Adjustable tensioning anchor rod for geological engineering
By designing an adjustment mechanism in the anchor rod and utilizing the cooperation of the inner rod and the hinged seat, the anchor rod is accurately positioned and stably supported in the borehole, solving the problem that the existing anchor rod is difficult to adjust to the center and adapt to different sizes of boreholes. problem, improving the flexibility and stability of the anchor.
Patent Information
- Application Number
- CN202420714728.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing anchor rod is difficult to adjust to the center position of the drill hole after being inserted into the drill hole, and cannot adapt to drill holes of different sizes, resulting in anchor shift and unstable support.
An inner rod including an anchor body and a rotary connection is designed. An adjustment mechanism is provided on the inner rod. Through the combination of the first ring, the slider, the connecting plate and the support plate, the inner rod can be rotated after being inserted into the drill hole. The cooperation of the hinge seat pushes the slide block and the support plate to slide, ensuring that the anchor body is adjusted to the center of the drill hole and adapts to drill holes of different sizes.
It achieves precise positioning and stable support of the anchor in the borehole, avoids anchor deviation, and improves the flexibility and support stability to adapt to boreholes of different sizes.
Smart Images

Figure CN221896621U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anchor rods, and more specifically, particularly relates to an adjustable tension anchor rod for geological engineering. Background Art
[0002] Anchor rods are the most basic component of tunnel support in modern coal mines. They reinforce the surrounding rock of the tunnel so that the surrounding rock can support itself. Anchor rods are not only used in mines, but also in engineering technology to reinforce the main body of slopes, tunnels, and dams. When constructing anchor rods, it is usually done by drilling holes first, then placing the anchor rod body into the holes, and then grouting; or grouting is done after drilling, and then placing the anchor rod body into the holes.
[0003] Announcement No. CN218934468U discloses a novel anchor rod structure for tunnel support, which relates to the field of anchor rod technology, and includes an anchor rod column, the right side of which is sleeved with an annular pad, and the right side outer wall of the anchor rod column is threadedly connected with a reinforcing nut through an opened thread. The novel anchor rod structure for tunnel support can achieve the connection between the anchor rod column and the anchor rod by setting a locking assembly to connect the anchor rod column and the anchor rod, and can ensure the normal transportation of concrete through the cooperation between the set grouting holes, grouting diversion holes and multiple grouting diversion holes, so as to achieve the normal use of the anchor rod structure for tunnel support. When it needs to be recovered later, the anchor rod column can be rotated to drive the arc-shaped hanging rod to disengage from the locking groove and then slide out of the insertion groove, so as to achieve the separation between the anchor rod column and the anchor rod, and the anchor rod column can be taken out of the tunnel hole, so as to achieve the recovery of the anchor rod column. However, after the anchor rod in the prior art is inserted into the borehole, it is not convenient to adjust the anchor rod to the center position of the borehole to avoid the anchor rod shifting in the borehole, and it can be adjusted and used according to boreholes of different sizes and support the inner wall of the borehole. Utility Model Content
[0004] In order to overcome the above-mentioned shortcomings, the utility model aims to provide an adjustable tension anchor rod for geological engineering, which can facilitate the adjustment of the anchor rod to the center position of the borehole, can be adjusted for use according to boreholes of different sizes, and support the inner wall of the borehole.
[0005] An adjustable tension anchor for geological engineering, comprising an anchor body and an inner rod rotatably connected thereto, one end of the inner rod being fixedly connected to the anchor head and a grouting hole provided on the inner rod being connected to a first grouting hole on the anchor head, and also comprising a plurality of adjustment mechanisms arranged in the anchor body, the adjustment mechanism comprising a first circular ring fixedly connected to the inner wall of the anchor body and penetrated by the inner rod, a plurality of first sliding grooves being circumferentially provided on the first circular ring, a slider being slidably connected in the first sliding groove, a connecting plate being fixedly connected to the side of the slider away from the inner rod, the connecting plate penetrating the anchor body and being slidably connected thereto, and a support plate being fixedly connected to the connecting plate at one end outside the anchor body.
[0006] Furthermore, an adjustment hole communicating with the interior is provided on the anchor rod body.
[0007] Furthermore, the first ring does not contact the inner rod.
[0008] Furthermore, the adjustment mechanism also includes a second ring located in the anchor rod body and penetrated by the inner rod, the second ring is threadedly connected to the inner rod and at least two connecting rods are fixed to its outer wall, and a second sliding groove adapted to the end of the connecting rod is opened on the inner wall of the anchor rod body and the connecting rod is slidably connected in the second sliding groove.
[0009] Furthermore, a first hinge seat is fixedly connected to the lower end surface of the sliding block, and a movable rod is hinged on the first hinge seat, and the other end of the movable rod is hinged to a second hinge seat fixedly connected to the outer side wall of the second circular ring.
[0010] Furthermore, central axes of the second circular ring, the first circular ring, the inner rod and the anchor rod body are located on the same straight line.
[0011] Furthermore, a pad is inserted on the end of the inner rod away from the anchor head, a grout stopper is fixedly connected to the pad close to the anchor rod body, and a nut is threadedly connected to the side of the inner rod located on the pad away from the anchor head.
[0012] Furthermore, the inner rod is located inside the anchor rod body and is provided with a second grouting hole connected to the internal grouting hole thereof.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] In the utility model, after the anchor rod body is inserted into the drilled hole, by rotating the inner rod, the second ring moves on the inner rod toward the anchor head under the cooperation restriction of the connecting rod and the second slide groove, and the sliding block is pushed to slide in the first slide groove away from the inner rod through the combination of each first hinge seat, the movable rod and the second hinge seat, so that the connecting plate slides in the adjustment hole and each support plate moves toward the inner wall of the drilled hole until each support plate abuts against and supports the inner wall of the drilled hole. Since the drilled hole is usually cylindrical and each support plate moves at the same time to support the drilled hole, the anchor rod body can be adjusted to the center position of the drilled hole, and the anchor rod body can be prevented from being offset in the drilled hole, and in the process it can also adapt to drilled holes of different sizes. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0016] Figure 1 It is a schematic diagram of the overall structure of an adjustable tension anchor used in geological engineering;
[0017] Figure 2 It is a cross-sectional view of an adjustable tension anchor for geological engineering;
[0018] Figure 3 It is a schematic diagram of the internal structure of an adjustable tension anchor used in geological engineering;
[0019] Figure 4 is a schematic diagram of the anchor body;
[0020] Figure 5 It is a structural diagram of the regulating mechanism;
[0021] Figure 6 It is a structural breakdown diagram of the regulating mechanism;
[0022] Figure 7 is a cross-sectional view of the second ring.
[0023] In the figure: 1. anchor rod body; 11. adjustment hole; 12. second slide groove; 2. inner rod; 21. second slurry outlet hole; 3. anchor head; 31. first slurry outlet hole; 4. adjustment mechanism; 41. first ring; 411. first slide groove; 42. slider; 43. connecting plate; 44. support plate; 45. second ring; 46. connecting rod; 47. first hinge seat; 48. movable rod; 49. second hinge seat; 410. second limit rod; 5. pad; 6. slurry stop plug; 7. nut. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Specific embodiment:
[0026] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, an adjustable tension anchor for geological engineering includes an anchor body 1, and an inner rod 2 rotatably connected to the anchor body 1, both ends of the inner rod 2 are located outside the anchor body 1, and when the inner rod 2 is inserted into the borehole, one end located in the borehole is fixedly connected to an anchor head 3, a grouting hole is opened in the inner rod 2 for grouting and is connected to a first grouting hole 31 opened on the anchor head 3, after the anchor body is inserted into the borehole, grouting is performed in the borehole through the grouting hole and the first grouting hole 31, and also includes a plurality of adjustment mechanisms 4 arranged in the anchor body 1, at least two adjustment mechanisms 4 are arranged, and three are arranged in the present embodiment.
[0027] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, the adjustment mechanism 4 includes a first ring 41 fixedly connected to the inner wall of the anchor body 1, the inner rod 2 passes through the hollow of the first ring 41 and does not contact it, the first ring 41, the inner rod 2 and the central axis of the anchor body 1 are located on the same straight line, and a plurality of first slide grooves 411 are opened on the first ring 41 along the circumferential direction, and the first slide grooves 411 all point to the center of the circle, and a slider 42 is slidably connected in the first slide groove 411, and the cross section of the slider 42 is roughly I-shaped to prevent the slider 42 from being in the first slide groove 411 in the length direction of the inner rod 2. The slider 42 is moved upward, and a connecting plate 43 is fixedly connected to the side away from the inner rod 2. The connecting plate 43 passes through the anchor body 1 and is slidably connected thereto. An adjusting hole 11 connected to the interior is opened on the anchor body 1 to pass through the connecting plate 43. One end of the connecting plate 43 located outside the anchor body 1 is fixedly connected to a supporting plate 44. The supporting plate 44 is used to contact and support the inner wall of the borehole. After the anchor body 1 is inserted into the borehole, the slider 42 is slid away from the inner rod 2 to enable each supporting plate 44 to contact close to the inner wall of the borehole.
[0028] like Figure 2 , Figure 5 , Figure 6 , Figure 7As shown, the adjustment mechanism 4 also includes a second ring 45 located in the anchor body 1 and penetrated by the inner rod 2, the central axes of the second ring 45, the first ring 41, the inner rod 2 and the anchor body 1 are located on the same straight line, the inner rod 2 is located in the anchor body 1 and is provided with an external thread, the second ring 45 is provided with an internal thread matched with the external thread on the inner rod 2 and is threadedly connected to the inner rod 2, the outer wall of the second ring 45 is fixedly connected with at least two connecting rods 46, and the inner wall of the anchor body 1 is provided with a second slide groove 12 matched with the end of the connecting rod 46, the end of the connecting rod 46 away from the second ring 45 is slidably connected in the second slide groove 12, so that when the inner rod 2 rotates, the second ring 45 can only move along the length direction of the inner rod 2 under the cooperation restriction of the connecting rod 46 and the second slide groove 12.
[0029] like Figure 2 , Figure 5 , Figure 6 , Figure 7 As shown, the lower end face of the slider 42 is fixedly connected to a first hinge seat 47, a movable rod 48 is hinged on the first hinge seat 47, and the movable rod 48 is hinged at one end away from the first hinge seat 47 to a second hinge seat 49 fixedly connected to the outer wall of the second ring 45. The second ring is connected to the slider 42, the connecting plate 43 and the support plate 44 by the first hinge seat 47, the movable rod 48 and the second hinge seat 49. Before the anchor body 1 is inserted into the drill hole, the support plate 44 is fitted with the outer wall of the anchor body 1. At this time, the angle between the movable rod 48 and the opening of the inner rod 2 toward the anchor head 3 is at least thirty degrees. After the anchor body 1 is inserted into the borehole, by rotating the inner rod 2, the second ring 45 moves on the inner rod 2 toward the anchor head 3 under the cooperation restriction of the connecting rod 46 and the second slide groove 12, and the sliding block 42 is pushed to slide in the first slide groove 411 away from the inner rod 2 through the combination of the first hinge seats 47, the movable rod 48 and the second hinge seats 49, so that the connecting plate 43 slides in the adjustment hole 11 and the support plates 44 move toward the inner wall of the borehole until the support plates 44 abut against and support the inner wall of the borehole. Since the borehole is usually cylindrical and the support plates 44 move at the same time to support the borehole, the anchor body 1 can be adjusted to the center position of the borehole and the anchor body 1 can be prevented from shifting in the borehole. In the process, it can also adapt to boreholes of different sizes, and the provision of multiple adjustment mechanisms 4 can improve the support stability.
[0030] like Figure 1 , Figure 3As shown, a pad 5 is inserted into the end of the inner rod 2 away from the anchor head 3, and a grouting plug 6 is fixedly connected to the side of the pad 5 close to the anchor body 1. The grouting plug 6 is also penetrated by the inner rod 2. The inner rod 2 is also provided with a thread on the side of the pad 5 away from the anchor head 3 and is threadedly connected with a nut 7. After the anchor body 1 is inserted into the borehole and the adjusting mechanism 4 is supported, the nut 7 is rotated to make the pad 5 contact the rock surface, and grouting is performed in the borehole through the grouting hole on the inner rod 2 and the first grouting hole 31 connected thereto.
[0031] like Figure 2 As shown, the inner rod 2 is located inside the anchor body 1 and is provided with a second grouting hole 21 which is connected to the internal grouting hole thereof, so that the grout can fill the inside of the anchor body 1 and improve the grouting effect.
[0032] The working principle of an adjustable tension anchor for geological engineering in the present embodiment is: when in use, first place the anchor body 1 into a pre-drilled hole on the surrounding rock, and rotate the inner rod 2 to move the second ring 45 toward the anchor head 3, and push the slider 42 in the first slide groove 411 to slide away from the inner rod 2 through the combination of the first hinge seats 47, the movable rod 48 and the second hinge seats 49, so that each support plate 44 moves toward the inner wall of the borehole, and each support plate 44 moves at the same time to support the borehole, so that the anchor body 1 can be adjusted to the center position of the borehole, and the anchor body 1 can be prevented from shifting in the borehole, and in the process it can also adapt to boreholes of different sizes.
[0033] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An adjustable tension anchor for geological engineering, characterized in that: The invention comprises an anchor rod body (1) and an inner rod (2) rotatably connected therein, wherein one end of the inner rod (2) is fixedly connected to an anchor head (3) and a grouting hole provided on the inner rod (2) is connected to a first grouting hole (31) on the anchor head (3), and further comprises a plurality of adjustment mechanisms (4) arranged in the anchor rod body (1), wherein the adjustment mechanism (4) comprises a first circular ring (41) fixedly connected to the inner wall of the anchor rod body (1) and penetrated by the inner rod (2), wherein the first circular ring (41) is provided with a plurality of first sliding grooves (411) along the circumferential direction, wherein a slider (42) is slidably connected in the first sliding groove (411), wherein a connecting plate (43) is fixedly connected to the side of the slider (42) away from the inner rod (2), wherein the connecting plate (43) penetrates the anchor rod body (1) and is slidably connected thereto, and wherein one end of the connecting plate (43) located outside the anchor rod body (1) is fixedly connected to a supporting plate (44).
2. The adjustable tension anchor rod for geological engineering according to claim 1, characterized in that: The anchor rod body (1) is provided with an adjustment hole (11) which is in communication with the interior.
3. The adjustable tension anchor rod for geological engineering according to claim 1, characterized in that: The first circular ring (41) does not contact the inner rod (2).
4. The adjustable tension anchor rod for geological engineering according to claim 1, characterized in that: The adjustment mechanism (4) also includes a second ring (45) located in the anchor rod body (1) and penetrated by the inner rod (2); the second ring (45) is threadedly connected to the inner rod (2) and at least two connecting rods (46) are fixedly connected to its outer wall; the inner wall of the anchor rod body (1) is provided with a second sliding groove (12) adapted to the end of the connecting rod (46) and the connecting rod (46) is slidably connected in the second sliding groove (12).
5. The adjustable tension anchor rod for geological engineering according to claim 4, characterized in that: The lower end surface of the slider (42) is fixedly connected to a first hinge seat (47), and the first hinge seat (47) is hingedly connected to a movable rod (48) whose other end is hingedly connected to a second hinge seat (49) fixedly connected to the outer wall of the second ring (45).
6. The adjustable tension anchor rod for geological engineering according to claim 4, characterized in that: The central axes of the second circular ring (45), the first circular ring (41), the inner rod (2) and the anchor rod body (1) are located on the same straight line.
7. The adjustable tension anchor rod for geological engineering according to claim 1, characterized in that: A pad (5) is inserted into the end of the inner rod (2) away from the anchor head (3), a grout stopper (6) is fixedly connected to the pad (5) on the side close to the anchor rod body (1), and a nut (7) is threadedly connected to the side of the inner rod (2) located on the pad (5) away from the anchor head (3).
8. The adjustable tension anchor rod for geological engineering according to claim 7, characterized in that: The inner rod (2) is located inside the anchor rod body (1) and is provided with a second grouting hole (21) which is connected to the grouting hole inside the inner rod (2).
Citation Information
Cited By
Anchoring device for enhancing anchoring force of anchor cable
CN119913896A
Anchoring devices that enhance the anchoring force of anchor cables
CN119913896B