Slag-scraping air-flotation efficient sedimentation tank
By introducing a rotating slag scraper and mud rake into the sedimentation tank, combined with air-water dilution technology, the problem of difficulty in removing scum in traditional sedimentation tanks has been solved, and the efficient collection and removal of scum and sludge has been achieved, improving the efficiency of the sedimentation tank. processing efficiency.
Patent Information
- Application Number
- CN202420514082.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-18
AI Technical Summary
It is difficult to remove floating scum in traditional sedimentation tanks, resulting in low impurity removal efficiency.
A high-efficiency sedimentation tank with slag scraping and air flotation is designed. It uses a central drive and a rotating slag scraper to rotate at the upper level of the tank body. It is combined with a rotating mud rake to collect sludge at the bottom of the tank body, and adds sewage through the air-water inlet pipe. The internal gas content promotes the floating of scum and the sedimentation of sludge. The scum collecting tank and slag discharge port are used to achieve efficient collection and removal of scum.
It improves the efficiency of cleaning scum and sludge in the sedimentation tank, realizes efficient collection and discharge of scum, and enhances the treatment effect of the sedimentation tank.
Smart Images

Figure CN221917502U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a scraping air flotation high-efficiency sedimentation tank, belonging to the technical field of sludge treatment. Background Art
[0002] In order to effectively treat sewage, various sewage treatment technologies are constantly emerging. Among them, sedimentation tanks are a common sewage treatment facility, which are mainly used to remove impurities in sewage. Traditional sedimentation tanks generally use impurities to settle to the bottom of the tank body, and then use mud rakes to scrape the impurities (sludge) and discharge them from the tank body. However, there are scum that is difficult to settle in the sewage, so the floating scum is difficult to remove and the impurity removal efficiency is low. In order to solve these problems, a scraping air flotation high-efficiency sedimentation tank is proposed. Utility Model Content
[0003] The utility model aims to provide a scraping and flotation high-efficiency sedimentation tank to solve the problems raised in the above-mentioned background technology.
[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a scraper flotation high-efficiency sedimentation tank, including a tank body, a central drive and a central shaft for the central drive to output rotational power are arranged at the center position of the tank body, the central shaft is vertically arranged at the center position of the tank body, at least one mud rake is arranged at the lower end of the central shaft, and a plurality of scrapers for pushing the precipitated sludge masses to the center of the tank body step by step are arranged on the lower side of each mud rake along the length direction of the mud rake, the output end of the central drive drives the central shaft to rotate, a scraper is arranged at the upper position of the tank body, and the middle position of the scraper is connected to the central shaft. When the central shaft rotates, the scraper and the mud rake rotate around the central shaft, the scraper rotates at the upper position of the tank body, and the scraper is at the sewage liquid surface in the tank body.
[0005] Preferably, a walking bridge platform is horizontally overlapped on the pool body for supporting the central drive and the central axis. The two ends of the walking bridge platform are overlapped on the upper end contour of the pool body. The central drive is installed at the center position of the walking bridge platform. The walking bridge platform can also facilitate workers to walk and facilitate the operation and maintenance of the central drive.
[0006] Preferably, a central coagulation well is sleeved on the central axis, the upper end of the central coagulation well is fixedly connected to the side wall of the walkway platform, and a sewage inlet pipe is fixedly connected to one side of the central coagulation well, and the end of the sewage inlet pipe away from the central coagulation well passes through the side wall of the pool body and extends to the outside.
[0007] Preferably, the outer end of the sewage inlet pipe is connected to an air-water inlet pipe, one end of which is inserted into the interior of the sewage inlet pipe. The air-water inlet pipe introduces air and water into the pool body, and the air, water and sewage are mixed to dilute the sewage and increase the gas content in the sewage. The diluted sewage accelerates the sinking of the sludge inside it, and the increase in gas content is conducive to the floating of the sewage scum.
[0008] Preferably, a back pressure valve capable of controlling the air-water pressure in the air-water inlet pipe is connected in series to the air-water inlet pipe, and the bubbles in the pool body are evenly distributed by adjusting the back pressure valve.
[0009] Preferably, a scum collecting trough for intercepting and collecting scum is installed inside the pool body, a scum box is fixedly installed on the outer wall of the pool body, the scum collecting trough is connected to the scum box, and a scum discharge port is provided on the side wall of the scum box. When the scraper rotates inside the pool body, the scum collecting trough intercepts the scum, and eventually the floating scum will gather inside the scum collecting trough. The scum in the scum collecting trough is collected inside the scum box, and is discharged externally for cleaning through the scum discharge port opened in the scum box.
[0010] Preferably, a traction rope is fixedly connected to the upper wall of the mud rake, and the upper end of the traction rope is fixed on the central axis. The number of traction ropes corresponds to the number of mud rakes, and multiple traction ropes are symmetrically arranged around the central axis. A single traction rope can form a stable triangular support structure with the central axis and the corresponding mud rake, thereby improving the stability and reliability of the mud rake's rotation.
[0011] Preferably, the bottom of the pool body is in a cone shape with a low middle part and high sides, the bottom of the mud rake is arranged in contact with the bottom wall of the pool body, a concave drainage trough is arranged at the center of the bottom of the pool body, and a drainage pipe is connected to the side wall of the drainage trough.
[0012] Compared with existing technologies:
[0013] 1. The utility model rotates the scraper at the upper position of the pool body, and the scraper is at the sewage liquid surface in the pool body. At this time, the scraper can scrape the scum floating in the pool body, and then scrape and concentrate the scum on the sewage liquid surface, and then the scum collection tank will intercept the scum, and finally the floating scum will gather inside the scum collection tank, and the scum in the scum collection tank will be collected inside the scum box, and the scum will be discharged and removed through the scum discharge port, thereby improving the scum collection and discharge efficiency, and improving the efficiency of cleaning scum in the sedimentation tank;
[0014] 2. The utility model uses a mud rake to rotate at the bottom of the pool body. The rotating mud rake uses a scraper to gather the settled sludge in the pool body. The sludge in the middle of the pool body will be concentrated to the center of the bottom of the pool body, and then the settled sludge will be gathered. Finally, the sludge will be discharged through the sewage pipe, thereby improving the gathering and discharge efficiency of the sedimentation tank and improving the efficiency of cleaning the sludge in the sedimentation tank. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 It is a structural schematic diagram of the mud rake and scraper of the utility model;
[0017] Figure 3 This is a schematic diagram of the structure of the back pressure valve, gas and water inlet pipe and sewage inlet pipe of the utility model.
[0018] Figure 4 It is a structural schematic diagram of the mud rake, sewage pipe and sewage trough of the utility model.
[0019] In the figure: 1. back pressure valve, 2. walking bridge platform, 3. scraper, 4. central drive, 5. central coagulation well, 6. scum collection tank, 7. scum box, 8. air and water inlet pipe, 9. sewage inlet pipe, 10. mud rake, 1001, scraper, 11. tank body, 12. traction rope, 13. central axis, 14. sewage pipe, 15. sewage tank. DETAILED DESCRIPTION
[0020] The present invention is described below with specific embodiments, but is not intended to be a limitation of the present invention.
[0021] Example 1
[0022] like Figure 1-Figure 4 As shown, in this embodiment, a scraper flotation high-efficiency sedimentation tank is provided, including a tank body 11, a central driver 4 and a central shaft 13 for the central driver 4 to output rotational power are arranged at the center of the tank body 11, the central shaft 13 is vertically arranged at the center of the tank body 11, at least one mud rake 10 is arranged at the lower end of the central shaft 13, and a plurality of scrapers 1001 for pushing the precipitated sludge mass step by step to the center of the tank body 11 are arranged on the lower side of each mud rake 10 along the length direction of the mud rake 10, the output end of the central driver 4 drives the central shaft 13 to rotate, a scraper 3 is arranged at the upper position of the tank body 11, and the middle part of the scraper 3 The position is connected to the central axis 13. When the central axis 13 rotates, the scraper 3 and the mud rake 10 rotate around the central axis 13. The scraper 3 rotates at the upper position of the pool body 11, and the scraper 3 is at the sewage liquid surface in the pool body 11. At this time, the scraper 3 can scrape the scum floating in the pool body 11, and then scrape and concentrate the scum on the sewage liquid surface. The mud rake 10 rotates at the bottom of the pool body 11, and the rotating mud rake 10 uses the scraper 1001 to gather the settled sludge in the pool body 11. The sludge in the middle of the pool body 11 will be concentrated to the center of the bottom of the pool body 11, and then the settled sludge will be gathered.
[0023] A walking bridge platform 2 for supporting the central drive 4 and the central axis 13 is horizontally overlapped on the pool body 11. Both ends of the walking bridge platform 2 are overlapped on the upper end contour of the pool body 11. The central drive 4 is installed at the center position of the walking bridge platform 2. The walking bridge platform 2 can also facilitate workers to walk and facilitate the operation and maintenance of the central drive 4.
[0024] In order to collect and discharge the scum, a scum collecting trough 6 for intercepting and collecting scum is installed inside the pool body 11, and a scum box 7 is fixedly installed on the outer wall of the pool body 11. The scum collecting trough 6 is connected to the scum box 7, and a scum discharge port is provided on the side wall of the scum box 7. When the scraper 3 rotates inside the pool body 11, the scum collecting trough 6 intercepts the scum, and finally the floating scum will gather inside the scum collecting trough 6. The scum in the scum collecting trough 6 is collected inside the scum box 7 and discharged and cleared externally through the scum discharge port opened in the scum box 7.
[0025] In order to increase the rotation strength of the mud rake 10, a traction rope 12 is fixedly connected to the upper wall of the mud rake 10, and the upper end of the traction rope 12 is fixed on the central axis 13. The number of traction ropes 12 corresponds to the number of mud rakes 10, and multiple traction ropes 12 are symmetrically arranged around the central axis 13. A single traction rope 12 can form a stable triangular support structure with the central axis 13 and the corresponding mud rake 10, thereby improving the stability and reliability of the rotation of the mud rake 10.
[0026] The bottom of the pool body 11 is in a conical shape with a low middle and high sides. The bottom of the mud rake 10 is arranged in contact with the bottom wall of the pool body 11. A concave drainage trough 15 is arranged at the bottom center of the pool body 11, and a drainage pipe 14 is connected to the side wall of the drainage trough 15.
[0027] Example 2
[0028] like Figure 1 As shown, on the basis of Example 1, in order to be able to introduce sewage into the interior of the tank body 11, a central coagulation well 5 is sleeved on the central axis 13, the upper end of the central coagulation well 5 is fixedly connected to the side wall of the walkway platform 2, and a sewage inlet pipe 9 is fixedly connected to one side of the central coagulation well 5, and the end of the sewage inlet pipe 9 away from the central coagulation well 5 passes through the side wall of the tank body 11 and extends to the outside;
[0029] The sewage, gas and water entering the tank body 11 are mixed inside the central coagulation well 5.
[0030] The sewage entering the central coagulation well 5 is diffused into the tank body 11 from the upper gap of the central coagulation well 5 to undergo flotation and sedimentation. After the sewage enters the interior of the tank body 11, the sludge mixed in the sewage begins to settle. Finally, the sludge particles sink to the bottom of the tank body 11 to form a sedimentary sludge mass, and the scum floats on the upper layer of the tank body 11, so that the sewage is efficiently treated.
[0031] In order to dilute the sewage and increase the gas content in the sewage, and then accelerate the sinking of sludge and the floating of scum, the outer end of the sewage inlet pipe 9 is connected to the air-water inlet pipe 8, one end of the air-water inlet pipe 8 is inserted into the sewage inlet pipe 9, and the air-water inlet pipe 8 introduces air and water into the tank body 11, and the air, water and sewage are mixed to dilute the sewage and increase the gas content in the sewage. The diluted sewage accelerates the sinking of the sludge inside it, and the increase in gas content is conducive to the floating of the sewage scum.
[0032] A back pressure valve 1 capable of controlling the air and water pressure in the air and water inlet pipe 8 is connected in series to the air and water inlet pipe 8 . By adjusting the back pressure valve 1 , the bubbles in the pool body 11 are evenly distributed.
[0033] Finally, it should be noted that the above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A scraping air flotation high-efficiency sedimentation tank, characterized in that: The invention comprises a tank body (11), wherein a central drive (4) and a central shaft (13) for the central drive (4) to output rotational power are arranged at the central position of the tank body (11), at least one mud rake (10) is arranged at the lower end of the central shaft (13), and a plurality of scrapers (1001) for gradually pushing precipitated sludge masses to the center of the tank body (11) are arranged on the lower side of each mud rake (10) along the length direction of the mud rake (10), and a scraper (3) is arranged at the upper position of the tank body (11), and the middle position of the scraper (3) is connected to the central shaft (13), and when the central shaft (13) rotates, the scraper (3) and the mud rake (10) rotate around the central shaft (13).
2. A scraping air flotation high-efficiency sedimentation tank according to claim 1, characterized in that: A walking bridge platform (2) for supporting a central drive (4) and a central axis (13) is overlapped laterally on the pool body (11), and both ends of the walking bridge platform (2) are overlapped on the upper end contour of the pool body (11).
3. A scraping air flotation high-efficiency sedimentation tank according to claim 2, characterized in that: A central coagulation well (5) is sleeved on the central axis (13), the upper end of the central coagulation well (5) is fixedly connected to the side wall of the walking bridge platform (2), and a sewage inlet pipe (9) is fixedly connected to one side of the central coagulation well (5), and the end of the sewage inlet pipe (9) away from the central coagulation well (5) passes through the side wall of the tank body (11) and extends to the outside.
4. A scraping air flotation high-efficiency sedimentation tank according to claim 3, characterized in that: The outer end of the sewage inlet pipe (9) is connected to the air and water inlet pipe (8), and one end of the air and water inlet pipe (8) is inserted into the interior of the sewage inlet pipe (9).
5. A scraping air flotation high-efficiency sedimentation tank according to claim 4, characterized in that: A back pressure valve (1) capable of controlling the air and water pressure in the air and water inlet pipe (8) is connected in series to the air and water inlet pipe (8).
6. The scraping air flotation high-efficiency sedimentation tank according to claim 1, characterized in that: A scum collecting trough (6) for intercepting and collecting scum is installed inside the pool body (11), a scum box (7) is fixedly installed on the outer wall of the pool body (11), the scum collecting trough (6) is connected to the scum box (7), and a scum discharge port is arranged on the side wall of the scum box (7).
7. The scraping air flotation high-efficiency sedimentation tank according to claim 1 is characterized in that: The upper wall of the mud rake (10) is fixedly connected with a traction rope (12), and the upper end of the traction rope (12) is fixed on the central axis (13).
8. The scraping air flotation high-efficiency sedimentation tank according to claim 1, characterized in that: The bottom of the pool body (11) is in a conical shape with a low middle portion and high sides. A concave drainage trough (15) is provided at the center of the bottom of the pool body (11), and a drainage pipe (14) is connected to the side wall of the drainage trough (15).
