Assembly type stacked concrete frame structure connecting joint

By adopting the node connection method of reserved steel bars, mechanical connection joints and cast-in-place concrete in prefabricated buildings, the specification problem of node connections in prefabricated buildings is solved, rapid construction and efficient construction are achieved, and the requirements of current specifications are met.

CN221895933UInactive Publication Date: 2024-10-25CHINA NORTHEAST ARCHITECTURAL DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420437999.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The lack of standard-supported node connection methods in prefabricated buildings results in the inability of the steel bars to be anchored normally, low construction efficiency, and the inability to achieve rapid construction and overall stiffness requirements.

Method used

A joint connection method including reserved steel bars, mechanical connection joints, stirrups and cast-in-situ concrete is adopted. The integral modules are prefabricated in the factory, and the mechanical connections and cast-in-situ concrete are poured on site to meet the requirements of the current specifications.

Benefits of technology

It achieves specification support for prefabricated stacked concrete frame structures, enables rapid construction, reduces construction errors and wet work volume, and improves construction quality and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895933U_ABST
    Figure CN221895933U_ABST
Patent Text Reader

Abstract

The utility model discloses a connection node of an assembly type stacked concrete frame structure, relates to the technical field of building components, and aims to solve the problem of meeting the requirements of a structural system by adopting a node connection method in the assembly process of an assembly type building component integral prefabricated module on a construction site. The integrated prefabricated module comprises a plurality of integrated prefabricated modules which are connected through upper joint areas of the integrated prefabricated modules, each integrated prefabricated module comprises a composite floor slab, a frame beam and a frame column, the tops of the frame columns are connected through the frame beam, the composite floor slabs are installed at the tops of the frame beams, and reserved steel bars are reserved at the column tops and the column bottoms of the frame columns; the node area comprises reserved steel bars, mechanical connectors, stirrups and cast-in-place concrete, the reserved steel bars are transversely bound through the stirrups and longitudinally connected through the mechanical connectors, and the cast-in-place concrete is poured outside the reserved steel bars. The whole prefabricated modules are all prefabricated in a factory, and compared with a conventional fabricated building, rapid construction can be achieved, and the construction period is greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building components, in particular to an assembled stacked concrete frame structure connection node. Background Art

[0002] Prefabricated buildings are a construction method that the country has actively promoted in recent years, with the goal of improving production efficiency and building quality, reducing carbon emissions, and realizing the industrialization of construction. At present, the usual practice is to prefabricate only single components (i.e. single beams and columns, single panels and walls). There is still a lot of work such as steel bar tying on the construction site, and problems such as steel bars not being able to be properly anchored often occur, and the efficiency is still low.

[0003] If the partial beams, slabs and columns of the building are prefabricated together in the factory (referred to as integral prefabricated modules), even including interior decoration, etc., and transported to the site and connected through convenient nodes to form an integral structure, it will greatly improve the construction efficiency and shorten the construction period, and play a great role in promoting the rapid construction of prefabricated buildings. Prefabricated integral modules should have the characteristics of a high degree of standardization to give full play to the advantages of factory production. This overall modular construction method will produce good social and environmental benefits. After the integral prefabricated modules are laid adjacent to each other or stacked up and down, they are connected through reliable nodes to form an overall stiffness between the modules to meet the requirements of the structural system. This is the problem and significance that this technology needs to solve.

[0004] Since there is currently no relevant specification as technical support for this structural system, it is necessary to study a node connection method to make it similar to the cast-in-place concrete frame structure system and meet the requirements of the current specifications, so as to promote the application of this overall modular rapid construction technology.

[0005] The present technology provides a solution for this node connection, which is not limited to the splicing of two or more units. When multiple units are spliced, it is only necessary to connect multiple adjacent columns into a whole.

[0006] For this type of prefabricated stacked concrete frame structure, there is no relevant node practice and no specifications as technical support, which makes it impossible to promote and apply. This technology adopts the provisions of the specifications for steel bar connection and cast-in-place node area concrete, so that this structure can be similar to a fully cast-in-place frame structure and meet the requirements of the current specifications. This is the core problem solved by this technology. The force calculation of the node area should meet the relevant provisions of the concrete deep beam and the frame node area. Utility Model Content

[0007] In order to solve the above problems, that is, to solve the problems raised by the above background technology, the utility model proposes an assembled stacked concrete frame structure connection node, which includes a plurality of integral prefabricated modules connected through the node area above, the integral prefabricated modules include a composite floor, a frame beam and a frame column, the tops of a plurality of the frame columns are connected through the frame beam, the top of the frame beam is installed with a composite floor, and the column top and the column bottom of the frame column are both reserved with reserved steel bars;

[0008] The node area includes reserved steel bars, mechanical connection joints, stirrups and cast-in-place concrete. The reserved steel bars are transversely bound by stirrups, the reserved steel bars are longitudinally connected by mechanical connection joints, and cast-in-place concrete is poured outside the reserved steel bars.

[0009] The utility model is further configured as follows: the mechanical connection joints between adjacent modules are arranged in a staggered manner longitudinally.

[0010] The utility model is further configured as follows: the reserved steel bars are selected from a small number of large-diameter steel bars, and the steel bar arrangement spacing is ≤200mm.

[0011] The beneficial technical effects of the utility model are as follows: 1. The utility model solves the key problem of the specification support of the assembled stacked concrete frame structure, making it similar to a fully cast-in-place frame structure, meeting the requirements of the current specifications and having unlimited application.

[0012] 2. All prefabricated modules are prefabricated in the factory. Compared with conventional prefabricated buildings, they can be built quickly and the construction period can be greatly reduced.

[0013] 3. Compared with single prefabricated components, the overall prefabricated module can greatly reduce construction errors, steel bar collisions and other problems at the construction site, and improve the quality of the building.

[0014] 4. Only the connection node areas and the cast-in-place layer of the composite floor slab are poured on site, which greatly reduces the amount of wet work on site.

[0015] 5. It can achieve the effect of plain concrete. If it is prefabricated in the factory together with the enclosure structure, it has a high degree of assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the overall prefabricated module is shown.

[0017] Figure 2 A schematic diagram of an assembled stacking frame structure is shown.

[0018] Figure 3 The elevation structure diagram of the stacked frame connection node area is shown.

[0019] Figure numerals: 1. composite floor, 2. frame beam, 3. frame column, 4. reserved steel bars, 5. mechanical connection joint, 6. stirrups, 7. cast-in-place concrete. DETAILED DESCRIPTION

[0020] Please refer to the attached Figure 1-3 Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0021] The utility model proposes an assembled stacked concrete frame structure connection node, including a plurality of integral prefabricated modules connected through the node area above, the integral prefabricated modules including a composite floor slab 1, a frame beam 2 and a frame column 3, the tops of the plurality of frame columns 3 are connected through the frame beam 2, the top of the frame beam 2 is installed with the composite floor slab 1, and the column top and the column bottom of the frame column 3 are both reserved with reserved steel bars 4;

[0022] The node area includes reserved steel bars 4, mechanical connection joints 5, stirrups 6 and cast-in-place concrete 7. The reserved steel bars 4 are transversely bound by stirrups 6, the reserved steel bars 4 are longitudinally connected by mechanical connection joints 5, and cast-in-place concrete 7 is poured outside the reserved steel bars 4.

[0023] The mechanical connection joints 5 between adjacent modules are arranged in a staggered manner in the longitudinal direction, and 50% of the total number of joints are staggered up and down. The reserved steel bars 4 are selected from a small number of large-diameter steel bars, and the spacing between the steel bars is ≤200mm.

[0024] Construction technology:

[0025] S1. The overall prefabricated module is prefabricated in the factory. The top and bottom of the frame column 3 are reserved with reserved steel bars 4 according to the design nodes, and then transported to the construction site after curing;

[0026] S2, first install the first module, and then install the second module in sequence;

[0027] S3, on-site tying of beam top steel bars, slab surface steel bars and column stirrups 6 in the cast-in-place layer of the composite floor slab, where the column stirrups 6 are used to tie together all the reserved steel bars 4 of two adjacent module frame columns 3;

[0028] S4, pouring concrete for the cast-in-place layer of the composite floor slab;

[0029] S5, installing the third module and the fourth module;

[0030] S6, connecting the reserved steel bars 4 of the upper and lower module frame columns 3 by using a mechanical connection joint 5;

[0031] S7, tying column stirrups 6 on site, tying all the reserved steel bars 4 of adjacent module frame columns 3 together to form an integral connection node;

[0032] S8, pouring cast-in-place concrete 7 in the node area;

[0033] S9. Repeat steps S2-S8 to complete the installation of the overall prefabricated modules of the entire building. When assembling more than two adjacent module units on the same floor, the same idea can be used.

[0034] like Figure 1 As shown, the integral prefabricated module is prefabricated as a whole in the factory and consists of a composite floor slab 1, a frame beam 2 and a frame column 3. When conditions permit, it may include lightweight partition walls, external protective walls and internal decoration, etc.

[0035] like Figure 2 As shown, the overall prefabricated modules are laid adjacent to each other or stacked up and down at the construction site, and a concrete frame with overall rigidity is formed through special connection nodes, which is called an assembled stacked concrete frame structure.

[0036] Although the present invention has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

[0037] In the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0038] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0039] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.

[0040] So far, the technical solution of the present invention has been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A prefabricated stacked concrete frame structure connection node, comprising a plurality of integral prefabricated modules connected through their upper node areas, Features: The integral prefabricated module comprises a composite floor slab (1), a frame beam (2) and a frame column (3), the tops of a plurality of the frame columns (3) are connected via a frame beam (2), the composite floor slab (1) is installed on the top of the frame beam (2), and reserved steel bars (4) are reserved at the top and bottom of each frame column (3); The node area comprises reserved steel bars (4), mechanical connection joints (5), stirrups (6) and cast-in-place concrete (7); the reserved steel bars (4) are bound transversely by stirrups (6); the reserved steel bars (4) are connected longitudinally by mechanical connection joints (5); and cast-in-place concrete (7) is poured outside the reserved steel bars (4).

2. According to claim 1, a prefabricated stacked concrete frame structure connection node, Features: The mechanical connection joints (5) between adjacent modules are arranged in a staggered manner longitudinally.

3. According to claim 1, a prefabricated stacked concrete frame structure connection node, Features: The reserved steel bars (4) are selected from a small number of large-diameter steel bars, and the steel bar arrangement spacing is ≤200mm.