Building material soaking preparation device

By designing the building material immersion preparation device for the box, adjustment, circulation and cleaning devices, the problem of the inability of the traditional device to be lifted up and the increase in the weight of the building materials has been solved, and the convenience of taking out the building materials and water circulation flushing have been achieved, improving work efficiency and the quality of the building materials.

CN221908645UActive Publication Date: 2024-10-29SHANGHAI TONGDA PLANNING & ARCHITECTURAL DESIGN CO LTD HEILONGJIANG BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323664440.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-29
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

Traditional building material soaking devices cannot lift heavy building materials, and the building materials absorb water and increase their weight during the soaking process, making it difficult for workers to take them out and inconvenient to use.

Method used

A building material immersion preparation device is designed, which includes a box, an adjustment device, a circulation device and a cleaning device. The position of the placement board is changed through the adjustment device. The circulation device realizes the recycling and flushing of water. The cleaning device facilitates cleaning and reduces the difficulty of taking out the building materials. and improved work efficiency.

Benefits of technology

The adjustment device facilitates the removal of building materials, the circulation device ensures the quality of building materials, and the cleaning device improves filtration quality and operational convenience, significantly reducing the difficulty of work and improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221908645U_ABST
    Figure CN221908645U_ABST
Patent Text Reader

Abstract

The utility model discloses a building material soaking preparation device which comprises a box body, a placing plate is arranged on the upper portion in the box body, a transverse plate is installed in the box body, ground feet are installed at the four corners of the bottom of the box body, a water supplementing pipe is installed on the lower portion of one side of the box body, and the building material soaking preparation device further comprises an adjusting device. The box body is arranged above the box body; the circulating device is mounted in the box body; the cleaning device is arranged below the box body; and the position height of the placing plate can be changed by the adjusting device. According to the building material soaking preparation device, through cooperation of the box body, the adjusting device, the placing plate and the transverse plate, when the building material is taken out, a worker pulls up the building material on the top of the placing plate through the adjusting device, and then the worker can take out the building material more conveniently; and the operation difficulty of workers can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building materials, in particular to a building material soaking preparation device. Background Art

[0002] Building materials are a general term for materials used in civil engineering and construction engineering, which can be divided into structural materials, decorative materials and certain special materials. Structural materials include wood, bamboo, stone, cement, concrete, metal, bricks and tiles, ceramics, glass, engineering plastics, composite materials, etc.; decorative materials include various coatings, paints, coatings, veneers, various colored tiles, glass with special effects, etc.; special materials refer to those used for waterproofing, moisture-proofing, anti-corrosion, fireproofing, flame retardancy, sound insulation, heat insulation, thermal insulation, sealing, etc. When using building materials such as bricks and tiles and ceramics, they need to be soaked in advance, which requires the use of a building material soaking device;

[0003] When the current building material soaking device is used, the staff directly puts the building materials into the soaking device, and then injects a certain amount of soaking water into the soaking device, and then the building materials can be soaked. When the building materials are soaked, the staff can take out the building materials and then put them into use;

[0004] When using traditional building materials soaking devices, they cannot lift and pull up the soaked building materials. In addition, due to the heavy weight of the building materials themselves, and because the building materials will absorb a certain amount of soaking water during soaking, the weight of the building materials themselves is further increased. This makes it more troublesome for workers to take the building materials out of the soaking device due to the weight of the building materials themselves, resulting in greater difficulty in the work and inconvenience for the workers. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a building material soaking preparation device, which solves the problem that traditional building material soaking devices cannot lift and pull up the soaked building materials when in use, and because the building materials themselves are heavy, and because the building materials will absorb a certain amount of soaking water during soaking, thereby further increasing the weight of the building materials themselves, it is more troublesome for the staff to take the building materials out of the soaking device due to the weight of the building materials themselves, resulting in greater difficulty in the work and inconvenience for the staff.

[0006] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a building material soaking preparation device, including a box body, a placement plate is arranged on the upper part of the interior of the box body, a horizontal plate is installed inside the box body, feet are installed at the four corners of the bottom of the box body, and a water supply pipe is installed at the lower side of the box body. The building material soaking preparation device also includes: an adjustment device, which is arranged on the top of the box body; a circulation device, which is installed inside the box body; and a cleaning device, which is arranged at the bottom of the box body; wherein, the adjustment device can change the position height of the placement plate, the circulation device can realize the recycling of soaking water, and the cleaning device can clean the circulation device.

[0007] Preferably, a baffle is installed on the top of the placement plate, a rubber pad is arranged on the top of the placement plate, and grooves are processed on both sides of the top of the placement plate.

[0008] Preferably, the adjusting device includes: four winding wheels, which are respectively arranged at the four upper corners of the box body; four guide wheels, which are respectively installed at the four top corners of the box body; four connecting rings, which are respectively installed at the four top corners of the placement plate; four limiting rods, which are respectively installed at the four corners of the cross plate and are movably connected to the four corners of the placement plate; wherein the winding wheel can adjust the position of the placement plate using the connecting ring through an external cable.

[0009] Preferably, the circulation device includes: a water pump, which is arranged at the lower part of the interior of the box; a conduit, which is connected to the output end of the water pump; a nozzle, which is connected to the top of the conduit; a collection box, which is installed between the cross plate and the box; a filter screen, which is installed above the collection box; a sewage pipe, which is installed at the bottom of the collection box and extends to the bottom of the box; wherein the water pump can draw out the water source at the lower part of the interior of the box, transport it through the conduit, and then spray it out from the nozzle, and then filter it through the filter screen installed above the collection box.

[0010] Preferably, the cleaning device includes: two servo motors, which are respectively installed on both sides of the bottom of the box; two lead screws, which are respectively detachably connected to the output ends of the two servo motors; two sleeves, which are respectively installed above the two lead screws; and a cleaning ring plate, which is installed on the side where the two sleeves are close to each other; wherein the servo motor can drive the lead screw to drive the sleeve and the cleaning ring plate to clean the circulation device.

[0011] Beneficial Effects

[0012] The utility model provides a building material soaking preparation device. It has the following beneficial effects: the building material soaking preparation device can cooperate with the box, the adjustment device, the placement plate and the horizontal plate, so that when taking out the building materials, the staff can pull up the building materials on the top of the placement plate through the adjustment device, so that the staff can take out the building materials more conveniently, which can greatly reduce the difficulty of the staff's operation and bring convenience to the staff's use;

[0013] Through the cooperation of the circulation device, the surface of the building materials can be washed, and the larger impurities washed down can be filtered and collected, thereby ensuring the quality of the building materials during use and facilitating the subsequent use of the staff;

[0014] Through the cooperation of the cleaning device, the circulation device can be cleaned, which can greatly improve the filtering quality of the circulation device. In addition, the operation is convenient, so that the staff can clean the circulation device more conveniently, which can effectively improve the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 for Figure 1 A cross-sectional view of

[0017] Figure 3 for Figure 2 Schematic diagram of the structure of the middle cross plate, filter screen and lead screw;

[0018] Figure 4 for Figure 2 Schematic diagram of the structure of the connecting ring, placement plate and cross plate.

[0019] In the figure: 1. box body, 2. adjusting device, 201. winding wheel, 202. guide wheel, 203. limiting rod, 204. connecting ring, 3. circulation device, 301. water pump, 302. conduit, 303. nozzle, 304. filter screen, 305. sewage pipe, 306. collecting box, 4. cleaning device, 401. servo motor, 402. lead screw, 403. sleeve, 404. cleaning ring plate, 5. cross plate, 6. foot, 7. placement plate, 8. rubber pad, 9. baffle, 10. water supply pipe. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.

[0022] When the conventional building material soaking device is in use, it is not possible to lift the soaked building materials, and because the building materials themselves are heavy, and because the building materials absorb a certain amount of soaking water during soaking, the weight of the building materials themselves is further increased, which makes it difficult for the staff to take the building materials out of the soaking device due to the weight of the building materials themselves, resulting in inconvenience for the staff;

[0023] In view of this, the utility model provides a building material soaking preparation device. Through the cooperation of the box body, the adjusting device, the placing plate and the cross plate, when taking out the building materials, the staff can pull up the building materials on the top of the placing plate through the adjusting device, so that the staff can take out the building materials more conveniently, which can greatly reduce the difficulty of the staff's operation and bring convenience to the staff's use.

[0024] Embodiment 1: Figure 1 , 2 , 3 and 4 show that a building material soaking preparation device includes a box body 1, a placement plate 7 is arranged on the upper part of the box body 1, a horizontal plate 5 is installed inside the box body 1, and feet 6 are installed at the four corners of the bottom of the box body 1. A water supply pipe 10 is installed at the lower side of the box body 1. The building material soaking preparation device also includes: an adjustment device 2, which is arranged on the upper part of the box body 1; a circulation device 3, which is installed inside the box body 1; and a cleaning device 4, which is arranged below the box body 1; wherein the adjustment device 2 can change the position height of the placement plate 7, the circulation device 3 can realize the recycling of soaking water, and the cleaning device 4 can clean the circulation device 3;

[0025] In the specific implementation process, it is worth pointing out that the external building materials are placed on the top of the placement plate 7, and then the building materials are transported to the inside of the box body 1 through the adjustment device 2, the circulation device 3 can rinse the building materials, and can also filter and remove the larger impurities washed down, and the cleaning device 4 can clean the circulation device 3;

[0026] Furthermore, a baffle 9 is installed on the top of the placement plate 7, a rubber pad 8 is provided on the top of the placement plate 7, and grooves are processed on both sides of the top of the placement plate 7;

[0027] In the specific implementation process, it is worth pointing out that the baffle 9 can limit the building materials, and the rubber pad 8 can increase the friction between the building materials and the placement plate 7 to prevent the building materials from accidentally sliding on the top of the placement plate 7;

[0028] Specifically, when using the building materials soaking preparation device, the staff first places the building materials on the top of the placement plate 7, and then the staff uses the adjustment device 2 to control the movement of the placement plate 7, and then inserts the building materials into the interior of the box 1. Then the staff introduces the external soaking water source into the interior of the box 1 through the water supply pipe 10, and then the staff turns on the external power supply of the circulation device 3. At this time, the circulation device 3 can extract and circulate the water source inside the box 1. While soaking the building materials, the building materials can also be rinsed. When the circulation device 3 needs to be cleaned, the staff turns on the external power supply of the cleaning device 4, and then the cleaning device 4 can be used to clean the circulation device 3.

[0029] Embodiment 2: By Figure 1 , 2 As can be seen from Figures 4 and 5, the adjusting device 2 includes: four winding wheels 201, which are respectively arranged at the four upper corners of the box body 1; four guide wheels 202, which are respectively arranged at the four top corners of the box body 1; four connecting rings 204, which are respectively arranged at the four top corners of the placement plate 7; four limiting rods 203, which are respectively arranged at the four corners of the horizontal plate 5 and are respectively movably connected to the four corners of the placement plate 7; wherein the winding wheel 201 can adjust the position of the placement plate 7 by using the connecting ring 204 through an external cable;

[0030] In the specific implementation process, it is worth pointing out that the reel 201 is connected to the external power equipment and needs to be used together with the external cable. The reel 201 can realize the reeling and releasing of the external cable, and then the placement plate 7 can be adjusted through the connecting ring 204;

[0031] Specifically, based on the above-mentioned embodiment 1, when the building materials need to be taken out, the staff turns on the external power equipment connected to the winding wheel 201, and the winding wheel 201 can then reel in the external cable. At this time, as the length of the cable is reduced, the placement plate 7 can be lifted through the connecting ring 204, so that the staff can take out the building materials more conveniently.

[0032] Embodiment 3: By Figure 2 , 3As can be seen from Figure 4, the circulation device 3 includes: a water pump 301, which is arranged at the lower part of the box body 1; a conduit 302, which is connected to the output end of the water pump 301; a nozzle 303, which is connected to the upper part of the conduit 302; a collection box 306, which is installed between the horizontal plate 5 and the box body 1; a filter screen 304, the mesh number of which is not specifically limited, and it can be installed above the collection box 306 as long as it meets the use requirements; a sewage pipe 305, which is installed at the bottom of the collection box 306 and extends to the lower part of the box body 1; wherein the water pump 301 can draw out the water source at the lower part of the box body 1, transport it through the conduit 302, and then spray it out from the nozzle 303, and then filter it through the filter screen 304 installed above the collection box 306;

[0033] In the specific implementation process, it is worth pointing out that the model of the water pump 301 is QD6-9-0.4. The water pump 301 can transport the water source at the bottom of the box body 1 through the conduit 302, and then spray it to the top of the box body 1 through the nozzle 303. Then, due to its own characteristics, the water source can be filtered and removed through the filter 304;

[0034] Specifically, based on the above-mentioned embodiments 1 and 2, when the building materials enter the interior of the box 1, the staff turns on the external power supply of the water pump 301, and the water pump 301 can spray the water source at the bottom of the interior of the box 1 to the top of the box 1 through the conduit 302 and the nozzle 303, and then the building materials can be rinsed. Then the water source is filtered through the filter net 304, re-enters the interior of the box 1, and then is extracted by the water pump 301, thereby realizing a circulation operation.

[0035] Embodiment 4: By Figure 2 and 3 It can be seen that the cleaning device 4 includes: a servo motor 401, the model of the servo motor 401 is ECMA-E11320RS, two are set, and are respectively installed on both sides of the bottom of the box body 1; two lead screws 402 are set, which are detachably connected to the output ends of the two servo motors 401; two sleeves 403 are set, and are respectively installed above the two lead screws 402; a cleaning ring plate 404 is installed on the side where the two sleeves 403 are close to each other; wherein the servo motor 401 can drive the lead screw 402 to drive the sleeve 403 and the cleaning ring plate 404 to clean the circulation device 3;

[0036] In the specific implementation process, it is worth pointing out that the servo motor 401 can drive the lead screw 402 to rotate, and then drive the sleeve 403 and the cleaning ring plate 404 to move up and down repeatedly, so as to clean the filter 304;

[0037] Specifically, based on the above-mentioned embodiments one, two and three, when the filter screen 304 needs to be cleaned, the staff turns on the external power supply of the servo motor 401, and the servo motor 401 can drive the lead screw 402 to rotate. As the lead screw 402 rotates, the cleaning ring plate 404 can be driven through the sleeve 403 to clean the filter screen 304.

[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0039] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A building material soaking preparation device, comprising a box (1), Features: A placement plate (7) is arranged above the interior of the box (1), a horizontal plate (5) is installed inside the box (1), feet (6) are installed at the four corners of the bottom of the box (1), a water supply pipe (10) is installed below one side of the box (1), and the building material soaking preparation device also includes: An adjusting device (2) is arranged above the box (1); A circulation device (3) installed inside the box (1); A cleaning device (4) is arranged below the box (1); The adjusting device (2) can change the height of the placement plate (7), the circulating device (3) can realize the recycling of soaking water, and the cleaning device (4) can clean the circulating device (3).

2. A building material soaking preparation device according to claim 1, Features: A baffle (9) is installed on the top of the placement plate (7), a rubber pad (8) is arranged on the top of the placement plate (7), and grooves are processed on both sides of the top of the placement plate (7).

3. A building material soaking preparation device according to claim 1, Features: The regulating device (2) comprises: Four winding wheels (201) are provided and are respectively arranged at the four upper corners of the box body (1); Four guide wheels (202) are provided and are respectively installed at the four corners of the top of the box body (1); Four connecting rings (204) are provided and are respectively installed at the four corners of the top of the placement plate (7); Four limiting rods (203) are provided, which are respectively installed at the four corners of the horizontal plate (5) and are movably connected to the four corners of the placement plate (7); The reel (201) can adjust the position of the placement plate (7) by using an external cable and a connecting ring (204).

4. A building material soaking preparation device according to claim 1, Features: The circulation device (3) comprises: A water pump (301) is arranged at the lower part of the box body (1); A conduit (302) connected to an output end of the water pump (301); A nozzle (303) connected to the top of the conduit (302); A miscellaneous box (306) is installed between the transverse plate (5) and the box body (1); A filter screen (304) is installed above the collecting box (306); A sewage pipe (305) is installed at the bottom of the collecting box (306) and extends to the bottom of the box body (1); The water pump (301) can draw water from the lower part of the box (1), transport it through the conduit (302), spray it out from the nozzle (303), and then filter it through the filter net (304) installed above the debris collection box (306).

5. A building material soaking preparation device according to claim 1, Features: The cleaning device (4) comprises: Two servo motors (401) are provided and are respectively installed on two sides of the bottom of the box body (1); Two lead screws (402) are provided and are detachably connected to the output ends of the two servo motors (401); Two sleeves (403) are provided and are respectively installed above the two lead screws (402); A cleaning ring plate (404) is installed on a side where the two sleeves (403) are close to each other; The servo motor (401) can drive the lead screw (402) to drive the sleeve (403) and the cleaning ring plate (404) to clean the circulation device (3).