Instrument gas flow control device
By designing instrument gas flow control devices suitable for different types of gas detectors, the problems of single applicability and complex installation of existing equipment are solved, high-accuracy verification and calibration of multiple instruments is achieved, and the installation process is simplified.
Patent Information
- Application Number
- CN202420566676.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-22
AI Technical Summary
Existing gas detector verification and calibration equipment has a relatively single applicability and is usually only suitable for a single type of gas detector or a specific environment. The installation is cumbersome, has many parts, and is easily damaged, resulting in reduced verification and calibration accuracy.
An instrument gas flow control device is designed, including a loading component and a flow measurement component. By setting up connecting pipes and switching valves in the device, it can be applied to different types of gas detectors and realize diffusion, positive pressure and pump suction. Verification and calibration of type instruments, simplifying the installation process and improving applicability.
It realizes the verification and calibration of various types of gas detectors, improves the applicability and accuracy of the equipment, reduces the installation complexity and the risk of parts damage, and ensures the accuracy of the measurement results.
Smart Images

Figure CN221884176U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas detection instrument measurement and calibration equipment, in particular to an instrument gas flow control device. Background Art
[0002] Gas detection instruments are instruments that analyze and measure gas concentration components or detect dangerous gas leaks and alarms. There are many types of gas detection instruments, a large number of them, and they are widely used. They are important and indispensable. According to the sampling method, they can be divided into diffusion instruments, pump suction instruments, and positive pressure instruments. The measurement performance of different gas detectors needs to be verified or calibrated at intervals. In other words, gas detectors need to be adjusted and calibrated according to the measurement standards to ensure their performance and measurement accuracy.
[0003] When calibrating a gas detector according to metrological regulations, precise control of the gas flow entering the detector is crucial to the accuracy of the final measurement results. Inaccurate flow control will produce a measurement error of up to 20%, resulting in the inability to compare and correctly trace the value of the gas detector, which will seriously affect its use and even have a counterproductive effect.
[0004] The applicability of existing gas detector verification and calibration equipment is relatively single, usually only applicable to a single type of gas detector, or only applicable to laboratory interior or outdoor environments. In addition, when installing the verification and calibration equipment, there are many parts, the installation is cumbersome, and it is easy to damage, thereby reducing the accuracy of verification and calibration. Utility Model Content
[0005] In view of this, an embodiment of the utility model provides an instrument gas flow control device, the main purpose of which is to provide an instrument gas flow control device that can be applied to various types of gas detectors.
[0006] In order to achieve the above purpose, the utility model mainly provides the following technical solutions:
[0007] The utility model provides an instrument gas flow control device, which includes:
[0008] A loading component, the loading component comprising a box body and a cover body, the cover body being detachably connected to the front side of the box body;
[0009] A flow metering component, the flow metering component includes a first metering component, a second metering component, a first intake pipe, a second intake pipe, a first switch valve, a second switch valve and a connecting pipe, the first metering component is connected to the first intake pipe, the second metering component is connected to the second intake pipe, both ends of the connecting pipe are respectively connected to the first intake pipe and the second intake pipe, the first switch valve is arranged on the connecting pipe, and the second switch valve is arranged on the second intake pipe.
[0010] Furthermore, the first metering component includes a first flow meter, a first air inlet interface and a first exhaust interface, the first air inlet interface and the first exhaust interface are arranged on one side of the box, the first air inlet pipe is arranged between the first flow meter and the first air inlet interface, and the first exhaust pipe is arranged between the first flow meter and the first exhaust interface.
[0011] Furthermore, the second metering component includes a second flow meter, a second air inlet interface and a second exhaust interface, the second air inlet interface and the second exhaust interface are arranged on the other side of the box, the second air inlet pipe is arranged between the second flow meter and the second air inlet interface, and the second exhaust pipe is arranged between the second flow meter and the second exhaust interface.
[0012] Furthermore, the first switch valve includes a first valve body and a first knob, the second switch valve includes a second valve body and a second knob, the first knob is connected to the first valve body, and the second knob is connected to the second valve body.
[0013] Furthermore, the upper side and the lower side of the cover body have arc grooves.
[0014] Furthermore, a fixing bolt is arranged on the front side of the cover body, and a fixing hole is arranged on the back side of the box body.
[0015] Furthermore, a buckle is provided on the side of the cover body, and a slot is provided on the side of the box body close to the cover body, and the buckle is engaged with the slot.
[0016] Furthermore, a handle component includes a first handle, a second handle and a Velcro component, the first handle and the second handle are respectively arranged on both sides of the box body close to the cover body, and the Velcro component is connected to the middle part of the first handle.
[0017] Furthermore, the middle portion of the hook and loop component is fixedly connected to the first handle, a hook surface is provided on the inner side of one end of the hook and loop component, and a fur surface is provided on the outer side of the other end of the hook and loop component.
[0018] Compared with the prior art, the utility model has the following technical effects:
[0019] In the technical solution provided by the embodiment of the utility model, the function of the loading component is to support the flow metering component, the loading component includes a box body and a cover body, and the cover body is detachably connected to the back of the box body; the function of the flow metering component is a flow metering component, the flow metering component includes a first metering component, a second metering component, a first air intake pipe, a second air intake pipe, a first switch valve, a second switch valve and a connecting pipe, the first metering component is connected to the first air intake pipe, the second metering component is connected to the second air intake pipe, the two ends of the connecting pipe are respectively connected to the first air intake pipe and the second air intake pipe, the first switch valve is arranged on the connecting pipe, and the second switch valve is arranged on the second air intake pipe. Compared with the prior art, the applicability of the verification and calibration equipment of the gas detector is relatively single, usually only applicable to a single type of gas detector, or only applicable to the laboratory interior or outdoor environment, and when installing the verification and calibration equipment, there are many parts and the installation is complicated. It is cumbersome and easy to be damaged, thereby reducing the accuracy of verification and calibration. In the technical scheme, a connecting pipe is set between the first air inlet pipe and the second air inlet pipe, a first switch valve is set on the connecting pipe, and a second switch valve is set on the second air inlet pipe. When verifying and calibrating the diffusion type gas detector and the positive pressure gas detector, the first switch valve is closed and the second switch valve is opened. The first gas enters the first metering component from the first air inlet pipe for verification, and the second gas enters the second metering component from the second air inlet pipe for verification. When verifying and calibrating the pump-suction gas detector, the first switch valve is opened and the second switch valve is closed. The first gas enters the first metering component and the second metering component from the first air inlet pipe and the connecting pipe. The outlet end of the first metering component is connected to the instrument to be detected, and the outlet end of the second metering component is vented, thereby achieving the technical effect of verifying and calibrating different types of gas detectors. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the three-dimensional structure of an instrument gas flow control device provided by an embodiment of the utility model;
[0021] Figure 2 A schematic diagram of the internal structure of an instrument gas flow control device provided in an embodiment of the utility model. DETAILED DESCRIPTION
[0022] The utility model is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0023] like Figure 1 and Figure 2 As shown, the embodiment of the utility model provides an instrument gas flow control device, the device comprising:
[0024] A loading component, the loading component comprises a box body 11 and a cover body 12, and the cover body 12 is detachably connected to the back side of the box body 11;
[0025] The flow metering component includes a first metering component, a second metering component, a first air intake pipe 23, a second air intake pipe 24, a first switch valve, a second switch valve and a connecting pipe 27. The first metering component is connected to the first air intake pipe 23, the second metering component is connected to the second air intake pipe 24, and both ends of the connecting pipe 27 are respectively connected to the first air intake pipe 23 and the second air intake pipe 24. The first switch valve is arranged on the connecting pipe 27, and the second switch valve is arranged on the second air intake pipe 24.
[0026] In the technical solution provided by the embodiment of the utility model, the function of the loading component is to support the flow metering component, and the loading component includes a box body 11 and a cover body 12, and the cover body 12 is detachably connected to the back of the box body 11; the function of the flow metering component is a flow metering component, and the flow metering component includes a first metering component, a second metering component, a first air intake pipe 23, a second air intake pipe 24, a first switch valve, a second switch valve and a connecting pipe 27, the first metering component is connected to the first air intake pipe 23, the second metering component is connected to the second air intake pipe 24, and the two ends of the connecting pipe 27 are respectively connected to the first air intake pipe 23 and the second air intake pipe 24, the first switch valve is arranged on the connecting pipe 27, and the second switch valve is arranged on the second air intake pipe 24. Compared with the prior art, the applicability of the verification and calibration equipment of the gas detector is relatively single, and is usually only applicable to a single type of gas detector, or only applicable to the laboratory interior or outdoor environment, and when installing the verification and calibration equipment, the parts There are many, the installation is cumbersome, and it is easy to be damaged, thereby reducing the accuracy of verification and calibration. In the present technical scheme, a connecting pipe 27 is set between the first air inlet pipe 23 and the second air inlet pipe 24, a first switch valve is set on the connecting pipe 27, and a second switch valve is set on the second air inlet pipe 24. When the diffusion type gas detector and the positive pressure gas detector are verified and calibrated, the first switch valve is closed and the second switch valve is opened. The first gas enters the first metering component from the first air inlet pipe 23 for verification, and the second gas enters the second metering component from the second air inlet pipe 24 for verification. When the pump-suction gas detector is verified and calibrated, the first switch valve is opened and the second switch valve is closed. The first gas enters the first metering component and the second metering component from the first air inlet pipe 23 and the connecting pipe 27. The outlet end of the first metering component is connected to the instrument to be detected, and the outlet end of the second metering component is vented, thereby achieving the technical effect of verifying and calibrating different types of gas detectors.
[0027] The function of the above-mentioned loading component is to support the flow metering component, and the loading component includes a box body 11 and a cover body 12, and the cover body 12 is detachably connected to the back side of the box body 11; the function of the flow metering component is a flow metering component, and the flow metering component includes a first metering component, a second metering component, a first air intake pipe 23, a second air intake pipe 24, a first switch valve, a second switch valve and a connecting pipe 27, the first metering component is connected to the first air intake pipe 23, the second metering component is connected to the second air intake pipe 24, and the two ends of the connecting pipe 27 are respectively connected to the first air intake pipe 23 and the second air intake pipe 24, the first switch valve is arranged on the connecting pipe 27, and the second switch valve is arranged on the second air intake pipe 24. Specifically, the first metering component includes a first flow The first air intake interface 212 and the first air exhaust interface 213 are arranged on one side of the box body 11, the first air intake pipeline 23 is arranged between the first flowmeter 211 and the first air intake interface 212, and the first exhaust pipeline 214 is arranged between the first flowmeter 211 and the first exhaust interface 213. The second metering component includes a second flowmeter 221, a second air intake interface 222 and a second exhaust interface 223, the second air intake interface 222 and the second exhaust interface 223 are arranged on the other side of the box body 11, the second air intake pipeline 24 is arranged between the second flowmeter 221 and the second air intake interface 222, and the second exhaust pipeline 224 is arranged between the second flowmeter 221 and the second exhaust interface 223. Optionally, an adjusting knob 28 is provided at the lower part of the first flow meter 211 and the second flow meter 221 for adjusting the air intake volume of the first flow meter 211 and the second flow meter 221 respectively. When the diffusion-type gas detector needs to be verified and calibrated, the first switch valve is closed so that the first flow meter 211 and the second flow meter 221 perform metering work respectively. The first air inlet interface 212 is connected to the gas source of the first gas, the first exhaust interface 213 and the second exhaust interface 223 are connected to the gas detection instrument to be detected, and the second air inlet interface 222 is connected to the gas source of the second gas. The first gas enters the first air inlet pipe 23 and the first flow meter 211 from the first air inlet interface 212, so that the device can verify the two gas detection instruments to be detected at the same time, or respectively. When two gases are calibrated for the same gas detection instrument to be tested and the pump-suction gas detector needs to be calibrated and calibrated, the first switch valve is opened and the second switch valve is closed. The first air inlet interface 212 is connected to the first gas source, the first exhaust interface 213 is connected to the gas detection instrument to be tested, the second exhaust interface 223 is vented, and the first gas is passed into the first flow meter 211 and the second flow meter 221. Since the gas detection instrument to be tested is of pump-suction type, when the air intake of the first gas source is insufficient, the second exhaust interface 223 will inhale air and enter the first flow meter 211 to make up for the air intake to avoid clogging the pump. It also reminds that the air intake of the first gas source needs to be increased to meet the pump suction flow rate, thereby achieving the technical effect of calibrating and calibrating different types of gas detectors.
[0028] Furthermore, the upper and lower sides of the cover body 12 have arc grooves 14. In this embodiment, the cover body 12 is further defined. Since the size of the cover body 12 is slightly larger than the size of the box body 11, the cover body 12 can completely cover the front of the box body 11. The arc grooves 14 are respectively arranged on the upper and lower sides of the cover body 12. The arc grooves 14 have the same curvature as the outer side of the standard gas cylinder. In addition, fixing bolts 15 are arranged on the front of the cover body 12, and fixing holes 16 are arranged on the back of the box body 11. When the box body 11 needs to be fixed on the gas cylinder, the fixing bolts 15 are removed, and then the cover body 12 is installed on the back of the box body 11 through the fixing bolts 15, so that the arc grooves 14 are completely stuck in the surface of the gas cylinder, so that the box body 11 is fixed on the gas cylinder, thereby achieving the technical effect of conveniently fixing the box body 11.
[0029] Further, the first switch valve includes a first valve body 251 and a first knob 252, and the second switch valve includes a second valve body 261 and a second knob 262, the first knob 252 is connected to the first valve body 251, and the second knob 262 is connected to the second valve body 261. In this embodiment, the first switch valve and the second switch valve are further defined, the first valve body 251 is installed on the connecting pipe 27, the second valve body 261 is installed on the second intake pipe 24, the first knob 252 and the second knob 262 are arranged inside the box 11, the first knob 252 is connected to the first valve body 251, and the second knob 262 is connected to the second valve body 261, so as to achieve the technical effect of conveniently controlling the first valve body 251 and the second valve body 261.
[0030] Furthermore, a buckle 13 is provided on the side of the cover body 12, and a slot is provided on the side of the box body 11 close to the cover body 12, and the buckle 13 is snapped into the slot. In this embodiment, a loading component is further defined, and a slot is provided on the side of the box body 11 close to the cover body 12, and the buckle 13 is rotatably connected to the cover body 12. When the cover body 12 needs to be installed, the buckle 13 is snapped into the slot, thereby achieving a technical effect of facilitating the installation or removal of the cover body 12. Optionally, a handle component is added, and the handle component includes a first handle 31, a second handle 32 and a Velcro component 33. The first handle 31 and the second handle 32 are respectively provided on both sides of the box body 11 close to the cover body 12, and the Velcro component 33 is connected to the middle part of the first handle 31. When the box body 11 needs to be lifted, the first handle 31 and the second handle 31 are brought close together, and then the Velcro component 33 is opened, the second handle 32 and the first handle 31 are put together, and then the fastener part 33 is closed. Optionally, an adjusting buckle for adjusting the length is added to the first handle 31, and the middle part of the fastener part 33 is fixedly connected to the first handle 31. A hook surface 331 is provided on the inner side of one end of the fastener part 33, and a rough surface is provided on the outer side of the other end of the fastener part 33. When the box body 11 needs to be fixed on the gas cylinder, the first handle 31 is adjusted to a suitable length, and then the cover body 12 is attached to the gas cylinder. The first handle 31 and the second handle 32 are wrapped around the side of the gas cylinder, and the fastener part 33 fixes the second handle 32, thereby achieving the technical effect of fixing the box body 11.
[0031] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. An instrument gas flow control device, characterized in that: include: A loading component, the loading component comprising a box body and a cover body, the cover body being detachably connected to the front side of the box body; A flow metering component, the flow metering component includes a first metering component, a second metering component, a first intake pipe, a second intake pipe, a first switch valve, a second switch valve and a connecting pipe, the first metering component is connected to the first intake pipe, the second metering component is connected to the second intake pipe, both ends of the connecting pipe are respectively connected to the first intake pipe and the second intake pipe, the first switch valve is arranged on the connecting pipe, and the second switch valve is arranged on the second intake pipe.
2. An instrument gas flow control device according to claim 1, characterized in that: The first metering component includes a first flow meter, a first air inlet interface and a first exhaust interface, the first air inlet interface and the first exhaust interface are arranged on one side of the box body, the first air inlet pipe is arranged between the first flow meter and the first air inlet interface, and the first exhaust pipe is arranged between the first flow meter and the first exhaust interface.
3. An instrument gas flow control device according to claim 2, characterized in that: The second metering component includes a second flow meter, a second air inlet interface and a second exhaust interface, the second air inlet interface and the second exhaust interface are arranged on the other side of the box body, the second air inlet pipe is arranged between the second flow meter and the second air inlet interface, and the second exhaust pipe is arranged between the second flow meter and the second exhaust interface.
4. An instrument gas flow control device according to claim 3, characterized in that: The first switch valve includes a first valve body and a first knob, and the second switch valve includes a second valve body and a second knob. The first knob is connected to the first valve body, and the second knob is connected to the second valve body.
5. The instrument gas flow control device according to claim 1, characterized in that: The upper side surface and the lower side surface of the cover body are provided with arc grooves.
6. An instrument gas flow control device according to claim 5, characterized in that: The front side of the cover body is provided with fixing bolts, and the back side of the box body is provided with fixing holes.
7. An instrument gas flow control device according to any one of claims 1 to 6, characterized in that: A buckle is arranged on the side of the cover body, and a slot is arranged on the side of the box body close to the cover body, and the buckle is engaged with the slot.
8. An instrument gas flow control device according to any one of claims 1 to 6, characterized in that: Also includes: The handle component includes a first handle, a second handle and a hook and loop fastener component. The first handle and the second handle are respectively arranged on two sides of the box body close to the cover body, and the hook and loop fastener component is connected to the middle part of the first handle.
9. An instrument gas flow control device according to claim 8, characterized in that: The middle portion of the hook and loop fastener is fixedly connected to the first handle, a hook surface is arranged on the inner side of one end of the hook and loop fastener, and a fur surface is arranged on the outer side of the other end of the hook and loop fastener.
