Plasma gasification melting device for treating multi-source solid waste

By using a multi-angle swinging plasma generator and a high-temperature gas circulation channel in the plasma gasification and melting device, the problems of slow material processing speed and incomplete melting of the molten residue in the existing technology are solved, and the gasification and melting effect is improved. and energy efficiency, and enhanced syngas quality.

CN221897798UActive Publication Date: 2024-10-25CHONGQING UNIVERSITY OF SCIENCE AND TECHNOLOGY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420509587.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-25
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The existing plasma gasification and melting furnace has a one-way output and a fixed angle or axial angle swing plasma generator, which results in slow material processing speed, poor gasification and melting effect, and it is difficult to ensure that the molten residue is completely melted.

Method used

A device including a push grate chamber and a plasma gasification and melting chamber is designed. It adopts an opposing spiral feeding device and a multi-angle swinging plasma generator. The multi-angle swing of the plasma generator is realized through a hydraulic rod. Combined with Induction heating coils and high-temperature gas circulation channels optimize the treatment of molten residue.

Benefits of technology

It significantly improves the gasification and melting effect, ensures complete melting of molten residue, improves heat utilization, reduces energy waste, and improves the H2/CO ratio and carbon conversion rate in the synthesis gas through the water vapor plasma torch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221897798U_ABST
    Figure CN221897798U_ABST
Patent Text Reader

Abstract

The utility model discloses a plasma gasifying and melting device for treating multi-source solid waste, which comprises a forward pushing fire grate chamber and a plasma gasifying and melting chamber, and the plasma gasifying and melting chamber is positioned right below the forward pushing fire grate chamber; a primary feeding bin, a feeding bin valve and a conical distributor are arranged above the forward-pushing fire grate chamber, opposite spiral feeding devices are symmetrically arranged on the top wall of the forward-pushing fire grate chamber in the transverse direction, the feeding ends of the opposite spiral feeding devices are communicated with the conical distributor, forward-pushing fire grates are symmetrically arranged on the two sides in the forward-pushing fire grate chamber, and the feeding ends of the forward-pushing fire grates are communicated with the conical distributor. The forward pushing fire grate is sequentially provided with a drying section and a pyrolysis gasification section from the two sides to the center, the tail ends of the pyrolysis gasification section of the forward pushing fire grate are communicated with the plasma gasification melting chamber through a slag falling channel, the discharging end of the opposite spiral feeding device is located over the head end of the drying section of the forward pushing fire grate, and the slag falling channel is connected with a synthesis gas output channel. And the synthesis gas output channel is provided with an online tail gas detector.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of solid waste treatment, in particular to a plasma gasification melting device for treating multi-source solid waste. Background Art

[0002] With the continuous acceleration of my country's industrialization process, it is an inevitable requirement for the current critical period of green and low-carbon transformation of the energy system. Compared with traditional treatment methods such as landfill and incineration, which have disadvantages such as low volume reduction rate and possible secondary pollution of dioxins, plasma treatment technology is internationally recognized as the most advanced solid waste treatment technology because of its fast reaction speed, strong raw material adaptability and no secondary pollution.

[0003] Existing plasma gasification and melting furnaces all have unidirectional output grates and gasification and melting, which slows down the material processing speed and causes the material output from the grate to accumulate on one side, resulting in poor gasification and melting effects. Moreover, when the molten residue in the plasma gasification and melting chamber has a certain reserve, it is difficult for a traditional plasma generator with a fixed angle or only axial angle swing to ensure that the residue is completely melted. Utility Model Content

[0004] The utility model aims to overcome the deficiencies of the prior art and provide a plasma gasification and melting device for treating multi-source solid waste, which can improve the gasification and melting effect.

[0005] The purpose of the utility model is achieved in this way:

[0006] A plasma gasification and melting device for treating multi-source solid wastes comprises a push grate chamber and a plasma gasification and melting chamber, wherein the plasma gasification and melting chamber is located directly below the push grate chamber;

[0007] A primary feeding bin, a feeding bin valve and a conical distributor are arranged above the forward push grate chamber from top to bottom in sequence, the primary feeding bin is connected to a material level monitor, the forward push grate chamber has a rectangular inner cavity, opposite spiral feeding devices are symmetrically arranged along the top wall of the forward push grate chamber, the feeding ends of the opposite spiral feeding devices are connected to the conical distributor, forward push grates are symmetrically arranged on both sides of the forward push grate chamber, the forward push grates are arranged into a drying section and a pyrolysis gasification section from both sides to the center in sequence, the ends of the pyrolysis gasification sections of the forward push grate are connected to a plasma gasification melting chamber through a slag dropping channel, the discharge end of the opposite spiral feeding device is located directly above the head end of the forward push grate drying section, the slag dropping channel is connected to a synthesis gas output channel, and the synthesis gas output channel is provided with an online exhaust gas detector.

[0008] Preferably, the furnace wall of the forward-pushing grate chamber is made of high-temperature resistant material, the forward-pushing grate includes a fixed grate and a movable grate, two independent wind chambers are arranged under the forward-pushing grate chamber, the two independent wind chambers respectively correspond to the drying section and the pyrolysis gasification section of the forward-pushing grate, and the air intake of the two independent wind chambers is controlled by ball valves respectively, and auxiliary burners and glass observation windows are respectively provided on the opposite furnace walls of the forward-pushing grate chamber perpendicular to the forward-pushing grate.

[0009] Preferably, a scraper is provided below the discharge end of the opposing screw feeding device, and the scraper is used to break up and crush the material conveyed by the opposing screw feeding device to the head end of the push grate.

[0010] Preferably, a plurality of plasma generators are evenly arranged on the top wall of the plasma gasification and melting chamber, one end of the plasma generator extends into the plasma gasification and melting chamber, the upper end of the plasma generator is sleeved with a plasma generator mounting seat, the lower end of the plasma generator is sleeved with an embedded rotating mechanism, the embedded rotating mechanism comprises an outer shell, a ball and an inner shell, the outer shell is embedded in the top wall of the plasma gasification and melting chamber, the facing surfaces of the outer shell and the inner shell are spherical surfaces, the outer shell and the inner shell are evenly filled with balls, and the outer shell and the inner shell are sealed by a high temperature resistant sealing ring, the inner shell is sleeved with the plasma generator, four hydraulic rods are evenly arranged on the outer circumferential surface of the plasma generator mounting seat at an interval of 90°, the two ends of the hydraulic rods are respectively hinged to the plasma generator mounting seat and the top wall of the plasma gasification and melting chamber, and the multi-angle swinging motion of the plasma generator around the center point of the embedded rotating mechanism is realized by controlling the movement stroke of each hydraulic rod.

[0011] Preferably, a limit point is set on the end surface of the inner shell to limit the maximum movable angle of the plasma generator.

[0012] Preferably, the plasma generator is a non-transferred arc DC plasma torch, which uses nitrogen as the working gas. An induction heating coil is arranged at the bottom of the plasma gasification and melting chamber, which prevents the molten liquid at the bottom of the plasma gasification and melting chamber from cooling and solidifying, thereby reducing the temperature difference with the molten liquid at the top of the plasma gasification and melting chamber. A drain port is arranged on the side wall of the plasma gasification and melting chamber, and a drain port is arranged at the bottom of the plasma gasification and melting chamber. Both the drain port and the drain port are controlled by valves. A liquid level sensor, a pressure sensor, and a temperature sensor are arranged on the side end of the bottom of the plasma gasification and melting chamber.

[0013] Preferably, the plasma gasification and melting chamber is connected to a gas circulation channel on both sides, and a high-temperature resistant circulation fan and an air inlet are provided on the gas circulation channel. The opening and closing of the air inlet is controlled by a valve, and the output end of the gas circulation channel is respectively connected to each independent wind chamber and the upper part of the push grate chamber, and the opening and closing are controlled by a valve to form a high-temperature flue gas circulation system.

[0014] Preferably, the synthesis gas output channel is connected to a flue gas treatment system, which includes a gas reforming secondary combustion chamber, a heat exchange device, a cyclone dust collector, a washing tower, a bag dust collector, an induced draft fan, a gas treatment and separator connected in sequence, the gas treatment and separator are respectively connected to a nitrogen storage tank and a synthesis gas storage tank, the gas reforming secondary combustion chamber is provided with a steam generator and a steam plasma torch, and a bottom ash return channel is provided at the bottom of the cyclone dust collector and the bag dust collector, and the bottom ash return channel transports the collected bottom ash back to the plasma gasification melting pool.

[0015] A working method of a plasma gasification melting device for treating multi-source solid waste,

[0016] (1) Close the feed silo valve of the primary feed silo, turn on the nitrogen generator, and adjust the nitrogen purity to 99.9% and the flow rate to 150m 3 / h-160m 3 / h, the nitrogen pressure is greater than 0.7Mpa, the prepared nitrogen is introduced into the plasma generator and ejected, the high temperature resistant circulation fan is turned on, the air inlet valve is closed, and the nitrogen is transported to the push grate chamber through the gas circulation channel, so that the push grate chamber and the plasma gasification and melting chamber are filled with nitrogen in an inert environment, and the auxiliary burner is turned on to start the furnace, and the temperature of the push grate chamber is raised to 600℃;

[0017] (2) After the multi-source solid waste materials are evenly mixed according to the set ratio, they are put into the primary feeding bin, and the feeding bin valve is opened. After the materials fall into the conical divider and are separated and the material layer sensor detects no pile of materials, the feeding bin valve is closed. The materials enter from both sides of the push grate chamber through the counter-rotating spiral feeding device, are broken up and crushed by the scraper, and fall onto the push grate. Under the joint action of the auxiliary burner and the nitrogen introduced into the grate chamber, the materials sequentially undergo the drying section and the pyrolysis and gasification section. The residue produced after pyrolysis and gasification falls into the plasma gasification and melting chamber through the slag falling channel;

[0018] (3) As the amount of material processed increases, the residues in the plasma gasification and melting chamber accumulate. At this time, the plasma generator is struck, and the nitrogen is ionized to form a plasma jet, which further gasifies and melts the unreacted residues.

[0019] At the same time, the auxiliary burner is turned off, and the valve of the air inlet is opened according to the working conditions. Under the action of the high-temperature resistant circulation fan, part of the air is introduced to premix with the high-temperature active groups generated by the plasma generator, and then introduced into the push grate chamber through the gas circulation channel to maintain the heat required for drying and pyrolysis and gasification of the materials in the push grate chamber;

[0020] When the molten residue in the molten pool in the plasma gasification melting chamber has a reserve, the rotation angle of the plasma generator is adjusted according to the observed melting condition in the molten pool so that the plasma generator is close to the incompletely melted part;

[0021] The induction heating coils evenly arranged at the bottom of the molten pool work simultaneously to keep the molten temperature in the molten pool at 1350-1600℃ and maintain the stability of the molten state. The power of the high-temperature circulation fan and the opening size of the drain and exhaust valves are controlled according to the common monitoring data of the liquid level sensor, pressure sensor and temperature sensor on both sides of the molten pool.

[0022] (4) The primary synthesis gas generated by the mixed organic solid waste after being gasified in the push grate chamber and the plasma gasification melting chamber in sequence enters the gas reforming secondary combustion chamber through the synthesis gas output channel. The gas reforming secondary combustion chamber supplies water vapor on demand according to the data of the gas composition in the online exhaust gas detector, and the water vapor temperature is 250-350°C;

[0023] After reforming, the primary synthesis gas passes through a heat exchanger, a cyclone dust collector, a spray tower and a bag filter to process and purify the synthesis gas, separate the inert gas in the synthesis gas, and collect the remaining gas.

[0024] Preferably, it also includes a water tank, a cold water station, and a membrane separation device connected in sequence. The water in the water tank is divided into two outputs. One path is transported to the water vapor generator of the gas reforming secondary combustion chamber, which is used to supply water vapor to the water vapor plasma torch of the gas reforming secondary combustion chamber. The other path is connected to the heat exchanger, the washing tower, and the membrane separation device in sequence. The membrane separation device is used to treat the waste liquid in the washing tower to make it meet the recycling standard, and then pass through the cold water station to reduce the circulating water temperature, and then gather in the water tank for reuse.

[0025] Due to the adoption of the above technical solution, the utility model has the following beneficial effects:

[0026] By using oppositely arranged grates, the materials are concentrated and then output into the gasification and melting chamber. All plasma emitters are normally pointed to the location where the materials are concentrated, which greatly improves the gasification and melting effect.

[0027] When there is a reserve of molten residue in the plasma gasification melting chamber, it is difficult for a conventional fixed-angle plasma generator to ensure complete melting of the residue. The utility model can adjust the rotation angle of the plasma generator according to the melting conditions observed in the molten pool, so that the plasma generator is as close as possible to the incompletely melted part, and the high-density, high-energy plasma jet generated by ionization is utilized to the greatest extent, thereby improving its thermal utilization rate.

[0028] The arrangement of the high-temperature gas circulation channel, on the one hand, enables efficient utilization of the heat of the high-temperature gas in addition to maintaining a stable molten state during normal operation of the device; on the other hand, no additional heat source is required in the grate chamber for a long time, thus avoiding energy waste.

[0029] The utility model uses water vapor directly as the working gas of the secondary combustion chamber plasma torch to react, which is more conducive to improving the H2 / CO ratio, calorific value and carbon conversion rate in the final synthesis gas, so that the reforming effect is better. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the structure of the utility model;

[0031] Figure 2 It is a schematic diagram of the second method of the utility model;

[0032] Figure 3 It is a schematic diagram of the structure of the push grate chamber and the plasma gasification and melting chamber;

[0033] Figure 4 , Figure 5 Schematic diagram of the installation of the plasma generator.

[0034] Reference numerals

[0035] In the attached drawings, 1. primary feeding bin, 2. feeding bin valve, 3. material level monitor, 4. conical distributor, 5. counter-screw feeding device, 6. furnace wall, 7. push grate chamber, 8. high-temperature gas inlet, 9. scraper, 10. movable grate, 11. execution cylinder, 12. fixed grate, 13. second wind chamber, 14. first wind chamber, 15. synthesis gas output channel, 16. gas circulation channel, 17. online tail gas detector, 18. reserved air inlet valve, 19. reserved air inlet, 20. pressure gauge, 21. device bracket, 22. drain port, 23. induction heating coil, 24. exhaust port, 25. temperature gauge, 26. auxiliary burner, 2 7-29. Valves B01~B03, 30. Slag falling channel, 31. Plasma generator, 32. Plasma generator mounting seat, 33. Three-axis linkage hydraulic rod, 34. Embedded rotating mechanism, 35. Temperature gauge, 36. Liquid level detection gauge, 37. Molten pool, 38. High temperature resistant circulating fan, 39. Steam generator, 40. Steam pipeline, 41. Steam plasma torch, 42. Gas reforming secondary combustion chamber, 43. Heat exchange device, 44. Cyclone dust collector, 45. Scrubber, 46. Bag dust collector, 47. Draft fan, 48. Gas treatment and separator, 49. Nitrogen storage tank, 50. Synthesis gas storage tank, 51. Bottom ash return channel. DETAILED DESCRIPTION

[0036] A plasma gasification and melting device for treating multi-source solid waste, comprising a push grate chamber 7, a plasma gasification and melting chamber, a high-temperature flue gas circulation system, and a flue gas treatment system. The push grate chamber is arranged at the upper end of the device, and a feeding device (primary feeding bin 1, feeding bin valve 2, material level monitor 3, conical distributor 4) is arranged on the top. Opposite spiral feeding devices 5 are symmetrically arranged in the transverse direction just above the push grate chamber 7. The push grate chamber is sequentially arranged into a drying section and a pyrolysis and gasification section from both sides to the center. A slag dropping channel 30 and a synthesis gas output channel 15 are arranged at the end of the pyrolysis and gasification section from top to bottom. The synthesis gas output channel is connected to the flue gas treatment system. Auxiliary burners 26 and glass observation windows are respectively arranged on the opposite furnace walls 6 of the push grate chamber 7.

[0037] The furnace wall of the push grate chamber is made of high temperature resistant material.

[0038] The feeding device includes, from top to bottom, a primary silo 1, a material layer sensor (material level monitor 3), a feed silo valve 2, and a conical distributor 4.

[0039] The fixed grate 12 and the movable grate 10 are symmetrically arranged in the push grate chamber. The movable grate is connected to the actuator cylinder 11. The grate installation angle is 15°-25°, the maximum stroke is 350mm, and the movable grate is detachable. At the same time, the gap between the movable grate and the fixed grate is extremely small. A scraper 9 is arranged above the movable grate close to the furnace wall to further break up and crush the materials delivered by the screw feeder (opposite screw feeding device 5). Two independent wind chambers (the second wind chamber 13 and the first wind chamber 14) are arranged below the push grate chamber, corresponding to the drying section and the pyrolysis gasification section of the grate respectively. The air intake of the two independent wind chambers is controlled by ball valves (B02-B03).

[0040] The plasma gasification and melting chamber is connected to the slag falling channel 30, and n≥2 plasma generators 31 of the same specification (500KW) are evenly arranged on the top side wall of the plasma gasification and melting chamber. A plasma generator mounting seat 32 with a length and width of 500mm and a thickness of 100mm is installed on the plasma generator, and four three-axis linkage hydraulic rods 33 are arranged at intervals of 90° around the mounting seat, and the stroke of the hydraulic rod is 0-400mm. By controlling the movement stroke of different hydraulic rods, the plasma generator can be realized to rotate around the embedded rotating mechanism 34 (similar to the concentric joint shaft) installed in the side wall under the linkage action of the four three-axis hydraulic rods. The rotation angle is 0-35°.

[0041] The embedded rotating mechanism is mainly composed of an outer shell, a ball and an inner shell. The outer shell is embedded in a shell with a thickness of 200mm at the top of the plasma gasification melting chamber. The facing surfaces of the outer shell and the inner shell have the same curvature and a certain gap. Balls and high-temperature resistant sealing rings are installed in the gap to ensure the relative rotation between the inner shell and the outer shell and the sealing inside and outside the furnace body; the inner shell is a cylindrical structure with narrow upper and lower parts and wide middle parts along the axis direction. The inner diameter of the cylinder is equal to the diameter of the plasma torch. The end face of the inner shell is set with a limit point to limit the maximum activity angle of its plasma torch to prevent damage to the device structure.

[0042] The plasma generator is a non-transferred arc DC plasma torch, using nitrogen as the working gas. The working gas pressure range is 0.7-1.0Mpa, and the core temperature of the generated continuous plasma jet can reach above 5000°C. The temperature measurement method uses a platinum-rhodium thermocouple, and its temperature measurement range is 0-1600°C.

[0043] Gas circulation channels 16 extending out of the device are arranged on both sides of the plasma gasification and melting chamber. A high temperature resistant fan and an air inlet are installed on the gas circulation channel (a total of 4 symmetrical air inlet channels are arranged along the cross section of the push grate chamber). Two air inlet ducts enter from the upper side wall of the push grate chamber; the other two air inlet ducts enter from the bottom of the push grate chamber to provide high temperature flue gas to the two independent air chambers (drying section, pyrolysis gasification section).

[0044] An induction heating coil is arranged at the bottom of the plasma gasification melting chamber to prevent the bottom molten liquid from cooling and solidifying on the one hand and to reduce the temperature difference with the upper molten liquid on the other hand. A liquid discharge port is arranged on the side wall of the plasma gasification melting chamber and a drain port is arranged at the bottom.

[0045] A temperature sensor is provided at the entrance of the high-temperature flue gas circulation channel (gas circulation channel 16) of the push grate chamber, and a liquid level sensor, a temperature sensor and a pressure sensor are provided in the plasma gasification melting chamber. An online tail gas detector 17 is provided in the synthesis gas output channel 15.

[0046] The flue gas treatment system includes a gas reforming secondary combustion chamber 42 (the power of the water vapor plasma torch is 100KW), a heat exchange device 43, a cyclone dust collector 44, a washing tower 45, a bag dust collector 46, an induced draft fan 47, a gas treatment and separator 48, which are connected in sequence by a duct. The gas treatment and separator 48 are respectively connected to a nitrogen storage tank 49 and a synthesis gas storage tank 50.

[0047] A working method of a plasma gasification melting device for treating multi-source solid waste comprises the following steps:

[0048] (1) Close the valve switch of the primary feeding bin, turn on the nitrogen generator, adjust the nitrogen purity to 99.9%, the flow rate to between 150m3 / h and 160m3 / h, and the nitrogen pressure to be greater than 0.7Mpa. The prepared nitrogen is introduced into the plasma generator and sprayed out. Turn on the high-temperature resistant circulation fan 38, close the air inlet valve, open the ball valve to transport the nitrogen to the push grate chamber through the high-temperature flue gas circulation channel (gas circulation channel 16), so that the entire device is filled with nitrogen and is in an inert environment. At the same time, turn on the auxiliary burner 26 to start the furnace and heat the push grate chamber to about 600°C.

[0049] (2) After multi-source solid wastes such as domestic garbage and hazardous waste oily sludge are uniformly mixed in a certain proportion and put into the primary feeding bin, the valve switch is opened, and the valve switch is closed after the raw materials fall into the conical distributor and are separated and the material layer sensor detects no pile of materials. The raw materials enter from both sides of the grate chamber through the counter-rotating spiral feeding device, and are broken up and crushed by the scraper and fall onto the push grate. Under the joint action of the auxiliary burner and the nitrogen introduced into the grate chamber, the raw materials pass through the scraper, drying section, pyrolysis gasification section in turn, and the residue produced after pyrolysis gasification falls into the plasma gasification melting chamber through the slag falling channel.

[0050] (3) As the processing volume increases, the residue in the plasma gasification and melting chamber accumulates to a certain extent. At this time, the plasma generator is struck, and the working gas is nitrogen, which is ionized to form a uniform, high-speed, high-temperature plasma jet to further gasify and melt the unreacted residue.

[0051] At the same time, the auxiliary burner is turned off, and the valve of the air inlet (reserved air inlet 19) is opened according to the working conditions. Under the action of the high-temperature resistant circulating fan (the operating temperature is 30-850°C), part of the air is introduced and premixed with the high-temperature active groups generated by the plasma generator and continuously passed into the grate chamber through the gas circulation channel to maintain the heat required for drying and pyrolysis and gasification of the raw materials in the grate chamber.

[0052] When the molten residue in the plasma gasification melting chamber has a certain reserve, it is difficult for the traditional fixed-angle plasma generator to ensure that the residue is completely melted. Therefore, four three-axis linkage hydraulic rods are arranged on the traditional fixed-angle plasma generator, so that the plasma generator can rotate in a semi-arc surface around the embedded rotating mechanism installed in the side wall of the plasma gasification melting chamber. In this way, the rotation angle of the plasma generator can be adjusted according to the melting situation in the molten pool observed through the (glass observation window), so that the plasma generator is as close as possible to the incompletely melted part, and the high-density and high-energy plasma jet generated by ionization is utilized to the greatest extent, thereby improving its thermal utilization rate.

[0053] The induction heating coils evenly arranged at the bottom of the molten pool work simultaneously to keep the molten temperature in the molten pool at 1350-1600℃ and maintain the stability of the molten state. The liquid level sensor, pressure sensor and temperature sensor installed at both ends of the molten pool jointly monitor the power of the high-temperature circulation fan and the opening size of the drain and exhaust valves to achieve automatic or manual control.

[0054] (4) The primary synthesis gas (containing H2 and CO) generated by the mixed organic solid waste after being gasified in the push grate chamber and the plasma gasification and melting chamber in sequence enters the reforming secondary combustion chamber through the synthesis gas output channel. The secondary combustion chamber is equipped with a water vapor generator and a water vapor plasma torch. Combined with the data of the gas component in the online exhaust gas detector, water vapor is supplied on demand. The water vapor temperature is 250-350°C. At the same time, compared with the traditional nitrogen plasma torch, using the water vapor directly as the working gas of the secondary combustion chamber plasma torch to react is more conducive to improving the H2 / CO ratio, calorific value and carbon conversion rate in the final synthesis gas, so that the reforming effect is better.

[0055] After the primary syngas is reformed in the secondary combustion chamber, it passes through a heat exchanger, a cyclone dust collector, a spray tower and a bag filter to process and purify the final syngas, and separate the inert gases such as nitrogen in the syngas. The remaining high-quality combustible gas is collected. A bottom ash return channel is provided at the bottom of the cyclone dust collector and the bag filter to transport the collected bottom ash back to the plasma gasification melting pool to achieve resource utilization and reduce the generation of harmful substances.

[0056] Second type:

[0057] On the basis of the first method, water tanks, cold water stations, membrane separation devices and other equipment are added for subsequent treatment. The water in the water tank is divided into two paths. One path is sent to the steam generator for supplying steam to the steam plasma torch, and the other path is connected to the heat exchanger, washing tower, membrane separation device and cold water station in sequence. The membrane separation device is used to treat the waste liquid in the washing tower to meet the recycling standards. After passing through the cold water station, the circulating water temperature is reduced. It is gathered in the water tank for reuse.

[0058] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the utility model.

Claims

1. A plasma gasification and melting device for treating multi-source solid waste, comprising a push grate chamber, characterized in that: It also includes a plasma gasification and melting chamber, which is located directly below the push grate chamber, and the push grate chamber is connected to the plasma gasification and melting chamber through a slag falling channel, and the slag falling channel is connected to the synthesis gas output channel; A plurality of plasma generators are evenly arranged on the top wall of the plasma gasification and melting chamber, one end of the plasma generator extends into the plasma gasification and melting chamber, the upper end of the plasma generator is sleeved with a plasma generator mounting seat, the lower end of the plasma generator is sleeved with an embedded rotating mechanism, the embedded rotating mechanism comprises an outer shell, a ball and an inner shell, the outer shell is embedded in the top wall of the plasma gasification and melting chamber, the facing surfaces of the outer shell and the inner shell are spherical surfaces, the outer shell and the inner shell are evenly filled with balls, and the outer shell and the inner shell are sealed by a high temperature resistant sealing ring, the inner shell is sleeved with the plasma generator, four hydraulic rods are evenly arranged on the outer circumferential surface of the plasma generator mounting seat at an interval of 90 degrees, the two ends of the hydraulic rods are respectively hinged with the plasma generator mounting seat and the top wall of the plasma gasification and melting chamber, and the multi-angle swinging motion of the plasma generator around the center point of the embedded rotating mechanism is realized by controlling the movement stroke of each hydraulic rod.

2. The plasma gasification and melting device for treating multi-source solid waste according to claim 1, characterized in that: A limit point is set on the end surface of the inner shell to limit the maximum activity angle of the plasma generator.

3. The plasma gasification and melting device for treating multi-source solid waste according to claim 1, characterized in that: The plasma generator is a non-transferred arc DC plasma torch, using nitrogen as the working gas, an induction heating coil is arranged at the bottom of the plasma gasification and melting chamber, the induction heating coil prevents the molten liquid at the bottom of the plasma gasification and melting chamber from cooling and solidifying, and reduces the temperature difference with the molten liquid at the top of the plasma gasification and melting chamber, a liquid discharge port is arranged on the side wall of the plasma gasification and melting chamber, and a drain port is arranged at the bottom of the plasma gasification and melting chamber, and both the liquid discharge port and the drain port are controlled by valves; A liquid level sensor, a pressure sensor and a temperature sensor are arranged on the side end of the bottom of the plasma gasification melting chamber.

Citation Information

Cited By

  • Micron-sized spherical tungsten powder preparation method based on plasma technology

    CN119870496A