Electric melting furnace noise reduction bin for zirconia corundum bricks
By designing the noise reduction chamber of the zirconium corundum brick electric furnace, using a motor to drive the screw rod and sealing gasket to open and close the chamber, and using water pumps and nozzles to quickly cool down, the problems of noise and temperature control of the electric furnace have been solved, and work safety and safety have been improved. Production efficiency.
Patent Information
- Application Number
- CN202420494886.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The electric melting furnace of zirconium corundum bricks produces huge noise during operation, which harms the eardrums of workers. The temperature and pressure need to be precisely controlled during the smelting process. After discharging, the temperature needs to be cooled for the next step of casting. However, it is difficult to effectively insulate sound and cool down quickly with existing technology. .
Design a zirconium corundum brick electric furnace noise reduction chamber, which is made of sound insulation materials. The opening and closing of the chamber body is realized by driving the screw rod and sealing gasket by a motor, and a water pump and nozzle are used for rapid cooling after discharging the material.
It effectively isolates noise, ensures the safety of workers, shortens waiting time through rapid spray cooling, and improves melting and casting efficiency.
Smart Images

Figure CN221882185U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of grinding devices, in particular to a noise reduction chamber of an electric melting furnace of zirconium corundum bricks. Background Art
[0002] The electric melting furnace of zirconium corundum bricks is a kind of equipment specially used for melting zirconium corundum bricks. Its working principle is to use the electrothermal effect to convert electrical energy into thermal energy to melt the materials in the furnace. The electric melting furnace is usually composed of electrodes, furnace body, control system and other parts. In the electric melting furnace, the materials are melted into liquid at high temperature, and finally form zirconium corundum bricks after a series of chemical reactions and physical changes. During the melting process, the temperature, pressure, atmosphere and other parameters need to be precisely controlled to ensure the quality and stability of the product.
[0003] However, when the electric melting furnace of zirconium corundum bricks is in operation, huge noise will be generated due to the processes of electrode rotation, heating and melting materials, which will cause serious eardrum damage to the workers and is not conducive to the workers getting close and working for a long time. Therefore, in view of the above technical problems, a noise reduction chamber of the electric melting furnace of zirconium corundum bricks is proposed herein. Utility Model Content
[0004] The utility model aims to provide a noise reduction bin for an electric melting furnace of zirconium corundum bricks, which can wrap the electric melting furnace of zirconium corundum bricks to isolate noise, and can also conveniently open the bin when internal discharge is required, and after the discharge is completed, the electric melting furnace of zirconium corundum bricks can be quickly sprayed to cool down, so as to facilitate the next step of melting and casting.
[0005] The utility model is realized by the following technical solutions:
[0006] A noise reduction chamber for an electric furnace of zirconium corundum bricks, comprising a noise reduction chamber main body and a fixed plate, the fixed plate being slidably connected to a movable plate on the outside, a cavity being provided on the outside of the noise reduction chamber main body, and the cavity being located directly below the movable plate, a No. 1 motor being fixedly connected to the outside of the noise reduction chamber main body, a No. 1 screw being fixedly connected to one side of the No. 1 motor, and the No. 1 screw being located inside the cavity, a No. 1 slide groove being provided on the upper side of the cavity, a connecting sleeve being threadedly connected to the outside of the No. 1 screw, and the connecting sleeve being fixedly connected to the movable plate and slidably connected to the No. 1 slide groove; a rear side of the noise reduction chamber main body is fixedly connected to the No. 1 motor, and a No. 1 screw being fixedly connected to one side of the No. 1 motor, and the No. 1 screw being located inside the cavity, and a No. 1 slide groove being provided on the upper side of the cavity, and a connecting sleeve being threadedly connected to the external side of the No. 1 screw, and the connecting sleeve being fixedly connected to the movable plate and slidably connected to the No. 1 slide groove; A No. 2 motor is fixedly connected thereto, a No. 2 screw rod is fixedly connected to one side of the No. 2 motor, and the No. 2 screw rod is located inside the noise reduction bin main body, a sliding sleeve is threadedly connected to the outside of the No. 2 screw rod, and the sliding sleeve and the noise reduction bin main body are slidingly connected, a water distribution plate is fixedly connected to the outside of the sliding sleeve, a nozzle is installed on the outside of the water distribution plate, a water storage tank is fixedly connected to the outside of the noise reduction bin main body, a No. 3 slide groove is provided on the outside of the noise reduction bin main body, a water pump is installed inside the water storage tank, a conduit is fixedly connected to the outside of the water pump, and the other end of the conduit passes through the No. 3 slide groove and is fixedly connected to the water distribution plate.
[0007] Preferably, the fixed plate and the movable plate are slidably connected.
[0008] Preferably, a No. 1 sealing gasket is fixedly connected to one side of the movable plate, a No. 2 sealing gasket is fixedly connected to one side of the noise reduction chamber body, and the No. 2 sealing gasket is meshed with the No. 1 sealing gasket.
[0009] Preferably, a mounting plate is fixedly connected to the interior of the noise reduction chamber body, and the second screw rod is rotatably connected to the mounting plate.
[0010] Preferably, a No. 2 slide groove is opened inside the noise reduction bin body, a slider is fixedly connected to one side of the sliding sleeve, and the slider is slidably connected to the No. 2 slide groove, and the sliding sleeve and the noise reduction bin body are slidably connected through the No. 2 slide groove and the slider.
[0011] Preferably, the nozzles are in several groups and arranged in an array.
[0012] Preferably, a water inlet pipe is fixedly connected to the upper side of the water storage tank, a drain pipe is fixedly connected to the outside of the noise reduction chamber body, and the drain pipe is located at the lower side of the outer side wall of the noise reduction chamber body.
[0013] The technical solution of the utility model has at least the following beneficial effects:
[0014] The utility model provides a noise reduction bin for an electric melting furnace of zirconium corundum bricks, which can wrap up the electric melting furnace of zirconium corundum bricks to isolate noise, and when internal discharge is required, the bin body can be opened conveniently and automatically, and after the discharge is completed, the electric melting furnace of zirconium corundum bricks can be sprayed and cooled repeatedly for rapid cyclical cooling, so as to facilitate the next step of melting and casting. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 for Figure 1 A magnified view of middle;
[0017] Figure 3 for Figure 1 Enlarged view of middle B;
[0018] Figure 4 It is a second overall structural schematic diagram of the utility model;
[0019] Figure 5 This is a third overall structural schematic diagram of the utility model;
[0020] Figure 6 for Figure 5 Enlarged view of middle C;
[0021] Figure 7 for Figure 1 Enlarged view of middle D;
[0022] Figure 8 It is a front cross-sectional view of a local structure of the utility model;
[0023] Icons: 1. Noise reduction chamber body; 2. Fixed plate; 3. Movable plate; 4. Cavity; 5. Motor No. 1; 6. Screw No. 1; 7. Slide No. 1; 8. Connecting sleeve; 9. Gasket No. 1; 10. Gasket No. 2; 11. Motor No. 2; 12. Mounting plate; 13. Screw No. 2; 14. Sleeve; 15. Slide No. 2; 16. Slider; 17. Water distribution plate; 18. Nozzle; 19. Water storage tank; 20. Water inlet pipe; 21. Water pump; 22. Conduit; 23. Drain pipe; 24. Slide No. 3. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figure 1-8 The utility model proposes a noise reduction bin for an electric furnace of zirconium corundum bricks, comprising a noise reduction bin body 1 and a fixed plate 2. The noise reduction bin body 1 is made of sound insulation material as a whole. The fixed plate 2 is slidably connected to a movable plate 3 on the outside. A cavity 4 is provided on the outside of the noise reduction bin body 1, and the cavity 4 is located directly below the movable plate 3. A No. 1 motor 5 is fixedly connected to the outside of the noise reduction bin body 1. A No. 1 screw rod 6 is fixedly connected to one side of the No. 1 motor 5, and the No. 1 screw rod 6 is located inside the cavity 4. A No. 1 slide groove 7 is provided on the upper side of the cavity 4. A connecting sleeve 8 is threadedly connected to the outside of the No. 1 screw rod 6, and the connecting sleeve 8 is fixedly connected to the movable plate 3 and slidably connected to the No. 1 slide groove 7; the rear of the noise reduction bin body 1 The side is fixedly connected with a No. 2 motor 11, one side of the No. 2 motor 11 is fixedly connected with a No. 2 screw rod 13, and the No. 2 screw rod 13 is located inside the noise reduction bin main body 1, the external thread of the No. 2 screw rod 13 is connected with a sleeve 14, and the sleeve 14 and the noise reduction bin main body 1 are slidably connected, the outside of the sleeve 14 is fixedly connected with a water distribution plate 17, the outside of the water distribution plate 17 is equipped with a nozzle 18, the outside of the noise reduction bin main body 1 is fixedly connected with a water storage tank 19, the outside of the noise reduction bin main body 1 is provided with a No. 3 slide groove 24, the inside of the water storage tank 19 is equipped with a water pump 21, the outside of the water pump 21 is fixedly connected with a conduit 22, and the other end of the conduit 22 passes through the No. 3 slide groove 24 and is fixedly connected to the water distribution plate 17.
[0026] The fixed plate 2 and the movable plate 3 are slidably connected, the fixed plate 2 is fixed and immovable, and the noise reduction chamber body 1 can only be opened and closed by moving the movable plate 3.
[0027] A No. 1 sealing gasket 9 is fixedly connected to one side of the movable plate 3, and a No. 2 sealing gasket 10 is fixedly connected to one side of the noise reduction chamber body 1, and the No. 2 sealing gasket 10 is meshed with the No. 1 sealing gasket 9, so that the No. 2 sealing gasket 10 and the No. 1 sealing gasket 9 can be completely sealed.
[0028] The interior of the noise reduction chamber body 1 is fixedly connected with a mounting plate 12 , and the second screw rod 13 is rotationally connected to the mounting plate 12 , so that the mounting plate 12 can support the second screw rod 13 .
[0029] A No. 2 slide groove 15 is opened inside the noise reduction bin body 1, a slider 16 is fixedly connected to one side of the sliding sleeve 14, and the slider 16 is slidingly connected to the No. 2 slide groove 15, and the sliding sleeve 14 and the noise reduction bin body 1 are slidingly connected through the No. 2 slide groove 15 and the slider 16.
[0030] The number of the nozzles 18 is several groups and arranged in an array, and the nozzles 18 can spray the electric melting furnace as a whole.
[0031] A water inlet pipe 20 is fixedly connected to the upper side of the water storage tank 19, and water can be added to the water storage tank 19 through the water inlet pipe 20. A drain pipe 23 is fixedly connected to the outside of the noise reduction bin main body 1, and the drain pipe 23 is located on the lower side of the outer wall of the noise reduction bin main body 1. Water inside the noise reduction bin main body 1 can be discharged through the drain pipe 23.
[0032] The working principle of the noise reduction bin of an electric furnace of zirconium corundum bricks based on the embodiment is that when the noise reduction bin is used, the electric furnace of zirconium corundum bricks is installed in the noise reduction bin body 1, and then the No. 1 motor 5 drives the No. 1 screw rod 6 to rotate, and controls the connecting sleeve 8 to translate, thereby driving the movable plate 3 to translate until the No. 1 sealing gasket 9 is tightly fitted with the No. 2 sealing gasket 10. Since the bin body is made of sound insulation material as a whole, the intensity of the sound emitted will be greatly reduced when the bin body is closed, thereby protecting the hearing safety of the staff, and when the electric furnace needs to discharge materials, the No. 1 motor 5 can also be reversed to separate the No. 1 sealing gasket 9 from the No. 2 sealing gasket 10. It is convenient to open the entire warehouse body for discharging materials. At the same time, after the electric furnace is discharged, its external and internal temperatures are very high, and it takes a long time to wait before the next step of smelting and casting. At this time, the No. 2 motor 11 can be operated to rotate the No. 2 screw rod 13, and the sliding sleeve 14 can be controlled to slide horizontally, thereby driving the water distribution plate 17 to circulate and translate, and then the water pump 21 is operated to allow the water stored in the water tank 19 to flow to the water distribution plate 17 through the conduit 22, and then the surface of the electric furnace can be sprayed through the nozzle 18, thereby accelerating the speed at which the temperature of the inner and outer surfaces of the electric furnace decreases, greatly shortening the waiting time and improving production efficiency.
[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A noise reduction chamber for an electric furnace made of zirconium corundum bricks, characterized in that: The invention comprises a noise reduction chamber body (1) and a fixed plate (2), wherein the fixed plate (2) is slidably connected to a movable plate (3) on the outside, a cavity (4) is provided on the outside of the noise reduction chamber body (1), and the cavity (4) is located directly below the movable plate (3), a No. 1 motor (5) is fixedly connected to the outside of the noise reduction chamber body (1), a No. 1 screw rod (6) is fixedly connected to one side of the No. 1 motor (5), and the No. 1 screw rod (6) is located inside the cavity (4), a No. 1 slide groove (7) is provided on the upper side of the cavity (4), a connecting sleeve (8) is threadedly connected to the outside of the No. 1 screw rod (6), and the connecting sleeve (8) and the movable plate (3) are fixedly connected and slidably connected to the No. 1 slide groove (7); a No. 2 motor (11) is fixedly connected to the rear side of the noise reduction chamber body (1), and the No. 2 motor ( A second screw rod (13) is fixedly connected to one side of the noise reduction chamber (11), and the second screw rod (13) is located inside the noise reduction chamber main body (1); the second screw rod (13) is externally threadedly connected to a sleeve (14), and the sleeve (14) and the noise reduction chamber main body (1) are slidably connected; the outside of the sleeve (14) is fixedly connected to a water distribution plate (17), and a nozzle (18) is installed on the outside of the water distribution plate (17); the outside of the noise reduction chamber main body (1) is fixedly connected to a water storage tank (19); a third slide groove (24) is provided on the outside of the noise reduction chamber main body (1), and a water pump (21) is installed inside the water storage tank (19); the outside of the water pump (21) is fixedly connected to a conduit (22), and the other end of the conduit (22) passes through the third slide groove (24) and is fixedly connected to the water distribution plate (17).
2. The noise reduction chamber of an electric furnace of zirconium corundum bricks according to claim 1 is characterized in that: The fixed plate (2) and the movable plate (3) are slidably connected.
3. The noise reduction chamber of an electric furnace of zirconium corundum bricks according to claim 1 is characterized in that: A first sealing gasket (9) is fixedly connected to one side of the movable plate (3), and a second sealing gasket (10) is fixedly connected to one side of the noise reduction chamber body (1), and the second sealing gasket (10) is meshed with the first sealing gasket (9).
4. The noise reduction chamber of an electric furnace of zirconium corundum bricks according to claim 1 is characterized in that: A mounting plate (12) is fixedly connected inside the noise reduction chamber body (1), and a second screw rod (13) is rotatably connected to the mounting plate (12).
5. The noise reduction chamber of an electric melting furnace of zirconium corundum bricks according to claim 1 is characterized in that: A second slide groove (15) is provided inside the noise reduction bin body (1), a slider (16) is fixedly connected to one side of the sliding sleeve (14), and the slider (16) and the second slide groove (15) are slidably connected, and the sliding sleeve (14) and the noise reduction bin body (1) are slidably connected via the second slide groove (15) and the slider (16).
6. The noise reduction chamber of an electric melting furnace of zirconium corundum bricks according to claim 1 is characterized in that: The number of the nozzles (18) is several groups and they are arranged in an array.
7. The noise reduction chamber of an electric melting furnace of zirconium corundum bricks according to claim 1 is characterized in that: The upper side of the water storage tank (19) is fixedly connected to a water inlet pipe (20), the outside of the noise reduction chamber body (1) is fixedly connected to a drainage pipe (23), and the drainage pipe (23) is located at the lower side of the outer side wall of the noise reduction chamber body (1).
