Electrostatic discharge test equipment

By using a combination of pneumatic movement and discharge mechanisms in electrostatic discharge testing equipment, automated testing is achieved, which solves the problems of insufficient testing accuracy and safety in the existing technology and improves the safety and accuracy of electrostatic discharge testing.

CN221883795UActive Publication Date: 2024-10-22ZHEJIANG LEAPMOTOR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420377689.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-10-22
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Existing electrostatic discharge testing equipment has deficiencies in test accuracy and safety, especially in high-level transient electromagnetic radiation environments where it is difficult to effectively improve test accuracy and safety.

Method used

An electrostatic discharge testing equipment is designed, which uses a combination of pneumatic moving mechanism and discharge mechanism. It automatically controls the stun gun to discharge the tested parts through the pneumatic triggering mechanism, realizing automated testing of multiple tested parts, reducing manual intervention and improving Test safety and improve test accuracy with pneumatic movement mechanism.

Benefits of technology

It effectively improves the safety and accuracy of electrostatic discharge testing, reduces the risks for experimenters, improves testing accuracy, and can test multiple tested parts without excessive manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221883795U_ABST
    Figure CN221883795U_ABST
Patent Text Reader

Abstract

The utility model provides electrostatic discharge test equipment. The electrostatic discharge test equipment comprises a pneumatic moving mechanism and a discharge mechanism, the discharging mechanism is arranged on the pneumatic moving mechanism, the pneumatic moving mechanism is used for driving the discharging mechanism to move to the corresponding tested piece, and the discharging mechanism is used for discharging the corresponding tested piece. Through the mode, the test accuracy and safety of the electrostatic discharge test can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of vehicle electrostatic discharge testing, and in particular to an electrostatic discharge testing device. Background Art

[0002] Electrostatic discharge (ESD) testing is a test method used to evaluate and verify the resistance of electronic equipment to electrostatic discharge events. Electronic equipment may face electrostatic discharge risks during manufacturing, transportation, installation and use. ESD testing is designed to simulate these risks to ensure that the equipment can be less affected by electrostatic discharge in real environments. The usual test standard is IEC61000-4-2. Due to the high level of electrostatic discharge testing, there will be strong transient electromagnetic radiation, so how to effectively improve the test accuracy and safety of electrostatic discharge testing is an urgent problem that needs to be solved. Utility Model Content

[0003] The present application provides an electrostatic discharge testing device for improving the test accuracy and safety of electrostatic discharge testing.

[0004] In order to solve the above technical problems, the technical solution adopted in this application is: this application provides an electrostatic discharge testing device, which includes: a pneumatic moving mechanism and a discharge mechanism; the discharge mechanism is arranged on the pneumatic moving mechanism, the pneumatic moving mechanism is used to drive the discharge mechanism to move to the corresponding device under test, and the discharge mechanism is used to discharge the corresponding device under test.

[0005] In some embodiments, the discharge mechanism includes: an electric shock gun and a pneumatic trigger mechanism. The electric shock gun is arranged on the pneumatic moving mechanism; the pneumatic trigger mechanism is arranged on the pneumatic moving mechanism, wherein the trigger mechanism is used to trigger the electric shock gun to work.

[0006] In some embodiments, the pneumatic trigger mechanism includes: a first air pump, a first cylinder assembly and a first switch valve; the first cylinder assembly is connected to the first air pump, and the first cylinder assembly is provided with an abutment portion, which abuts against the trigger member of the stun gun; the first switch valve is connected to the first air pump, and is used to selectively control the operation of the first air pump, so that the first air pump drives the first cylinder assembly to trigger the stun gun to operate.

[0007] In some embodiments, the pneumatic moving mechanism includes: a second air pump, a second cylinder assembly, a fixed assembly and a second switching valve; the second cylinder assembly is connected to the second air pump, and the second cylinder assembly is provided with a moving part that can move relative to the test piece along the detection direction; the fixed assembly is arranged on the moving part, and the discharge mechanism is arranged on the fixed assembly; the second switching valve is connected to the second air pump, and is used to selectively control the operation of the second air pump so that the second air pump drives the moving part to drive the fixed assembly to move along the detection direction.

[0008] In some embodiments, the fixing assembly includes: a bracket assembly detachably connected to the moving part; and a clamping member disposed on the bracket assembly, the clamping member being used to fix the discharge mechanism to the bracket assembly.

[0009] In some embodiments, the electrostatic discharge testing equipment further includes: a processing circuit, which is respectively connected to the pneumatic moving mechanism and the discharge mechanism, the processing circuit is used to control the pneumatic moving mechanism to drive the discharge mechanism to move to the corresponding device under test along the detection direction, and control the discharge mechanism to discharge the corresponding device under test.

[0010] In some embodiments, a processing circuit controls a discharge mechanism to discharge the same device under test for a preset number of times, and the preset number of discharges includes at least a first discharge and a second discharge. The processing circuit includes: a trigger circuit, which is used to generate a trigger signal in response to a trigger operation; a control circuit, which is connected to the discharge mechanism, and the trigger circuit controls the discharge mechanism to perform a first discharge on the current device under test based on the trigger signal, and the discharge mechanism generates a discharge end signal in response to the end of the discharge; a first timing circuit, which is connected to the control circuit and the trigger circuit, wherein the first timing circuit performs a first timing based on the discharge end signal, generates a first timing signal in response to the end of the first timing, and the control circuit controls the discharge mechanism to perform a second discharge on the device under test based on the first timing signal.

[0011] In some embodiments, the control circuit is connected to the pneumatic moving mechanism, and the processing circuit also includes: a second timing circuit, connected to the control circuit and the trigger circuit; wherein the second timing circuit performs a second timing based on a discharge end signal, generates a second timing signal in response to the end of the second timing, and the control circuit controls the pneumatic moving mechanism based on the second timing signal to drive the discharge mechanism to move to another piece of test that is adjacent to the current piece of test; wherein the second timing is equal to the first timing multiplied by a preset number of discharges.

[0012] In some embodiments, the processing circuit also includes: a third timing circuit, connected to the control circuit and the trigger circuit; wherein the third timing circuit performs a third timing based on a discharge end signal, generates a third timing signal in response to the end of the third timing, and the control circuit controls the discharge mechanism to discharge another device under test based on the third timing signal; wherein the third timing is equal to the sum of the second timing and the movement time of the discharge mechanism to move to another device under test.

[0013] In some embodiments, the electrostatic discharge testing device further includes: a static elimination component connected to the processing circuit, wherein the processing circuit is configured to control the static elimination component to eliminate static electricity from the device under test in response to the discharge mechanism completing discharge of the device under test.

[0014] The beneficial effect of the embodiment of the present application is that the electrostatic discharge test equipment of the present application includes a discharge mechanism and a pneumatic moving mechanism. Among them, the discharge mechanism is arranged on the pneumatic moving mechanism, and the pneumatic moving mechanism drives the discharge mechanism to move to the corresponding test piece. For example, multiple test pieces are arranged at intervals along a preset direction. After the pneumatic moving mechanism moves the discharge mechanism to the corresponding test piece and completes the discharge, it further drives the discharge mechanism to the location of the next test piece. Based on this, the electrostatic discharge test equipment can realize the electrostatic discharge test of multiple test pieces without excessive manual intervention, prevent the electrostatic discharge test process from causing damage to the experimenter, and effectively improve the safety of the electrostatic discharge test. In addition, by driving the discharge mechanism to move by the pneumatic moving mechanism, compared with manual or other types of motion mechanisms, such as chain drive, gear drive and other motion mechanisms, the relative position accuracy between the discharge mechanism and the test piece can be effectively improved, thereby effectively improving the accuracy of the electrostatic discharge test. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the working state structure of an embodiment of an electrostatic discharge test device of the present application;

[0016] Figure 2 yes Figure 1 A schematic diagram of the structure of the electrostatic discharge test equipment;

[0017] Figure 3 yes Figure 1 Schematic diagram of the circuit structure of the processing circuit of the electrostatic discharge test equipment. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0019] The terms "first" and "second" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically limited. In addition, the terms "including" and "having" and any of their variations are intended to cover exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.

[0020] The present application provides an electrostatic discharge testing device 10, such as Figure 1 As shown, the electrostatic discharge test device 10 is applied to electrostatic discharge testing, for example, a discharge island test in automotive electronic electrostatic discharge testing, wherein the device under test 300, such as a wiring harness of the device under test, is placed on a coupling belt, and static electricity is applied to three discharge islands on the coupling belt to simulate the interference of the actual vehicle wiring harness.

[0021] Among them, Figure 1 As shown, the electrostatic discharge testing device 10 includes: a pneumatic moving mechanism 100 and a discharge mechanism 200; the discharge mechanism 200 is arranged on the pneumatic moving mechanism 100, the pneumatic moving mechanism 100 is used to drive the discharge mechanism 200 to move to the corresponding device under test 300, and the discharge mechanism 200 is used to discharge the corresponding device under test 300.

[0022] Specifically, the discharge mechanism 200 is a mechanism for emitting static electricity, and is used to discharge to the DUT 300 located at the corresponding discharge conductor, so as to perform an electrostatic discharge test on the DUT 300. The pneumatic moving mechanism 100 is a motion mechanism driven by pneumatic means, for example, the driven member is driven to move along a preset direction by pneumatic means such as a cylinder. Among them, the discharge mechanism 200 is arranged on the pneumatic moving mechanism 100, and the pneumatic moving mechanism 100 drives the discharge mechanism 200 to move to the corresponding DUT 300. For example, a plurality of DUTs 300 are arranged at intervals along a preset direction. After the pneumatic moving mechanism 100 moves the discharge mechanism 200 to the corresponding DUT 300 and completes the discharge, the discharge mechanism 200 is further driven to the location of the next DUT 300. Based on this, the electrostatic discharge test equipment 10 can realize the electrostatic discharge test of multiple DUTs 300 without excessive manual intervention, prevent the electrostatic discharge test process from causing damage to the experimenter, and effectively improve the safety of the electrostatic discharge test.

[0023] Furthermore, the pneumatic moving mechanism 100 drives the discharge mechanism 200 to move, which can effectively improve the relative position accuracy between the discharge mechanism 200 and the test piece 300 compared to manual or other types of motion mechanisms, such as chain drive, gear drive and other motion mechanisms, thereby effectively improving the accuracy of the electrostatic discharge test.

[0024] Optionally, in some embodiments, the discharge mechanism 200 includes: an electric shock gun 220 and a pneumatic trigger mechanism 210. The electric shock gun 220 is disposed on the pneumatic moving mechanism 100; the pneumatic trigger mechanism 210 is disposed on the pneumatic moving mechanism 100, wherein the trigger mechanism is used to trigger the electric shock gun 220 to work.

[0025] Specifically, the stun gun 220 is a mechanism for emitting static electricity, wherein the pneumatic trigger mechanism 210 is used to trigger the stun gun 220 to operate. For example, when the pneumatic moving mechanism 100 moves the electric gun to the corresponding device under test 300, the pneumatic trigger mechanism 210 is started to trigger the electric gun to emit static electricity to the device under test 300. Based on this, the electrostatic discharge test equipment 10 can automatically discharge to the device under test 300 through the pneumatic trigger mechanism 210, thereby eliminating the need for manual operation, thereby effectively improving the safety of the electrostatic discharge test equipment 10.

[0026] Alternatively, if Figure 2 As shown, in some embodiments, the pneumatic trigger mechanism 210 includes: a first air pump (not shown), a first cylinder assembly (not shown) and a first switch valve (not shown); the first cylinder assembly is connected to the first air pump, and the first cylinder assembly is provided with an abutment portion 211, and the abutment portion 211 abuts against the trigger member 221 of the stun gun 220; the first switch valve is connected to the first air pump, and is used to selectively control the operation of the first air pump, so that the first air pump drives the first cylinder assembly to trigger the stun gun 220 to work.

[0027] Specifically, the first cylinder assembly includes a cylinder and a piston rod assembly, wherein the abutment portion 211 is arranged at one end of the piston rod assembly away from the cylinder, and the first air pump is connected to the cylinder through the first switch valve, and the cylinder is connected or disconnected with the first air pump by controlling the opening or closing of the first switch valve, so that the piston rod assembly moves relative to the cylinder, so that the abutment portion 211 abuts against the trigger member 221, triggering the electric gun to work. Among them, the pneumatic trigger mechanism 210 is set as a pneumatic structure in the above manner, based on which the interference of the electric shock gun 220 on the pneumatic trigger mechanism 210 when emitting static electricity can be effectively reduced, thereby effectively improving the stability of the pneumatic trigger mechanism 210. Optionally, in some embodiments, the second switch valve can be any one of controllable switch valves such as a solenoid valve and a manual switch valve.

[0028] Alternatively, if Figure 2 As shown, in some embodiments, the pneumatic moving mechanism 100 includes: a second air pump (not shown), a second cylinder assembly 110, a fixed assembly 120 and a second switch valve (not shown); the second cylinder assembly 110 is connected to the second air pump, and the second cylinder assembly 110 is provided with a moving portion (not shown) that can move relative to the test piece 300 along the detection direction x1; the fixed assembly 120 is arranged on the moving portion, and the discharge mechanism 200 is arranged on the fixed assembly; the second switch valve is connected to the second air pump, and is used to selectively control the operation of the second air pump so that the second air pump drives the moving portion to drive the fixed assembly 120 to move along the detection direction x1.

[0029] Specifically, the detection direction x1 is the arrangement direction of the test pieces 300 arranged at intervals, which is also referred to as the preset direction in the above content of this article. The second cylinder assembly 110 is a mechanical rodless cylinder, wherein the fixed assembly 120 is arranged on the moving part, and the second air pump is connected to the second cylinder assembly 110 through the second switch valve. By controlling the opening or closing of the second switch valve, the second air pump is connected or disconnected with the second cylinder assembly 110, so that the moving part drives the fixed assembly 120 and the discharge mechanism 200 arranged on the fixed assembly 120 to move along the detection direction x1.

[0030] Alternatively, if Figure 2 As shown, in some embodiments, the fixing assembly 120 includes: a bracket assembly 121 and a clamp 122; the bracket assembly 121 is detachably connected to the moving part; the clamp 122 is disposed on the bracket assembly 121, and the clamp 122 is used to fix the discharge mechanism 200 to the bracket assembly 121.

[0031] Specifically, the bracket assembly 121 is a component for supporting the discharge mechanism 200 on the moving part, and its structure can be set according to actual conditions, for example, it can be composed of two mutually perpendicular rods, etc. Among them, the bracket assembly 121 is a replaceable component, which is detachably connected to the moving part. Based on this, in different application scenarios, the applicability of the electrostatic discharge test device 10 can be effectively improved by replacing the corresponding bracket assembly 121.

[0032] Furthermore, the discharge mechanism 200 is fixed to the support assembly 121 by a clamping member 122. In some embodiments, the clamping member 122 includes a fixing claw 123 and a connecting plate 124, wherein the fixing claw 123 is configured to detachably fix the stun gun 220 to the support assembly, for example, the fixing claw 123 is fixedly connected to the support assembly 121, and fixes the stun gun 220 to the support assembly 121 in a clamping manner, and when disassembly is required, the fixing claw 123 can be loosened to allow the stun gun 220 to be disassembled. The pneumatic trigger mechanism 210 is fixed to the bracket assembly 121 through the connecting plate 124. The connecting plate 124 can provide a good fixing effect for the pneumatic trigger mechanism 210, and at the same time, enable the abutment portion 211 of the pneumatic trigger mechanism 210 to accurately abut against the trigger member 221. For example, the connecting plate 124 includes a first connecting end and a second connecting end, wherein the first connecting end is fixedly connected to the bracket assembly 121, and the second connecting end is used to fix the pneumatic trigger mechanism 210, wherein the relative position relationship between the pneumatic trigger mechanism 210 and the electric shock gun 220 can be adjusted by adjusting the relative position relationship between the first connecting end and the second connecting end, so that the abutment portion 211 can accurately abut against the trigger member 221.

[0033] Alternatively, if Figure 3As shown, in some embodiments, the electrostatic discharge testing equipment 10 also includes: a processing circuit 20, which is respectively connected to the pneumatic moving mechanism 100 and the discharge mechanism 200, and the processing circuit 20 is used to control the pneumatic moving mechanism 100 to drive the discharge mechanism 200 to move to the corresponding device under test 300 along the detection direction x1, and control the discharge mechanism 200 to discharge the corresponding device under test 300.

[0034] Specifically, the processing circuit 20 can be a circuit integrated component such as a processing chip with certain computing power. The pneumatic moving mechanism 100 and the discharge mechanism 200 are respectively connected to the processing circuit 20, and under the control of the processing circuit 20, the electrostatic discharge test is performed on multiple test pieces 300. Based on this, the electrostatic discharge test equipment 10 can automatically perform an electrostatic discharge test on the test piece 300, thereby effectively improving the safety of the electrostatic discharge test equipment 10.

[0035] Among them, the way in which the electrostatic discharge test equipment 10 automatically performs electrostatic discharge tests on multiple test pieces 300 can be set according to actual conditions. For example, in some embodiments, in one test, each test piece 300 needs to be subjected to an electrostatic discharge test of a preset number of discharges, such as two times, five times, twenty times, etc., and the time interval between two adjacent electrostatic discharge tests is five seconds (in other embodiments, according to the actual test situation, the time interval can also be set to other times, such as 10 seconds, etc.), based on which the electrostatic discharge test equipment 10 automatically performs an electrostatic discharge test on the same test piece 300 at a time interval of five seconds. For example, the preset number of discharges is at least two, which are the first discharge and the second discharge, respectively, and the processing circuit 20 controls the discharge mechanism 200 to perform the first discharge on the test piece 300, and after an interval of five seconds, performs the second discharge on the test piece 300. Further, after the electrostatic discharge test device 10 completes the electrostatic discharge test of the preset number of discharges on the DUT 300, the processing circuit 20 further controls the pneumatic moving mechanism 100 so that the pneumatic moving mechanism 100 moves the discharge mechanism 200 to the next DUT 300. Further, after the pneumatic moving mechanism 100 moves the discharge mechanism 200 to the next DUT 300, the processing circuit 20 further controls the discharge mechanism 200 to perform an electrostatic discharge test on the DUT 300. For example, in some embodiments, the time for the pneumatic moving mechanism 100 to move from the previous DUT 300 to the next DUT 300 along the detection direction x1 is 10 seconds. The processing circuit 20 starts to control the pneumatic mechanism to drive the discharge mechanism 200, and after an interval of 10 seconds, controls the discharge mechanism 200 to start performing an electrostatic discharge test on the DUT 300.

[0036] Alternatively, if Figure 3As shown, in some embodiments, the processing circuit 20 includes a trigger circuit 21, a control circuit 22, a first timing circuit 23, a second timing circuit 24, and a third timing circuit 25. The trigger circuit 21 is connected to the control circuit 22, and the control circuit 22 is connected to the discharge mechanism 200, the pneumatic moving mechanism 100, the first timing circuit 23, the second timing circuit 24, and the third timing circuit 25, respectively.

[0037] Specifically, the trigger circuit 21 includes a button circuit, a display touch circuit and other circuits. After the user completes the preparation for the electrostatic discharge test, for example, fixes the stun gun 220 on the bracket assembly 121, and fixes the pneumatic trigger mechanism 210 on the bracket assembly 121, etc., the user operates the trigger circuit 21 through trigger operations such as pressing or clicking. The trigger circuit 21 generates a corresponding trigger signal based on the trigger operation and sends it to the control circuit 22. The control circuit 22 starts to control the discharge mechanism 200 to discharge for a preset number of times. The preset number of discharges for the same test piece 300 can be set according to actual conditions, for example, set to two times, twenty times, etc.

[0038] The first timing circuit 23 is used to time the time interval of the electrostatic discharge test of the same device under test 300, and generate a timing signal after the timing is completed, and send it to the control circuit 22, and the control circuit 22 controls the discharge mechanism 200 to perform the next electrostatic discharge test on the device under test 300 based on the timing signal. For example, the preset number of discharges as described above includes two times, wherein the control circuit 22 controls the discharge mechanism 200 to perform the first discharge on the device under test 300 in response to the trigger signal, and generates a discharge end signal after the first discharge is completed. Further, the first timing circuit 23 performs a first timing based on a discharge end signal, wherein the first timing is the time interval between two adjacent electrostatic discharge tests of the device under test 300, and the first timing circuit 23 generates a first timing signal after the first timing is completed, and the control circuit 22 controls the discharge mechanism 200 to further discharge the device under test 300 for the second time based on the first timing signal. In some embodiments, the preset number of discharges also includes 20 times, wherein the control circuit 22 controls the discharge mechanism 200 to discharge the same device under test 300, which can be referred to the above content, and will not be described in detail here.

[0039] The second timing circuit 24 is used to time the electrostatic discharge test time of the device under test 300, that is, to perform the second timing, wherein the second timing circuit 24 performs timing based on a discharge end signal, that is, the second timing is the first timing multiplied by the interval number of preset discharge times, for example, if the preset discharge number is n, then the interval number of preset discharge times is n-1, and for another example, if the preset discharge number is 20, then the interval number of preset discharge times is 19. Further, the second timing circuit 24 generates a second timing signal after the second timing ends, and the control circuit 22 controls the pneumatic moving mechanism 100 to drive the discharge mechanism 200 to move to another device under test 300 that is arranged adjacent to the current device under test 300 based on the second timing signal.

[0040] The third timing circuit 25 is used to perform a third timing, wherein the third timing circuit 25 performs a third timing based on a discharge end signal, that is, the third timing is the sum of the second timing and the movement time of the discharge mechanism 200 from the current device under test 300 to another device under test 300. For example, the preset number of discharges is 20 times, the first timing is 5 seconds, and the second timing signal is 95 seconds, then the third timing is 105 seconds. For example, the control circuit 22 is connected to the second switch valve, and the control circuit 22 controls the second switch valve to connect to the second air pump and the second cylinder assembly 110 based on the second timing signal.

[0041] Optionally, in some embodiments, the electrostatic discharge testing equipment 10 further includes: a static elimination component 400, which is connected to the processing circuit 20, and the processing circuit 20 is used to control the static elimination component 400 to remove static electricity from the test piece 300 in response to the discharge mechanism 200 completing the discharge of the test piece 300. Based on this, the safety and automation performance of the electrostatic discharge testing equipment 10 can be effectively improved.

[0042] For example, in some embodiments, the electrostatic discharge testing device 10 tests three DUTs 300 , wherein the three DUTs 300 are spaced apart along the testing direction x1 at a preset spacing distance.

[0043] After the user completes the preparation for the electrostatic discharge test, for example, fixing the stun gun 220 on the bracket assembly 121, and fixing the pneumatic trigger mechanism 210 on the bracket assembly 121, etc., the user operates the trigger circuit 21 by pressing or clicking, etc. The trigger circuit 21 generates a corresponding trigger signal based on the trigger operation, and sends it to the control circuit 22. The control circuit 22 starts to control the discharge mechanism 200 to perform the first discharge on the first device under test 300, and generates a discharge end signal after the first discharge ends. Further, the first timing circuit 23, the second timing circuit 24, and the third timing circuit 25 start the first timing based on the discharge end signal (wherein the discharge end signal is the discharge end signal generated when the first device under test 300 ends the first discharge).

[0044] The control circuit 22 generates a discharge end signal after each discharge of the discharge mechanism 200 is completed. The first timing circuit 23 repeatedly performs the first timing based on the discharge end signal before the second timing is completed, so that the control circuit 22 controls the discharge mechanism 200 to discharge the first device under test 300 for a preset number of times based on the above method. When the first second timing is completed, the first timing circuit 23 stops timing, and the control circuit 22 controls the pneumatic moving mechanism 100 to drive the discharge mechanism 200 to move to the second device under test 300 (wherein the second device under test 300 is a device under test 300 adjacent to and spaced from the first device under test 300) based on the first second timing signal. After the first third timing is completed, the control circuit 22 controls the pneumatic moving mechanism 100 to stop working based on the third timing signal, and controls the discharge mechanism 200 to perform the first discharge on the second device under test 300, and generates a discharge end signal after the first discharge is completed. Further, the first timing circuit 23, the second timing circuit 24, and the third timing circuit 25 respectively start the second timing based on the discharge end signal generated after the first discharge is completed on the second device under test 300. The control circuit 22 further controls the discharge mechanism 200 to discharge the second device under test 300 for a preset number of discharges according to the above method.

[0045] Further, when the second timing of the second time is over, the first timing circuit 23 stops timing, and the control circuit 22 controls the pneumatic moving mechanism 100 to drive the discharge mechanism 200 to move to the third device under test 300 (wherein the third device under test 300 is a device under test 300 adjacent to and spaced from the second device under test 300) based on the second second timing signal. After the third timing of the second time is over, the control circuit 22 controls the pneumatic moving mechanism 100 to stop working based on the second third timing signal, and controls the discharge mechanism 200 to perform the first discharge on the third device under test 300, and generates a discharge end signal after the first discharge is completed. Further, the first timing circuit 23, the second timing circuit 24, and the third timing circuit 25 respectively start the third timing based on the discharge end signal generated after the first discharge of the third device under test 300 is completed. The control circuit 22 further controls the discharge mechanism 200 to discharge the third device under test 300 for a preset number of times according to the above method.

[0046] Further, when the third second timing is over, the first timing circuit 23 stops timing, and the control circuit 22 controls the pneumatic moving mechanism 100 to drive the discharge mechanism 200 to move to the first device under test 300 based on the third second timing signal, that is, to reset the discharge mechanism 200, so as to facilitate the next electrostatic discharge test. Among them, the third third timing is the sum of the second timing and the movement time of the discharge mechanism 200 from the last device under test 300 to the first device under test 300. For example, in this embodiment, the last device under test 300 is the third device under test 300, and the third third timing should be the sum of the movement time of the discharge mechanism 200 from the third device under test 300 to the first device under test 300 and the second timing. When the third third timing is over, the control circuit 22 controls the pneumatic moving mechanism 100 to stop working based on the third third timing signal.

[0047] In summary, the electrostatic discharge test device 10 of the present application includes: a pneumatic moving mechanism 100 and a discharge mechanism 200; the discharge mechanism 200 is arranged on the pneumatic moving mechanism 100, and the pneumatic moving mechanism 100 is used to drive the discharge mechanism 200 to move to the corresponding device under test 300, and the discharge mechanism 200 is used to discharge the corresponding device under test 300. In the above manner, the discharge mechanism 200 is arranged on the pneumatic moving mechanism 100, and the pneumatic moving mechanism 100 drives the discharge mechanism 200 to move to the corresponding device under test 300. For example, a plurality of devices under test 300 are arranged at intervals along a preset direction, and the pneumatic moving mechanism 100 moves the discharge mechanism 200 to the corresponding device under test 300 and completes the discharge, and then further drives the discharge mechanism 200 to the location of the next device under test 300. Based on this, the electrostatic discharge test device 10 can realize the electrostatic discharge test of multiple devices under test 300 without excessive manual intervention, prevent the electrostatic discharge test process from causing damage to the experimenter, and effectively improve the safety of the electrostatic discharge test.

[0048] Furthermore, the pneumatic moving mechanism 100 drives the discharge mechanism 200 to move, which can effectively improve the relative position accuracy between the discharge mechanism 200 and the test piece 300 compared to manual or other types of motion mechanisms, such as chain drive, gear drive and other motion mechanisms, thereby effectively improving the accuracy of the electrostatic discharge test.

[0049] It is worth noting that the drawings in this article are only intended to illustrate the structural relationship and connection relationship of the utility model product of the present application, and do not limit the specific structural dimensions of the utility model product of the present application.

[0050] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of the present utility model, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present utility model.

Claims

1. An electrostatic discharge test device, characterized in that: include: Pneumatic moving mechanism; The discharge mechanism is arranged on the pneumatic moving mechanism, and the pneumatic moving mechanism is used to drive the discharge mechanism to move to the corresponding device under test, and the discharge mechanism is used to discharge the corresponding device under test.

2. The electrostatic discharge testing device according to claim 1, characterized in that: The discharge mechanism comprises: An electric shock gun, arranged on the pneumatic moving mechanism; A pneumatic trigger mechanism is arranged on the pneumatic moving mechanism, wherein the trigger mechanism is used to trigger the electric shock gun to work.

3. The electrostatic discharge testing device according to claim 2, characterized in that: The pneumatic trigger mechanism comprises: First air pump; A first cylinder assembly connected to the first air pump, wherein the first cylinder assembly is provided with an abutment portion, and the abutment portion abuts against a trigger member of the stun gun; The first switch valve is connected to the first air pump and is used to selectively control the operation of the first air pump so that the first air pump drives the first cylinder assembly to trigger the electric shock gun to operate.

4. The electrostatic discharge testing device according to claim 1, characterized in that: The pneumatic moving mechanism comprises: Second air pump; A second cylinder assembly connected to the second air pump, wherein the second cylinder assembly is provided with a moving part that can move relative to the tested object along a testing direction; A fixed component is arranged on the moving part, and the discharge mechanism is arranged on the fixed component; The second switch valve is connected to the second air pump and is used to selectively control the operation of the second air pump so that the second air pump drives the moving part to drive the fixed component to move along the detection direction.

5. The electrostatic discharge testing device according to claim 4, characterized in that: The fixing assembly comprises: A bracket assembly, detachably connected to the moving part; A clamping member is arranged on the bracket assembly, and the clamping member is used to fix the discharge mechanism to the bracket assembly.

6. The electrostatic discharge testing device according to any one of claims 1 to 5, characterized in that: The electrostatic discharge testing equipment further comprises: The processing circuit is connected to the pneumatic moving mechanism and the discharge mechanism respectively, and is used to control the pneumatic moving mechanism to drive the discharge mechanism to move to the corresponding device under test along the detection direction, and control the discharge mechanism to discharge the corresponding device under test.

7. The electrostatic discharge testing device according to claim 6, characterized in that: The processing circuit controls the discharge mechanism to discharge the same device under test for a preset number of discharges, wherein the preset number of discharges at least includes a first discharge and a second discharge, and the processing circuit includes: A trigger circuit, for generating a trigger signal in response to a trigger operation; A control circuit connected to the discharge mechanism, wherein the trigger circuit controls the discharge mechanism to perform the first discharge on the current device under test based on the trigger signal, and the discharge mechanism generates a discharge end signal in response to the end of the discharge; A first timing circuit is connected to the control circuit, wherein the first timing circuit performs a first timing based on the first discharge end signal, generates a first timing signal in response to the first timing end, and the control circuit controls the discharge mechanism to perform the second discharge on the device under test based on the first timing signal.

8. The electrostatic discharge testing device according to claim 7, characterized in that: The control circuit is connected to the pneumatic moving mechanism, and the processing circuit further includes: A second timing circuit connected to the control circuit; Wherein, the second timing circuit performs a second timing based on the first discharge end signal, generates a second timing signal in response to the end of the second timing, and the control circuit controls the pneumatic moving mechanism to drive the discharge mechanism to move to another device under test that is adjacent to the current device under test based on the second timing signal; wherein, the second timing is equal to the first timing multiplied by the number of intervals of the preset discharge times.

9. The electrostatic discharge testing device according to claim 8, characterized in that: The processing circuit further comprises: A third timing circuit connected to the control circuit; Wherein, the third timing circuit performs a third timing based on the first discharge end signal, generates a third timing signal in response to the end of the third timing, and the control circuit controls the discharge mechanism to discharge the other device under test based on the third timing signal; wherein, the third timing is equal to the sum of the second timing and the movement time of the discharge mechanism to the other device under test.

10. The electrostatic discharge testing device according to claim 6, characterized in that: The electrostatic discharge testing equipment further comprises: The static elimination component is connected to the processing circuit, and the processing circuit is used to control the static elimination component to eliminate static electricity of the device under test in response to the discharge mechanism completing the discharge of the device under test.