Internal climbing type tower crane bottom protection device
The combined structure of I-beams, square steel pipes, and patterned steel plates is fixed with steel wire ropes and high-strength bolts, which solves the problems of high safety risks and high costs during the installation of the tower crane bottom protection device, and achieves rapid, safe protection and low-cost maintenance of the tower crane bottom. .
Patent Information
- Application Number
- CN202420457829.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-11
AI Technical Summary
During the construction process of the internal climbing tower crane, the safety risks and costs during the installation of the protective device at the bottom of the tower crane are high, which is difficult to effectively solve with existing technology.
Multiple sets of wire ropes are used to connect the protection mechanism to the main body of the tower crane. High-strength bolts and nuts are used to fix the connecting plates and lifting lugs. I-beams, square steel pipes and patterned steel plates are set up to form a protective platform, and wire ropes are used to connect the I-beams and lifting lugs. , to realize the synchronous climbing of the protection mechanism.
It achieves rapid and safe protection of the bottom of the tower crane, reduces installation and maintenance costs, simplifies the operating process, and improves construction safety.
Smart Images

Figure CN221917177U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a bottom protective device of an inner climbing tower crane. Background Art
[0002] As a common large-scale mechanical equipment in the construction of super-high-rise buildings, the internal climbing tower crane is based on the principle of attaching to the inner wall of the core tube and climbing along with the structural construction. Because it is inside the tube and there is structural construction at the bottom of the tower crane, the bottom horizontal hard protection can generally only be achieved by pre-embedding I-beams in the structure every few floors, setting up horizontal steel pipes and laying formwork. Not only is the on-site investment large, but the safety risk of workers during the installation process is also high. Therefore, a bottom protection device for an internal climbing tower crane is needed. Utility Model Content
[0003] In order to solve the above technical problems, the utility model proposes an internal climbing tower crane bottom protection device, which connects the bottom protection mechanism to the tower crane body through multiple sets of steel wire ropes. When the tower crane body climbs, the protection mechanism is driven to climb synchronously for protection, which is convenient and quick, and only requires regular cleaning and maintenance afterwards.
[0004] The technical solution to achieve the purpose of the utility model is: a bottom protection device of an inner climbing tower crane, comprising a tower crane body, a plurality of connecting plates are symmetrically arranged at the bottom of the tower crane body, a plurality of lower sides of the connecting plates are fixed with lifting ears, and the plurality of connecting plates are respectively fixed to the bottom of the tower crane body by a plurality of high-strength bolts and high-strength nuts, and also includes: a protection mechanism, the protection mechanism is arranged at a lower position of the tower crane body; the protection mechanism comprises a plurality of I-beams, the plurality of I-beams are specifically two transverse and four longitudinal, which are fixed with a plurality of U-shaped bolts, a plurality of square steel pipes are evenly spaced on the upper side of the plurality of I-beams, which are fixed by welding, the upper side of the plurality of square steel pipes are fully covered with patterned steel plates, a plurality of lifting points are evenly spaced on the inner side of the patterned steel plates, a plurality of steel wire ropes are passed through the inner sides of the plurality of lifting points, and the plurality of steel wire ropes are respectively connected to a plurality of lifting ears and I-beams.
[0005] In some embodiments, two ends of the patterned steel plate are symmetrically rotatably connected to have two flaps via hinges.
[0006] In some embodiments, angle steel caps are added to the outer sides of the plurality of U-bolts and fixed with double nuts.
[0007] In some embodiments, the patterned steel plate is 3 mm thick.
[0008] In some embodiments, when a plurality of the steel wire ropes are connected to a plurality of I-beams, riding-type rope clamps and safety rings are used for enhanced fixation.
[0009] Compared with the prior art, the present invention has the following significant advantages:
[0010] First, the utility model connects the bottom protection mechanism with the tower crane body through multiple sets of steel wire ropes. When the tower crane body climbs, the protection mechanism is driven to climb synchronously for protection, which is convenient and quick, and only needs regular cleaning and maintenance later;
[0011] Second, the utility model connects multiple lifting ears with the tower crane body through multiple sets of high-strength bolts and high-strength nuts to ensure stability. Multiple I-beams are used as main keels, multiple square steel pipes are laid on the upper side of the multiple I-beams, and are fixed by welding. The upper side of the multiple square steel pipes is fully covered with patterned steel plates, which is simple to install and has low cost.
[0012] The problem of protecting the bottom of the tower crane body has been solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:
[0014] Figure 1 It is a schematic diagram of the overall front view of a local structure provided by the utility model in one embodiment;
[0015] Figure 2 The utility model provides in one embodiment Figure 1 The enlarged structural diagram at A in the middle;
[0016] Figure 3 The utility model provides in one embodiment Figure 1 The enlarged structural diagram at B in the middle;
[0017] Figure 4 The utility model provides in one embodiment Figure 1 Enlarged structural diagram at point C in the middle.
[0018] Description of reference numerals:
[0019] 1. Tower crane body; 2. Connecting plate; 3. Lifting lug; 4. High-strength bolts; 5. High-strength nuts; 6. I-beam; 7. U-bolts; 8. Square steel pipe; 9. Patterned steel plate; 10. Lifting point; 11. Steel wire rope; 12. Flap plate. DETAILED DESCRIPTION
[0020] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] The utility model provides an inner climbing tower crane bottom protection device through improvement. The technical solution of the utility model is:
[0022] like Figure 1-Figure 4 As shown, a bottom protection device of an inner climbing tower crane comprises a tower crane body 1, a plurality of connecting plates 2 are symmetrically arranged at the bottom of the tower crane body 1, a plurality of connecting plates 2 are fixed with lifting ears 3 on the lower sides of the plurality of connecting plates 2, and the plurality of connecting plates 2 are respectively fixed to the bottom of the tower crane body 1 by a plurality of high-strength bolts 4 and high-strength nuts 5, thereby ensuring the fixing effect, and further comprises: a protection mechanism, which is arranged at a position below the tower crane body 1; the protection mechanism comprises a plurality of I-beams 6, which are specifically two transverse and four longitudinal, Use multiple U-bolts 7 to fix it, multiple square steel pipes 8 are laid at equal intervals on the upper side of multiple I-beams 6 and fixed by welding, the upper side of multiple square steel pipes 8 is fully covered with patterned steel plates 9 to form a steel platform, multiple hanging points 10 are arranged at equal intervals on the inner side of the patterned steel plates 9, multiple steel wire ropes 11 are passed through the inner side of the multiple hanging points 10, and the multiple steel wire ropes 11 are respectively connected to multiple lifting ears 3 and I-beams 6 to complete the overall installation, and subsequent protection climbs with each climb of the tower crane body 1, and the operation is simple.
[0023] like Figure 1 As shown, in one embodiment, two ends of the patterned steel plate 9 are connected to two flaps 12 by hinges for symmetrical rotation. The flaps 12 are opened before climbing to protect the steel platform and the structure.
[0024] like Figure 4 As shown, in one embodiment, in order to ensure the fixing effect of the multiple U-bolts 7 on the multiple longitudinal and transverse I-beams 6, the outer sides of the multiple U-bolts 7 are all provided with angle steel caps and fixed with double nuts.
[0025] like Figure 4 As shown, in one embodiment, the thickness of the patterned steel plate 9 is 3 mm.
[0026] like Figure 2 As shown, in one embodiment, when multiple steel wire ropes 11 are connected to multiple I-beams 6, riding-type rope clamps and safety rings are used to strengthen and fix them.
[0027] The specific working method is: when in use, two I-beams 6 are used horizontally and four I-beams 6 are arranged vertically, and they are fixed by multiple U-bolts 7. Angle steel caps and double nuts are added to the outer sides of the multiple U-bolts 7 for fixing, ensuring the fixing effect, and multiple square steel pipes 8 are laid on the upper sides of the multiple I-beams 6 as secondary keels, and patterned steel plates 9 are laid on the upper sides of the multiple square steel pipes 8 to form a steel platform. A flap 12 is used to protect the steel platform and the structure. Before climbing, the flap 12 is opened, and the multiple lifting ears 3 are fixed and installed on the bottom of the tower crane body 1 through multiple groups of high-strength bolts 4 and high-strength nuts 5. One end of the multiple steel wire ropes 11 are respectively tied and connected to the multiple I-beams 6, and the other end is respectively connected to the multiple lifting ears 3 to complete the overall installation. Subsequent protection is climbed with each climb of the tower crane body 1, and the operation is simple.
[0028] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.
Claims
1. A bottom protection device for an inner climbing tower crane, comprising a tower crane body (1), a plurality of connecting plates (2) symmetrically arranged at the bottom of the tower crane body (1), a plurality of connecting plates (2) having lifting ears (3) fixed on the lower sides of the plurality of connecting plates (2), and the plurality of connecting plates (2) being fixed to the bottom of the tower crane body (1) by a plurality of high-strength bolts (4) and high-strength nuts (5), characterized in that: Also includes: A protection mechanism, the protection mechanism being arranged below the tower crane body (1); The protective mechanism comprises a plurality of I-beams (6), wherein the plurality of I-beams (6) are specifically two transverse ones and four longitudinal ones, and are fixed by using a plurality of U-shaped bolts (7). A plurality of square steel tubes (8) are laid at equal intervals on the upper side of the plurality of I-beams (6) and are fixed by welding. The upper side of the plurality of square steel tubes (8) is fully covered with patterned steel plates (9), and a plurality of hanging points (10) are arranged at equal intervals on the inner side of the patterned steel plates (9). A plurality of steel wire ropes (11) are passed through the inner side of the plurality of hanging points (10), and the plurality of steel wire ropes (11) are respectively connected to a plurality of lifting ears (3) and the I-beams (6).
2. The bottom protection device of an inner climbing tower crane according to claim 1 is characterized in that: The two ends of the patterned steel plate (9) are symmetrically rotatably connected to two flaps (12) via hinges.
3. The bottom protection device of an inner climbing tower crane according to claim 1 is characterized in that: The outer sides of the plurality of U-shaped bolts (7) are all provided with angle steel pressure tops and are fixed with double nuts.
4. The bottom protection device of an inner climbing tower crane according to claim 1 is characterized in that: The thickness of the patterned steel plate (9) is 3 mm.
5. The bottom protection device of an inner climbing tower crane according to claim 1 is characterized in that: When a plurality of the steel wire ropes (11) are connected to a plurality of I-beams (6), a riding-type rope clamp and a safety ring are used to strengthen and fix them.