Seepage and drainage device for sponge city
By introducing emergency drainage pipes and automatic adjustment mechanisms into the sponge city seepage drainage device, the problem of insufficient drainage in the existing technology is solved, effective drainage during high-intensity rainfall is achieved, and urban waterlogging and traffic inconvenience are avoided.
Patent Information
- Application Number
- CN202420552802.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The existing seepage and drainage devices in sponge cities cannot be adjusted in an emergency according to the amount of drainage. In high-intensity rainfall weather, it is easy to cause rainwater to accumulate, resulting in untimely drainage, causing urban waterlogging, and causing inconvenience to life and transportation.
A sponge city seepage and drainage device is designed, including a drainage well, a rainwater outlet, a main drainage pipe, an emergency drainage pipe, a limit chute, a closing plate and a float. By automatically opening the emergency drainage pipe in heavy rainfall weather, the drainage volume is increased. And adjust the drainage volume according to the height of accumulated water in the drainage well to prevent rainwater from accumulating.
It effectively prevents road water accumulation caused by untimely drainage of rainwater, avoids urban waterlogging, ensures smooth travel of citizens and vehicles, and improves the drainage capacity of the sponge city drainage system.
Smart Images

Figure CN221919693U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sponge city drainage devices, in particular to a sponge city infiltration and drainage device. Background Art
[0002] Sponge city is a new generation of urban stormwater management concept. It means that the city can be like a sponge, with good flexibility in adapting to environmental changes and coping with natural disasters caused by rain. It absorbs, stores, infiltrates and purifies water when it rains. When needed, the stored water is released and utilized to achieve the free migration of rainwater in the city. In the existing technology, the infiltration and drainage device of the sponge city cannot make emergency adjustments according to the amount of drainage. In high-intensity rainfall weather, it is easy to cause rainwater to accumulate in the pipes, resulting in untimely drainage and urban waterlogging, which brings great inconvenience to urban life and transportation. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides a sponge city infiltration and drainage device, which solves the problem in the prior art that the sponge city infiltration and drainage device cannot be adjusted emergency-wise according to the amount of drainage, and in high-intensity rainfall weather, rainwater is easily accumulated in the pipes, resulting in untimely drainage, causing urban waterlogging and bringing great inconvenience to urban life and transportation.
[0004] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a sponge city infiltration and drainage device, including a drainage well, a rainwater outlet is arranged on the top of the drainage well, a drainage cross pipe is connected to the bottom of the drainage well, a main drainage pipe is arranged on one side of the bottom of the drainage well, an emergency drainage pipe is arranged on one side of the main drainage pipe, branch drainage pipes are connected to the upper and lower sides of the drainage well close to the main drainage pipe, the branch drainage pipe located at the bottom is connected to the main drainage pipe, the branch drainage pipe located at the top is connected to the emergency drainage pipe, and a limiting slide is arranged on the outer side of the branch drainage pipe located at the top near one end of the drainage well, a closing plate is cooperatively connected to the inner wall of the limiting slide, the closing plate is cooperatively connected to the branch drainage pipe located at the top, and a float is fixedly connected to the side of the closing plate away from the branch drainage pipe.
[0005] Preferably, a permeable surface layer is equidistantly arranged on one side of the drainage well, a concrete layer is arranged below the permeable surface layer, drainage grooves are equidistantly arranged on the top of the concrete layer, and water pipes are equidistantly connected to the side of the drainage horizontal pipe close to the concrete layer. The water pipes are embedded in the concrete layer, and the water pipes are provided with water inlets inside the drainage grooves.
[0006] Preferably, a support net is provided on the top of the concrete layer, a gravel layer is provided on the top of the support net, a filter layer is provided on the top of the gravel layer, a sand layer is provided on the top of the filter layer, and the sand layer is cooperatively connected to the permeable surface layer.
[0007] Preferably, the inner wall of the drainage trough is located above the water pipe and is cooperatively connected with a permeable net.
[0008] Preferably, the drainage well is located below the rainwater inlet and is provided with a filter screen.
[0009] The utility model provides a sponge city infiltration and drainage device. It has the following beneficial effects: the sponge city infiltration and drainage device, through the cooperation between the drainage well, the rainwater outlet, the drainage transverse pipe, the main drainage pipe, the emergency drainage pipe, the limit slide, the closing plate, the buoy and the branch drainage pipe, by adding the emergency drainage pipe to the drainage system of the sponge city, in heavy rain weather, when the main drainage pipe is difficult to meet the drainage demand, the branch drainage pipe connected to the emergency drainage pipe can be automatically opened to increase the drainage volume of the drainage system, and the drainage volume can be automatically adjusted according to the height of the accumulated water in the drainage well, which can prevent the rainwater from being discharged in time and causing water accumulation on the road surface, thereby avoiding urban waterlogging, ensuring the smooth travel of citizens and vehicles, and thus improving the drainage capacity of the sponge city drainage system.
[0010] Through the coordination among drainage transverse pipes, permeable surface layer, concrete layer, drainage grooves, water pipes and water inlets, rainwater can penetrate downward through the permeable surface layer, be collected in the drainage grooves of the concrete layer, and enter the water pipes through the water inlets, and be transported to drainage transverse pipes by water pipes, thereby increasing the permeability of the road surface, improving the discharge efficiency of rainwater on the road surface, and thus reducing the generation of water accumulation on urban roads, thus ensuring the travel convenience of citizens and vehicles. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model;
[0012] Figure 2 for Figure 1 A partial enlarged view of the middle A area;
[0013] Figure 3 for Figure 1 A partial enlarged view of area B in the middle.
[0014] In the figure: 1. drainage well, 2. rainwater inlet, 3. drainage transverse pipe, 4. main drainage pipe, 5. emergency drainage pipe, 6. limiting slide, 7. closing plate, 8. buoy, 9. permeable surface layer, 10. concrete layer, 11. drainage trough, 12. water guide pipe, 13. water inlet, 14. support net, 15. gravel layer, 16. filter layer, 17. sand layer, 18. permeable net, 19. filter net, 20. branch drainage pipe. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0016] In the prior art, the infiltration and drainage devices of sponge cities cannot be adjusted in an emergency according to the amount of drainage. In high-intensity rainfall weather, rainwater is easily accumulated in the pipes, resulting in untimely drainage and urban waterlogging, which brings great inconvenience to urban life and transportation.
[0017] In view of this, the utility model provides a sponge city infiltration and drainage device, which adds an emergency drainage pipe to the drainage system of the sponge city through the coordination of drainage wells, rainwater outlets, drainage transverse pipes, main drainage pipes, emergency drainage pipes, limiting slides, closing plates, buoys and branch drainage pipes. In heavy rainfall weather, when the main drainage pipe is unable to meet the drainage demand, the branch drainage pipe connected to the emergency drainage pipe can be automatically opened to increase the drainage volume of the drainage system, and the drainage volume can be automatically adjusted according to the height of the accumulated water in the drainage well, so as to prevent water accumulation on the road surface due to untimely drainage of rainwater, avoid urban waterlogging, and ensure smooth travel for citizens and vehicles.
[0018] Through the personnel in this field, all the electrical components in this case are connected to their corresponding power supplies through wires, and appropriate controllers and encoders should be selected according to actual conditions to meet the control requirements. The specific connection and control sequence should refer to the following working principle, and the electrical connection between the electrical components is completed in the order of working in sequence. The detailed connection means are well-known technologies in this field. The following mainly introduces the working principles and processes, and no longer explains the electrical control.
[0019] Depend on Figure 1-3It can be seen that a sponge city infiltration and drainage device includes a drainage well 1, a rainwater inlet 2 is arranged at the top of the drainage well 1, a drainage transverse pipe 3 is connected to the bottom of the drainage well 1, a main drainage pipe 4 is arranged on one side of the bottom of the drainage well 1, an emergency drainage pipe 5 is arranged on one side of the main drainage pipe 4, and a branch drainage pipe 20 is connected to the upper and lower sides of the drainage well 1 near the main drainage pipe 4. The branch drainage pipe 20 located at the bottom is connected to the main drainage pipe 4, and the branch drainage pipe 20 located at the top is connected to the emergency drainage pipe 5. A limiting chute 6 is arranged on the outer side of the branch drainage pipe 20 located at the top near the drainage well 1, and a closing plate 7 is connected to the inner wall of the limiting chute 6. The closing plate 7 is connected to the branch drainage pipe 20 located at the top, and a buoy 8 is fixedly connected to the side of the closing plate 7 away from the branch drainage pipe 20.
[0020] In the specific implementation process, it is worth pointing out that the drainage well 1 is arranged on both sides of the road surface. Through the cooperation between the drainage well 1, the rainwater inlet 2 and the drainage transverse pipe 3, rainwater can enter the drainage well 1 from the rainwater inlet 2, and the drainage transverse pipe 3 makes the drainage wells 1 connected. Through the cooperation between the drainage well 1, the branch drainage pipe 20, the main drainage pipe 4 and the emergency drainage pipe 5, the drainage well 1 is connected with the main drainage pipe 4 and the emergency drainage pipe 5, and the branch drainage pipe 20 connected with the emergency drainage pipe 5 is above the branch drainage pipe 20 connected with the main drainage pipe 4. In heavy rainfall weather, when the main drainage pipe 4 is unable to meet the drainage demand, the water level in the drainage well 1 reaches the position of the branch drainage pipe 20 located above, so that rainwater can enter the emergency drainage pipe 5 through the branch drainage pipe 20 located above, thereby increasing the drainage volume. Through the cooperation among the drainage well 1, the emergency drainage pipe 5, the limiting chute 6, the closing plate 7 and the branch drainage pipe 20, the closing plate 7 is used to close the branch drainage pipe 20 located above inside the limiting chute 6, so that the emergency drainage pipe 5 remains closed when it is not raining. The cooperation between the plate 7, the buoy 8 and the branch drainage pipe 20 is that when water accumulates inside the drainage well 1, the accumulated water causes the buoy 8 to drive the closing plate 7 to move upward, open the branch drainage pipe 20 located above, and automatically adjust the drainage volume of the branch drainage pipe 20 according to the water level in the drainage well 1, so that the accumulated water can enter the emergency drainage pipe 5 through the branch drainage pipe 20 for rapid drainage, thereby preventing the rainwater from being discharged in time and causing water accumulation on the road surface. After the water level in the drainage well 1 drops, the buoy 8 moves downward, causing the closing plate 7 to re-close the branch drainage pipe 20, and the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 3, the drainage well 1, the rainwater outlet 4, the drainage well 2, the rainwater outlet 5, the drainage well 2, the rainwater outlet 5, the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 3, the drainage well 2, the rainwater outlet 3, the drainage well 2, the rainwater outlet 3, the drainage well 1, the rainwater outlet 4, the drainage well 2, the rainwater outlet 5, the drainage well 2, the rainwater outlet 2, the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 2, the drainage well 1, the rainwater outlet 2, the drainage well 2 ... The cooperation among the water horizontal pipe 3, the main drainage pipe 4, the emergency drainage pipe 5, the limit slide 6, the closing plate 7, the buoy 8 and the branch drainage pipe 20, by adding the emergency drainage pipe 5 to the drainage system of the sponge city, in heavy rain weather, when the main drainage pipe 4 is difficult to meet the drainage demand, the branch drainage pipe 20 connected to the emergency drainage pipe 5 can be automatically opened to increase the drainage volume of the drainage system, and the drainage volume can be automatically adjusted according to the height of the accumulated water in the drainage well 1, so as to prevent the rainwater from being discharged in time and causing water accumulation on the road surface, avoid urban waterlogging, and ensure smooth travel for citizens and vehicles;
[0021] Furthermore, a permeable surface layer 9 is equidistantly arranged on one side of the drainage well 1. The permeable surface layer 9 is a permeable pavement composed of permeable bricks, permeable concrete or permeable asphalt. A concrete layer 10 is arranged below the permeable surface layer 9. The concrete layer 10 is a concrete base of the pavement. Drainage grooves 11 are equidistantly arranged on the top of the concrete layer 10. A water pipe 12 is equidistantly connected to one side of the drainage horizontal pipe 3 close to the concrete layer 10. The water pipe 12 is embedded in the concrete layer 10. The water pipe 12 is located inside the drainage groove 11 and has a water inlet 13.
[0022] In the specific implementation process, it is worth pointing out that the permeable surface layer 9 is a permeable pavement composed of permeable bricks, permeable concrete or permeable asphalt, and the concrete layer 10 is the concrete base of the pavement. Through the cooperation between the permeable surface layer 9, the concrete layer 10 and the drainage groove 11, the permeable surface layer 9 with a permeable structure can make the rainwater on the pavement penetrate downward and be collected in the drainage groove 11 of the concrete layer 10. Through the cooperation between the drainage horizontal pipe 3, the concrete layer 10, the drainage groove 11, the water guide pipe 12 and the water inlet 13, the rainwater in the drainage groove 11 can be collected. Rainwater enters the water pipe 12 through the water inlet 13 and is transported to the drainage transverse pipe 3 by the water pipe 12. Through the cooperation among the drainage transverse pipe 3, the permeable surface layer 9, the concrete layer 10, the drainage groove 11, the water pipe 12 and the water inlet 13, the rainwater can penetrate downward through the permeable surface layer 9, be collected in the drainage groove 11 of the concrete layer 10, and enter the water pipe 12 through the water inlet 13, and be transported to the drainage transverse pipe 3 by the water pipe 12, thereby increasing the water permeability of the road surface, improving the discharge efficiency of rainwater on the road surface, and reducing the risk of urban flooding;
[0023] Furthermore, a support net 14 is provided on the top of the concrete layer 10, a gravel layer 15 is provided on the top of the support net 14, a filter layer 16 is provided on the top of the gravel layer 15, a sand layer 17 is provided on the top of the filter layer 16, and the sand layer 17 is connected with the permeable surface layer 9;
[0024] In the specific implementation process, it is worth pointing out that, through the cooperation between the permeable surface layer 9, the concrete layer 10, the support net 14, the gravel layer 15, the filter layer 16 and the sand layer 17, the permeable surface layer 9 is supported on the top of the concrete layer 10, and after the rainwater penetrates into the permeable surface layer 9, it enters the sand layer 17, and after being filtered by the filter layer 16, it enters the gravel layer 15 and moves downward, so that the filtered rainwater can be collected at the concrete layer 10 and discharged into the drainage horizontal pipe 3, so as to achieve stable support for the permeable surface layer 9, filter, collect and conduct the rainwater, so that the rainwater on the road surface can penetrate downward, and avoid water accumulation on the road surface;
[0025] Furthermore, the inner wall of the drainage trough 11 is located above the water pipe 12 and is connected with a water-permeable net 18. The water-permeable net 18 is a trapezoidal block of a plastic material with a random wire structure, which is used to support the support net 14 at the top of the drainage trough 11 and allows the seepage water to smoothly enter the drainage trough 11.
[0026] In the specific implementation process, it is worth pointing out that the water-permeable net 18 is a trapezoidal block of a plastic material with a random wire structure, which is used to support the support net 14 at the top of the drainage trough 11 and allows the seepage water to smoothly enter the drainage trough 11;
[0027] Furthermore, the drainage well 1 is provided with a filter screen 19 below the rainwater inlet 2, and the filter screen 19 is used to filter the water entering the rainwater inlet 2 to prevent larger debris from entering the drainage system and causing blockage;
[0028] In the specific implementation process, it is worth pointing out that the filter 19 is used to filter the water entering the rainwater inlet 2 to prevent larger debris from entering the drainage system and causing blockage;
[0029] Specifically, when the sponge city infiltration and drainage device is used, rainwater penetrates from the permeable surface layer 9 to the sand layer 17, enters the gravel layer 15 after being filtered by the filter layer 16, and is collected in the drainage trough 11 at the bottom of the gravel layer 15. The rainwater collected in the drainage trough 11 enters the water guide pipe 12 through the water inlet 13, and enters the drainage transverse pipe 3 from the water guide pipe 12. The rainwater in the drainage transverse pipe 3 flows into the drainage wells 1 at various locations, and enters the main drainage pipe 4 from the bottom of the drainage well 1 through the branch drainage pipe 20 located below. When the rainfall is large, the main drainage pipe 4 is difficult to meet the drainage demand, and rainwater accumulates in the drainage well 1. When the rainwater level in the drainage well 1 reaches the height of the buoy 8, the buoy 8 drives the closing plate 7 to move upward under the action of buoyancy, so that the closing plate 7 releases the closure of the branch drainage pipe 20 located above, and the rainwater accumulated in the drainage well 1 enters the emergency drainage pipe 5. In order to increase the drainage capacity of the sponge city drainage system, the height of the closing plate 7 is automatically adjusted with the height of the rainwater level in the drainage well 1, so that the drainage wells 1 in various places can automatically adjust the emergency drainage volume according to their respective conditions to ensure the effective discharge of rainwater. Through the cooperation between the drainage well 1, the rainwater outlet 2, the drainage cross pipe 3, the main drainage pipe 4, the emergency drainage pipe 5, the limiting slide 6, the closing plate 7, the buoy 8 and the branch drainage pipe 20, by adding an emergency drainage pipe 5 to the drainage system of the sponge city, in heavy rainfall weather, when the main drainage pipe 4 is difficult to meet the drainage demand, the branch drainage pipe 20 connected to the emergency drainage pipe 5 can be automatically opened to increase the drainage volume of the drainage system, and the drainage volume can be automatically adjusted according to the height of the accumulated water in the drainage well 1 to prevent the rainwater from being discharged in time and causing water accumulation on the road surface, avoid urban waterlogging, and ensure smooth travel for citizens and vehicles.
[0030] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0031] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A sponge city drainage device, comprising a drainage well (1), characterized in that: A rainwater outlet (2) is provided at the top of the drainage well (1), a drainage transverse pipe (3) is connected to the bottom of the drainage well (1), a main drainage pipe (4) is provided on one side of the bottom of the drainage well (1), an emergency drainage pipe (5) is provided on one side of the main drainage pipe (4), and a branch drainage pipe (20) is connected to the upper and lower sides of the drainage well (1) near the main drainage pipe (4), the branch drainage pipe (20) located at the bottom is connected to the main drainage pipe (4), and the branch drainage pipe (20) located at the top is connected to the emergency drainage pipe (5), and a limiting slide groove (6) is provided on the outer side of the branch drainage pipe (20) located at the top near one end of the drainage well (1), and the inner wall of the limiting slide groove (6) is connected with a closing plate (7), and the closing plate (7) is connected with the branch drainage pipe (20) located at the top, and a buoy (8) is fixedly connected to the side of the closing plate (7) away from the branch drainage pipe (20).
2. A sponge city drainage device according to claim 1, characterized in that: A permeable surface layer (9) is equidistantly arranged on one side of the drainage well (1), a concrete layer (10) is arranged below the permeable surface layer (9), drainage grooves (11) are equidistantly arranged on the top of the concrete layer (10), and a water pipe (12) is equidistantly connected to the side of the drainage transverse pipe (3) close to the concrete layer (10), the water pipe (12) is embedded in the concrete layer (10), and a water inlet (13) is arranged on the inside of the drainage groove (11) of the water pipe (12).
3. A sponge city drainage device according to claim 2, characterized in that: A support net (14) is arranged on the top of the concrete layer (10), a gravel layer (15) is arranged on the top of the support net (14), a filter layer (16) is arranged on the top of the gravel layer (15), a sand layer (17) is arranged on the top of the filter layer (16), and the sand layer (17) is connected to the permeable surface layer (9).
4. A sponge city drainage device according to claim 2, characterized in that: The inner wall of the drainage trough (11) is located above the water pipe (12) and is cooperatively connected with a water permeable net (18).
5. A sponge city drainage device according to claim 1, characterized in that: The drainage well (1) is located below the rainwater inlet (2) and is provided with a filter screen (19).
