By designing a construction engineering sampler with a mobile trolley and positioning components, the problems of sampling device movement and drill bit damage in the existing technology are solved, sampling accuracy and stability are achieved, and sampling efficiency and cost-effectiveness are improved.

CN221895743UInactive Publication Date: 2024-10-25杨映龙
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420478228.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing sampling devices for construction engineering inspections are prone to device movement during sampling, resulting in sampling failure and drill bit damage, which affects the sampling progress and cost.

Method used

A construction engineering sampler including a mobile car, a sampling component and a positioning component is designed. The driving motor drives the screw and the moving block to realize the landing of the spiral sampling paddle for sampling, and the positioning component maintains the vertical state of the sampling tube. Prevent deflection.

Benefits of technology

The accuracy and stability of the sampling process are achieved, device movement and drill bit damage are avoided, and sampling efficiency and cost-effectiveness are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895743U_ABST
    Figure CN221895743U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction engineering sampler, which relates to the technical field of construction engineering sampling and comprises a moving trolley, a sampling hole is arranged in the middle of the moving trolley, a sampling component is arranged at the top of the moving trolley, a positioning component is arranged outside the top of the sampling hole, and the positioning component is positioned inside the sampling component. The sampling assembly comprises a bearing frame, a driving motor is arranged at the top of the bearing frame, a first lead screw is arranged at the bottom of the driving motor, a moving block and a connecting plate are arranged outside the first lead screw, a transmission lead screw and a moving rod are arranged at the bottom of the connecting plate, and a spiral sampling paddle and a sampling pipe are arranged outside the moving rod. Sampling is achieved through the arranged sampling assembly, the arranged moving block drives the connecting plate and the sampling pipe to descend, the moving rod drives the spiral sampling paddle to descend along the transmission lead screw, sampling is achieved in the descending process, the structure is simple, and convenience and rapidness are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering sampling, in particular to a construction engineering sampler. Background Art

[0002] Construction projects refer to all kinds of buildings and engineering facilities that provide material and technical basis for human life and production. Construction projects are organized, purposeful, large-scale economic activities of human beings. According to their natural attributes, construction projects can be divided into three categories: architectural engineering, civil engineering and mechanical and electrical engineering. They are engineering projects that form comprehensive production capacity or exert engineering benefits in the process of fixed asset reproduction; construction projects refer to the construction of new or the transformation of existing fixed assets, so it is necessary to test and sample the site to be constructed in advance before work.

[0003] The existing sampling devices for construction project inspection do not have an ideal fixing effect on the sampling tube. When sampling, the device is prone to move due to excessive pressure, resulting in sampling failure and affecting the sampling progress. In addition, the movement of the device is prone to damage the sampling drill bit, which consumes costs. Therefore, it is necessary to provide a construction project sampler to solve the problem. Utility Model Content

[0004] The main purpose of the utility model is to provide a construction engineering sampler, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A construction engineering sampler comprises a mobile trolley, a sampling hole is arranged in the middle of the mobile trolley, a sampling assembly is arranged on the top of the mobile trolley, a positioning assembly is arranged outside the top of the sampling hole, and the positioning assembly is located inside the sampling assembly;

[0007] The sampling assembly includes a bearing frame, a driving motor is arranged on the top of the bearing frame, a first lead screw is arranged on the bottom of the driving motor, a moving block is arranged outside the first lead screw, a connecting plate is arranged on the side of the moving block, a transmission lead screw is arranged at the bottom of the connecting plate, a moving rod is arranged outside the transmission lead screw, a spiral sampling paddle is arranged outside the moving rod, and a sampling tube is arranged outside the spiral sampling paddle;

[0008] The positioning assembly includes a positioning ring, a mounting frame is arranged in the middle of the positioning ring, a motor is arranged on one side of the interior of the mounting frame, a partition is arranged on the side of the motor, a second lead screw is arranged in the middle of the partition, an ejector rod is arranged on the outside of the second lead screw, a movable slide is arranged at one end of the ejector rod, and an arc-shaped positioning plate is arranged at the other end of the ejector rod, and a sliding ball is arranged on the side of the arc-shaped positioning plate.

[0009] Preferably, the supporting frame is fixedly connected to the top of the mobile trolley, and the sampling hole is located in the middle of the bottom of the supporting frame. The driving motor is connected to the supporting frame by bolts, and there are two driving motors, which are symmetrically distributed on both sides of the top of the supporting frame. The output end of the driving motor is connected to the first lead screw transmission, and both ends of the first lead screw are installed inside the supporting frame through bearings.

[0010] Preferably, the first lead screw and the moving block are sleeved together, and the side of the moving block away from the first lead screw is connected to the connecting plate by bolts, a servo motor is provided on the top of the connecting plate, and the output end of the servo motor is transmission-connected to the transmission lead screw, and the top end of the transmission lead screw is installed in the middle of the connecting plate through a bearing, the transmission lead screw and the moving rod are sleeved together, the moving rod is fixedly connected to the spiral sampling paddle, the spiral sampling paddle and the sampling tube are sleeved together, the top of the sampling tube is connected to the bottom of the connecting plate by bolts, and the bottom end of the spiral sampling paddle is fixedly connected to a drill bit.

[0011] Preferably, the bottom of the positioning ring is fixedly mounted on the top of the moving trolley, the positioning ring is connected to the mounting frame by bolts, there are four mounting frames, which are symmetrically distributed on the four sides of the positioning ring, the mounting frame is connected to the motor by bolts, and the mounting frame is fixedly connected to the partition, the motor is located between the partition and the mounting frame, the output end of the motor is transmission connected to the second lead screw, and the end of the second lead screw close to the motor is installed in the middle of the partition through a bearing.

[0012] Preferably, the second lead screw and the ejector rod are sleeved together, the ejector rod is fixedly connected to the movable slide, and the inner wall of the movable slide is tightly fitted with the outer wall of the second lead screw, the outer wall of the movable slide is slidably connected to the inside of the mounting frame, the end of the ejector rod away from the movable slide passes through the end of the mounting frame away from the motor, the end of the ejector rod away from the movable slide is installed with a mounting seat by bolts, and the side surface of the mounting seat is connected to the arc-shaped positioning plate by bolts, and the side surface of the arc-shaped positioning plate is installed with sliding beads.

[0013] Preferably, a stabilizing bearing is installed at the end of the second screw away from the motor, and the stabilizing bearing is sleeved inside the ejector rod. A support block is fixedly connected to the outer wall of the stabilizing bearing, and there are two support blocks, which are symmetrically distributed on both sides of the stabilizing bearing. A through groove is opened in the middle of the side wall of the ejector rod, and the support block is slidably connected to the inside of the through groove.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] 1. Sampling is achieved through the sampling assembly. The connecting plate and the sampling tube are driven to descend by the moving block, so that the moving rod drives the spiral sampling paddle to descend along the transmission screw. Sampling is achieved during the descent. The structure is simple, convenient and fast.

[0016] 2. The sampling tube is positioned by means of a positioning assembly, and the ejector rod is moved along the second lead screw, so that the mounting seat, the arc-shaped positioning plate and the sliding ball can stably clamp the sampling tube, thereby keeping the sampling tube in a vertical state, preventing the sampling tube from shifting during the sampling process and affecting the sampling accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a first-view stereogram of the entire device of the utility model;

[0018] Figure 2 It is a second perspective stereogram of the entire device of the utility model;

[0019] Figure 3 It is a structural schematic diagram of the sampling assembly of the utility model;

[0020] Figure 4 It is a structural schematic diagram of the positioning assembly of the utility model;

[0021] Figure 5 It is a schematic diagram of the structure inside the installation frame of the utility model.

[0022] In the figure: 1. moving trolley; 2. sampling hole; 3. sampling assembly; 4. bearing frame; 5. driving motor; 6. first screw; 7. moving block; 8. connecting plate; 9. transmission screw; 10. moving rod; 11. spiral sampling paddle; 12. drill bit; 13. sampling tube; 14. positioning assembly; 15. positioning ring; 16. mounting frame; 17. motor; 18. partition; 19. second screw; 20. ejector rod; 21. moving slide plate; 22. stabilizing bearing; 23. support block; 24. through groove; 25. mounting seat; 26. arc positioning plate; 27. sliding ball. DETAILED DESCRIPTION

[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0024] See also Figure 1-Figure 5 As shown, the construction engineering sampler comprises a mobile trolley 1, a sampling hole 2 is arranged in the middle of the mobile trolley 1, a sampling assembly 3 is arranged on the top of the mobile trolley 1, a positioning assembly 14 is arranged outside the top of the sampling hole 2, and the positioning assembly 14 is located inside the sampling assembly 3;

[0025] See also Figure 1 , Figure 2 , Figure 3 As shown, the sampling assembly 3 includes a carrying frame 4, a driving motor 5 is arranged on the top of the carrying frame 4, and a first screw 6 is arranged at the bottom of the driving motor 5, a moving block 7 is arranged outside the first screw 6, and a connecting plate 8 is arranged on the side of the moving block 7, a transmission screw 9 is arranged at the bottom of the connecting plate 8, a moving rod 10 is arranged outside the transmission screw 9, a spiral sampling paddle 11 is arranged outside the moving rod 10, and a sampling tube 13 is arranged outside the spiral sampling paddle 11, the carrying frame 4 is fixedly connected to the top of the moving trolley 1, and the sampling hole 2 is located in the middle of the bottom of the carrying frame 4, the driving motor 5 is connected to the carrying frame 4 by bolts, and there are two driving motors 5, which are symmetrically distributed on both sides of the top of the carrying frame 4, the output end of the driving motor 5 is transmission-connected to the first screw 6, and the two ends of the first screw 6 are installed inside the carrying frame 4 through bearings. The moving block 7 is sleeved together, and the side of the moving block 7 away from the first screw 6 is connected to the connecting plate 8 by bolts. A servo motor is arranged on the top of the connecting plate 8, and the output end of the servo motor is connected to the transmission screw 9 by transmission. The top of the transmission screw 9 is installed in the middle of the connecting plate 8 through a bearing. The transmission screw 9 is sleeved with a moving rod 10, and the moving rod 10 is fixedly connected to a spiral sampling paddle 11. The spiral sampling paddle 11 is sleeved with a sampling tube 13. The top of the sampling tube 13 is connected to the bottom of the connecting plate 8 by bolts, and the bottom end of the spiral sampling paddle 11 is fixedly connected with a drill bit 12. Sampling is achieved by the set sampling assembly 3. The connecting plate 8 and the sampling tube 13 are driven to descend by the set moving block 7, so that the moving rod 10 drives the spiral sampling paddle 11 to descend along the transmission screw 9, and sampling is achieved in the process of descending. The structure is simple and convenient.

[0026] See also Figure 1 , Figure 2 , Figure 4 , Figure 5As shown, the positioning assembly 14 includes a positioning ring 15, a mounting frame 16 is arranged in the middle of the positioning ring 15, and a motor 17 is arranged on one side of the inner side of the mounting frame 16, a partition 18 is arranged on the side of the motor 17, a second lead screw 19 is arranged in the middle of the partition 18, and an ejector rod 20 is arranged on the outside of the second lead screw 19, a moving slide plate 21 is arranged at one end of the ejector rod 20, and an arc-shaped positioning plate 26 is arranged at the other end of the ejector rod 20, and a sliding ball 27 is arranged on the side of the arc-shaped positioning plate 26, and the bottom of the positioning ring 15 is fixedly installed on the top of the mobile trolley 1, and the positioning ring 15 and the mounting frame are fixedly installed on the top of the mobile trolley 1, and the positioning ring 15 and the mounting frame are fixedly installed on the inner side of the mobile trolley 1. 16 is connected by bolts, there are four mounting frames 16, which are symmetrically distributed on the four sides of the positioning ring 15, the mounting frame 16 is connected to the motor 17 by bolts, and the mounting frame 16 is fixedly connected to the partition 18, the motor 17 is located between the partition 18 and the mounting frame 16, the output end of the motor 17 is transmission-connected to the second lead screw 19, and the end of the second lead screw 19 close to the motor 17 is installed in the middle of the partition 18 through a bearing, the second lead screw 19 is sleeved with the ejector rod 20, the ejector rod 20 is fixedly connected to the moving slide 21, and the inner wall of the moving slide 21 is connected to the outer wall of the second lead screw 19. The outer wall of the movable slide plate 21 is slidably connected with the inner wall of the mounting frame 16, the end of the ejector rod 20 away from the movable slide plate 21 passes through the end of the mounting frame 16 away from the motor 17, the end of the ejector rod 20 away from the movable slide plate 21 is installed with a mounting seat 25 by bolts, and the side of the mounting seat 25 is connected with the arc positioning plate 26 by bolts, and the side of the arc positioning plate 26 is installed with a sliding ball 27, and the end of the second lead screw 19 away from the motor 17 is installed with a stabilizing bearing 22, and the stabilizing bearing 22 is sleeved inside the ejector rod 20, and the outer wall of the stabilizing bearing 22 is fixedly connected with There are two support blocks 23, which are symmetrically distributed on both sides of the stable bearing 22. A through groove 24 is opened in the middle of the side wall of the ejector rod 20, and the support block 23 is slidably connected to the inside of the through groove 24. The positioning component 14 is provided to realize the positioning of the sampling tube 13. The ejector rod 20 is provided to move along the second screw 19, so that the mounting seat 25, the arc-shaped positioning plate 26 and the sliding ball 27 can realize the stable clamping of the sampling tube 13, so that the sampling tube 13 can be kept in a vertical state to prevent the sampling tube 13 from being offset during the sampling process, which affects the sampling accuracy.

[0027] It should be noted that the utility model is a construction engineering sampler. When in use, the mobile trolley 1 is pushed to move the device to the desired position. The first screw 6 is driven to rotate by the set driving motor 5, so that the moving block 7 drives the connecting plate 8 to descend. A servo motor is installed on the top of the connecting plate 8, so that the servo motor drives the transmission screw 9 to rotate, so that the moving rod 10 drives the spiral sampling paddle 11 to descend along the transmission screw 9, and the sampling effect is realized in the process of descending. A positioning component 14 is arranged on the outside of the sampling tube 13, and the second screw 19 is driven to rotate by the set motor 17, so that the moving slide plate 2 The ejector rod 20 is driven to slide inside the mounting frame 16, so that the ejector rod 20 can eject the mounting seat 25 and the arc-shaped positioning plate 26. A sliding ball 27 is installed on the side of the arc-shaped positioning plate 26 to prevent the sampling tube 13 from falling during the positioning and clamping process. A stabilizing bearing 22 is installed at one end of the second lead screw 19 away from the motor 17 to further increase the stability of the second lead screw 19. Both sides of the stabilizing bearing 22 are connected to the middle of the side of the mounting frame 16 through a supporting block 23, and the supporting block 23 is slidably connected to the through slot 24 in the middle of the ejector rod 20, thereby improving the convenience and stability of the device.

[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction engineering sampler, comprising a mobile trolley (1), characterized in that: A sampling hole (2) is provided in the middle of the mobile trolley (1), and a sampling assembly (3) is provided on the top of the mobile trolley (1); a positioning assembly (14) is provided outside the top of the sampling hole (2), and the positioning assembly (14) is located inside the sampling assembly (3); The sampling assembly (3) comprises a carrying frame (4), a driving motor (5) is arranged on the top of the carrying frame (4), a first screw (6) is arranged on the bottom of the driving motor (5), a moving block (7) is arranged outside the first screw (6), a connecting plate (8) is arranged on the side of the moving block (7), a transmission screw (9) is arranged at the bottom of the connecting plate (8), a moving rod (10) is arranged outside the transmission screw (9), a spiral sampling paddle (11) is arranged outside the moving rod (10), and a sampling tube (13) is arranged outside the spiral sampling paddle (11); The positioning assembly (14) comprises a positioning ring (15), a mounting frame (16) is arranged in the middle of the positioning ring (15), a motor (17) is arranged on one side of the inner part of the mounting frame (16), a partition (18) is arranged on the side of the motor (17), a second lead screw (19) is arranged in the middle of the partition (18), an ejector rod (20) is arranged outside the second lead screw (19), a movable slide plate (21) is arranged at one end of the ejector rod (20), and an arc-shaped positioning plate (26) is arranged at the other end of the ejector rod (20), and a sliding ball (27) is arranged on the side of the arc-shaped positioning plate (26).

2. The construction engineering sampler according to claim 1, characterized in that: The bearing frame (4) is fixedly connected to the top of the moving trolley (1), and the sampling hole (2) is located in the middle of the bottom of the bearing frame (4). The driving motor (5) is connected to the bearing frame (4) by bolts, and there are two driving motors (5), which are symmetrically distributed on both sides of the top of the bearing frame (4). The output end of the driving motor (5) is connected to the first lead screw (6) in a transmission manner, and the two ends of the first lead screw (6) are installed inside the bearing frame (4) through bearings.

3. The construction engineering sampler according to claim 2, characterized in that: The first lead screw (6) and the moving block (7) are sleeved together, and the side of the moving block (7) away from the first lead screw (6) is connected to the connecting plate (8) by bolts. A servo motor is arranged on the top of the connecting plate (8), and the output end of the servo motor is transmission-connected to the transmission lead screw (9). The top end of the transmission lead screw (9) is installed in the middle of the connecting plate (8) by a bearing. The transmission lead screw (9) and the moving rod (10) are sleeved together, and the moving rod (10) is fixedly connected to the spiral sampling paddle (11). The spiral sampling paddle (11) and the sampling tube (13) are sleeved together. The top of the sampling tube (13) is connected to the bottom of the connecting plate (8) by bolts, and the bottom end of the spiral sampling paddle (11) is fixedly connected to a drill bit (12).

4. The construction engineering sampler according to claim 1, characterized in that: The bottom of the positioning ring (15) is fixedly mounted on the top of the moving trolley (1), the positioning ring (15) is connected to the mounting frame (16) by bolts, there are four mounting frames (16), which are symmetrically distributed on four sides of the positioning ring (15), the mounting frame (16) is connected to the motor (17) by bolts, and the mounting frame (16) is fixedly connected to the partition (18), the motor (17) is located between the partition (18) and the mounting frame (16), the output end of the motor (17) is transmission-connected to the second lead screw (19), and the end of the second lead screw (19) close to the motor (17) is mounted in the middle of the partition (18) through a bearing.

5. The construction engineering sampler according to claim 4, characterized in that: The second lead screw (19) and the ejector rod (20) are sleeved together, the ejector rod (20) is fixedly connected to the movable slide (21), and the inner wall of the movable slide (21) is tightly fitted with the outer wall of the second lead screw (19), the outer wall of the movable slide (21) is slidably connected to the inside of the mounting frame (16), one end of the ejector rod (20) away from the movable slide (21) passes through one end of the mounting frame (16) away from the motor (17), one end of the ejector rod (20) away from the movable slide (21) is bolted with a mounting seat (25), and the side of the mounting seat (25) is bolted to the arc-shaped positioning plate (26), and a sliding ball (27) is installed on the side of the arc-shaped positioning plate (26).

6. The construction engineering sampler according to claim 5, characterized in that: A stabilizing bearing (22) is installed at one end of the second lead screw (19) away from the motor (17), and the stabilizing bearing (22) is sleeved inside the ejector rod (20). A support block (23) is fixedly connected to the outer wall of the stabilizing bearing (22), and there are two support blocks (23), which are symmetrically distributed on both sides of the stabilizing bearing (22). A through groove (24) is opened in the middle of the side wall of the ejector rod (20), and the support block (23) is slidably connected inside the through groove (24).