] Difficulty in cave detection: Detection and exploration are difficult. Traditional geological exploration methods (such as drilling, seismic exploration, etc.) may not be able to accurately identify and locate caves, resulting in increased uncertainty in the treatment process.
[0004] Variations in cave size and morphology: The size and morphology of caves may vary greatly and be uncertain, making the selection and design of treatment technologies and equipment difficult. In addition, the structural complexity of the cave interior also increases the challenge of treatment.
[0005] High cost of treatment: The cost of external treatment of water erosion cavity in the shallow karst buried section of extra-long tunnels is usually high. Specialized equipment and technology are required, which increases the difficulty and cost of construction and may limit the progress of the project.
[0006] Environmental protection issues: When dealing with cavities, attention should be paid to environmental protection. Some traditional treatment technologies may have adverse effects on the surrounding environment, such as soil pollution and water pollution.
[0007] The causes of these problems and deficiencies can be attributed to the following points:
[0008] Complex geological conditions: The geological conditions outside the water erosion cavity of the shallow karst buried section of the extra-long tunnel may be very complex. The interaction of factors such as groundwater and karst characteristics increases the difficulty of treatment.
[0009] Technical and equipment limitations: At present, there are still certain limitations on the technology and equipment for treating karst caves in shallow buried sections of extra-long tunnels, and there is no fully mature solution, which will affect the treatment effect.
[0010] Lack of comprehensive evaluation and specifications: There may be a lack of unified comprehensive evaluation standards and specifications for the external treatment of water erosion cavities in shallow karst buried sections of extra-long tunnels, resulting in diversity and uncertainty in the selection of treatment methods and equipment. Utility Model Content
[0011] Therefore, the utility model provides a rigid reinforced skeleton structure for the external water erosion cavity of the shallow buried section of the karst of an extra-long tunnel. The implementation of this structure can ensure the stability of the tunnel support structure, ensure the safety risks in the later operation, shorten the treatment time of the initial support intrusion limit of the shallow buried section, and achieve the effect of reducing costs and ensuring the safety of operators.
[0012] The utility model is implemented in this way, constructing a rigid reinforced skeleton structure for the outer water erosion cavity of a karst shallow buried section of an extra-long tunnel, characterized in that the structure includes a primary support and a secondary lining, and an arch-anchor integrated machine is used to install a protective arch on the primary support, and a steel arch frame is installed at the tunnel arch waist position for support, so as to ensure the stability of the protective arch and the primary support, so as to avoid excessive stress released by falling blocks due to excessive height, which may lead to the impact on the primary support limit, personnel safety and later operation.
[0013] The utility model has the following advantages: the utility model provides a rigid reinforced skeleton structure on the outside of the water erosion cavity of the shallow buried section of the karst of an extra-long tunnel. The implementation of this structure can ensure the stability of the tunnel support structure, ensure the safety risks in the later operation, shorten the handling time of the initial support intrusion limit of the shallow buried section, and achieve the effect of reducing costs and ensuring the safety of operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is an implementation structure diagram of this application.
[0015] Among them: primary support 1, secondary lining 2, arch protection 3, steel arch frame 4. DETAILED DESCRIPTION
[0016] The following will be combined with the attached Figure 1 The utility model is described in detail, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] The utility model provides a rigid reinforced skeleton structure for the outer part of the water erosion cavity of a karst shallow buried section of a super-long tunnel, such as Figure 1As shown, it can be implemented as follows; the structure includes a primary support 1 and a secondary lining 2, and an arch guard 3 is installed on the primary support 1 using an arch anchor integrated machine, and a steel arch frame 4 is installed at the tunnel arch waist position for support, so as to ensure the stability of the arch guard 3 and the primary support 1, so as to avoid excessive stress released by falling blocks due to excessive height, which may lead to the impact on the primary support limit, personnel safety and subsequent operations.
[0018] This application is mainly used for tunnel construction where the tunnel body passes through geological karst development. If the scale of the karst cavity is large, measures such as adding external temporary arch protection, steel arch frame, spraying concrete, grouting, and spraying lightweight materials are mainly taken to ensure the safety of the tunnel's initial support construction and operation period. At the same time, after the external protection is formed, real-time monitoring and measurement are used to observe the changes in the initial support and surrounding rock. After stabilization, the original design of the initial support arch construction is continued. Through this optimization and improvement, the patent solves the safety of front-line workers (arch protection, steel arch frame support and spraying concrete are completed by an arch-anchor integrated machine and an intelligent mechanical wet sprayer), shortens the handling time of the initial support intrusion limit of the shallow buried section, and achieves the effect of reducing costs and ensuring the safety of workers.
[0019] During implementation, after the tunnel was excavated, due to the large karst caves in the karst tunnel, the initial spraying and sealing was carried out first to block the risk of continuous block falling. Subsequently, the arch protection was installed with an arch-anchor integrated machine and the steel arch frame was supported at the arch waist to ensure the stability of the arch protection and the initial support, so as to avoid the excessive stress released by the falling blocks due to the high height, which would lead to the intrusion of the initial support, personnel safety and subsequent operations.
[0020] This patent has the following advantages and beneficial effects: It ensures the stability of the tunnel support structure and ensures the safety risks in the later operation. It shortens the treatment time of the initial support intrusion limit of the shallow buried section, achieving the effect of reducing costs and ensuring the safety of operators.
[0021] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A rigid reinforced skeleton structure for the outer part of a water-eroded cavity in a karst shallow buried section of an extra-long tunnel, characterized in that ; The structure comprises a primary support (1) and a secondary lining (2), and a protective arch (3) is installed on the primary support (1) using an arch-anchor integrated machine, and a steel arch frame (4) is installed at the tunnel arch waist position for support, so as to ensure the stability of the protective arch (3) and the primary support (1).