Large-span steel corridor integral lifting tool

By introducing a pull-assist mechanism into the steel structure corridor lifting tooling to provide reverse pulling force, the problem of insufficient stability of the steel structure corridor during the lifting process is solved and the safety during the lifting process is improved.

CN221917119UActive Publication Date: 2024-10-29CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420627509.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-10-29
Estimated Expiration
2034-03-28

Smart Images

  • Figure CN221917119U_ABST
    Figure CN221917119U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-span steel corridor integral lifting tool which comprises a base, a first building frame is arranged on one side of the base, a second building frame is arranged on the other side of the base, a corridor steel structure frame playing a corridor role is arranged between the first building frame and the second building frame, and the large-span steel corridor integral lifting tool further comprises two sets of lifting mechanisms and a lifting mechanism, the traction devices are arranged at the upper ends of the first building frame and the second building frame correspondingly and used for pulling the corridor steel structure frame to be lifted to the joint of the first building frame and the second building frame; and the pulling assisting mechanism is arranged on the base and connected to the bottom end of the corridor steel structure frame, and when the corridor steel structure frame is lifted upwards, the pulling assisting mechanism is used for providing pulling force in the direction opposite to the traction force of the lifting mechanism. By arranging the pulling assisting mechanism, the corridor steel structure frame is not prone to shaking, and the stability of the corridor steel structure frame in the lifting process is kept.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a steel structure corridor, in particular to an overall lifting tool for a large-span steel corridor. Background Art

[0002] One of the main types of building structures in steel structure engineering is one of the more common structural forms in modern construction projects; the corridor was originally a form of ancient Chinese architecture, that is, a connecting structure between buildings, with a roof and no enclosure structure. The maximum installation height of the steel structure corridor is about 31.4m. The structure has a large deadweight and many rods. If conventional high-altitude bulk assembly is used, not only will the workload of high-altitude assembly and welding be huge, but there will also be great quality and safety risks, and the construction will be difficult. Based on the successful experience of similar projects in the past, the use of "super-large component hydraulic synchronous lifting technology" to lift and install the corridor steel structure can greatly reduce the difficulty of installation and construction, and effectively ensure the quality, safety and progress of the project.

[0003] When the existing steel structure corridor integral lifting device is lifted to the installation position, the steel structure corridor is subjected to the upward traction force of the lifter, but the stability of the steel structure corridor is not strong during the lifting, and there will be shaking, which makes the steel structure corridor have a safety hazard when lifting. Utility Model Content

[0004] The purpose of the utility model is to solve the above-mentioned shortcomings and provide a large-span steel corridor overall lifting tool.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] The large-span steel corridor integral lifting tool comprises a base, a first building frame is provided on one side of the base, a second building frame is provided on the other side of the base, a corridor steel structure frame serving as a corridor is provided between the first building frame and the second building frame, and further comprises:

[0007] A lifting mechanism, disposed at the upper ends of the first building frame and the second building frame, for pulling the corridor steel structure frame and lifting it to the connection point between the first building frame and the second building frame;

[0008] The auxiliary pulling mechanism is arranged on the base and connected to the bottom end of the corridor steel structure frame, and is used to provide a pulling force in the opposite direction to the traction force of the lifting mechanism when the corridor steel structure frame is lifted upward.

[0009] Preferably, the lifting mechanism comprises:

[0010] Steel strands, arranged at the upper end of the steel structure frame of the corridor and used to lift the steel structure frame of the corridor;

[0011] A hoist connected to the steel strand and used to pull the steel strand;

[0012] A lifting bracket, disposed at the upper ends of the first building frame and the second building frame and used for placing the lifter;

[0013] A guide frame is arranged on the lifting bracket and guides the steel strand.

[0014] Preferably, the pulling-assisting mechanism comprises:

[0015] A steel wire rope connected to the lower end of the steel structure frame of the corridor;

[0016] A winding roller is provided at the upper end of the base and is used for winding the steel wire rope. When the steel structure frame of the corridor is lifted upward, the winding roller unwinds the steel wire rope. A fixing plate rotatably connected to the winding roller is provided at the upper end of the base.

[0017] A locking assembly is arranged at the lower end of the corridor steel structure frame and is used to lock the steel wire rope on the corridor steel structure frame.

[0018] Preferably, the locking assembly comprises:

[0019] A connecting column connected to the lower end of the steel structure frame of the corridor;

[0020] A U-shaped plate connected to the lower end of the connecting column;

[0021] A baffle, connected to the upper end of the steel wire rope and sliding transversely on the U-shaped plate, wherein the U-shaped plate is provided with a groove for the steel wire rope to pass through;

[0022] A locking piece is arranged on the U-shaped plate and is used to lock the steel wire rope on the U-shaped plate.

[0023] Preferably, the locking member comprises:

[0024] A slide groove, provided on the U-shaped plate and used for the baffle to slide horizontally;

[0025] The plug-in rod is arranged above the slide groove and slidably arranged on the U-shaped plate, and is used for plugging into the baffle.

[0026] Preferably, the baffle is provided with an insertion hole for the insertion of the insertion rod.

[0027] Preferably, a fixing block for sliding of the plug-in rod is provided on one side of the U-shaped plate close to the plug-in rod.

[0028] Preferably, a plug-in slot for the plug-in rod to slide is provided in the fixing block;

[0029] A spring is arranged in the plug-in slot, the upper and lower ends of the spring are both connected to the plug-in slot and the spring is sleeved on the plug-in rod.

[0030] Preferably, a first cross bar connected to the steel wire rope is provided at the lower end of the corridor steel structure frame, and a second cross bar connected to the steel strand is provided at the upper end.

[0031] Compared with the prior art, the beneficial effects of the utility model are:

[0032] The utility model provides an auxiliary pulling mechanism, which exerts a force in the opposite direction to the traction force of the lifting mechanism at the bottom end of the corridor steel structure frame, so that the corridor steel structure frame is not only subjected to an upward traction force when being lifted, but also to a downward force, thereby giving the corridor steel structure frame balance when being lifted, making it less likely for the corridor steel structure frame to shake, and maintaining the stability of the corridor steel structure frame when being lifted. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0034] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0035] Figure 2 For this utility model Figure 1 The enlarged view of point A in the middle;

[0036] Figure 3 It is a structural schematic diagram of the steel structure frame in the utility model;

[0037] Figure 4 For this utility model Figure 3 The enlarged view of point B in the middle;

[0038] Figure 5 For this utility model Figure 4 Enlarged view of point C in the middle;

[0039] Figure 6 It is a structural schematic diagram of the locking component in the utility model;

[0040] Figure 7 This is a connection diagram of the steel wire rope and the baffle in the utility model;

[0041] Figure 8 It is a structural schematic diagram of the locking member in the utility model;

[0042] Fig. 9 For this utility model Figure 8 The enlarged view of point D in the middle;

[0043] Fig.10 It is an exploded view of the fixing block in the utility model.

[0044] In the figure:

[0045] 1. Base; 2. First building frame; 3. Second building frame;

[0046] 4. Corridor steel structure frame; 41. First crossbar; 42. Second crossbar;

[0047] 5. Steel strand;

[0048] 61. lifting bracket; 62. lifting device; 63. guide frame;

[0049] 701, fixed plate; 702, winding roller; 703, connecting column; 704, U-shaped plate; 705, wire rope; 706, baffle; 7061, plug-in hole; 7062, slide groove; 707, through groove; 708, limit plate; 709, plug-in rod; 710, fixed block; 711, plug connector; 712, spring; 713, plug-in groove. DETAILED DESCRIPTION

[0050] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0051] See also Figure 1-10 A large-span steel corridor integral lifting tool comprises a base 1, a first building frame 2 is provided on one side of the base 1, a second building frame 3 is provided on the other side, a corridor steel structure frame 4 serving as a corridor is provided between the first building frame 2 and the second building frame 3, and further comprises:

[0052] A lifting mechanism is provided at the upper ends of the first building frame 2 and the second building frame 3, and is used to pull the corridor steel structure frame 4 and lift it to the connection point of the first building frame 2 and the second building frame 3;

[0053] The auxiliary pulling mechanism is arranged on the base 1 and connected to the bottom end of the corridor steel structure frame 4. When the corridor steel structure frame 4 is lifted upward, it is used to provide a force in the opposite direction to the traction force of the lifting mechanism.

[0054] With this design, there is a height difference between the first building frame 2 and the second building frame 3, and the lifting mechanism located at the upper ends of the first building frame 2 and the second building frame 3 lifts the corridor steel structure frame 4 to the connection point of the first building frame 2 and the second building frame 3; the lifting mechanisms corresponding to different heights are designed according to the height difference between the first building frame 2 and the second building frame 3; when the lifting mechanism lifts the corridor steel structure frame 4 upward, the auxiliary pulling mechanism at the bottom end of the corridor steel structure frame 4 exerts a force in the opposite direction to the traction force of the lifting mechanism, so that the corridor steel structure frame 4 is not only subjected to an upward traction force when being lifted, but also to a downward force, giving the corridor steel structure frame 4 balance when being lifted, making it less likely for the corridor steel structure frame 4 to shake, thereby maintaining the stability of the corridor steel structure frame 4 when being lifted.

[0055] It is worth noting that the upward traction force applied to the corridor steel structure frame 4 when it is lifted is much greater than the downward force applied to it, so that the corridor steel structure frame 4 will not be disturbed when it is lifted upward.

[0056] In one embodiment, the lifting mechanism comprises:

[0057] The steel strand 5 is arranged at the upper end of the corridor steel structure frame 4 and is used to lift the corridor steel structure frame 4;

[0058] A lifter 62 connected to the steel strand 5 and used to pull the steel strand 5;

[0059] A lifting bracket 61 is provided at the upper ends of the first building frame 2 and the second building frame 3 and is used to place a lifter 62;

[0060] The guide frame 63 is disposed on the lifting bracket 61 and guides the steel strand 5 .

[0061] In this design, the lifting bracket 61 is installed on the first building frame 2 and the second building frame 3 at different heights; the lifter 62 and the guide frame 63 are installed on the lifting bracket 61; the lifter 62 pulls the steel strand 5, so that the steel strand 5 lifts the corridor steel structure frame 4.

[0062] In one embodiment, the pulling-assisting mechanism comprises:

[0063] Steel wire rope 705, connected to the lower end of the corridor steel structure frame 4;

[0064] The winding roller 702 is provided at the upper end of the base 1 and is used for winding the steel wire rope 705. When the corridor steel structure frame 4 is lifted upward, the winding roller 702 unwinds the steel wire rope 705. The upper end of the base 1 is provided with a fixed plate 701 rotatably connected to the winding roller 702;

[0065] The locking assembly is arranged at the lower end of the corridor steel structure frame 4 and is used to lock the steel wire rope 705 on the corridor steel structure frame 4.

[0066] In this design, the fixing plate 701 is fixedly installed on the upper end of the base 1; the wire rope 705 is wound on the winding roller 702, and when the corridor steel structure frame 4 is lifted upward, the winding roller 702 unwinds the wire rope 705.

[0067] In one embodiment, the locking assembly comprises:

[0068] A connecting column 703 connected to the lower end of the corridor steel structure frame 4;

[0069] U-shaped plate 704, connected to the lower end of the connecting column 703;

[0070] The baffle 706 is connected to the upper end of the steel wire 705 and slides transversely on the U-shaped plate 704. The U-shaped plate 704 is provided with a groove 707 for the steel wire 705 to pass through;

[0071] The locking member is disposed on the U-shaped plate 704 and is used to lock the steel wire rope 705 on the U-shaped plate 704 .

[0072] In this design, the baffle 706 is fixedly connected to the upper end of the wire rope 705 ; the baffle 706 slides on the U-shaped plate 704 through the groove 707 and overlaps the U-shaped plate 704 .

[0073] In one embodiment, the locking member comprises:

[0074] A slide groove 7062 is provided on the U-shaped plate 704 and is used for the baffle plate 706 to slide horizontally;

[0075] The plug-in rod 709 is disposed above the slide groove 7062 and slidably disposed on the U-shaped plate 704 for being plugged into the baffle plate 706 .

[0076] With this design, the bottom end of the plug rod 709 is fixedly connected with a plug connector 711 to facilitate plugging of the plug rod 709 . The plug rod 709 is plugged into the baffle 706 , that is, the steel wire rope 705 is fixed on the U-shaped plate 704 .

[0077] In one embodiment, the baffle 706 is provided with an insertion hole 7061 for the insertion of the insertion rod 709 .

[0078] In one embodiment, a fixing block 710 for the plug-in rod 709 to slide is provided on one side of the U-shaped plate 704 close to the plug-in rod 709 .

[0079] With this design, the fixing block 710 is fixedly mounted on the U-shaped plate 704 .

[0080] In one embodiment, a plug-in slot 713 is provided in the fixing block 710 for the plug-in rod 709 to slide;

[0081] A spring 712 is disposed in the plug-in slot 713 . The upper and lower ends of the spring 712 are both connected to the plug-in slot 713 and the spring 712 is sleeved on the plug-in rod 709 .

[0082] With this design, the upper end of the plug rod 709 is fixedly connected to the limit plate 708; the plug rod 709 is lifted upward, the spring 712 is compressed in the plug groove 713, and the plug rod 709 is now away from the plug hole 7061; after the plug rod 709 is released, the spring 712 recovers its deformation, and the plug rod 709 moves downward and plugs into the plug hole 7061, thereby realizing the fixed state of the wire rope 705 on the U-shaped plate 704.

[0083] In one embodiment, the lower end of the corridor steel structure frame 4 is provided with a first cross bar 41 connected to the steel wire rope 705 , and the upper end is provided with a second cross bar 42 connected to the steel strand 5 .

[0084] Working principle: When in use, there is a height difference between the first building frame 2 and the second building frame 3, and the lifting mechanism located at the upper ends of the first building frame 2 and the second building frame 3 lifts the corridor steel structure frame 4 to the connection point of the first building frame 2 and the second building frame 3; the lifting mechanisms corresponding to different heights are designed according to the height difference between the first building frame 2 and the second building frame 3; when the lifting mechanism lifts the corridor steel structure frame 4 upward, the auxiliary pulling mechanism exerts a pulling force in the opposite direction to the traction force of the lifting mechanism at the bottom end of the corridor steel structure frame 4, so that the corridor steel structure frame 4 is not only subjected to an upward traction force during lifting, but also to a downward pulling force, so that the corridor steel structure frame 4 is not easy to shake, thereby maintaining the stability of the corridor steel structure frame 4 during lifting.

[0085] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indications will also change accordingly.

[0086] In addition, if there are descriptions of "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" can explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above-mentioned exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present invention is limited by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.

Claims

1. A large-span steel corridor integral lifting tool, comprising a base (1), a first building frame (2) is provided on one side of the base (1), a second building frame (3) is provided on the other side, a corridor steel structure frame (4) is provided between the first building frame (2) and the second building frame (3), characterized in that: Also includes: A lifting mechanism, arranged at the upper ends of the first building frame (2) and the second building frame (3), and used for lifting the corridor steel structure frame (4); The auxiliary pulling mechanism is arranged on the base (1) and connected to the bottom end of the corridor steel structure frame (4), and is used to provide a force in the opposite direction to the traction force of the lifting mechanism when the corridor steel structure frame (4) is lifted upward.

2. The large-span steel corridor integral lifting tool according to claim 1 is characterized in that: The lifting mechanism comprises: A steel strand (5) is arranged at the upper end of the corridor steel structure frame (4) and is used to lift the corridor steel structure frame (4); A lifter (62) connected to the steel strand (5) and used to pull the steel strand (5); A lifting bracket (61) is arranged at the upper ends of the first building frame (2) and the second building frame (3) and is used to place the lifting device (62); A guide frame (63) is arranged on the lifting bracket (61) and guides the steel strand (5).

3. The large-span steel corridor integral lifting tool according to claim 2 is characterized in that: The pulling-assisting mechanism comprises: A steel wire rope (705) connected to the lower end of the corridor steel structure frame (4); A winding roller (702) is arranged at the upper end of the base (1) and is used for winding the steel wire rope (705). When the corridor steel structure frame (4) is lifted upward, the winding roller (702) unwinds the steel wire rope (705). The upper end of the base (1) is provided with a fixed plate (701) rotatably connected to the winding roller (702); A locking assembly is arranged at the lower end of the corridor steel structure frame (4) and is used to lock the steel wire rope (705) on the corridor steel structure frame (4).

4. The large-span steel corridor integral lifting tool according to claim 3 is characterized in that: The locking assembly comprises: A connecting column (703) connected to the lower end of the corridor steel structure frame (4); A U-shaped plate (704) connected to the lower end of the connecting column (703); a baffle (706) connected to the upper end of the steel wire rope (705) and sliding transversely on the U-shaped plate (704); the U-shaped plate (704) is provided with a groove (707) for the steel wire rope (705) to pass through; A locking member is provided on the U-shaped plate (704) and is used to lock the steel wire rope (705) on the U-shaped plate (704).

5. The large-span steel corridor integral lifting tool according to claim 4 is characterized in that: The locking member comprises: A slide groove (7062) is provided on the U-shaped plate (704) and is used for allowing the baffle plate (706) to slide horizontally; The plug-in rod (709) is arranged above the slide groove (7062) and is slidably arranged on the U-shaped plate (704) for being plugged into the baffle plate (706).

6. The large-span steel corridor integral lifting tool according to claim 5 is characterized in that: The baffle (706) is provided with an insertion hole (7061) for the insertion of the insertion rod (709).

7. The large-span steel corridor integral lifting tool according to claim 5 is characterized in that: A fixing block (710) for the plug-in rod (709) to slide is provided on one side of the U-shaped plate (704) close to the plug-in rod (709).

8. The large-span steel corridor integral lifting tool according to claim 7 is characterized in that: The fixing block (710) is provided with a plug-in slot (713) for the plug-in rod (709) to slide. A spring (712) is arranged in the plug-in slot (713), the upper and lower ends of the spring (712) are connected to the plug-in slot (713), and the spring (712) is sleeved on the plug-in rod (709).

9. The large-span steel corridor integral lifting tool according to claim 3 is characterized in that: The lower end of the corridor steel structure frame (4) is provided with a first cross bar (41) connected to the steel wire rope (705), and the upper end is provided with a second cross bar (42) connected to the steel strand (5).