Energy storage device and energy storage system
By designing a high-strength frame and a detachably connected hoisting system in the energy storage device, the problem of insufficient load-bearing capacity of the hoisting parts of the energy storage system is solved, and higher transfer reliability and stability are achieved.
Patent Information
- Application Number
- CN202322608155.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-09-25
AI Technical Summary
During the on-site installation and transportation of the energy storage system, the load-bearing capacity of the hoisting parts is poor, which affects the reliability of the transportation.
An energy storage device is designed. Its cabinet has a high-strength frame, and the detachable connection between the hanging part and the frame is achieved through nut boxes and connectors, which increases the load-bearing capacity of the hanging part and is protected by an anti-rust coating. and wax filling reduce the risk of corrosion.
The load-bearing capacity and transfer reliability of the hoisting parts are improved, and the stable and safe transportation of the energy storage device is ensured.
Smart Images

Figure CN221885255U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of energy storage systems, and in particular to an energy storage device and an energy storage system. Background Art
[0002] Due to the widespread market demand for clean energy, energy storage systems have been widely used. The energy storage system includes at least one energy storage device, which includes a cabinet and a battery arranged in the cabinet.
[0003] During on-site installation and transportation, the energy storage device needs to be hoisted and moved, so the cabinet of the energy storage device is usually connected with a hoisting device. How to improve the transportation reliability of the energy storage system is a technical problem that needs to be solved urgently. Utility Model Content
[0004] The present application provides an energy storage device and an energy storage system, wherein the lifting parts have a high load-bearing capacity, meet the transportation requirements, and have high transportation reliability.
[0005] This application is achieved through the following technical solutions:
[0006] In a first aspect, an embodiment of the present application provides an energy storage device, which includes a cabinet and a lifting component, wherein the cabinet includes a frame; the lifting component is connected to the frame, and the lifting component is provided with a first lifting hole, and the first lifting hole is used for a hook of a crane to cooperate to lift the energy storage device.
[0007] According to the energy storage device of the embodiment of the present application, the frame has a certain strength, and the lifting member is connected to the frame, and the two are firmly connected, so that the lifting member has a higher load-bearing capacity, which is convenient for the lifting needs of the heavier energy storage device, and the transportation reliability of the energy storage device is higher.
[0008] According to some embodiments of the present application, the energy storage device further includes a connection assembly, and the hanging component is detachably connected to the frame via the connection assembly.
[0009] In the above scheme, the lifting parts are detachably connected to the frame through a connecting assembly to facilitate the replacement and removal of the lifting parts; in different application scenarios, after the lifting is completed, the lifting parts can be removed to reduce the risk of interference between the lifting parts and other components.
[0010] According to some embodiments of the present application, the connection assembly includes a nut box and a connecting piece, the nut box is connected to the frame, the nut box includes a nut, and the connecting piece is threadedly connected to the nut.
[0011] In the above scheme, the nut box is used to provide the nut, and the connecting piece is provided with a threaded section that cooperates with the nut so that the connecting piece can be threadedly connected with the nut. The hanging piece is fixed to the frame through the connecting piece. At the same time, the connecting piece can be disconnected from the nut to facilitate separation of the hanging piece from the frame. The structure is simple and easy to operate.
[0012] According to some embodiments of the present application, there are multiple connecting members, multiple nuts, and each connecting member is connected to one nut.
[0013] In the above scheme, there are multiple connectors, and the lifting member can be connected to the frame through multiple connectors, which increases the connection stability between the lifting member and the frame and can improve the carrying capacity of the lifting member. When the weight of the energy storage device is heavy, it can meet the transportation reliability requirements.
[0014] According to some embodiments of the present application, the nut box also includes a box body, the box body is connected to the frame, the nut is arranged in the box body and fixed to the box body, the box body is provided with an avoidance hole, and the nut blocks the avoidance hole.
[0015] In the above scheme, the box body is connected to the frame, the nut is arranged in the box body, and the nut is surrounded by the box body to form a barrier on the outside of the nut to reduce the risk of nut corrosion; the avoidance hole is set to facilitate the connection between the connector and the nut.
[0016] According to some embodiments of the present application, the nut is a blind hole nut.
[0017] In the above scheme, the blind hole nut has only one end open, and the blind hole nut can be cylindrical so that the blind hole nut and the box body have a larger connection area; at the same time, the blind hole nut is arranged in the box body, which can reduce the risk of corrosion of the connecting part.
[0018] According to some embodiments of the present application, the box body is a closed structure, and the box body is filled with anti-rust wax.
[0019] In the above solution, the box body is filled with anti-rust wax, which can isolate the nut from the external environment, reduce the risk of the nut being corroded, and ensure that the connection between the hanging part and the frame is reliable.
[0020] According to some embodiments of the present application, the outer surface of the box body is coated with an anti-rust coating.
[0021] In the above solution, the outer surface of the box body is coated with an anti-rust coating, which can reduce the risk of corrosion of the box body and reduce the probability of corrosion of the nut, so that the connection between the hanging parts and the frame is reliable.
[0022] According to some embodiments of the present application, the box body includes a first wall facing the hanging piece, the avoidance hole is arranged on the first wall, the nut includes a first end face facing the hanging piece, the first end face is provided with a limiting groove, the limiting groove is arranged around the circumference of the first end face, and a portion of the first wall is embedded in the limiting groove.
[0023] In the above scheme, the avoidance hole is arranged on the first wall, and the nut is connected to the first wall, so as to reduce the length of the connecting piece and make the connection between the connecting piece and the nut stable; the setting of the limiting groove can limit the position of the nut and prevent the nut from separating from the first wall, so that the connecting piece and the nut are firmly connected.
[0024] According to some embodiments of the present application, the first wall includes a second end surface facing the hanging component, and the first end surface is lower than the second end surface.
[0025] In the above solution, the first end face is lower than the second end face, and after the nut is assembled with the box body, the nut does not protrude from the outer surface of the first wall, so as to reduce the assembly interference of the nut with other components.
[0026] According to some embodiments of the present application, the hanging part includes a bottom wall and a side wall, the bottom wall is connected to the nut box, the bottom wall is provided with at least two mounting holes corresponding to the nut, each of the mounting holes is penetrated by one of the connecting parts, the side wall is arranged around the bottom wall, and the first hanging hole is arranged on the side wall.
[0027] In the above scheme, the bottom wall is connected to the nut box so that the hanging piece and the nut box can have a larger connection area, and more mounting holes can be set on the bottom wall to increase the carrying capacity of the hanging piece; the side wall is arranged around the bottom wall, so that the overall strength of the hanging piece is higher, further increasing the carrying capacity of the hanging piece.
[0028] According to some embodiments of the present application, the side wall includes a first side wall, a second side wall and a third side wall, the first side wall and the third side wall are arranged opposite to each other along a first direction, the first direction intersects with the thickness direction of the bottom wall, the second side wall connects the first side wall and the third side wall, and the first lifting hole is arranged on the second side wall.
[0029] In the above scheme, the first side wall is arranged opposite to the third side wall, the second side wall connects the first side wall and the third side wall, and the first lifting hole is arranged on the second side wall, so that the force on the second side wall is balanced, thereby improving the overall strength of the lifting component and thus improving the carrying capacity of the lifting component.
[0030] According to some embodiments of the present application, the first side wall is bent relative to the bottom wall in a direction away from the nut box, the second side wall is bent relative to the bottom wall in a direction away from the nut box, the third side wall is bent relative to the bottom wall in a direction away from the nut box, the second side wall is welded to the first side wall and the third side wall respectively, and the first side wall, the second side wall, the third side wall and the bottom wall are formed integrally.
[0031] In the above scheme, the first side wall is bent relative to the bottom wall in a direction away from the nut box, the second side wall is bent relative to the bottom wall in a direction away from the nut box, and the third side wall is bent relative to the bottom wall in a direction away from the nut box, so that the side wall and the bottom wall can be formed as one piece, which is convenient for processing and manufacturing, and the connection between the side wall and the bottom wall is firm, and the overall strength of the lifting parts is relatively high.
[0032] According to some embodiments of the present application, there are multiple hanging parts, and the multiple hanging parts are arranged at intervals around the center of the frame; the frame includes multiple columns and multiple beams, the multiple columns are arranged at intervals, each of the beams is connected between two adjacent columns, the multiple columns and the multiple beams jointly enclose a first accommodating space, and the second side wall is arranged on a side of the bottom wall close to the first accommodating space.
[0033] In the above solution, multiple hanging parts are arranged around the center of the frame at intervals, so that the multiple hanging parts are subjected to balanced forces, thereby improving the transportation reliability of the energy storage device. By making the second side wall located on the side of the bottom wall close to the first accommodating space, the first hanging hole can be closer to the center of gravity of the entire energy storage device, which can reduce the force on the first hanging hole, thereby reducing the risk of deformation of the first hanging hole.
[0034] According to some embodiments of the present application, the energy storage device further includes a reinforcement member, the reinforcement member is disposed on the side wall, the reinforcement member is provided with a second lifting hole, and the second lifting hole is disposed opposite to the first lifting hole.
[0035] In the above scheme, the reinforcement can be fitted with the side wall to increase the strength of the side wall. The second lifting hole is arranged opposite to the first lifting hole, and the second lifting hole has the same structure as the first lifting hole and is coaxially arranged. During lifting operations, the second lifting hole and the first lifting hole cooperate with the lifting equipment to enhance the carrying capacity of the lifting component.
[0036] According to some embodiments of the present application, the frame includes interconnected crossbeams and columns, and the hanging component is connected to the crossbeams and / or the columns.
[0037] In the above scheme, the crossbeams and columns constitute the frame, so that the overall strength of the frame is relatively high. The hanging parts are connected to the crossbeams and / or columns, so that the hanging parts are firmly connected to the frame, the carrying capacity of the hanging parts is improved, and the transportation reliability of the energy storage device is relatively high.
[0038] According to some embodiments of the present application, the top end of the column is lower than the beam corresponding to the column and forms a second accommodating space, and the nut box is located in the second accommodating space and welded to the beam and the column.
[0039] In the above scheme, the top of the column and the crossbeam form a second accommodating space, and the nut box is located in the second accommodating space to facilitate the connection between the nut box, the crossbeam and the column, so that the nut box is firmly connected to the frame.
[0040] In a second aspect, an embodiment of the present application further provides an energy storage system, comprising an energy storage device as provided in any of the above embodiments.
[0041] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0043] Figure 1 A schematic diagram of the structure of an energy storage device provided in some embodiments of the present application;
[0044] Figure 2 A schematic diagram of the structure of a rack provided in some embodiments of the present application;
[0045] Figure 3 A schematic diagram of assembling a hanging member and a frame provided in some embodiments of the present application;
[0046] Figure 4 A schematic diagram of assembling a hanging member and a connecting assembly provided in some embodiments of the present application;
[0047] Figure 5 A schematic diagram of the structure of a nut box provided in some embodiments of the present application;
[0048] Figure 6 A schematic diagram of the structure of a nut provided in some embodiments of the present application;
[0049] Figure 7A schematic diagram of the structure of the anti-rust coating and the box body provided in some embodiments of the present application;
[0050] Figure 8 for Figure 4 A local enlarged view of point A;
[0051] Fig. 9 A schematic diagram of the structure of a hoisting member provided in some embodiments of the present application;
[0052] Fig.10 for Figure 2 A partial enlarged view of point B.
[0053] Icons: 100-energy storage device; 10-cabinet; 11-frame; 111-beam; 112-column; 113-first accommodating space; 114-second accommodating space; 12-first package; 13-second package; 14-third package; 20-hanging piece; 20a-first hanging piece; 20b-second hanging piece; 20c-third hanging piece; 20d-fourth hanging piece; 21-bottom wall; 211-mounting hole; 22-side wall; 22a-first side wall; 22b-second side wall; 22c-third side wall; 221-first hanging hole; 30-connection assembly ;31-nut box;311-nut;3111-first end face;3112-limiting groove;312-box body;312a-first wall;312b-second wall;312c-third wall;312d-fourth wall;312e-fifth wall;312f-sixth wall;3121-avoidance hole;3122-second end face;313-anti-rust coating;32-connector;321-threaded section;322-body;323-flange;33-gasket;34-reinforcement member;341-second lifting hole;X-first direction;Y-second direction;Z-thickness direction of the bottom wall. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0055] Unless otherwise defined, all technical and scientific terms used in this application have the same meaning as those commonly understood by technicians in the technical field of this application; the terms used in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned drawings and any variations thereof are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of this application or the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order or a primary and secondary relationship.
[0056] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described in this application may be combined with other embodiments.
[0057] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "attached" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0058] The term "and / or" in this application is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this application generally indicates that the associated objects before and after are in an "or" relationship.
[0059] The term "multiple" as used in this application refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple sheets" refers to more than two sheets (including two sheets).
[0060] The energy storage system usually includes at least one energy storage cabinet, which includes a cabinet body and a battery disposed in the cabinet body. During on-site installation or transportation, the energy storage cabinet needs to be adjusted in position, and the energy storage cabinet is usually moved by hoisting. Therefore, the energy storage cabinet is usually provided with a lifting member, and the lifting member is provided with a lifting hole for the connection of the lifting device to the lifting member. In some embodiments, the cabinet body includes a frame and a packaging member disposed on the periphery of the frame, and the lifting member is connected to the packaging member of the cabinet body. The load-bearing capacity of the lifting member is poor, which affects the transportation reliability when the energy storage device is transported.
[0061] In view of this, in order to solve the problem that the carrying capacity of the lifting parts is poor and affects the transportation reliability of the energy storage system, the embodiment of the present application provides a technical solution, the energy storage device includes a cabinet and a lifting part, the lifting part is connected to the frame of the cabinet, the frame has high strength, after the lifting part is connected to the frame, the lifting part can carry a heavier weight, thereby improving the carrying capacity of the lifting part and improving the transportation reliability.
[0062] The energy storage device disclosed in the embodiment of the present application is used to store energy. For example, a device that needs to use electric energy needs a device that stores electric energy. The energy storage device can also be called an energy storage cabinet.
[0063] Please refer to Figures 1 to 3 , Figure 1 A schematic diagram of the structure of an energy storage device provided in some embodiments of the present application, Figure 2 A schematic diagram of the structure of a rack provided in some embodiments of the present application, Figure 3 The following is a schematic diagram of the assembly of the hanging parts and the frame provided in some embodiments of the present application. For the convenience of description, Figure 3 Only the assembly structure of the hanging member and the frame is shown. According to some embodiments of the present application, the present application embodiment provides an energy storage device 100, which includes a cabinet 10 and a hanging member 20. The cabinet 10 includes a frame 11, and the hanging member 20 is connected to the frame 11. The hanging member 20 is provided with a first hanging hole 221, and the first hanging hole 221 is used for the hook of the crane to cooperate with the energy storage device 100.
[0064] The cabinet 10 is used to accommodate batteries. The rack 11 may be a frame structure, and the rack 11 may be the foundation of the cabinet 10. The rack 11 may include a crossbeam 111 and a column 112, and the crossbeam 111 and the column 112 are connected to form a frame structure, for example, a rectangular frame.
[0065] The cabinet 10 may further include a packaging member connected to the frame 11 to enclose a chamber for accommodating the battery.
[0066] The frame 11 may be made of metal, such as steel, aluminum alloy, etc., to have higher strength.
[0067] The energy storage device 100 further includes a battery, which is disposed in the cabinet 10 .
[0068] The hoisting member 20 is a component used to cooperate with the lifting device, and the first hoisting hole 221 is used for the hook of the crane to pass through, so as to facilitate the crane to lift the energy storage device 100.
[0069] The first hanging hole 221 may have various shapes, such as circular, rectangular or irregular shapes, etc. Optionally, the first hanging hole 221 may have a circular shape so that the hanging tool and the hanging member 20 have a larger connection area.
[0070] The hanging member 20 and the cabinet 10 can be two independent parts, which are easy to manufacture. The hanging member 20 is connected to the frame 11, and the hanging member 20 and the frame 11 can be connected to the crossbeam 111 or the column 112 of the frame 11 by bolts.
[0071] According to the energy storage device 100 of the embodiment of the present application, the frame 11 has a certain strength, and the lifting component 20 is connected to the frame 11, and the two are firmly connected, so that the lifting component 20 has a higher load-bearing capacity, which is convenient for the lifting requirements of the heavier energy storage device 100, and the transportation reliability of the energy storage device 100 is higher.
[0072] In some embodiments, depending on the application scenario, after the energy storage device 100 is transported, the hanging component 20 needs to be separated from the cabinet 10 to reduce the risk of interference with other components. Therefore, while ensuring that the hanging component 20 is firmly connected to the rack 11, it is necessary to consider the detachable cooperation between the hanging component 20 and the rack 11.
[0073] Please refer to Figure 3 , and further refer to Figure 4 , Figure 4 Schematic diagram of assembly of a hanging member and a connecting assembly provided in some embodiments of the present application. According to some embodiments of the present application, the energy storage device 100 further includes a connecting assembly 30, and the hanging member 20 is detachably connected to the frame 11 through the connecting assembly 30.
[0074] The connection assembly 30 is a assembly used to connect the hanging member 20 with the frame 11, which is convenient for assembly.
[0075] The hanging member 20 is detachably connected to the frame 11 via a connecting assembly 30 to facilitate replacement and removal of the hanging member 20; in different application scenarios, after the hanging is completed, the hanging member 20 can be removed to reduce the risk of interference between the hanging member 20 and other components.
[0076] Please refer to Figure 4 According to some embodiments of the present application, the connecting assembly 30 includes a nut box 31 and a connecting piece 32 , the nut box 31 is connected to the frame 11 , the nut box 31 includes a nut 311 , and the connecting piece 32 is threadedly connected to the nut 311 .
[0077] The nut box 31 is a component having a nut 311 , and is used to provide the nut 311 for connection with the connecting member 32 .
[0078] The nut box 31 is connected to the frame 11, and the nut box 31 may be welded to the frame 11, or the nut box 31 may be connected to the frame 11 by bolts. Optionally, the nut box 31 is welded to the frame 11, so that the nut box 31 is firmly connected to the frame 11, and when the hanging part 20 is connected to the nut 311 of the nut box 31, the nut box 31 is integrated with the frame 11, so that the hanging part 20 is firmly connected to the frame 11.
[0079] The connecting member 32 is provided with a threaded section 321 that cooperates with the nut 311 . The connecting member 32 may be a bolt or a rod-shaped structure with threads.
[0080] The connecting member 32 may include a body 322 and a threaded section 321 disposed on the outer circumference of the body 322 to form an external thread. When the hanging member 20 is assembled with the frame 11, the hanging member 20 is connected to the nut 311 through the connecting member 32 to achieve the connection between the hanging member 20 and the frame 11.
[0081] In the above scheme, the nut box 31 is used to provide the nut 311, and the connecting piece 32 is provided with a threaded section 321 that cooperates with the nut 311, so that the connecting piece 32 can be threadedly connected with the nut 311, and the hanging piece 20 is fixed to the frame 11 through the connecting piece 32. At the same time, the connecting piece 32 can be disconnected from the nut 311 to facilitate the separation of the hanging piece 20 from the frame 11. The structure is simple and easy to operate.
[0082] Please refer to Figure 4 According to some embodiments of the present application, there are multiple connectors 32 , multiple nuts 311 , and each connector 32 is connected to a nut 311 .
[0083] There are multiple connecting members 32 , and correspondingly, there are multiple nuts 311 . The multiple connecting members 32 correspond to the multiple nuts 311 one by one, so that the hanging member 20 and the frame 11 have multiple connection positions.
[0084] In the above scheme, there are multiple connectors 32, and the lifting component 20 can be connected to the frame 11 through multiple connectors 32, which increases the connection stability between the lifting component 20 and the frame 11, and can improve the carrying capacity of the lifting component 20. When the weight of the energy storage device 100 is heavy, it can meet the transportation reliability requirements.
[0085] Please refer to Figure 4 , and further refer to Figure 5 , Figure 5A schematic diagram of the structure of a nut box provided for some embodiments of the present application. According to some embodiments of the present application, the nut box 31 further includes a box body 312, the box body 312 is connected to the frame 11, the nut 311 is disposed in the box body 312 and fixed to the box body 312, the box body 312 is provided with an avoidance hole 3121, and the nut 311 blocks the avoidance hole 3121.
[0086] The box body 312 is a hollow structure, and there is a space inside the box body 312 for accommodating the nut 311 .
[0087] The nut 311 is disposed in the box body 312 and fixed to the box body 312 . For example, the nut 311 can be welded to the box body 312 so that the nut 311 and the box body 312 are firmly connected, thereby making the connecting member 32 and the nut 311 firmly connected.
[0088] The avoidance hole 3121 may be a through hole provided in the box body 312 , through which the threaded hole of the nut 311 can be exposed, so as to facilitate the connection between the connector 32 and the nut 311 .
[0089] The nut 311 blocks the avoidance hole 3121 , a portion of the nut 311 is located inside the avoidance hole 3121 , and another portion of the nut 311 is located outside the avoidance hole 3121 .
[0090] In the above scheme, the box body 312 is connected to the frame 11, the nut 311 is arranged in the box body 312, and the nut 311 is surrounded by the box body 312 to form a barrier on the outside of the nut 311 to reduce the risk of corrosion of the nut 311; the avoidance hole 3121 is set to facilitate the connection between the connecting piece 32 and the nut 311.
[0091] Please refer to Figure 4 and Figure 5 , and further refer to Figure 6 , Figure 6 A schematic diagram of the structure of a nut provided in some embodiments of the present application. According to some embodiments of the present application, the nut 311 is a blind hole nut.
[0092] The blind hole nut is a nut 311 with one end open and the other end closed. The opening of the blind hole nut is exposed in the avoidance hole 3121 , and the closed end of the blind hole nut is located inside the box body 312 .
[0093] The nut 311 is arranged in the box body 312, and the nut 311 is fixed to the box body 312. When the connecting piece 32 is connected with the nut 311, there is no need to screw the nut 311. Therefore, the nut 311 can be cylindrical, and the avoidance hole 3121 can be a circular hole, so that the blind hole nut and the box body 312 have a larger connection area; at the same time, the blind hole nut is arranged in the box body 312, which can reduce the risk of corrosion of the connecting piece 32.
[0094] Please refer to Figure 4 and Figure 5 According to some embodiments of the present application, the box body 312 is a closed structure, and the box body 312 is filled with anti-rust wax.
[0095] The box body 312 is a closed structure, the nut 311 is a blind hole nut, and the nut 311 is sealedly connected to the box body 312, so that the inside of the box body 312 is isolated from the outside.
[0096] The anti-rust wax has good anti-rust performance, and the anti-rust wax can fill the internal space of the box body 312. Before the box body 312 is closed, the anti-rust wax is filled into the box body 312, and the operation is simple. After the anti-rust wax is filled, since the box body 312 is a closed structure, the nut 311 can be effectively isolated from the external environment, and the anti-rust wax is not easy to leak from the box body 312.
[0097] In the above solution, the box body 312 is filled with anti-rust wax, which can isolate the nut 311 from the external environment, reduce the risk of the nut 311 being corroded, and ensure that the hanging component 20 is reliably connected to the frame 11.
[0098] Please refer to Figure 7 , Figure 7 The schematic diagram of the structure of the anti-rust coating and the box body provided in some embodiments of the present application. According to some embodiments of the present application, the outer surface of the box body 312 is coated with an anti-rust coating 313 .
[0099] The box body 312 is a hollow structure. The interior of the box body 312 has a space for accommodating the nut 311 . The outer surface of the box body 312 refers to the surface of the box body 312 that is away from the interior.
[0100] The box body 312 and the nut 311 are both metal parts, and the surface of the box body 312 is easily corroded.
[0101] The anti-rust coating 313 can be formed by applying anti-rust paint to the outer surface of the box body 312. Anti-rust paint is a paint that can protect the metal surface from chemical or electrochemical corrosion in the atmosphere, seawater, etc. Applying anti-rust paint on the metal surface can effectively prevent the direct invasion of various corrosive substances in the atmosphere, thereby maximizing the service life of the metal.
[0102] In the above solution, the outer surface of the box body 312 is coated with an anti-rust coating 313, which can reduce the risk of the box body 312 being corroded, thereby reducing the probability of the nut 311 being corroded, so that the hanging member 20 is reliably connected to the frame 11.
[0103] Please refer to Figures 4 to 6 , and further refer to Figure 8 , Figure 8 for Figure 4According to some embodiments of the present application, the box body 312 includes a first wall 312a facing the hanging member 20, the avoidance hole 3121 is arranged on the first wall 312a, the nut 311 includes a first end face 3111 facing the hanging member 20, the first end face 3111 is provided with a limiting groove 3112, the limiting groove 3112 is arranged around the circumference of the first end face 3111, and a part of the first wall 312a is embedded in the limiting groove 3112.
[0104] The avoidance hole 3121 is a through hole penetrating the first wall 312a.
[0105] The first end surface 3111 may be a surface parallel to the first wall 312a. The limiting groove 3112 is arranged around the circumference of the first end surface 3111, and the limiting groove 3112 may be arranged around the circumference of the nut 311. The limiting groove 3112 may be arranged at the edge of the first end surface 3111, and extend from the first end surface 3111 in a direction away from the hanging member 20.
[0106] The area of the first wall 312a around the avoidance hole 3121 is embedded in the limiting groove 3112, and the limiting groove 3112 has a groove bottom surface parallel to the first end surface 3111, and the groove bottom surface can be attached to the inner surface of the first wall 312a. The inner surface of the first wall 312a faces the inside of the box body 312.
[0107] The connection method between the nut 311 and the first wall 312a can be various. For example, the edge of the bottom wall of the limiting groove 3112 of the nut 311 is welded to the inner surface of the first wall 312a, or the edge of the first end face 3111 of the nut 311 is welded to the hole wall of the avoidance hole 3121, or the edge of the bottom wall of the limiting groove 3112 of the nut 311 is welded to the inner surface of the first wall 312a, and the edge of the first end face 3111 of the nut 311 is welded to the hole wall of the avoidance hole 3121.
[0108] After the nut 311 is matched with the first wall 312a, one end of the nut 311 is located inside the box body 312, and the end of the opening of the threaded hole of the nut 311 is located in the avoidance hole 3121. The limiting groove 3112 is used to limit the assembly position of the nut 311 and the first wall 312a, which can prevent the nut 311 from moving from the inside of the box body 312 to the outside.
[0109] In the above scheme, the avoidance hole 3121 is arranged on the first wall 312a, and the nut 311 is connected to the first wall 312a, so as to reduce the length of the connecting member 32, so that the connection between the connecting member 32 and the nut 311 is stable; the setting of the limiting groove 3112 can limit the position of the nut 311 and prevent the nut 311 from separating from the first wall 312a, so that the connecting member 32 and the nut 311 are firmly connected.
[0110] Please refer to Figure 8According to some embodiments of the present application, the first wall 312 a includes a second end surface 3122 facing the hanging component 20 , and the first end surface 3111 is lower than the second end surface 3122 .
[0111] The second end surface 3122 may be an outer surface of the first wall 312a, and the second end surface 3122 is away from the interior of the box body 312. Along the Z direction, the first end surface 3111 is lower than the second end surface 3122. The first end surface 3111 is closer to the interior of the box body 312 than the second end surface 3122.
[0112] The first end surface 3111 is located in the avoidance hole 3121 , and the first end surface 3111 is lower than the second end surface 3122 , so that the nut 311 does not exceed the second end surface 3122 , thereby reducing the space occupied by the nut 311 .
[0113] In the above solution, the first end face 3111 is lower than the second end face 3122 , and after the nut 311 is assembled with the box body 312 , the nut 311 does not protrude from the outer surface of the first wall 312 a , so as to reduce the assembly interference of the nut 311 with other components.
[0114] Please refer to Figure 4 , and further refer to Fig. 9 , Fig. 9 A schematic diagram of the structure of a hanging member provided for some embodiments of the present application. According to some embodiments of the present application, the hanging member 20 includes a bottom wall 21 and a side wall 22, the bottom wall 21 is connected to the nut box 31, the bottom wall 21 is provided with at least two mounting holes 211 corresponding to the nut 311, each mounting hole 211 is penetrated by a connecting member 32, the side wall 22 is arranged around the bottom wall 21, and the first hanging hole 221 is arranged on the side wall 22.
[0115] The bottom wall 21 is used to be connected to the nut box 31 . The bottom wall 21 may be directly connected to the nut box 31 , or may be connected to the nut box 31 through other components.
[0116] The mounting hole 211 is a through hole provided on the bottom wall 21 , and the mounting hole 211 matches with the threaded hole of the nut 311 , so that the connecting member 32 can be connected with the nut 311 after passing through the mounting hole 211 .
[0117] The number of nuts 311 is the same as the number of mounting holes 211 , and each mounting hole 211 corresponds to a nut 311 .
[0118] The side wall 22 is disposed around the bottom wall 21 , and the first hanging hole 221 is disposed on the side wall 22 to facilitate cooperation with a hanging device.
[0119] In the above scheme, the bottom wall 21 is connected to the nut box 31 so that the hanging component 20 and the nut box 31 can have a larger connection area, and more mounting holes 211 can be set on the bottom wall 21 to increase the carrying capacity of the hanging component 20; the side wall 22 is arranged around the bottom wall 21, so that the overall strength of the hanging component 20 is higher, further increasing the carrying capacity of the hanging component 20.
[0120] In some embodiments, the energy storage device 100 further includes a first package 12, which is located at one end of the frame 11, and the first package 12 cooperates with the frame 11 to enclose a chamber for accommodating the battery. The first package 12 can cover the nut box 31, and is provided with a hollow portion to expose the threaded hole of the nut 311. The first package 12 is located between the nut box 31 and the bottom wall 21. When the connector 32 is connected to the nut 311, the connector 32 fixes the bottom wall 21, the first package 12 and the nut box 31.
[0121] The first packaging component 12 may be a plate-like structure, the bottom wall 21 may be fitted with the first packaging component 12, and the first packaging component 12 may be fitted with the first wall 312a, so that after the connecting component 32 is connected to the nut 311, the hanging component 20 is firmly connected to the nut box 31.
[0122] In some embodiments, Figure 1 and Figure 2 As shown, the energy storage device 100 also includes a second package 13 and a third package 14. The third package 14 is arranged opposite to the first package 12, and the second package 13 is arranged around the first package 12. The first package 12, the second package 13 and the third package 14 cooperate with the frame 11 to form a chamber for accommodating batteries.
[0123] According to some embodiments of the present application, the connecting member 32 may include a main body 322 and a flange 323, wherein the flange 323 is arranged at one end of the main body 322 and is arranged around the outer peripheral surface of the main body 322, and the flange 323 is used to limit the movement of the connecting member 32 toward the nut box 31; the outer peripheral surface of the other end of the main body 322 is provided with a threaded section 321 for connecting with the nut 311.
[0124] like Figure 4 As shown, along the thickness direction Z of the bottom wall 21, the projection of the flange 323 on the bottom wall 21 covers the mounting hole 211. The thickness direction Z of the bottom wall 21 may be parallel to the gravity direction.
[0125] According to some embodiments of the present application, a gasket 33 is provided between the flange 323 and the bottom wall 21 , and along the thickness direction Z of the bottom wall 21 , the projection of the flange 323 falls into the gasket 33 to increase the connection area between the flange 323 and the bottom wall 21 , thereby increasing the force-bearing area.
[0126] Please refer to Fig. 9 According to some embodiments of the present application, the side wall 22 includes a first side wall 22a, a second side wall 22b and a third side wall 22c, the first side wall 22a and the third side wall 22c are arranged opposite to each other along a first direction X, the first direction X intersects with the thickness direction Z of the bottom wall 21, the second side wall 22b connects the first side wall 22a and the third side wall 22c, and the first lifting hole 221 is set on the second side wall 22b.
[0127] The first side wall 22a, the second side wall 22b and the third side wall 22c are all connected to the edge of the bottom wall 21. The first side wall 22a and the third side wall 22c are arranged in parallel. The second side wall 22b connects the first side wall 22a and the third side wall 22c, so that the side wall 22 is firmly connected to the bottom wall 21.
[0128] In some embodiments, the first direction X may be perpendicular to the thickness direction Z of the bottom wall 21 .
[0129] The first hanging hole 221 may penetrate the second side wall 22b along the thickness direction of the second side wall 22b. The first side wall 22a, the second side wall 22b, the third side wall 22c and the bottom wall 21 may all be plate-shaped.
[0130] In some embodiments, a thickness direction of the second sidewall 22 b may be perpendicular to the first direction X.
[0131] In the above scheme, the first side wall 22a is arranged opposite to the third side wall 22c, the second side wall 22b connects the first side wall 22a and the third side wall 22c, and the first lifting hole 221 is arranged on the second side wall 22b, so that the second side wall 22b is subjected to balanced force, thereby improving the overall strength of the lifting component 20, thereby improving the carrying capacity of the lifting component 20.
[0132] According to some embodiments of the present application, one end of the first side wall 22a is connected to the edge of the bottom wall 21, and the other end of the first side wall 22a extends in a direction away from the nut box 31, one end of the second side wall 22b is connected to the edge of the bottom wall 21, and the other end of the second side wall 22b extends in a direction away from the nut box 31, and one end of the third side wall 22c is connected to the edge of the bottom wall 21, and the other end of the third side wall 22c extends in a direction away from the nut box 31.
[0133] Please refer to Fig. 9 According to some embodiments of the present application, the first side wall 22a is bent relative to the bottom wall 21 in a direction away from the nut box 31, the second side wall 22b is bent relative to the bottom wall 21 in a direction away from the nut box 31, the third side wall 22c is bent relative to the bottom wall 21 in a direction away from the nut box 31, the second side wall 22b is welded to the first side wall 22a and the third side wall 22c respectively, and the first side wall 22a, the second side wall 22b, the third side wall 22c and the bottom wall 21 are formed integrally.
[0134] In the above scheme, the first side wall 22a is bent relative to the bottom wall 21 in a direction away from the nut box 31, the second side wall 22b is bent relative to the bottom wall 21 in a direction away from the nut box 31, and the third side wall 22c is bent relative to the bottom wall 21 in a direction away from the nut box 31, so that the side wall 22 and the bottom wall 21 can be formed as one piece, which is convenient for processing and manufacturing, and the side wall 22 and the bottom wall 21 are firmly connected, and the overall strength of the hanging part 20 is relatively high.
[0135] According to some embodiments of the present application, the hanging member 20 is integrally formed, for example, the hanging member 20 can be formed by bending a plate. During the forming process of the hanging member 20, a plurality of slits are cut into a plate, and then at least three parts are bent relative to another part to form the bottom wall 21, the first side wall 22a, the second side wall 22b and the third side wall 22c, and the first side wall 22a is welded to the second side wall 22b, and the third side wall 22c is welded to the second side wall 22b.
[0136] The hanging member 20 is formed by bending a plate, so that the overall strength of the hanging member 20 is relatively high, so as to improve the load-bearing capacity of the hanging member 20 .
[0137] According to some embodiments of the present application, the material of the hanging component 20 may be steel. For example, the hanging component 20 may be formed by bending a steel plate.
[0138] Please refer to Figure 1 and Figure 2 According to some embodiments of the present application, there are multiple hanging parts 20, and the multiple hanging parts 20 are arranged at intervals around the center of the frame 11; the frame 11 includes multiple columns 112 and multiple beams 111, the multiple columns 112 are arranged at intervals, each beam 111 is connected between two adjacent columns 112, the multiple columns 112 and the multiple beams 111 jointly enclose the first accommodating space 113, and the second side wall 22b is arranged on the side of the bottom wall 21 close to the first accommodating space 113.
[0139] The first accommodation space 113 is formed by a plurality of columns 112 and a plurality of beams 111 , and the first accommodation space 113 is used to accommodate batteries.
[0140] like Figure 2As shown, the number of the hanging parts 20 can be four, and the four hanging parts 20 are distributed on the top of the frame 11 and are distributed in a rectangular array. The four hanging parts 20 can be a first hanging part 20a, a second hanging part 20b, a third hanging part 20c and a fourth hanging part 20d. The first hanging part 20a and the second hanging part 20b are arranged at intervals in the first direction X, the third hanging part 20c and the fourth hanging part 20d are arranged at intervals in the first direction X, the first hanging part 20a and the third hanging part 20c are arranged oppositely in the second direction Y, and the second hanging part 20b and the fourth hanging part 20d are arranged oppositely in the second direction Y. The second side wall 22b of the first hanging piece 20a is arranged on the side of the bottom wall 21 close to the third hanging piece 20c, and the second side wall 22b of the third hanging piece 20c is arranged on the side of the bottom wall 21 close to the first hanging piece 20a; similarly, the second side wall 22b of the second hanging piece 20b is arranged on the side of the bottom wall 21 close to the fourth hanging piece 20d, and the second side wall 22b of the fourth hanging piece 20d is arranged on the side of the bottom wall 21 close to the second hanging piece 20b.
[0141] In the above solution, multiple hanging parts 20 are arranged at intervals around the center of the frame 11, so that the multiple hanging parts 20 are subjected to balanced forces, thereby improving the transportation reliability of the energy storage device 100. By locating the second side wall 22b on the side of the bottom wall 21 close to the first accommodating space, the first hanging hole 221 can be closer to the center of gravity of the entire energy storage device 100, which can reduce the force on the first hanging hole 221, thereby reducing the risk of deformation of the first hanging hole 221.
[0142] Please refer to Fig. 9 According to some embodiments of the present application, the energy storage device 100 further includes a reinforcement member 34 , which is disposed on the side wall 22 . The reinforcement member 34 is provided with a second lifting hole 341 , and the second lifting hole 341 is disposed opposite to the first lifting hole 221 .
[0143] The reinforcement member 34 may be a plate-like structure, so that the reinforcement member 34 can fit the side wall 22. The reinforcement member 34 can be welded to the side wall 22, so that the reinforcement member 34 and the side wall 22 are firmly connected.
[0144] The second hanging hole 341 is disposed opposite to the first hanging hole 221 . The second hanging hole 341 and the first hanging hole 221 have the same structure and are coaxially disposed.
[0145] In the above scheme, the reinforcement 34 can be fitted with the side wall 22 to increase the strength of the side wall 22. The second lifting hole 341 is arranged around the first lifting hole 221, and the second lifting hole 341 has the same structure as the first lifting hole 221 and is coaxially arranged. During lifting operations, the second lifting hole 341 and the first lifting hole 221 cooperate with the lifting equipment to enhance the load-bearing capacity of the lifting component 20.
[0146] Please refer to Figure 5 According to some embodiments of the present application, the box body 312 may further include a second wall 312b, a third wall 312c, a fourth wall 312d, a fifth wall 312e, and a sixth wall 312f, wherein the second wall 312b and the third wall 312c are arranged opposite to each other along the first direction X, the fourth wall 312d and the fifth wall 312e are arranged opposite to each other along the second direction Y, and the first wall 312a and the sixth wall 312f are arranged opposite to each other along the thickness direction Z of the bottom wall 21, and the thickness direction Z of the bottom wall 21 is parallel to the length direction of the column 112. The first wall 312a, the second wall 312b, the third wall 312c, the fourth wall 312d, the fifth wall 312e, and the sixth wall 312f form a hollow rectangular parallelepiped structure. The first wall 312a, the second wall 312b, the third wall 312c, the fourth wall 312d and the fifth wall 312e can be integrally formed, and the sixth wall 312f can be welded and fixed to the second wall 312b, the third wall 312c, the fourth wall 312d and the fifth wall 312e to increase the overall strength of the box body 312.
[0147] In some embodiments, the sixth wall 312 f may be welded to the end surface of the pillar 112 .
[0148] Please refer to Figure 2 According to some embodiments of the present application, the frame 11 includes a crossbeam 111 and a column 112 connected to each other, and the hanging component 20 is connected to the crossbeam 111 and / or the column 112 .
[0149] The crossbeam 111 and the column 112 are components of the frame 11. The crossbeam 111 and the column 112 have high strength. The crossbeam 111 and the column 112 are fixed to form a frame-type frame 11. For example, the crossbeam 111 can be welded with the column 112 to form a rectangular frame. The crossbeam 111 can be connected to the end of the column 112, and can be connected to the end and the middle of the column 112. When the crossbeam 111 is connected to the end of the column 112, the crossbeam 111 can be connected to the end face of the column 112, and the crossbeam 111 can also be connected to the side of the end of the column 112.
[0150] Optionally, the crossbeam 111 is connected to the side surface of the end of the column 112 , and the box body 312 of the nut box 31 is connected to the end surface of the column 112 .
[0151] The cross beam 111 and the column 112 may be made of steel or other metals with higher strength.
[0152] In the above scheme, the cross beam 111 and the column 112 constitute the frame 11, so that the overall strength of the frame 11 is relatively high. The hanging parts 20 are connected to the cross beam 111 and / or the column 112, so that the hanging parts 20 are firmly connected to the frame 11, thereby improving the carrying capacity of the hanging parts 20 and making the transportation reliability of the energy storage device 100 relatively high.
[0153] Please refer to Fig.10 , Fig.10 for Figure 2 According to some embodiments of the present application, the top of the column 112 is lower than the beam 111 corresponding to the column 112 and forms a second accommodation space 114 , and the nut box 31 is located in the second accommodation space 114 and welded to the beam 111 and the column 112 .
[0154] The column 112 can be connected to the two beams 111, and the top of the column 112 is lower than the beam 111 corresponding to the top of the column 112 to form a second accommodating space 114, which is convenient for accommodating the nut box 31 and reducing the space occupied in the height direction. The nut box 31 is located in the second accommodating space 114 and can be welded to the column 112 and the two beams 111 connected to the column 112, thereby increasing the connection area between the nut box 31 and the frame 11, so that the nut box 31 is firmly connected to the frame 11.
[0155] When the first packaging member 12 is closed at the top of the frame 11 , the first packaging member 12 can cover the nut box 31 , so that the cabinet 10 has a beautiful appearance and reduces the interference between the nut box 31 and other components.
[0156] In the above scheme, the top of the column 112 and the beam 111 form a second accommodating space 114, and the nut box 31 is located in the second accommodating space 114 to facilitate the connection between the nut box 31 and the beam 111 and the column 112, so that the nut box 31 is firmly connected to the frame 11.
[0157] According to some embodiments of the present application, an energy storage system is provided. The energy storage system includes an energy storage device 100 provided in any of the above embodiments.
[0158] According to some embodiments of this application, please refer to Figures 1 to 10The embodiment of the present application provides an energy storage device 100, which includes a cabinet 10, a hanging member 20 and a connecting assembly 30. The cabinet 10 includes a frame 11 and a first packaging member 12. The frame 11 includes a crossbeam 111 and a column 112. The crossbeam 111 and the column 112 cooperate to form a rectangular frame structure. The first packaging member 12 is located at the top of the frame 11, and the first packaging member 12 is connected to the crossbeam 111 and the column 112. There are four columns 112, which are distributed at the four corners of the frame 11. There are four hanging members 20, and one hanging member 20 cooperates with one column 112. There are four groups of connecting assemblies 30, and each group of connecting assemblies 30 includes a nut box 31 and two connecting members 32. The nut box 31 is welded to the end face of the column 112 of the frame 11, and the first packaging member 12 is located between the nut box 31 and the column 112. The nut box 31 includes a box body 312 and two nuts 311. The box body 312 includes a first wall 312a. The first wall 312a is located on the side of the box body 312 away from the frame 11. The nut 311 is a blind hole nut. The nut 311 is fixed to the first wall 312a. The first wall 312a is provided with an escape opening to expose the nut 311. The top of the column 112 is lower than the beam 111 corresponding to the end to form a second accommodating space 114. The box body 312 is accommodated in the second accommodating space 114. The box body 312 is welded to the column 112 and the beam 111. The box body 312 is a closed structure. The box body 312 is filled with anti-rust wax. The outer surface of the box body 312 is coated with an anti-rust coating 313. The hanging component 20 is connected to the first wall 312a. The hanging component 20 is formed by bending a plate. The hanging member 20 includes a bottom wall 21, a first side wall 22a, a second side wall 22b and a third side wall 22c. The first side wall 22a is bent relative to the bottom wall 21 in a direction away from the nut box 31, the second side wall 22b is bent relative to the bottom wall 21 in a direction away from the nut box 31, and the third side wall 22c is bent relative to the bottom wall 21 in a direction away from the nut box 31. The first side wall 22a and the third side wall 22c are arranged opposite to each other, and the first side wall 22a and the third side wall 22c are welded to the second side wall 22b respectively. The bottom wall 21 is provided with two mounting holes 211 corresponding to the nuts 311. The connecting member 32 is a bolt, and each connecting member 32 corresponds to a mounting hole 211 and a nut 311. The connecting member 32 is penetrated through the mounting hole 211 and is threadedly connected to the nut 311. A gasket 33 is arranged between the connecting member 32 and the bottom wall 21. The second side wall 22b is provided with a first hanging hole 221. The energy storage device 100 further includes a reinforcement member 34, which is provided on the second side wall 22b. The reinforcement member 34 is provided with a second hanging hole 341 corresponding to the first hanging hole 221. The second hanging hole 341 is coaxially arranged with the first hanging hole 221 and has the same profile.
[0159] According to the energy storage device 100 of the embodiment of the present application, the nut box 31 is welded to the column 112, the lifting component 20 is connected to the nut box 31 through two connecting parts 32, and the side wall 22 of the lifting component 20 where the first lifting hole 221 is set is fixed with a reinforcement member 34, so that the lifting component 20 has a higher load-bearing capacity, adapts to the lifting and transportation requirements, and improves the transportation reliability.
[0160] Although the present application has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present application. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. An energy storage device, characterized in that: include: The cabinet comprises a frame, wherein the frame comprises a plurality of columns and a plurality of beams, wherein the plurality of columns are arranged at intervals, each of the beams is connected between two adjacent columns, and the plurality of columns and the plurality of beams jointly enclose a first accommodation space; A battery, contained in the first containing space; A connecting assembly, the connecting assembly comprising a nut box and a connecting piece, the nut box being arranged on the top of the column, the nut box comprising a nut and a box body, and the box body being connected to the frame; A lifting piece is connected to the nut through the connecting piece, and the lifting piece is provided with a first lifting hole, and the first lifting hole is used for a hook of a crane to cooperate with the energy storage device.
2. The energy storage device according to claim 1, characterized in that: There are multiple connecting members, multiple nuts, and each connecting member is connected to one nut.
3. The energy storage device according to claim 1, characterized in that: The nut is arranged in the box body and fixed to the box body. The box body is provided with an avoidance hole, and the nut blocks the avoidance hole.
4. The energy storage device according to claim 3, characterized in that: The nut is a blind hole nut.
5. The energy storage device according to claim 4, characterized in that: The box body is a closed structure and is filled with anti-rust wax.
6. The energy storage device according to claim 3, characterized in that: The outer surface of the box body is coated with an anti-rust coating.
7. The energy storage device according to claim 3, characterized in that: The box body includes a first wall facing the hanging component, the avoidance hole is arranged on the first wall, the nut includes a first end face facing the hanging component, the first end face is provided with a limiting groove, the limiting groove is arranged around the circumference of the first end face, and part of the first wall is embedded in the limiting groove.
8. The energy storage device according to claim 7, characterized in that: The first wall includes a second end surface facing the hanging component, and the first end surface is lower than the second end surface.
9. The energy storage device according to claim 1, characterized in that: The hanging part includes a bottom wall and a side wall, the bottom wall is connected to the nut box, the bottom wall is provided with at least two mounting holes corresponding to the nut, each mounting hole is penetrated by a connecting part, the side wall is arranged around the bottom wall, and the first hanging hole is arranged on the side wall.
10. The energy storage device according to claim 9, characterized in that: The side wall includes a first side wall, a second side wall and a third side wall, the first side wall and the third side wall are arranged opposite to each other along a first direction, the first direction intersects with the thickness direction of the bottom wall, the second side wall connects the first side wall and the third side wall, and the first lifting hole is arranged on the second side wall.
11. The energy storage device according to claim 10, characterized in that: The first side wall is bent relative to the bottom wall in a direction away from the nut box, the second side wall is bent relative to the bottom wall in a direction away from the nut box, the third side wall is bent relative to the bottom wall in a direction away from the nut box, the second side wall is welded to the first side wall and the third side wall respectively, and the first side wall, the second side wall, the third side wall and the bottom wall are formed as one piece.
12. The energy storage device according to claim 10, characterized in that: There are multiple hanging parts, and the multiple hanging parts are arranged around the center of the frame at intervals; The second side wall is disposed on a side of the bottom wall close to the first accommodation space.
13. The energy storage device according to claim 9, characterized in that: The energy storage device further includes a reinforcement member, which is disposed on the side wall. The reinforcement member is provided with a second hoisting hole, and the second hoisting hole is disposed opposite to the first hoisting hole.
14. The energy storage device according to claim 1, characterized in that: The hanging parts are connected to the cross beam and the column through nut boxes.
15. The energy storage device according to claim 14, characterized in that: The top end of the column is lower than the beam corresponding to the column and forms a second accommodation space. The nut box is located in the second accommodation space and is welded to the beam and the column.
16. An energy storage system, characterized in that: Comprising the energy storage device as claimed in any one of claims 1 to 15.