Conveyor belt inspection corridor
By designing the conveyor belt inspection corridor and using columns, shielding structures and load-bearing rods to form a mobile corridor, the difficulty and danger of high-altitude conveyor belt inspections are solved, and convenient and safe inspection operations are achieved.
Patent Information
- Application Number
- CN202420645447.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-03-29
AI Technical Summary
During the concrete preparation process, the conveyor belt inspection operation at high altitude is difficult and dangerous, making it difficult to ensure accuracy and safety.
Design a conveyor belt inspection corridor that includes multiple columns, shielding structures, load-bearing rods and pads to form a mobile corridor so that staff can perform inspection operations conveniently and accurately and improve the safety of the inspection process.
Through this design, workers can conduct inspections on a stable bottom surface, making the operation more convenient and safer, effectively solving the difficulties and dangers of high-altitude inspections.
Smart Images

Figure CN221893905U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of aggregate transportation, and more specifically relates to a conveyor belt inspection corridor. Background Art
[0002] In the process of concrete preparation, a variety of aggregates need to be transported from the storage bin to the mixing chamber. Aggregates are mostly transported by conveyor belts. To ensure the accuracy and reliability of the conveyor belt during the transmission process, the staff needs to regularly inspect the conveyor belt. Since the storage bin is far away from the mixing chamber and the mixing chamber is located at a high position, the conveyor belt is also in the air, which makes it difficult for the staff to inspect the conveyor belt and is somewhat dangerous. Utility Model Content
[0003] The utility model aims to provide a conveyor belt inspection corridor to solve the technical problems existing in the prior art that the inspection operation of the conveyor belt in the air is difficult and dangerous.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: to provide a conveyor belt inspection corridor, including:
[0005] There are multiple columns, all of which are used to be fixedly installed on one side of the conveyor belt; the multiple columns are arranged at intervals along the length direction of the conveyor belt;
[0006] A shielding structure is fixedly mounted on the plurality of uprights; the shielding structure comprises two long shielding plates arranged at intervals, and a moving corridor for walking is formed between the two long shielding plates; a plurality of operating openings are arranged on the long shielding plate close to the conveyor belt; the length direction of the long shielding plate is consistent with the length direction of the conveyor belt;
[0007] There are multiple load-bearing bars, all of which are installed between the two long shielding plates and are arranged at intervals along the length direction of the long shielding plates; each load-bearing bar is provided with a mounting groove on one side close to the adjacent load-bearing bar;
[0008] There are multiple pads, which are respectively installed between two adjacent load-bearing bars; two ends of the pads are respectively installed in the installation grooves on the two adjacent load-bearing bars.
[0009] In a possible implementation, the long shielding plate includes:
[0010] There are multiple vertical rods, which are arranged parallel to each other along the length direction of the conveyor belt at intervals;
[0011] There are multiple transverse rods, which are arranged at intervals in the upper and lower parts. Each of the vertical rods is fixedly connected to the multiple vertical rods. Two adjacent vertical rods and two adjacent transverse rods form a mounting hole.
[0012] A plurality of safety nets corresponding one to one with the plurality of mounting holes; the safety nets are installed in the mounting holes and fixedly connected to the vertical rods and the transverse rods;
[0013] The operation opening is arranged on the upper transverse rod and the corresponding safety net.
[0014] In a possible implementation, a plurality of U-shaped rods recessed downward are provided on the upper transverse rod, and the height of the U-shaped rod is less than the distance between two adjacent transverse rods; and the inside of the U-shaped rod is the operation opening.
[0015] In a possible implementation, one U-shaped rod is provided between each of two adjacent vertical rods.
[0016] In a possible implementation, inclined plates are respectively provided at the upper ends of the long shielding plates away from the conveyor belt, and the inclined plates extend toward a side away from the long shielding plates close to the conveyor belt; the inclined plates are used to increase the width of the moving corridor.
[0017] In a possible implementation, a limiting column is provided on the bottom surface of the installation groove, and a limiting hole that is mounted in cooperation with the limiting column is provided at the lower end of the pad.
[0018] In a possible implementation, the thickness of the pad is greater than or equal to the depth of the mounting groove.
[0019] In a possible implementation, a plurality of anti-slip protrusions are provided on the upper end of the pad.
[0020] In a possible implementation, a mounting plate is provided on the outer side of the long shielding plate, and fixing holes are provided on the mounting plate; and fasteners for fixing connection with the mounting plate are provided on the upright column.
[0021] In a possible implementation, the plurality of columns are divided into two groups, and the two groups of columns are respectively arranged on both sides of the conveyor belt; and the shielding structures are two, which are respectively installed on the two groups of columns.
[0022] The beneficial effect of the conveyor belt inspection corridor provided by the utility model is that: compared with the prior art, in the conveyor belt inspection corridor of the utility model, multiple columns are fixed on one side of the conveyor belt and are arranged along the arrangement direction of the multiple columns; then the two long shielding plates in the shielding structure are fixedly installed on the upper ends of the multiple columns, and with the help of the height of the columns, the two long shielding plates are located on the same side of the conveyor belt; and multiple bearing rods are arranged on the moving corridor between the two long shielding plates, and the sides where two adjacent bearing rods are close to each other are provided with mounting grooves, and finally multiple pads are installed in the moving corridor, and the two ends of the pads are respectively installed in the two mounting grooves, and a relatively stable bottom surface is formed in the moving corridor with the help of multiple pads. In this way, with the help of the shielding structure, the bearing rods and the pads, a moving corridor located on one side of the conveyor belt is formed, and the staff can perform inspection operations conveniently and accurately, and the inspection process is highly safe. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0024] Figure 1 The main view of the conveyor belt inspection corridor provided by the embodiment of the utility model Figure 1 ;
[0025] Figure 2 The main view of the conveyor belt inspection corridor provided by the embodiment of the utility model Figure 2 ;
[0026] Figure 3 A top view of a conveyor belt inspection corridor provided by an embodiment of the utility model;
[0027] Figure 4 A top view of a conveyor belt inspection corridor without a pad installed provided in an embodiment of the utility model;
[0028] Figure 5 A schematic diagram of the connection between the column and the shielding structure provided in an embodiment of the utility model;
[0029] Figure 6 A schematic diagram of the connection between the pad and the bearing rod provided in the embodiment of the utility model;
[0030] Figure 7 A schematic structural diagram of a pad provided in an embodiment of the utility model.
[0031] Among them, the reference numerals in the figure are:
[0032] 1. Column; 11. Fasteners; 2. Shielding structure; 21. Long shielding board; 22. Mobile corridor; 23. Operation opening; 24. Vertical rod; 25. Horizontal rod; 26. Safety net; 27. U-shaped rod; 28. Inclined plate; 29. Mounting plate; 3. Load-bearing rod; 31. Mounting groove; 32. Limiting column; 4. Pad; 41. Limiting hole; 42. Anti-slip protrusion; 5. Conveyor belt. DETAILED DESCRIPTION
[0033] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0034] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0035] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0036] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0037] See also Figures 1 to 7Now, the conveyor belt 5 inspection corridor provided by the utility model is described. A conveyor belt 5 inspection corridor comprises a column 1, a shielding structure 2, a bearing rod 3 and a pad 4, wherein the number of the columns 1 is multiple, all of which are used for fixed installation on one side of the conveyor belt 5; the multiple columns 1 are arranged at intervals along the length direction of the conveyor belt 5; the shielding structure 2 is fixedly installed on the multiple columns 1; the shielding structure 2 has two long shielding plates 21 arranged at intervals, and a moving corridor 22 for walking is formed between the two long shielding plates 21; a plurality of operating openings 23 are provided on the long shielding plate 21 close to the conveyor belt 5; the length direction of the long shielding plate 21 is consistent with the length direction of the conveyor belt 5; the number of the bearing rods 3 is multiple, all of which are installed between the two long shielding plates 21, and are arranged at intervals along the length direction of the long shielding plates 21; each bearing rod 3 is provided with a mounting groove 31 on one side close to the adjacent bearing rod 3; the number of the pads 4 is multiple, respectively installed between two adjacent bearing rods 3; the two ends of the pad 4 are respectively installed in the mounting grooves 31 on the two adjacent bearing rods 3.
[0038] Compared with the prior art, the inspection corridor for the conveyor belt 5 provided by the utility model has a plurality of columns 1 fixed on one side of the conveyor belt 5 and arranged along the arrangement direction of the plurality of columns 1; then the two long shielding plates 21 in the shielding structure 2 are fixedly installed on the upper ends of the plurality of columns 1, and by virtue of the height of the columns 1, the two long shielding plates 21 are located on the same side of the conveyor belt 5; and a plurality of bearing rods 3 are arranged on the moving corridor between the two long shielding plates 21, and a mounting groove 31 is provided on the side close to two adjacent bearing rods 3, and finally a plurality of pads 4 are installed in the moving corridor 22, and the two ends of the pads 4 are respectively installed in the two mounting grooves 31, and a relatively stable bottom surface in the moving corridor 22 is formed by means of the plurality of pads 4. In this way, the moving corridor 22 located on one side of the conveyor belt 5 is formed by means of the shielding structure 2, the bearing rods 3 and the pads 4, so that the staff can conveniently and accurately perform the inspection operation, and the inspection process is highly safe.
[0039] See also Figures 1 to 4As a specific embodiment of the inspection corridor of the conveyor belt 5 provided by the utility model, the long shielding plate 21 includes a vertical rod 24, a transverse rod 25 and a safety net 26. The number of the vertical rods 24 is multiple, and they are arranged in parallel along the length direction of the conveyor belt 5; the number of the transverse rods 25 is multiple, and they are arranged in intervals up and down, and each vertical rod 24 is fixedly connected to multiple vertical rods 24; two adjacent vertical rods 24 and two adjacent transverse rods 25 surround a mounting hole; the number of the safety net 26 is multiple, and it is connected to multiple The mounting holes correspond one to one; the safety net 26 is installed in the mounting hole and fixedly connected with the vertical rod 24 and the transverse rod 25; the operation opening 23 is set on the transverse rod 25 located above and the corresponding safety net 26; multiple vertical rods 24 and multiple transverse rods 25 are arranged vertically and crosswise, wherein one transverse rod 25 is used as the bottom, multiple vertical rods 24 are arranged at intervals, and the lower ends are all fixed on the transverse rod 25, and the transverse rod 25 is directly fixed on multiple columns 1, so as to realize the fixed connection between the long shielding plate 21 and the column 1. Mounting holes are formed between the multiple vertical rods 24 and the multiple transverse rods 25, and the safety net 26 is installed in the multiple mounting holes. The multiple vertical rods 24 and the multiple transverse rods 25 form a structure with a relatively small weight, and the safety net 26 ensures that the entire inspection corridor has good safety performance. And the operation opening 23 is opened on the safety net 26 to facilitate the inspection operation of the staff.
[0040] See also Figures 1 to 4 As a specific embodiment of the inspection corridor of the conveyor belt 5 provided by the utility model, a plurality of U-shaped rods 27 that are recessed downward are provided on the upper transverse rod 25, and the height of the U-shaped rod 27 is less than the spacing between two adjacent transverse rods 25; the inside of the U-shaped rod 27 is the operation opening 23; one of the transverse rods 25 is fixedly installed on the upper end of the plurality of vertical rods 24, and a plurality of U-shaped rods 27 that are recessed downward are provided on the transverse rod 25, and the inner area of the U-shaped rod 27 is the operation opening 23, and the U-shaped rod 27 is integrally formed with the transverse rod 25. In this way, the operation opening 23 is stabilized by the U-shaped rod 27, and no accidents will occur.
[0041] See also Figure 1 , Figure 3 and Figure 4 As a specific implementation of the conveyor belt 5 inspection corridor provided by the utility model, a U-shaped rod 27 is provided between two adjacent vertical rods 24; in this way, the operation openings 23 are distributed more evenly, so that the inspection of the conveyor belt 5 is more accurate and more convenient.
[0042] See also Figure 3 and Figure 4As a specific embodiment of the inspection corridor of the conveyor belt 5 provided by the utility model, the upper ends of the long shielding plates 21 away from the conveyor belt 5 are respectively provided with inclined plates 28, and the inclined plates 28 extend toward the side away from the long shielding plates 21 close to the conveyor belt 5; the inclined plates 28 are used to increase the width of the moving corridor 22; the width of both ends of the entire inspection corridor is increased by the inclined plates 28, so that when the staff enters or leaves the moving corridor 22, the staff can move more steadily through a wider distance, and adapt to the inspection corridor of the high-altitude environment more quickly. The inclined plates 28 are integrally formed with the long shielding plates 21 and are inclined outward.
[0043] See also Figure 6 As a specific implementation of the inspection corridor for the conveyor belt 5 provided by the utility model, a limiting column 32 is provided on the bottom surface of the installation groove 31, and a limiting hole 41 is provided at the lower end of the pad 4 to be installed in cooperation with the limiting column 32; when the pad 4 is installed on the two bearing rods 3, the two ends of the pad 4 are respectively supported in the two installation grooves 31, and the limiting hole 41 at the lower end of the pad 4 is installed in cooperation with the limiting column 32 on the installation groove 31, which serves the purpose of limiting the pad 4 and ensuring that the pad 4 is accurately and stably installed.
[0044] See also Figure 6 As a specific implementation of the conveyor belt 5 inspection corridor provided by the utility model, the thickness of the pad 4 is greater than or equal to the depth of the installation groove 31; therefore, after the pad 4 is installed in the two installation grooves 31 between two adjacent load-bearing rods 3, the upper end surface of the pad 4 is equal to or higher than the upper end surface of the load-bearing rod 3, so that the bottom surface of the moving corridor 22 composed of multiple pads 4 will not interfere with or block the staff.
[0045] See also Figure 7 As a specific embodiment of the conveyor belt 5 inspection corridor provided by the utility model, a plurality of anti-skid protrusions 42 are provided on the upper end of the pad 4, and the friction of the pad 4 is increased by the anti-skid protrusions 42, so that the staff can walk safely and smoothly on the moving corridor 22. The anti-skid protrusions 42 are densely arranged on the pad 4.
[0046] See also Figures 1 to 4As a specific embodiment of the inspection corridor of the conveyor belt 5 provided by the utility model, a mounting plate 29 is provided on the outer side of the long shielding plate 21, and a fixing hole is provided on the mounting plate 29; a fastener 11 for fixing and connecting with the mounting plate 29 is provided on the column 1; that is, the mounting plates 29 extending outward are provided on the opposite sides of the long shielding plate 21, and a fixing hole is provided on the mounting plate 29. When the long shielding plate 21 is installed on the column 1, the fastener 11 is used to pass through the fixing hole to fix the mounting plate 29 on the column 1, so as to ensure that the long shielding plate 21 and the column 1 are firmly fixed. The fastener 11 is a bolt or a nut, and the anchor bolts prefabricated on the column 1 can also be used, and then the nuts are used to lock and fix.
[0047] See also Figure 3 and Figure 4 As a specific embodiment of the inspection corridor of the conveyor belt 5 provided by the utility model, a plurality of columns 1 are divided into two groups, and the two groups of columns 1 are respectively arranged on both sides of the conveyor belt 5; there are two shielding structures 2, which are respectively installed on the two groups of columns 1; that is, inspection corridors are arranged on both sides of the length direction of the conveyor belt 5, so that the staff can operate on both sides of the conveyor belt 5. A plurality of columns 1 are divided into two groups, which are respectively fixed on both sides of the conveyor belt 5, and two shielding structures 2 are respectively fixed on the two groups of columns 1. Each group of columns 1 is set to three to five, which can stably support two long shielding plates 21 in a shielding structure 2.
[0048] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A conveyor belt inspection corridor, characterized in that: include: There are multiple columns, all of which are used to be fixedly installed on one side of the conveyor belt; the multiple columns are arranged at intervals along the length direction of the conveyor belt; A shielding structure is fixedly mounted on the plurality of uprights; the shielding structure comprises two long shielding plates arranged at intervals, and a moving corridor for walking is formed between the two long shielding plates; a plurality of operating openings are arranged on the long shielding plate close to the conveyor belt; the length direction of the long shielding plate is consistent with the length direction of the conveyor belt; There are multiple load-bearing bars, all of which are installed between the two long shielding plates and are arranged at intervals along the length direction of the long shielding plates; each load-bearing bar is provided with a mounting groove on one side close to the adjacent load-bearing bar; There are multiple pads, which are respectively installed between two adjacent load-bearing bars; two ends of the pads are respectively installed in the installation grooves on the two adjacent load-bearing bars.
2. The conveyor belt inspection corridor according to claim 1, characterized in that: The long shielding plate comprises: There are multiple vertical rods, which are arranged parallel to each other along the length direction of the conveyor belt at intervals; There are multiple transverse rods, which are arranged at intervals in the upper and lower parts. Each of the vertical rods is fixedly connected to the multiple vertical rods. Two adjacent vertical rods and two adjacent transverse rods form a mounting hole. A plurality of safety nets corresponding one to one with the plurality of mounting holes; the safety nets are installed in the mounting holes and fixedly connected to the vertical rods and the transverse rods; The operation opening is arranged on the upper transverse rod and the corresponding safety net.
3. The conveyor belt inspection corridor according to claim 2, characterized in that: The upper transverse rod is provided with a plurality of U-shaped rods recessed downwards, and the height of the U-shaped rod is less than the distance between two adjacent transverse rods; the inside of the U-shaped rod is the operation opening.
4. The conveyor belt inspection corridor according to claim 3, characterized in that: A U-shaped rod is provided between two adjacent vertical rods.
5. The conveyor belt inspection corridor according to claim 1, characterized in that: Inclined plates are respectively provided at the upper ends of the long shielding plates away from the conveyor belt, and the inclined plates extend toward a side away from the long shielding plates close to the conveyor belt; the inclined plates are used to increase the width of the moving corridor.
6. The conveyor belt inspection corridor according to claim 1, characterized in that: A limiting column is arranged on the bottom surface of the installation groove, and a limiting hole which is matched with the limiting column and installed at the lower end of the pad is arranged.
7. The conveyor belt inspection corridor according to claim 1, characterized in that: The thickness of the pad is greater than or equal to the depth of the mounting groove.
8. The conveyor belt inspection corridor according to claim 1, characterized in that: The upper end of the pad is provided with a plurality of anti-slip protrusions.
9. The conveyor belt inspection corridor according to claim 1, characterized in that: A mounting plate is provided on the outer side of the long shielding plate, and a fixing hole is provided on the mounting plate; and a fastener for fixing and connecting with the mounting plate is provided on the column.
10. The conveyor belt inspection corridor according to any one of claims 1 to 9, characterized in that: The plurality of upright posts are divided into two groups, and the two groups of upright posts are respectively arranged on both sides of the conveyor belt; the plurality of shielding structures are two, and are respectively installed on the two groups of upright posts.