Drilling and cleaning integrated structure for anchor cable hole of anchor cable frame beam
By using the design of the anchor body and the inner casing in the integrated structure of anchor cable hole drilling and cleaning of the anchor cable frame beam, synchronous suction of debris during the drilling process is achieved, which solves the problem of anchor cable holes in tunnel construction. Clean up tedious problems and improve construction efficiency.
Patent Information
- Application Number
- CN202420682604.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-04-03
AI Technical Summary
During tunnel construction, the anchor cable holes of the anchor cable frame beams need to be cleaned separately with high-pressure air after drilling, resulting in cumbersome construction procedures and low efficiency.
Design an integrated structure for anchor cable hole drilling and cleaning of anchor cable frame beams, including the anchor rod body, drill bit, inner casing and suction chamber, and use the suction hole and rear chuck to connect to the suction equipment. Realize synchronous cleaning during drilling process.
By synchronously pumping debris, the construction process is optimized and construction efficiency is improved.
Smart Images

Figure CN221879451U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anchor cable drill rods, in particular to an anchor cable hole drilling and hole cleaning integrated structure of an anchor cable frame beam. Background Art
[0002] During the tunnel construction process, there is often a steep slope and exposed bedrock above the top of the tunnel. Therefore, it is necessary to set up anchor frame beams to protect the slope. The anchor frame beams are anchored on the slope for stability. At this time, anchor holes are drilled on the slope using anchor rods to set up anchor points. After drilling, the anchor holes need to be cleaned with high-pressure air to maintain the stability of the subsequent anchor pouring. However, this construction process is relatively cumbersome and is not conducive to improving efficiency.
[0003] In view of this, a design or technical improvement is now proposed to solve the above problems.
[0004] The above contents are only used to assist in understanding the technical solution of the present utility model, and do not constitute an admission that the above contents are the closest prior art. Utility Model Content
[0005] The utility model aims to solve the above-mentioned deficiencies and provide an integrated structure for drilling and cleaning anchor holes of an anchor frame beam.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] An integrated structure for drilling and cleaning anchor holes of an anchor frame beam, comprising an anchor rod body and a drill bit arranged on the anchor rod body, an inner sleeve which can rotate independently relative to the anchor rod body is arranged inside the anchor rod body, and a pumping chamber is arranged between the anchor rod body and the inner sleeve;
[0008] A suction hole connected to the pumping chamber is provided on one side of the anchor rod body close to the drill bit, and a rear clamp connected to the pumping chamber and used for connecting to a suction device is provided on one side of the inner sleeve away from the drill bit.
[0009] Furthermore, a first annular groove is provided on the inner wall of the anchor rod body on one side close to the drill bit, and a first annular convex plate adapted to be clamped with the first annular groove is provided on one end of the inner sleeve close to the drill bit.
[0010] Furthermore, the rear clamping head is provided with a clamping groove adapted to clamp with the end of the anchor rod body away from the drill bit, a second annular groove is provided in the clamping groove, and the outer surface of the end of the anchor rod body away from the drill bit is provided with a second annular convex plate adapted to clamp with the second annular groove.
[0011] Furthermore, the rear clamp is also provided with a cable threading opening which is connected with the interior of the inner sleeve.
[0012] Furthermore, a connecting cavity communicating with the pumping chamber is also provided in the clamping groove, and an external connecting pipe opening communicating with the connecting cavity is provided on the rear clamping head.
[0013] Furthermore, the anchor rod body is also provided with a focusing ring located outside the suction hole, the opening of the focusing ring faces the drill bit and the diameter of the focusing ring is smaller than the diameter of the drill bit.
[0014] Compared with the prior art, the beneficial effect of this solution is that the solution optimizes the construction process and improves the construction efficiency by arranging a structure inside the anchor body that can simultaneously perform slag suction in the hole when drilling. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0016] Figure 1 It is a front three-dimensional schematic diagram of the utility model;
[0017] Figure 2 It is a side perspective schematic diagram of the utility model;
[0018] Figure 3 It is a cross-sectional schematic diagram of the utility model;
[0019] Figure 4 It is a cross-sectional schematic diagram of the anchor rod body in the utility model;
[0020] Figure 5 It is a cross-sectional schematic diagram of the inner sleeve in the utility model;
[0021] Figure 6 It is a schematic diagram of the structural disassembly of the utility model.
[0022] In the figure: 1. Anchor rod body; 11. Drill bit; 2. Inner casing; 21. Pumping chamber; 22. Suction hole; 3. Post-mounted clamp; 31. First ring groove; 32. First ring convex plate; 33. Clamping groove; 34. Second ring groove; 35. Second ring convex plate; 4. Rope threading port; 41. Connecting chamber; 42. External connecting pipe port; 43. Focusing ring cover. DETAILED DESCRIPTION
[0023] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0024] like Figure 1-6 The anchor hole drilling and cleaning integrated structure of the anchor frame beam shown in the figure comprises an anchor rod body 1 and a drill bit 11 arranged on the anchor rod body 1, an inner sleeve 2 which can rotate independently relative to the anchor rod body 1 is arranged inside the anchor rod body 1, and a pumping chamber 21 is arranged between the anchor rod body 1 and the inner sleeve 2; a suction hole 22 connected to the pumping chamber 21 is opened on the side of the anchor rod body 1 close to the drill bit 11, and a rear end connected to the pumping chamber 21 for connecting to a suction device is arranged on the side of the inner sleeve 2 far from the drill bit 11 The clamping head 3, the scheme is to set an inner casing 2 which can rotate independently of the anchor body 1 inside the anchor body 1, so that when the anchor body 1 cooperates with the drill bit 11 to drill and excavate, the inner casing 2 inside can remain relatively still, and then the rear clamping head 3 is connected to the high-pressure suction equipment, so that the suction equipment can suck the debris excavated by the drill bit 11 through the suction chamber 21 and the suction hole 22 set on the anchor body 1, thereby realizing synchronous cleaning work during the drilling process.
[0025] In one embodiment, a first annular groove 31 is provided on the inner wall of the anchor body 1 on one side close to the drill bit 11, and a first annular convex plate 32 that is adapted to be clamped with the first annular groove 31 is provided at one end of the inner casing 2 close to the drill bit 11. A clamping groove 33 that is adapted to be clamped with one end of the anchor body 1 away from the drill bit 11 is provided on the rear clamp 3, and a second annular groove 34 is provided in the clamping groove 33. A second annular convex plate 35 that is adapted to be clamped with the second annular groove 34 is provided on the outer surface of the end of the anchor body 1 away from the drill bit 11. One end of the inner casing 2 is clamped with the first annular groove 31 through the first annular convex plate 32, and the other end is clamped with the second annular convex plate 35 through the second annular groove 34, so that the inner casing 2 can rotate relative to the anchor body 1, and can also follow the anchor body 1 to achieve synchronous excavation.
[0026] In one embodiment, the rear clamp 3 is further provided with a cable insertion port 4 connected to the interior of the inner casing 2, the clamping groove 33 is further provided with a connecting cavity 41 connected to the flow extraction chamber 21, the rear clamp 3 is provided with an external connecting pipe port 42 connected to the connecting cavity 41, and the anchor body 1 is further provided with a focusing ring cover 43 located outside the suction hole 22, the opening of the focusing ring cover 43 faces the drill bit 11 and the diameter is smaller than the diameter of the drill bit 11. During the use of this structure, the suction equipment is first connected to the external connecting pipe port 42 through a hose, and then the anchor body 1 is fixed to the anchor cable drilling rig, and the rear clamp 3 is fixed by connecting with the suction equipment, so that the anchor body 1 rotates and drives the drill bit 11 to drill the slope. The inner casing 2 will remain stationary relative to the rotation of the anchor body 1, and the two will simultaneously perform synchronous excavation and exploration. At this time, the vacuum equipment is started to form a high-intensity negative pressure in the suction chamber 21, so that the suction hole 22 will absorb the debris in the drilled anchor hole and make it enter the suction chamber 21, so as to achieve the purpose of cleaning the anchor hole. The setting of the focusing ring 43 is used to ensure that the debris is absorbed more concentratedly during the suction process, so that it is convenient for it to enter the suction chamber 21 through the suction hole 22. After the drilling and cleaning are completed, the anchor cable is inserted through the cable insertion port 4, so that it passes through the inner casing 2 to reach the bottom of the anchor hole, and then the anchor body 1 is pulled to separate it from the drill bit 11, and then grouting operations can be carried out in the anchor hole.
[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.
Claims
1. An integrated structure for drilling and cleaning anchor holes of an anchor frame beam, comprising an anchor rod body (1) and a drill bit (11) arranged on the anchor rod body (1), characterized in that: An inner sleeve (2) which can rotate independently relative to the anchor rod body (1) is arranged inside the anchor rod body (1), and a pumping chamber (21) is arranged between the anchor rod body (1) and the inner sleeve (2); A suction hole (22) connected to a suction chamber (21) is provided on a side of the anchor rod body (1) close to the drill bit (11), and a rear clamp (3) connected to the suction chamber (21) for connection to a suction device is provided on a side of the inner sleeve (2) away from the drill bit (11).
2. The integrated structure for drilling and cleaning anchor holes of anchor cable frame beams according to claim 1 is characterized in that: A first annular groove (31) is provided on the inner wall of the anchor rod body (1) on one side close to the drill bit (11), and a first annular convex plate (32) adapted to be clamped with the first annular groove (31) is provided on one end of the inner sleeve (2) close to the drill bit (11).
3. The integrated structure for drilling and cleaning anchor holes of an anchor frame beam according to any one of claims 1 or 2, characterized in that: The rear clamp (3) is provided with a clamping groove (33) adapted to clamp with the end of the anchor rod body (1) away from the drill bit (11), a second annular groove (34) is provided in the clamping groove (33), and the outer surface of the end of the anchor rod body (1) away from the drill bit (11) is provided with a second annular convex plate (35) adapted to clamp with the second annular groove (34).
4. The integrated structure for drilling and cleaning anchor holes of an anchor frame beam according to claim 2, characterized in that: The rear clamp (3) is also provided with a cable insertion opening (4) which is in communication with the interior of the inner sleeve (2).
5. The integrated structure of anchor hole drilling and cleaning of anchor cable frame beam according to claim 3 is characterized in that: A communication cavity (41) communicating with the pumping chamber (21) is also provided in the clamping groove (33), and an external connection pipe opening (42) communicating with the communication cavity (41) is provided on the rear clamping head (3).
6. The integrated structure for drilling and cleaning anchor holes of anchor cable frame beams according to claim 1, characterized in that: The anchor rod body (1) is also provided with a focusing ring (43) located outside the suction hole (22); the opening of the focusing ring (43) faces the drill bit (11) and has a smaller diameter than the drill bit (11).
