Temporary pavement structure

By adopting a combination scheme of upper and lower fastening devices in the temporary pavement structure, combined with the cooperation of wedge blocks and wedge grooves and the use of T-shaped connecting plates, the problem of edge bulges when steel pavement is stacked is solved, and the problem is improved. Improve worker safety and road stability.

CN221918825UActive Publication Date: 2024-10-29CHINA RAILWAY SHISIJU GROUP CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420365911.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-10-29
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

In the existing temporary pavement structure, the edges of the steel plates are prone to bulges when the steel plates are stacked, making workers prone to tripping and injuries.

Method used

A combination scheme of upper and lower fastening devices is adopted, and the joints between the steel plate pavement bodies are reduced through the cooperation of wedge-shaped blocks and wedge-shaped grooves, and T-shaped connecting plates and elastic steel sheets are used to prevent the edges of the steel plates from bulging and tripping.

Benefits of technology

It effectively avoids the risk of workers tripping due to the bulging edge of the steel plate, and through tight joint cooperation, further reduces the possibility of tripping and improves the safety of workers on the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221918825U_ABST
    Figure CN221918825U_ABST
Patent Text Reader

Abstract

A temporary pavement structure comprises a plurality of steel plate pavement bodies, the steel plate pavement bodies are arranged side by side, and an upper fastening device and a lower fastening device are arranged on the two sides of each steel plate pavement body respectively. On one hand, a higher steel plate edge protruding part cannot appear at the connecting part of the two steel plate pavement bodies, workers are prevented from being stumbled easily, on the other hand, after the bolts are screwed down, joints between the two steel plate pavement bodies can be more tightly matched under the guiding effect of the wedge-shaped blocks and the wedge-shaped grooves, and therefore the joints between the two steel plate pavement bodies are reduced, and the service life of the two steel plate pavement bodies is prolonged. And workers are further prevented from being stumbled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a pavement structure, more precisely to a temporary pavement structure. Background Art

[0002] The existing temporary pavement structure generally uses the combination of pins and holes to fix the two steel plate pavement bodies. Since the stacked part of the steel plate pavement body will have a raised part on the edge of the steel plate, it is easy to trip workers and cause them to be injured. For example, Patent Publication No.: CN210085971U discloses an assembled temporary construction access road, as shown in Figure 6. This device uses bayonet screws and holes to connect adjacent decking boards. This method has a raised part on the stacked part of the decking boards because of the overlapping parts of the adjacent decking boards. When workers walk on it, they will be easily moved. Considering that there are many construction equipment and messy steel bars on the construction site, workers will suffer serious injuries after being tripped. Summary of the invention

[0003] The purpose of the utility model is to provide a temporary pavement structure, which can be combined with an upper fastening device and a lower fastening device. When used to fix two adjacent steel plate pavement bodies, on the one hand, no higher steel plate edge protrusions will appear at the connecting part of the two steel plate pavement bodies, thereby preventing workers from being easily tripped. On the other hand, after the bolts are tightened, the joint between the two steel plate pavement bodies will be more tightly matched under the guiding action of the wedge block and the wedge groove, thereby reducing the joint between the two steel plate pavement bodies and further preventing workers from tripping.

[0004] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:

[0005] A temporary pavement structure comprises several steel plate pavement bodies, which are arranged side by side, and upper fastening devices and lower fastening devices are respectively arranged on both sides of the steel plate pavement bodies, wherein the upper fastening device comprises a first protruding plate, one side of the steel plate pavement body is connected to the first protruding plate, and the steel plate pavement body is provided with a first positioning groove below the first protruding plate, and a through hole is provided in the middle of the first protruding plate, and a fixing ring is installed in the middle of the inner side of the through hole, and the outer ring of the fixing ring is connected to the inner wall side of the through hole, and a bolt is installed on the fixing ring, and the screw rod of the bolt passes through the middle hole of the fixing ring, and a limiting plate is installed in the middle of the screw rod of the bolt, and the limiting plate is an annular plate structure. The positioning plate and the screw rod of the bolt are inserted and welded, and the head of the bolt and the limiting plate cannot pass through the middle hole of the fixing ring. A wedge block is connected to the bottom of one side of the first protruding plate, and the lower fastening device includes a second protruding plate, and the other side of the steel plate pavement body is connected to the second protruding plate. The steel plate pavement body is located below the second protruding plate and a second positioning groove is provided. A wedge groove is provided on the upper part of the second protruding plate, and the wedge block on one of the steel plate pavement bodies can be plugged into and matched with the wedge groove on the adjacent steel plate pavement body. A screw hole is provided in the middle of the second protruding plate, and a bolt on one of the steel plate pavement bodies can be threadedly connected with the screw hole on the adjacent steel plate pavement body.

[0006] In order to further achieve the purpose of the utility model, the following technical solution can also be adopted: a first inclined surface is opened on one side of the wedge block, and a second inclined surface is opened on one side of the wedge groove, and the first inclined surface of one steel plate pavement body can cooperate with the second inclined surface of the adjacent steel plate pavement body.

[0007] The first protruding plate of the steel plate pavement body can be plugged and matched with the second positioning groove of the adjacent steel plate pavement body, and the second protruding plate of the steel plate pavement body can be plugged and matched with the first positioning groove of the adjacent steel plate pavement body.

[0008] Among the several steel plate pavement bodies, a T-shaped connecting plate is installed between two adjacent steel plate pavement bodies. The T-shaped connecting plate includes an elastic steel sheet, the middle part of the elastic steel sheet is connected to the longitudinal plate, oblique grooves are provided on both sides of the steel plate pavement body, and both sides of the elastic steel sheet have folded edges. The two folded edges can be respectively plugged into and matched with the oblique grooves on the two steel plate pavement bodies.

[0009] The advantages of the utility model are: the utility model combines the upper fastening device and the lower fastening device, and when used to fix two adjacent steel plate pavement bodies, on the one hand, no higher steel plate edge protrusions will appear at the connecting part of the two steel plate pavement bodies, thereby preventing workers from being easily tripped; on the other hand, after the bolts are tightened, the joints between the two steel plate pavement bodies will be more tightly matched under the guiding action of the wedge blocks and the wedge grooves, thereby reducing the joints between the two steel plate pavement bodies and further preventing workers from tripping. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0011] Figure 1 This is one of the structural schematic diagrams of the utility model;

[0012] Figure 2 This is the second structural diagram of the utility model;

[0013] Figure 3 for Figure 2 A schematic diagram of the enlarged structure in the B direction;

[0014] Figure 4 This is the third structural diagram of the utility model;

[0015] Figure 5 for Figure 4 A schematic diagram of the enlarged structure in the A direction;

[0016] Figure 6 It is a structural schematic diagram of the prior art patent publication number: CN210085971U. DETAILED DESCRIPTION

[0017] The preferred embodiments of the present utility model are described below in conjunction with the accompanying drawings. Example 1

[0018] A temporary pavement structure, such as Figure 1-Figure 5As shown, it includes several steel plate pavement bodies 6, which are arranged side by side, and upper fastening devices and lower fastening devices are respectively arranged on both sides of the steel plate pavement body 6, the upper fastening device includes a first protruding plate 1, one side of the steel plate pavement body 6 is connected to the first protruding plate 1, the steel plate pavement body 6 is located below the first protruding plate 1 and has a first positioning groove 7, a through hole 2 is arranged in the middle of the first protruding plate 1, a fixing ring 4 is installed in the middle of the inner side of the through hole 2, the outer ring of the fixing ring 4 is connected to the inner wall side of the through hole 2, a bolt 3 is installed on the fixing ring 4, the screw rod of the bolt 3 passes through the middle hole of the fixing ring 4, a limiting plate 5 is installed in the middle of the screw rod of the bolt 3, the limiting plate 5 is an annular plate structure, and the limiting plate 5 and the screw rod of the bolt 3 are connected. The rods are welded after being plugged in. The heads of the bolts 3 and the limiting plates 5 cannot pass through the middle hole of the fixing ring 4. A wedge block 9 is connected to the bottom of one side of the first protruding plate 1. The lower fastening device includes a second protruding plate 13. The other side of the steel plate pavement body 6 is connected to the second protruding plate 13. The steel plate pavement body 6 is located below the second protruding plate 13 and a second positioning groove 15 is provided. A wedge groove 11 is provided on the upper part of the second protruding plate 13. The wedge block 9 on one of the steel plate pavement bodies 6 can be plugged in and matched with the wedge groove 11 on the adjacent steel plate pavement body 6. A screw hole 19 is provided in the middle of the second protruding plate 13. The bolts 3 on one of the steel plate pavement bodies 6 can be threadedly connected with the screw hole 19 on the adjacent steel plate pavement body 6.

[0019] The utility model combines an upper fastening device with a lower fastening device. When used to fix two adjacent steel plate pavement bodies 6, on the one hand, no higher steel plate edge protrusions will appear at the connecting portion of the two steel plate pavement bodies 6, thereby preventing workers from being easily tripped. On the other hand, after the bolts 3 are tightened, the joints between the two steel plate pavement bodies 6 will be more tightly fitted under the guiding action of the wedge blocks 9 and the wedge grooves 11, thereby reducing the joints between the two steel plate pavement bodies 6 and further preventing workers from tripping.

[0020] Material selection and feasibility analysis for specific implementation: The samples we actually made use the drawings in the specification as drawings, and are implemented according to the proportions and matching methods of the various components in the drawings. The connection is a common connection method such as strong adhesive connection, welding, riveting, flange connection, one-piece molding connection, etc. In actual production, the corresponding connection method, thickness and strength of the connection point can be selected according to the actual connection strength requirements without creativity. After the bolt 3 is tightened, the first bevel 10 and the second bevel 12 can match. As the wedge block 9 is inserted into the wedge groove 11, the first bevel 10 and the second bevel 12 can drive the gap 8 between the first protruding plate 1 and the steel plate pavement body 6 to be minimized, thereby avoiding easily tripping workers. The utility model is only used for temporary pavements for workers to walk on construction sites. Example 2

[0021] A temporary pavement structure, such as Figure 1-Figure 5 As shown, it includes several steel plate pavement bodies 6, which are arranged side by side, and upper fastening devices and lower fastening devices are respectively arranged on both sides of the steel plate pavement body 6, the upper fastening device includes a first protruding plate 1, one side of the steel plate pavement body 6 is connected to the first protruding plate 1, the steel plate pavement body 6 is located below the first protruding plate 1 and has a first positioning groove 7, a through hole 2 is arranged in the middle of the first protruding plate 1, a fixing ring 4 is installed in the middle of the inner side of the through hole 2, the outer ring of the fixing ring 4 is connected to the inner wall side of the through hole 2, a bolt 3 is installed on the fixing ring 4, the screw rod of the bolt 3 passes through the middle hole of the fixing ring 4, a limiting plate 5 is installed in the middle of the screw rod of the bolt 3, the limiting plate 5 is an annular plate structure, and the limiting plate 5 and the screw rod of the bolt 3 are connected. After the rods are plugged in and welded, the heads of the bolts 3 and the limiting plates 5 cannot pass through the middle hole of the fixing ring 4. The bottom of one side of the first protruding plate 1 is connected to a wedge block 9. The lower fastening device includes a second protruding plate 13. The other side of the steel plate pavement body 6 is connected to the second protruding plate 13. The steel plate pavement body 6 is located below the second protruding plate 13 and has a second positioning groove 15. The upper part of the second protruding plate 13 has a wedge groove 11. The wedge block 9 on one of the steel plate pavement bodies 6 can be plugged and matched with the wedge groove 11 on the adjacent steel plate pavement body 6. The middle part of the second protruding plate 13 has a screw hole 19. The bolts 3 on one of the steel plate pavement bodies 6 can be threadedly connected with the screw hole 19 on the adjacent steel plate pavement body 6. The first inclined surface 10 is provided on one side of the wedge block 9, and the second inclined surface 12 is provided on one side of the wedge groove 11. The first inclined surface 10 of one of the steel plate pavement bodies 6 can be matched with the second inclined surface 12 of the adjacent steel plate pavement body 6.

[0022] The cooperation between the first inclined surface 10 and the second inclined surface 12 of the utility model can play a guiding role in the cooperation between the wedge block 9 and the wedge groove 11 . Example 3

[0023] A temporary pavement structure, such as Figure 1-Figure 5As shown, it includes several steel plate pavement bodies 6, which are arranged side by side, and upper fastening devices and lower fastening devices are respectively arranged on both sides of the steel plate pavement body 6, the upper fastening device includes a first protruding plate 1, one side of the steel plate pavement body 6 is connected to the first protruding plate 1, the steel plate pavement body 6 is located below the first protruding plate 1 and has a first positioning groove 7, a through hole 2 is arranged in the middle of the first protruding plate 1, a fixing ring 4 is installed in the middle of the inner side of the through hole 2, the outer ring of the fixing ring 4 is connected to the inner wall side of the through hole 2, a bolt 3 is installed on the fixing ring 4, the screw rod of the bolt 3 passes through the middle hole of the fixing ring 4, a limiting plate 5 is installed in the middle of the screw rod of the bolt 3, the limiting plate 5 is an annular plate structure, and the limiting plate 5 and the screw rod of the bolt 3 are connected. After the rods are plugged in and welded, the heads of the bolts 3 and the limiting plates 5 cannot pass through the middle hole of the fixing ring 4. The bottom of one side of the first protruding plate 1 is connected to the wedge block 9. The lower fastening device includes a second protruding plate 13. The other side of the steel plate pavement body 6 is connected to the second protruding plate 13. The steel plate pavement body 6 is located below the second protruding plate 13 and has a second positioning groove 15. The upper part of the second protruding plate 13 has a wedge groove 11. The wedge block 9 on one of the steel plate pavement bodies 6 can be plugged in and matched with the wedge groove 11 on the adjacent steel plate pavement body 6. The middle part of the second protruding plate 13 has a screw hole 19. The bolts 3 on one of the steel plate pavement bodies 6 can be threadedly connected with the screw hole 19 on the adjacent steel plate pavement body 6. The first protruding plate 1 of the steel plate pavement body 6 can be plugged in and matched with the second positioning groove 15 of the adjacent steel plate pavement body 6, and the second protruding plate 13 of the steel plate pavement body 6 can be plugged in and matched with the first positioning groove 7 of the adjacent steel plate pavement body 6.

[0024] The first protruding plate 1, the second positioning groove 15, the second protruding plate 13 and the first positioning groove 7 of the utility model cooperate with each other to avoid excessive protrusion of the edge of the steel plate pavement body 6 when the two steel plate pavement bodies 6 cooperate. Example 4

[0025] A temporary pavement structure, such as Figure 1-Figure 5As shown, it includes several steel plate pavement bodies 6, which are arranged side by side, and upper fastening devices and lower fastening devices are respectively arranged on both sides of the steel plate pavement body 6, the upper fastening device includes a first protruding plate 1, one side of the steel plate pavement body 6 is connected to the first protruding plate 1, the steel plate pavement body 6 is located below the first protruding plate 1 and has a first positioning groove 7, a through hole 2 is arranged in the middle of the first protruding plate 1, a fixing ring 4 is installed in the middle of the inner side of the through hole 2, the outer ring of the fixing ring 4 is connected to the inner wall side of the through hole 2, a bolt 3 is installed on the fixing ring 4, the screw rod of the bolt 3 passes through the middle hole of the fixing ring 4, a limiting plate 5 is installed in the middle of the screw rod of the bolt 3, the limiting plate 5 is an annular plate structure, and the limiting plate 5 and the screw rod of the bolt 3 are connected. The rods are welded after being plugged in. The heads of the bolts 3 and the limiting plates 5 cannot pass through the middle hole of the fixing ring 4. A wedge block 9 is connected to the bottom of one side of the first protruding plate 1. The lower fastening device includes a second protruding plate 13. The other side of the steel plate pavement body 6 is connected to the second protruding plate 13. The steel plate pavement body 6 is located below the second protruding plate 13 and a second positioning groove 15 is provided. A wedge groove 11 is provided on the upper part of the second protruding plate 13. The wedge block 9 on one of the steel plate pavement bodies 6 can be plugged in and matched with the wedge groove 11 on the adjacent steel plate pavement body 6. A screw hole 19 is provided in the middle of the second protruding plate 13. The bolts 3 on one of the steel plate pavement bodies 6 can be threadedly connected with the screw hole 19 on the adjacent steel plate pavement body 6. Among the several steel plate pavement bodies 6, a T-shaped connecting plate is installed between two adjacent steel plate pavement bodies 6, and the T-shaped connecting plate includes an elastic steel sheet 17, the middle of the elastic steel sheet 17 is connected to a longitudinal plate 18, and both sides of the steel plate pavement body 6 are provided with inclined grooves 14, and both sides of the elastic steel sheet 17 are provided with folded edges 20, and the two folded edges 20 can be respectively plugged and matched with the inclined grooves 14 on the two steel plate pavement bodies 6.

[0026] The T-shaped connecting plate of the utility model can wrap the edges of the first protruding plate 1 and the steel plate pavement body 6, thereby preventing the edges of the first protruding plate 1 and the steel plate pavement body 6 from easily tripping workers. After the elastic steel sheet 17 is installed, the first protruding plate 1 and the steel plate pavement body 6 can cooperate to clamp the longitudinal plate 18, thereby preventing the T-shaped connecting plate from easily separating from the steel plate pavement body 6. The two sides of the elastic steel sheet 17 are respectively plugged and matched with the two inclined grooves 14 through the folding edges 20, which can prevent the edge of the elastic steel sheet 17 from tilting up on the one hand, and on the other hand, can cover the joint between the first protruding plate 1 and the steel plate pavement body 6 to prevent workers from tripping.

[0027] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention.

Claims

1. A temporary pavement structure, Features: The invention comprises a plurality of steel plate pavement bodies (6), the plurality of steel plate pavement bodies (6) are arranged side by side, an upper fastening device and a lower fastening device are respectively arranged on both sides of the steel plate pavement body (6), the upper fastening device comprises a first protruding plate (1), one side of the steel plate pavement body (6) is connected to the first protruding plate (1), a first positioning groove (7) is provided on the steel plate pavement body (6) located below the first protruding plate (1), a through hole (2) is provided in the middle of the first protruding plate (1), a fixing ring (4) is installed in the middle of the inner side of the through hole (2), the outer ring of the fixing ring (4) is connected to the inner wall side of the through hole (2), a bolt (3) is installed on the fixing ring (4), the screw rod of the bolt (3) passes through the middle hole of the fixing ring (4), a limiting plate (5) is installed in the middle of the screw rod of the bolt (3), the limiting plate (5) is an annular plate structure, and the limiting plate (5) and the screw rod of the bolt (3) are connected to each other. After plugging and welding, the head of the bolt (3) and the limit plate (5) cannot pass through the middle hole of the fixing ring (4); the bottom of one side of the first protruding plate (1) is connected to a wedge block (9); the lower fastening device includes a second protruding plate (13); the other side of the steel plate pavement body (6) is connected to the second protruding plate (13); the steel plate pavement body (6) is located below the second protruding plate (13) and has a second positioning groove (15); the upper part of the second protruding plate (13) has a wedge groove (11); the wedge block (9) on one of the steel plate pavement bodies (6) can be plugged into and matched with the wedge groove (11) on the adjacent steel plate pavement body (6); the middle part of the second protruding plate (13) has a screw hole (19); the bolt (3) on one of the steel plate pavement bodies (6) can be threadedly connected with the screw hole (19) on the adjacent steel plate pavement body (6).

2. A temporary pavement structure according to claim 1, Features: A first inclined surface (10) is formed on one side of the wedge-shaped block (9), and a second inclined surface (12) is formed on one side of the wedge-shaped groove (11), wherein the first inclined surface (10) of one steel plate pavement body (6) can cooperate with the second inclined surface (12) of an adjacent steel plate pavement body (6).

3. A temporary pavement structure according to claim 1, Features: The first protruding plate (1) of the steel plate pavement body (6) can be plugged into and matched with the second positioning groove (15) of the adjacent steel plate pavement body (6), and the second protruding plate (13) of the steel plate pavement body (6) can be plugged into and matched with the first positioning groove (7) of the adjacent steel plate pavement body (6).

4. A temporary pavement structure according to claim 1, Features: Among the plurality of steel plate pavement bodies (6), a T-shaped connecting plate is installed between two adjacent steel plate pavement bodies (6), the T-shaped connecting plate comprises an elastic steel sheet (17), the middle of the elastic steel sheet (17) is connected to a longitudinal plate (18), both sides of the steel plate pavement body (6) are provided with an inclined groove (14), both sides of the elastic steel sheet (17) are provided with a folded edge (20), and the two folded edges (20) can be respectively plugged into and matched with the inclined grooves (14) on the two steel plate pavement bodies (6).