Pipeline and equipment for preparing semiconductor chip
By introducing a real-time monitoring and automatic control pipeline system into semiconductor CVD equipment, combined with high-efficiency filtration and multi-pump power guarantee, the problems of gas backflow and dust pollution are solved, and stable operation and efficient production of the equipment are achieved.
Patent Information
- Application Number
- CN202420457177.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-11
AI Technical Summary
Existing technology has deficiencies in preventing gas backflow and dust pollution in semiconductor CVD process equipment. It cannot effectively monitor and respond to abnormal gas flow in pipelines in real time, leading to equipment pollution and failure.
A piping system including a reaction chamber, a filter and a one-way valve and a pressure sensor is designed to monitor the gas flow in real time and automatically close the valve through the pressure sensor and control system to prevent gas backflow. It is also equipped with a high-efficiency filtration system and multiple The pump power is guaranteed to realize regular automatic cleaning of pipelines.
It effectively prevents gas backflow and dust pollution, ensures the sealing and production stability of the equipment, reduces the failure rate and maintenance costs, and improves the product quality and production efficiency of semiconductor chip preparation.
Smart Images

Figure CN221881158U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure belongs to the technical field of semiconductor production equipment, and in particular relates to a pipeline and equipment for preparing semiconductor chips. Background Art
[0002] In today's high-tech world, semiconductor chips have become the core components of electronic devices, from smartphones to data centers to aerospace, and are almost everywhere. Behind this, the thin film deposition process, as a front-end process for semiconductor manufacturing, plays a vital role. It not only determines the performance of the chip, but also directly affects its reliability and cost.
[0003] Thin film deposition is the process of uniformly depositing a thin film on the main substrate material of the semiconductor. The quality and characteristics of this thin film are crucial to subsequent process steps such as etching and doping. The thickness, crystal structure, chemical composition, etc. of the thin film need to be strictly controlled to ensure that the performance of the final chip meets the standards.
[0004] Thin film preparation processes are mainly divided into two categories based on the film formation method: physical vapor deposition (PVD) and chemical vapor deposition (CVD). PVD uses physical processes such as vacuum evaporation or sputtering to transfer materials from source materials to substrates. CVD, on the other hand, uses chemical reactions to convert gaseous precursors into solid thin films. The CVD process dominates semiconductor manufacturing because of its ability to form complex crystal structures and large-area thin films.
[0005] However, the operation and maintenance of CVD process equipment faces many challenges. The biggest problem is the environmental pollution of the reaction chamber. During the operation of the equipment, if the gas in the pipeline flows back, pollutants may be brought into the reaction chamber, causing serious pollution. These pollutants will not only affect the quality of the film, but also cause equipment failure, and may even cause the entire equipment to be scrapped, resulting in huge economic losses. The main source of pollution comes from the backflow of gas in the pipeline. This may be due to the loose installation of certain components in the pipeline or damage to the pipeline itself. Once the pipeline leaks, the leaked gas may form dust, which in turn pollutes the equipment. In addition, this dust may also be deposited inside the equipment, further exacerbating the problem.
[0006] In order to prevent the contamination of the reaction chamber, the equipment needs to be leak-checked regularly and timely, which is also an important part of the daily use of the maintenance pipeline. Through leak detection, the sealing problems of the equipment can be discovered in time, so that corresponding measures can be taken to repair them, ensuring the smooth progress of the production process, and thus ensuring the key to product quality and production efficiency.
[0007] Existing technical means have obvious deficiencies in preventing gas backflow and dust pollution. Although there are some technologies that can prevent gas backflow in the reaction chamber, these technologies usually rely on devices such as mechanical one-way valves. For example, the prior art CN208471540 U discloses that in order to prevent gas backflow in the reactor from causing pollution, a one-way valve is installed between the filter and the reactor. These mechanical one-way valves in the aforementioned technology have problems with closing timing and sealing performance, and cannot respond quickly according to real-time conditions. In addition, it is also impossible to effectively prevent dust problems caused by human operating errors or emergencies.
[0008] Therefore, it is necessary to develop a new type of pipeline system and equipment that can achieve multiple functions. First of all, this equipment and system needs to have real-time monitoring and intelligent control functions to monitor the gas flow in the pipeline in real time. Once an abnormal situation is detected, the system should immediately take countermeasures, such as starting a cleaning procedure or closing relevant valves to prevent gas backflow and further contamination.
[0009] Secondly, this new type of equipment should be equipped with a high-efficiency filtration system. This filtration system can not only filter out leaked gas and dust particles, but also automatically clean the pipeline regularly to ensure long-term stable operation of the pipeline. This can effectively prevent dust problems caused by pipeline leakage or loose components. Utility Model Content
[0010] A technical problem to be solved by the present disclosure is: how to provide a pipeline for preparing semiconductor chips and a device including the pipeline, so as to better detect pipeline damage, prevent gas backflow in the reaction chamber, and promptly detect whether the sealing of the equipment is good to ensure smooth production.
[0011] To solve the above technical problems, on the one hand, some embodiments of the present disclosure provide a pipeline for preparing semiconductor chips, the pipeline including a reaction chamber, a filter and a first pipeline connected between the reaction chamber and the filter, a one-way valve and a pressure sensor are provided on the first pipeline, the pressure sensor is provided downstream of the one-way valve, and is configured to monitor the gas condition flowing through the one-way valve in real time.
[0012] In some embodiments, a large pump and a second pipeline connecting the filter and the large pump are provided downstream of the filter.
[0013] In some embodiments, a first ball valve is disposed downstream of the pressure sensor, and the number of the first ball valves is 2 or more.
[0014] In some embodiments, a pneumatic ball valve is disposed on the second pipeline, and a hand valve, a butterfly valve and a second ball valve are sequentially disposed downstream of the pneumatic ball valve.
[0015] In some embodiments, the large pump includes a first pump and a second pump connected in parallel, and the second pipeline connects the first pump and the second pump in parallel downstream of the butterfly valve.
[0016] In some embodiments, the first pump and the second pump are further connected in series through a third pipeline, the third pipeline includes a main line connecting the first pump and the second pump in series and a branch line connected to the main line at one end, and the other end of the branch line is connected to the exhaust gas treatment equipment.
[0017] In some embodiments, the hand valve is provided with an interface for connecting a leak detector.
[0018] In some embodiments, the number of the second ball valves includes 2 or more.
[0019] In some embodiments, the pressure sensor and the first pipeline, and the one-way valve and the first pipeline are all detachably connected.
[0020] On the other hand, an embodiment of the present disclosure further provides an apparatus for preparing a semiconductor chip, the apparatus comprising the aforementioned pipeline.
[0021] The beneficial effects of the present disclosure include at least:
[0022] The pipeline and equipment disclosed in the present invention are provided with a one-way valve in the reaction chamber and the filter, and a pressure sensor that can be linked with the one-way valve is provided downstream of the one-way valve, so that the equipment can prevent the gas in the pipeline from flowing back during the operation of the equipment, and at the same time, it can timely detect whether the sealing of the equipment is good, thereby ensuring smooth production. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0024] Figure 1 A schematic diagram of a pipeline provided by some embodiments of the present disclosure is shown.
[0025] Description of reference numerals:
[0026] 1. Reaction chamber; 2. One-way valve; 3. Pressure sensor; 4. First ball valve; 5. Filter; 6. Pneumatic ball valve; 7. Hand valve; 8. Butterfly valve; 9. Second ball valve; 10. Large pump; 101. First pump; 102. Second pump; 11. Exhaust gas treatment equipment; 12. Air outlet; 13. Air inlet; 14. First pipeline; 15. Second pipeline; 16. Third pipeline. DETAILED DESCRIPTION
[0027] The following is a further detailed description of the embodiments of the present disclosure in conjunction with the accompanying drawings and examples. The detailed description of the following embodiments and the accompanying drawings are used to exemplarily illustrate the principles of the present disclosure, but cannot be used to limit the scope of the present disclosure. The present disclosure can be implemented in many different forms and is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
[0028] The present disclosure provides these embodiments to make the present disclosure thorough and complete, and to fully express the scope of the present disclosure to those skilled in the art. It should be noted that unless otherwise specifically stated, the relative arrangement of the components described in these embodiments should be interpreted as merely exemplary, rather than as a limitation.
[0029] It should be noted that, in the description of the present disclosure, unless otherwise specified, the meaning of "multiple" is greater than or equal to two; the terms "upper", "lower", "left", "right", "inner", "outer", etc., indicating the orientation or positional relationship, are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present disclosure. When the absolute position of the object being described changes, the relative positional relationship may also change accordingly.
[0030] In addition, the words "first", "second" and similar words used in this disclosure do not indicate any order, quantity or importance, but are only used to distinguish different parts. The words "include" or "comprise" and similar words mean that the elements before the word include the elements listed after the word, and do not exclude the possibility of including other elements.
[0031] It should also be noted that in the description of the present disclosure, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to the specific circumstances.
[0032] All terms used in the present disclosure have the same meanings as those understood by those of ordinary skill in the art to which the present disclosure belongs, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries, for example, should be interpreted as having meanings consistent with their meanings in the context of the relevant technology, and should not be interpreted in an idealized or extremely formal sense, unless explicitly defined as such herein.
[0033] Techniques and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the techniques and equipment should be considered part of the specification.
[0034] like Figure 1 As shown, in some embodiments, the pipeline for preparing semiconductor chips disclosed in the present invention includes a reaction chamber 1, a filter 5 and a first pipeline 14 connected between the reaction chamber 1 and the filter 5, and a one-way valve 2 and a pressure sensor 3 are provided on the first pipeline 14. The pressure sensor 3 is arranged downstream of the one-way valve 2 and is configured to monitor the gas condition flowing through the one-way valve 2 in real time. The pipeline for preparing semiconductor chips disclosed in the present invention is provided with a one-way valve 2 in the first pipeline 14 between the reaction chamber 1 and the filter 5, and a pressure sensor 3 capable of being linked with the one-way valve 2 is provided downstream of the one-way valve 2, that is, the pressure difference in the first pipeline 14 is monitored in real time by the pressure sensor 3 to detect the change of the gas in the first pipeline 14, and the change is transmitted to the control system (not shown in the figure). When the pressure difference in the first pipeline 14 is greater than the set value in the control system, the control system makes a judgment and then immediately closes the one-way valve 2 to ensure that no gas backflow occurs in the first pipeline 14; when the pressure sensor 3 monitors that the difference in the first pipeline 14 is less than or equal to the set value in the control system or is within the set range, the pressure sensor 3 uploads the data to the control system, and the one-way valve 2 is not closed after the control system makes a judgment. The structure disclosed in the present invention can prevent the gas in the first pipeline 14 from flowing back during the production process. At the same time, it can timely detect whether the sealing performance of the equipment is good, thereby ensuring smooth production. After the one-way valve 2 is linked with the pressure sensor 3, the pressure sensor 3 has a real-time monitoring function. The monitoring situation of the pressure sensor 3 can be fed back in time, thereby improving the response speed of the first pipeline 14 and reducing errors, thereby reducing the failure rate of the first pipeline 14, and correspondingly reducing the failure rate of the pipeline used to prepare semiconductor chips.
[0035] The reaction chamber 1 of the present disclosure is also provided with a plurality of gas inlets 13 upstream, and a plurality of gas outlets 12 downstream of the reaction chamber 1 for discharging the reacted gas. The gas outlets 12 are connected to a first pipeline 14, and the gas enters the first pipeline 14 for subsequent treatment.
[0036] In the pipeline for preparing semiconductor chips disclosed in some embodiments of the present disclosure, a large pump 10 and a second pipeline 15 connecting the filter 5 and the large pump 10 are provided downstream of the filter 5. The function of the large pump 10 is to provide power for the flow of gas in the pipeline for preparing semiconductor chips.
[0037] In some embodiments, a first ball valve 4 is provided downstream of the pressure sensor 3. The purpose is to facilitate closing the first pipeline 14 during pipeline maintenance, prevent gas backflow, protect the reaction chamber 1, etc. Figure 1In the illustrated embodiment, the first pipeline 14 includes two first ball valves 4, both of which are arranged downstream of the pressure sensor 3 and between the filter 5 and the pressure sensor 3. It should be understood that the number of the first ball valves 4 is not limited thereto.
[0038] In some embodiments, a pneumatic ball valve 6 is provided on the second pipeline 15, and a hand valve 7, a butterfly valve 8 and a second ball valve 9 are provided in sequence downstream of the pneumatic ball valve 6. The purpose of providing the hand valve 7, the butterfly valve 8 and the second ball valve 9 is also to further facilitate pipeline maintenance.
[0039] In order to further improve the stability of the pipeline for preparing semiconductor chips disclosed in the present invention, in some embodiments of the present invention, the large pump 10 includes a first pump 101 and a second pump 102 in parallel, and the second pipeline 15 connects the first pump 101 and the second pump 102 in parallel downstream of the butterfly valve 8.
[0040] The present invention sets a first pump 101 and a second pump 102 in parallel. The two pumps can provide super strong power at the same time. If one pump fails, the other pump can maintain the operation of the pipeline for preparing semiconductor chips, thereby avoiding the gas in the pipeline for preparing semiconductor chips from being retained due to lack of power provided by the pump.
[0041] In some embodiments, the first pump 101 and the second pump 102 are further connected in series through a third pipeline 16, and the third pipeline 16 includes a main line connecting the first pump 101 and the second pump 102 in series and a branch line connected to the main line at one end, and the other end of the branch line is connected to the exhaust gas treatment device 11. The exhaust gas treatment device 11 can timely treat the exhaust gas in the pipeline for preparing semiconductor chips, ensure the stability of the operation of the pipeline for preparing semiconductor chips, and protect the production environment at the same time.
[0042] In some embodiments, the hand valve 7 is provided with an interface for connecting a leak detector (not shown in the figure), which makes it easier to determine the leak point in the pipeline used to prepare semiconductor chips.
[0043] In some embodiments, the number of the first ball valve or the second ball valve includes 2 or more, including but not limited to 2, 3 or 4.
[0044] In some embodiments, the pressure sensor 3 and the first pipeline 14, and the one-way valve 2 and the first pipeline 14 are all detachably connected. The detachable connection facilitates replacement of the one-way valve 2 or the pressure sensor 3 when a failure occurs.
[0045] On the other hand, the present disclosure also provides an apparatus for preparing semiconductor chips, the apparatus comprising the aforementioned pipeline for preparing semiconductor chips.
[0046] In order to further illustrate the solution of the present disclosure, the working principle of the pipeline for preparing semiconductor chips of the present disclosure is explained as follows with reference to the gas flow direction in the pipeline for preparing semiconductor chips of the present disclosure:
[0047] like Figure 1 As shown, a gas deposition reaction occurs in the reaction chamber 1, and the gas required for the reaction enters the reaction chamber 1 through the air inlet 13. After the reaction occurs in the reaction chamber 1, the remaining gas is discharged from the air outlet 12 to the first pipeline 14. In the first pipeline 14, the gas passes through the one-way valve 2 and the pressure sensor 3. At this time, the pressure sensor 3 detects the pressure of the first pipeline 14 and feeds it back to the control system. The control system determines whether the first pipeline 14 is leaking. If a leak occurs, the control system controls the one-way valve 12 to close, thereby protecting the gas in the first pipeline 14 from backflow and protecting the reaction chamber 1; when the control system determines that there is no leak in the first pipeline 14, the gas continues to move forward, passes through the first ball valve 4, and then enters the filter 5 to treat the gas for the first time. The gas treated by the filter 5 enters the second pipeline 15, and the gas in the second pipeline 15 first passes through the pneumatic ball valve 4. Valve 6, and then pass through hand valve 7 and butterfly valve 8. At this time, the second pipeline 15 is "Y"-shaped and bifurcated, and the gas is divided into two parallel streams. The two gases enter the two branches of the second pipeline 15 respectively. Second ball valves 9 are arranged on the two branches of the second pipeline 15. The two gases pass through two second ball valves 9 respectively, and then the two gases enter the first pump 101 and the second pump 102 respectively. The first pump 101 and the second pump 102 provide power for the gas flow of the entire pipeline for preparing semiconductor chips. After passing through the first pump 101 and the second pump 102, the gas comes out from the second gas outlet arranged on the first pump 101 and the second pump 102, and merges on the third pipeline 16. The third pipeline 16 is provided with a three-way structure. After the two gases merge at the three-way structure, they enter the exhaust gas treatment equipment 11 through the third pipeline 16. This process is the second treatment of gas. At this point, the gas flow path ends.
[0048] So far, various embodiments of the present disclosure have been described in detail. Although some specific embodiments of the present disclosure have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present disclosure. It should be understood by those skilled in the art that the above embodiments may be modified or some technical features may be replaced by equivalents without departing from the scope and spirit of the present disclosure. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict.
Claims
1. A pipeline for preparing semiconductor chips, It is characterized in that The invention comprises a reaction chamber (1), a filter (5) and a first pipeline (14) connected between the reaction chamber (1) and the filter (5); a one-way valve (2) and a pressure sensor (3) are arranged on the first pipeline (14); the pressure sensor (3) is arranged downstream of the one-way valve (2) and is configured to monitor the gas flowing through the one-way valve (2) in real time.
2. The pipeline according to claim 1, It is characterized in that A large pump (10) and a second pipeline (15) connecting the filter (5) and the large pump (10) are arranged downstream of the filter (5).
3. The pipeline according to claim 1, It is characterized in that A first ball valve (4) is arranged downstream of the pressure sensor (3), and the number of the first ball valves (4) is 2 or more.
4. The pipeline according to claim 2, It is characterized in that The second pipeline (15) is provided with a pneumatic ball valve (6), and a hand valve (7), a butterfly valve (8) and a second ball valve (9) are sequentially provided downstream of the pneumatic ball valve (6).
5. The pipeline according to claim 4, It is characterized in that The large pump (10) comprises a first pump (101) and a second pump (102) connected in parallel, and the second pipeline (15) connects the first pump (101) and the second pump (102) in parallel downstream of the butterfly valve (8).
6. The pipeline according to claim 5, It is characterized in that The first pump (101) and the second pump (102) are also connected in series via a third pipeline (16), the third pipeline (16) comprising a main line connecting the first pump (101) and the second pump (102) in series and a branch line having one end connected to the main line, the other end of the branch line being connected to the exhaust gas treatment device (11).
7. The pipeline according to claim 4, It is characterized in that The hand valve (7) is provided with an interface for connecting to a leak detector.
8. The pipeline according to claim 4, It is characterized in that The number of the second ball valves (9) includes 2 or more.
9. The pipeline according to claim 1, It is characterized in that The pressure sensor (3) and the first pipeline (14), as well as the one-way valve (2) and the first pipeline (14) are all detachably connected.
10. An apparatus for preparing a semiconductor chip, It is characterized in that The device comprises the pipeline for preparing semiconductor chips according to any one of claims 1 to 9.
Citation Information
Cited By
Pipeline for preparing semiconductor chip
CN223662768U