Writing test device for electric energy meter
By designing the calibration platform and the limit part of the electric energy meter running test device, the fixing and unfixing process of the electric energy meter is simplified, the problem of complex structure in the existing technology is solved, and the convenience and efficiency of operation are improved.
Patent Information
- Application Number
- CN202420262231.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-02-02
AI Technical Summary
The existing electric energy meter movement test device has a complex structure and is not conducive to use, especially when limiting the electric energy meter, it is inconvenient to operate.
An electric energy meter running test device is designed, which includes an electric energy meter calibration chassis and a calibration platform. It is equipped with multiple detection areas, fixed seats, limit parts and control parts. The limit parts are realized by push-pull clamps and sliding rails. Fixing and unfixing the electric energy meter simplifies the operation process.
It makes the position limit of the electric energy meter simpler and more convenient, reduces the complexity of operation, and improves the efficiency of use.
Smart Images

Figure CN221899320U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric energy meter detection, in particular to an electric energy meter running test device. Background Art
[0002] The electric energy meter movement test is used to check whether the relationship between the transmission ratio of the electric energy meter and the constant of the electric energy meter is correct, and whether the transmission ratio and carry of the meter itself are normal. In addition, it can also find out whether the worm gear of the meter and the worm on the shaft are too tight, and the errors that may occur during the error measurement process.
[0003] For example, the "detection device for electric energy meter calibration" disclosed in the Chinese utility model patent (publication number: CN218675282U) includes a meter mounting plate, the upper part of the front of the meter mounting plate is provided with a pressing plate mechanism, the middle part is provided with a clamping plate mechanism, and the lower part is provided with a bottom support mechanism. The bottom support mechanism and the clamping plate mechanism are transmitted through a rack mechanism, and the rack mechanism is provided on the back of the meter mounting plate. The inventor found that the above patent has the following defects:
[0004] When limiting the position of the electric energy meter, the rack mechanism can be used to move the bottom support mechanism and drive the clamping mechanism to move, so that the electric energy meter can be limited more conveniently. However, the structure is relatively complex and not convenient for use. Therefore, we make improvements and propose an electric energy meter movement test device. Utility Model Content
[0005] The purpose of the utility model is to solve the problem that the structure currently used for limiting the position of an electric energy meter is relatively complex and not conducive to use.
[0006] In order to achieve the above purpose, the utility model provides an electric energy meter running test device to improve the above problem.
[0007] The specific application is as follows:
[0008] A watt-hour meter movement test device comprises a watt-hour meter calibration case and a calibration support connected to one side of the watt-hour meter calibration case, wherein the calibration support is provided with a plurality of detection areas, each detection area is provided with a plurality of fixing seats and a plurality of limiting parts, and the limiting parts move under the action of external force to realize the fixing and releasing of the watt-hour meter.
[0009] As a preferred technical solution of the present application, a display screen and a plurality of Bluetooth pulse modules are installed on the front of the calibration platform, and the display screen and the Bluetooth pulse modules are connected to the electric energy meter calibration chassis;
[0010] A display and a printer are installed on the front of the electric energy meter calibration box.
[0011] As a preferred technical solution of the present application, a plurality of ejectors are installed in the fixing seat, and the plurality of ejectors are connected to the electric energy meter calibration chassis through wires.
[0012] As a preferred technical solution of the present application, first clamping plates are fixedly connected to both sides of the fixing seat, and first gaps are provided between the two first clamping plates and the fixing seat;
[0013] Second clamping plates are fixedly connected to both sides of the fixing seat, and second gaps are provided between the two second clamping plates and the fixing seat.
[0014] As a preferred technical solution of the present application, the limiting part is a push-pull clamp, and the push-pull clamp is installed on the calibration platform and is located above the fixed seat.
[0015] As a preferred technical solution of the present application, the limiting part includes a second guide rail fixedly mounted on the calibration platform and located above the fixed seat, the outer surface of the second guide rail is slidably connected to a second slide seat, and the bottom of the second slide seat is fixedly connected to a pressure seat.
[0016] As a preferred technical solution of the present application, a control part is provided between the multiple limit parts of each detection area, and the control part is used to control the movement of the limit parts.
[0017] As a preferred technical solution of the present application, the control unit includes a first guide rail fixedly mounted on the front side of the calibration platform, the outer surface of the first guide rail is slidably connected to a first slide seat, both sides of the first slide seat are fixedly connected to a transmission rod, the back side of the transmission rod is fixedly connected to a connecting rod, and the connecting rod is fixedly connected to the second slide seat;
[0018] Two connecting seats are fixedly installed on the front side of the first sliding seat, a rotating shaft is connected between the two connecting seats via a bearing, and a limiting plate is fixedly sleeved on the outer surface of the rotating shaft.
[0019] As a preferred technical solution of the present application, a slot is provided on the limit plate, a first plug plate is plugged into the slot, the first plug plate is connected to an electric telescopic rod, and the electric telescopic rod is installed on the front side of the calibration platform.
[0020] As a preferred technical solution of the present application, the control unit further includes a limiter, which is installed on the front side of the calibration platform, and is located on a side of the first slide away from the electric telescopic rod;
[0021] The limiting member includes two second plug-in plates, both of which are installed on the front side of the calibration platform, and the second plug-in plates are used in conjunction with the slots.
[0022] Compared with the prior art, the utility model has the following beneficial effects:
[0023] In the scheme of this application:
[0024] In order to solve the problem that the structure used in the prior art for limiting the electric energy meter is relatively complex and inconvenient to use, the present application provides a fixing seat and a limiting part, and the limiting part and the fixing seat cooperate with each other to achieve the limitation of the electric energy meter, and the limiting part moves under the action of external force to achieve the fixing and releasing of the electric energy meter, making the fixing of the electric energy meter simpler, more convenient and easier to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A schematic diagram of the structure of an electric energy meter running test device provided in this application;
[0026] Figure 2 A schematic structural diagram of a first clamping plate and a second clamping plate of an electric energy meter running test device provided in the present application;
[0027] Figure 3 A schematic diagram of the structure of an electric energy meter running test device provided in this application;
[0028] Figure 4 A schematic diagram of the structure of an electric telescopic rod of an electric energy meter running test device provided in the present application;
[0029] Figure 5 A kind of electric energy meter running test device provided in this application Figure 4 Enlarged structural diagram at A in the middle.
[0030] Indicated in the figure:
[0031] 1. Electric energy meter calibration chassis; 2. Calibration support platform; 3. Display; 4. Printer; 5. Fixed seat; 501. Ejector; 502. First clamp; 503. Second clamp; 6. Display screen; 7. Bluetooth pulse module; 8. Push-pull clamp; 901. First guide rail; 902. First slide; 903. Transmission rod; 904. Connecting rod; 905. Second slide; 906. Second guide rail; 907. Pressing seat; 908. Electric telescopic rod; 909. Connecting seat; 910. Limiting plate; 911. Slot; 912. First plug-in board; 913. Second plug-in board. DETAILED DESCRIPTION
[0032] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.
[0033] As described in the background art, when limiting the position of the electric energy meter, the rack mechanism is used to move the base mechanism while driving the clamping plate mechanism to move, thereby limiting the position of the electric energy meter more conveniently. However, the structure used is relatively complex and not convenient for use.
[0034] In order to solve this technical problem, the utility model provides an electric energy meter movement test device, which is used for the movement detection of the electric energy meter.
[0035] Specifically, please refer to Figure 1-Figure 4 , an electric energy meter running test device specifically comprises:
[0036] The electric energy meter calibration case 1 and the calibration platform 2 connected to one side of the electric energy meter calibration case 1, the calibration platform 2 is provided with a plurality of detection areas, each detection area is installed with a plurality of fixing seats 5 and a plurality of limiting parts, the limiting parts move under the action of external force to realize the fixing and releasing of the electric energy meter.
[0037] The utility model provides an electric energy meter movement test device. The present application provides a fixing seat 5 and a limiting part. The limiting part and the fixing seat 5 cooperate with each other to achieve the limitation of the electric energy meter. The limiting part moves under the action of external force to achieve the fixing and releasing of the electric energy meter, making the fixing of the electric energy meter simpler, more convenient and easier to use.
[0038] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings.
[0039] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0040] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0041] Example 1
[0042] Please refer to Figure 1-Figure 4A kind of electric energy meter running test device comprises an electric energy meter calibration case 1 and a calibration support 2 connected to one side of the electric energy meter calibration case 1, wherein a plurality of detection areas are arranged on the calibration support 2, and a plurality of fixing seats 5 and a plurality of limiting parts are installed in each detection area. The limiting parts and the fixing seats 5 cooperate with each other to limit the electric energy meter. The limiting parts move under the action of external force to fix and release the electric energy meter, thereby making the fixing of the electric energy meter simpler and more convenient, and convenient for use.
[0043] Further, such as Figure 1 and Figure 3 As shown, a display screen 6 and a plurality of Bluetooth pulse modules 7 are installed on the front of the calibration platform 2. The display screen 6 and the Bluetooth pulse module 7 are connected to the electric energy meter calibration chassis 1. The electric energy meter calibration chassis 1 is provided with an error calculator. In addition to calibrating the electric energy meter, the present application can also calibrate the Internet of Things meter. The Internet of Things meter is calibrated through the Bluetooth pulse module 7 plus the error calculator. The Internet of Things meter communicates through the Bluetooth pulse module 7. The electric energy meter is calibrated through the ejector pin 501 and the error calculator. The electric energy meter has a weak current terminal for communication, but the Internet of Things meter does not, so the Internet of Things meter uses the Bluetooth pulse module 7 for communication.
[0044] A display 3 and a printer 4 are installed on the front of the electric energy meter calibration box 1. The printer 4 is used to print the calibration results.
[0045] Further, such as Figure 1-Figure 3 As shown, a plurality of ejector pins 501 are installed in the fixing seat 5, and the plurality of ejector pins 501 are connected to the electric energy meter calibration chassis 1 through wires, and the plurality of ejector pins 501 are divided into strong current terminals and weak current terminals.
[0046] Further, such as Figure 2 As shown, first clamping plates 502 are fixedly connected to both sides of the fixing seat 5, and first gaps are provided between the two first clamping plates 502 and the fixing seat 5. The first gaps provide the required space for the deformation of the first clamping plates 502, and the electric energy meter can be clamped by the first clamping plates 502;
[0047] Second clamping plates 503 are fixedly connected to both sides of the fixing seat 5. Second gaps are provided between the two second clamping plates 503 and the fixing seat 5. The second gaps provide the required space for the deformation of the second clamping plates 503. The second clamping plates 503 can further clamp the electric energy meter to improve the stability of the electric energy meter.
[0048] Example 2
[0049] The electric energy meter running test device provided in Example 1 is further optimized. Specifically, Figure 2As shown, the limiting part is a push-pull clamp 8, which is installed on the calibration platform 2 and located above the fixed seat 5. By pushing and pulling the push-pull clamp 8, the push-pull clamp 8 can be moved toward or away from the fixed seat 5. When the push-pull clamp 8 moves toward the fixed seat 5, it can cooperate with the fixed seat 5 to clamp the electric energy meter, and when the push-pull clamp 8 is away from the fixed seat 5, it can contact the fixing of the electric energy meter. For ease of understanding, this application uses D to represent the electric energy meter and is marked in the figure;
[0050] During testing, the electric energy meter is inserted into the fixing seat 5 so that the ejector pin 501 is plugged into the wiring port of the electric energy meter, and the first clamp 502 and the second clamp 503 clamp the electric energy meter. The push-pull clamp 8 is pushed downward so that the push-pull clamp 8 contacts the top of the electric energy meter to fix the electric energy meter. The testing of the electric energy meter is a prior art and will not be described in detail in this application. After the testing is completed, the push-pull clamp 8 is pushed upward so that the push-pull clamp 8 is separated from the electric energy meter, and then the electric energy meter can be removed by pulling it upward.
[0051] Example 3
[0052] The electric energy meter running test device provided in Example 1 is further optimized. Specifically, Figure 3-Figure 4 As shown, the limiting part includes a second guide rail 906 fixedly mounted on the calibration platform 2 and located above the fixed seat 5, the outer surface of the second guide rail 906 is slidably connected to the second slide 905, the bottom of the second slide 905 is fixedly connected to a pressure seat 907, and when the second slide 905 moves, it can drive the pressure seat 907 to move, and the electric energy meter can be pressed by the pressure seat 907.
[0053] Further, such as Figure 4 As shown, a control part is arranged between the multiple limiting parts of each detection area, and the control part is used to control the movement of the limiting parts, so that the pressure seat 907 can move closer to or away from the electric energy meter.
[0054] Further, such as Figure 4 As shown, the control unit includes a first guide rail 901 fixedly mounted on the front side of the verification platform 2, the outer surface of the first guide rail 901 is slidably connected to a first slide 902, both sides of the first slide 902 are fixedly connected to a transmission rod 903, the back of the transmission rod 903 is fixedly connected to a connecting rod 904, and the connecting rod 904 is fixedly connected to a second slide 905; when the first slide 902 moves up and down, it can drive the transmission rod 903 to move up and down, and the transmission rod 903 can drive the second slide 905 to move through the connecting rod 904;
[0055] Two connecting seats 909 are fixedly installed on the front side of the first sliding seat 902. A rotating shaft is connected between the two connecting seats 909 via a bearing. A limiting plate 910 is fixedly sleeved on the outer surface of the rotating shaft. The limiting plate 910 can rotate around the rotating shaft.
[0056] Further, such as Figure 5 As shown, a slot 911 is provided on the limit plate 910, and a first plug plate 912 is plugged into the slot 911. The first plug plate 912 is connected to an electric telescopic rod 908, and the electric telescopic rod 908 is installed on the front side of the calibration platform 2. When the electric telescopic rod 908 is extended or retracted, the limit plate 910 can be driven to move through the first plug plate 912, and the limit plate 910 can drive the first slide seat 902 to move.
[0057] Further, such as Figure 5 As shown, the control unit also includes a limiter, which is installed on the front of the verification platform 2, and the limiter is located on the side of the first slide 902 away from the electric telescopic rod 908;
[0058] The limiting member includes two second plug plates 913, both of which are installed on the front side of the calibration platform 2, and the second plug plates 913 are used in conjunction with the slot 911. After the limiting plate 910 is rotated so that the slot 911 is separated from the first plug plate 912, the first slide 902 can be manually pushed to move, so that it can be temporarily manually operated when the electric telescopic rod 908 is damaged. At this time, the limiting plate 910 can be limited by plugging the slot 911 and the second plug plate 913, and then the first slide 902 can be limited.
[0059] When in use, the electric energy meter is inserted into the fixing seat 5, so that the ejector pin 501 is plugged into the wiring port of the electric energy meter, and the first clamping plate 502 and the second clamping plate 503 clamp the electric energy meter, and the electric telescopic rod 908 drives the limit plate 910 to descend through the slot 911 and the first plug plate 912, and the limit plate 910 drives the pressure seat 907 to descend through the first slide seat 902, the transmission rod 903, the connecting rod 904 and the second slide seat 905 so that the pressure seat 907 presses the electric energy meter. After the detection is completed, the electric telescopic rod 908 pushes the limit plate 910 to rise, so that the pressure seat 907 is separated from the electric energy meter, and then the electric energy meter can be removed;
[0060] During manual operation, the limiting plate 910 is rotated to separate the slot 911 from the first plugging plate 912 , and the first slide seat 902 is manually pushed up and down, and then the limiting plate 910 is rotated to connect the slot 911 with the second plugging plate 913 .
[0061] Example 4
[0062] This device uses the standard meter method to calibrate the electric energy meter under test, and mainly carries out the running test of three-phase intelligent Internet of Things electric energy meters and three-phase intelligent electric energy meters. The electric energy meter calibration box (1) is also equipped with a three-phase power source, a three-phase multifunctional standard meter, a multi-channel communication server, and a computer. The three-phase power source is used to generate three-phase voltage and current signals. The amplitude, phase, and frequency of the voltage and current can be set at will. It has the function of output voltage and current soft start and stop. The voltage, current, phase, and frequency of the device can be programmably adjusted, and can be adjusted in the output state; the output electric energy pulses of the standard meter and the meter under test are sent to the error calculator to calculate the errors of each meter under test, which are displayed separately by the error display of each meter position; the three-phase multifunctional standard meter is used Generate standard electric energy pulses, and measure and display parameters such as three-phase voltage, current, active power, reactive power, apparent power, power factor, load impedance angle, frequency, etc. to monitor the output status of the power source; and the power source and standard meter work under the control of the computer; the 500K standard clock pulse output by the standard clock source and the standard clock pulse of the meter under test are sent to the error calculator to calculate the clock error, which is displayed on the error display; the computer controls the entire verification process through the electric energy meter verification software platform, and processes and manages the verification data;
[0063] The whole device adopts an integrated design, targeting IoT electric energy meters with higher technical standards, and is compatible with the 20th edition and 13th edition smart electric energy meters currently being promoted, realizing the running test items under the new technical specifications; to ensure stable measurement, the electronic source is well shielded, reliably grounded, and the power supply has good low-noise heat dissipation and ventilation measures;
[0064] This application is also equipped with a wireless barcode gun (not shown in the figure), which can recognize mainstream barcode types such as one-dimensional and two-dimensional;
[0065] This application supports DL / T698.45 "Electric Energy Information Collection and Management System Part 4-5: Object-oriented Interoperability Data Exchange Protocol". All test projects need to be planned and designed for the 698 protocol and be compatible with both 645 and 698 protocols.
[0066] This application can complete the running test of 24 electric energy meters at the same time. The types of electric energy meters include 2013 version, 2020 version three-phase smart electric energy meters and three-phase smart IoT electric energy meters;
[0067] This application should be equipped with a programmable high-power precision test power supply, and have the output voltage and current soft start and stop function, and can programmably adjust the voltage, current, phase, frequency, and timing of the device; and set the device emergency stop button;
[0068] The application also provides a platform body detection position (voltage, current and standard frequency terminal) to facilitate the use of the device;
[0069] The device can automatically collect and display the electric energy value of each meter position and the main reference standard electric energy value and save the data. After the test, the system can automatically calculate the combined error of the electric energy indication value according to the indication value of each rate period, and judge whether it is qualified according to the requirements of the regulations;
[0070] The device shall have an automatic short-circuit function, and each meter position shall have a current open circuit detection function;
[0071] This application has a self-checking function when powered on or running, which can detect faults in various devices in time, alarm and display the fault location and cut off the output of the power source, with perfect protection function;
[0072] The device has GPS time synchronization function, which can edit the time of the electric energy meter;
[0073] The device can monitor the running process and provide automatic protection and sound and light alarm when the electric system exceeds the limit or loses pressure, the crimping is abnormal, or the connection and disconnection fails.
[0074] If a voltage short circuit occurs at a certain position during the running process, or the running item fails, this application can display the working conditions according to the actual situation;
[0075] Each meter position of the device has a current loop open circuit detection function. When a meter position current loop is detected to be open circuit, the meter position is automatically short-circuited. The open circuit detection response speed should be better than the current open circuit protection of the device. When all the meter positions are open circuited at once, the current open circuit protection of the device does not work, and there is a relay status output, which can be read instantly by the main control software;
[0076] The device has the function of memorizing the current status of the word-sliding project and the word-sliding data. In case of sudden power failure, there is no need to re-sliding.
[0077] The source parameters can be adjusted manually to achieve the test requirements, or the software can be set to achieve the test requirements. It can perform positive and reverse power timing and quantitative test on three-phase electric energy meters according to the regulations, automatically switch the load point and direction, and complete the meter indication combination error test;
[0078] The device's virtual load power supply uses a digital potentiometer to ensure full-scale accuracy. There is no need to manually adjust the potentiometer to ensure calibration accuracy.
[0079] A. The voltage and current ranges of this application are as follows:
[0080] Output voltage range: 480V / 240V / 120V / 60V;
[0081] Output current range: 100A / 20A / 5A / 1A / 0.2A / 0.1A;
[0082] Voltage measurement: 0.01% (30V-500V);
[0083] Current measurement: 0.01% (0.01A-120A);
[0084] Active power: 0.02% (30V-500V, 0.01A-120A, PF>=0.5);
[0085] Reactive power: 0.05%;
[0086] B. Active power: 0.02% (30V-500V, 0.01A-120A, PF>=0.5) output load capacity;
[0087] Voltage loop: not less than 20VA / meter position / phase;
[0088] Current loop: not less than 40VA / meter position;
[0089] C. Output power regulation:
[0090] Voltage Regulation:
[0091] Voltage range: 3×57.7V / 100V / 220V / 380V;
[0092] Adjustment range: 0% to 120% of the gear value;
[0093] Adjustment fineness: better than 0.01%;
[0094] Maximum output voltage: 480V;
[0095] Current Regulation:
[0096] Current range: 1mA, 10mA, 0.1A, 0.25A, 0.5A, 1A, 2.5A, 5A, 10A, 25A, 50A, 100A;
[0097] Adjustment range: 0% to 120% of the gear value;
[0098] Adjustment fineness: better than 0.01%;
[0099] Minimum output current: 3mA, accuracy not less than 2%. Starting power accuracy not less than 2%;
[0100] Maximum output current: 120A.
[0101] Neutral current source:
[0102] Current range: 20mA, 0.1A, 0.25A, 0.5A, 1A, 2.5A, 5A, 10A, 25A, 50A, 100A;
[0103] Adjustment range: 0% to 120% of the gear value;
[0104] Adjustment fineness: better than 0.01%.
[0105] Phase adjustment:
[0106] Adjustment range: 0°~359.99°;
[0107] Adjustment fineness: better than 0.01%.
[0108] D. Output distortion: ≤0.3%;
[0109] E. Output stability: ≤0.05% / 2 minutes.
[0110] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0111] Obviously, the embodiments described above are only some embodiments of the utility model, rather than all embodiments. The preferred embodiments of the utility model are given in the accompanying drawings, but they do not limit the patent scope of the utility model. The utility model can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the utility model more thorough and comprehensive. Although the utility model is described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific implementation methods, or to replace some of the technical features therein with equivalents. Any equivalent structure made using the contents of the utility model specification and the accompanying drawings, directly or indirectly used in other related technical fields, is also within the scope of patent protection of the utility model.
Claims
1. An electric energy meter running test device, comprising an electric energy meter calibration case (1) and a calibration support (2) connected to one side of the electric energy meter calibration case (1), characterized in that: The verification support platform (2) is provided with a plurality of detection areas, each of which is provided with a plurality of fixing seats (5) and a plurality of limiting parts, wherein the limiting parts move under the action of an external force to achieve fixing and releasing of the electric energy meter; The limiting portion comprises a second guide rail (906) fixedly mounted on the calibration platform (2) and located above the fixed seat (5); the outer surface of the second guide rail (906) is slidably connected to a second slide seat (905); and the bottom of the second slide seat (905) is fixedly connected to a pressure seat (907); A control part is arranged between the multiple limit parts in each detection area, and the control part is used to control the movement of the limit parts; The control unit comprises a first guide rail (901) fixedly mounted on the front side of the calibration platform (2); the outer surface of the first guide rail (901) is slidably connected to a first slide seat (902); both sides of the first slide seat (902) are fixedly connected to transmission rods (903); the back side of the transmission rod (903) is fixedly connected to a connecting rod (904); and the connecting rod (904) is fixedly connected to a second slide seat (905); Two connecting seats (909) are fixedly mounted on the front of the first sliding seat (902); a rotating shaft is connected between the two connecting seats (909) via a bearing; and a limiting plate (910) is fixedly sleeved on the outer surface of the rotating shaft; The limiting plate (910) is provided with a slot (911), a first plug plate (912) is plugged into the slot (911), the first plug plate (912) is connected to an electric telescopic rod (908), and the electric telescopic rod (908) is installed on the front side of the calibration support platform (2); The control unit further comprises a limiter, which is mounted on the front side of the calibration support platform (2), and is located on a side of the first slide seat (902) away from the electric telescopic rod (908); The limiting member comprises two second plug plates (913), the two second plug plates (913) are both mounted on the front side of the verification support platform (2), and the second plug plates (913) are used in conjunction with the slots (911).
2. The electric energy meter running test device according to claim 1 is characterized in that: A display screen (6) and a plurality of Bluetooth pulse modules (7) are installed on the front of the calibration platform (2); the display screen (6) and the Bluetooth pulse modules (7) are both connected to the electric energy meter calibration chassis (1); A display (3) and a printer (4) are installed on the front of the electric energy meter calibration box (1).
3. The electric energy meter running test device according to claim 2 is characterized in that: A plurality of ejector pins (501) are installed in the fixing seat (5), and the plurality of ejector pins (501) are connected to the electric energy meter calibration box (1) via wires.
4. The electric energy meter running test device according to claim 3 is characterized in that: First clamping plates (502) are fixedly connected to both sides of the fixing seat (5), and first gaps are provided between the two first clamping plates (502) and the fixing seat (5); Second clamping plates (503) are fixedly connected to both sides of the fixing seat (5), and a second gap is provided between the two second clamping plates (503) and the fixing seat (5).