Side slope planting belt structure for mine geological environment governance
By designing an adjustable slope planting belt structure in the mine geological environment management, the problem of insufficient protection of seedlings is solved, flexible protection of vegetation and appropriate water management are achieved, and the growth environment and survival rate of vegetation are improved.
Patent Information
- Application Number
- CN202420507280.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN221901622U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of environmental management, in particular to a slope planting belt structure for mine geological environment management. Background Art
[0002] During the mining process, the ecological environment is extremely damaged. After the mining is completed, the geology is very likely to cause mudslides, landslides and other phenomena due to the lack of vegetation in the mine. Therefore, after the mining is completed, the mine ecological environment needs to be repaired to restore the mine's ecological environment.
[0003] After searching, a slope planting belt structure for mine geological environment management disclosed by the existing patent announcement number CN217267555U includes a foundation, a soil layer is laid on the surface of the foundation, and several planting areas are provided on the foundation. A first intercepting ditch is provided at the bottom of the planting area, and a flood discharge channel is provided on the side of the planting area. The first intercepting ditch is connected to the flood discharge channel. A drainage structure is laid in the planting area, and the drainage structure includes a first baffle and a second baffle. The first baffle and the second baffle form a frame structure. A drainage channel is formed between the several drainage structures, and the bottom of the drainage channel is connected to the first intercepting ditch.
[0004] However, in actual use, the utility model does not take into account that vegetation needs more complete protection when it is a seedling, and after the vegetation grows, the original protection structure needs to be expanded to reduce the constraints on the vegetation and facilitate vegetation growth. Utility Model Content
[0005] The technical solution of the utility model is aimed at the existing technology that solves too single technical problems, and provides a solution that is significantly different from the existing technology. In order to overcome the above defects of the existing technology, the utility model provides a new solution to solve the problems raised in the above background technology.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a slope planting belt structure for mine geological environment management, including a frame, a first grass grid is installed on the inner side of the frame, a second grass grid is arranged below the first grass grid, two opposite right-angled sides of the second grass grid are cut with beveled surfaces, bearings are installed on the beveled surfaces, a screw is rotatably connected inside the bearing, a through groove is correspondingly opened near the screw on the frame, and a threaded sleeve is fixed inside the through groove.
[0007] Optionally, the inner sides of the first grass grid and the second grass grid are both formed by a plurality of horizontal bars and vertical bars connected in series to form a plurality of small grass grids arranged in a rectangular shape.
[0008] Optionally, the frame, the first grass grid, the second grass grid and the small grass grid are all squares.
[0009] Optionally, a plurality of linearly arranged intercepting grooves are installed on the outer side of the frame, and the bottom of the intercepting grooves is connected to the rainwater pipe inside the frame, and the rainwater pipe is inclined toward the inner side of the frame.
[0010] Optionally, a humidity detector is installed on the outer side of the frame.
[0011] Optionally, a GPS locator is also provided near the humidity detector.
[0012] Optionally, the first grass grid is fixed to the inner side of the frame through a plurality of fixing rods.
[0013] Optionally, a rain baffle is installed at the bottom of the frame.
[0014] Compared with the prior art, the advantages and positive effects of the utility model are:
[0015] In the utility model, the second grass grid is installed below the first grass grid and connected with the screw by means of a threaded sleeve, so that the forty-five-degree oblique displacement adjustment of the position of the second grass grid can be achieved. In addition, the frame and the small grass grids in the two grass grids are all square structures, so that the small grass grids in the upper and lower layers can overlap with each other or reduce the intervals, providing a more precise protection space for vegetation. This structure not only strengthens the protection of internal vegetation, but also can flexibly adjust the position according to the specific needs of plant growth. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 An overall stereogram of a slope planting belt structure for mine geological environment management provided by the utility model;
[0017] Figure 2 A partial stereoscopic diagram of the first grass grid structure of a slope planting belt structure for mine geological environment management provided by the utility model;
[0018] Figure 3 The utility model provides a slope planting belt structure for mine geological environment management Figure 2 Enlarged view of part A;
[0019] Figure 4 The utility model provides a schematic cross-sectional structure diagram of a water interception and rainwater channel of a slope planting belt structure for mine geological environment management.
[0020] Legend:
[0021] 1. Frame; 2. First grass grid; 3. Horizontal bar; 4. Vertical bar; 5. Fixed bar; 6. Through slot; 7. Threaded sleeve; 8. Second grass grid; 9. Beveled surface; 10. Screw; 11. Bearing; 12. Water intercepting trough; 13. Rainwater baffle; 14. Rainwater pipe; 15. Humidity detector; 16. GPS locator. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example
[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the utility model provides a technical solution: a slope planting belt structure for mine geological environment management, including a frame 1, a first grass grid 2 is installed on the inner side of the frame 1, a second grass grid 8 is arranged below the first grass grid 2, two opposite right-angled sides of the second grass grid 8 are cut with chamfered surfaces 9, a bearing 11 is installed on the chamfered surface 9, a screw 10 is rotatably connected inside the bearing 11, a through groove 6 is correspondingly opened near the screw 10 on the frame 1, a threaded sleeve 7 is fixed inside the through groove 6, the inner sides of the first grass grid 2 and the second grass grid 8 are both formed by a plurality of horizontal bars 3 and vertical bars 4 spliced in series, and form a plurality of small grass grids arranged in a rectangular shape, and the frame 1, the first grass grid 2, the second grass grid 8 and the small grass grids are all square.
[0025] In this embodiment, the second grass grid 8 is installed below the first grass grid 2 and connected with the screw 10 by means of a threaded sleeve 7, so that the forty-five-degree oblique displacement adjustment of the position of the second grass grid 8 can be achieved. In addition, the frame 1 and the small grass grids in the two grass grids are all square structures, so that the small grass grids in the upper and lower layers can overlap with each other or reduce the intervals, providing a more precise protection space for vegetation. This structure not only strengthens the protection of internal vegetation, but also allows for flexible position adjustment according to the specific needs of plant growth.
[0026] A plurality of linearly arranged intercepting grooves 12 are installed on the outer side of the frame 1 . The bottom of the intercepting grooves 12 is connected to a rainwater pipe 14 inside the frame 1 . The rainwater pipe 14 is inclined toward the inner side of the frame 1 . A rainwater baffle 13 is installed at the bottom of the frame 1 .
[0027] In this embodiment, the intercepting groove 12 can collect moisture on the outside of the frame 1 and transport it to the vegetation protected inside the frame 1 through the rainwater pipe 14. The soil under the rainwater baffle 13 can store a certain amount of moisture and block the sun to reduce evaporation.
[0028] A humidity detector 15 is installed on the outside of the frame 1 , and a GPS locator 16 is also arranged near the humidity detector 15 . The first grass grid 2 is fixed to the inside of the frame 1 through a plurality of fixing rods 5 .
[0029] In this embodiment, the humidity detector 15 can detect the moisture content of the air. When a long-term drought state is detected, the GPS locator 16 is used for positioning, so that the vegetation inside the planting structure can be quickly replenished with moisture, thereby improving the survival rate of the vegetation.
[0030] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A slope planting belt structure for mine geological environment management, comprising a frame (1), characterized in that: A first grass grid (2) is installed inside the frame (1), a second grass grid (8) is provided below the first grass grid (2), two opposite right-angled sides of the second grass grid (8) are cut with chamfered surfaces (9), a bearing (11) is installed on the chamfered surface (9), a screw rod (10) is rotatably connected inside the bearing (11), a through groove (6) is correspondingly opened near the screw rod (10) on the frame (1), and a threaded sleeve (7) is fixed inside the through groove (6).
2. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: The inner sides of the first grass grid (2) and the second grass grid (8) are both formed by a plurality of horizontal bars (3) and vertical bars (4) connected in series, forming a plurality of small grass grids arranged in a rectangular shape.
3. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: The frame (1), the first grass grid (2), the second grass grid (8) and the small grass grid are all squares.
4. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: A plurality of linearly arranged intercepting grooves (12) are installed on the outside of the frame (1); the bottom of the intercepting grooves (12) is connected to a rainwater pipe (14) inside the frame (1); and the rainwater pipe (14) is inclined toward the inside of the frame (1).
5. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: A humidity detector (15) is installed on the outer side of the frame (1).
6. The slope planting belt structure for mine geological environment management according to claim 5 is characterized by: A GPS locator (16) is also provided near the humidity detector (15).
7. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: The first grass grid (2) is fixed to the inner side of the frame (1) via a plurality of fixing rods (5).
8. The slope planting belt structure for mine geological environment management according to claim 1 is characterized by: A rainwater baffle (13) is installed at the bottom of the frame (1).