Prefabricated flush valve overflow well

Through the modular design of precast concrete standard unit cylinders and underground flushing gate valves, the problem of difficulty and high cost in the construction of existing overflow wells has been solved, rapid assembly and efficient construction of overflow wells have been achieved, and construction has been improved. efficiency and structural stability.

CN221919717UActive Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420507633.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-29
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The construction of overflow wells in the existing water supply pipeline network has problems such as large excavation depth, high construction difficulty, long construction period, and high construction cost.

Method used

Use precast concrete standard unit cylinders for modular design, connect water supply lines and tee pipes through rigid joints, use buried flushing gate valves and flushing valve extension rods, set gravity-type one-way check valves, and install them at the top of the overflow well Set up a sealed manhole cover and use hoisting equipment to quickly assemble the overflow well, simplifying the construction process and improving structural stability and sealing.

Benefits of technology

Improves construction efficiency, simplifies the construction process of overflow wells, enhances structural stability and sealing, facilitates pipeline connections, ensures the accuracy of pipeline locations, and improves the convenience of valve operation and maintenance and the safety of the system performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919717U_ABST
    Figure CN221919717U_ABST
Patent Text Reader

Abstract

The utility model relates to a prefabricated flush valve overflow well. The utility model is applicable to the technical field of underground pipelines. The technical scheme comprises an overflow well, a water supply pipeline, a three-way pipe, a flushing gate valve, a flushing pipeline and an overflow pipe, the water supply pipeline is connected with the three-way pipe through the rigid joint; one end of the flushing gate valve is connected with the three-way pipe, and the other end is connected with the flushing pipeline; one end of the flushing pipeline away from the flushing gate valve is connected with the overflow well bottom; the top of the overflow well is connected with an overflow pipe; the overflow well is composed of a first prefabricated concrete standard unit barrel, a second prefabricated concrete standard unit barrel and a third prefabricated concrete standard unit barrel from bottom to top. A concrete bottom plate is arranged at the bottom of the first prefabricated concrete standard unit barrel, the top of the first prefabricated concrete standard unit barrel is hollow, and the top of a side wall of the first prefabricated concrete standard unit barrel is in a tongue-and-groove shape; the bottom and the top of the side wall of the second prefabricated concrete standard unit barrel are both in a tongue-and-groove shape; and a concrete top plate is arranged at the top of the third prefabricated concrete standard unit barrel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of underground pipelines, and more specifically, to a prefabricated flushing valve overflow well. Background Art

[0002] In the water supply network, due to long-term operation and accumulation of sediment, scale and impurities may form, affecting the water supply quality. Through the pipeline flushing valve, the pipeline can be flushed and cleaned regularly or irregularly to remove the sediment and impurities in the pipe to ensure the water supply quality.

[0003] Since the water supply pipelines and flushing pipelines that pass under rivers, roads, culverts, etc. are located at the lowest point or local low point, an overflow well needs to be set after the flushing pipe to facilitate the discharge of deposits and wastewater in the pipeline, dredge the pipeline, and make the pipeline operate normally.

[0004] At present, overflow wells for water supply and drainage on the market are mostly cast-in-place concrete wells, which have problems such as large excavation depth leading to great construction difficulty, long construction period, and high construction cost. Utility Model Content

[0005] The utility model aims to overcome the deficiencies in the prior art and provides a prefabricated flushing valve overflow well.

[0006] In a first aspect, a prefabricated flushing valve overflow well is provided, comprising: an overflow well, a water supply pipeline, a tee pipe, a flushing gate valve, a flushing pipeline and an overflow pipe;

[0007] Wherein, the water supply pipeline is connected to the tee through a rigid joint; one end of the flushing gate valve is connected to the tee, and the other end of the flushing gate valve is connected to the flushing pipe; the end of the flushing pipe away from the flushing gate valve is connected to the bottom of the overflow well; the top of the overflow well is connected to the overflow pipe; the overflow well is composed of a first precast concrete standard unit cylinder, a second precast concrete standard unit cylinder and a third precast concrete standard unit cylinder from bottom to top; the bottom of the first precast concrete standard unit cylinder is provided with a concrete bottom plate, the top is hollow, and the top of the side wall of the first precast concrete standard unit cylinder is in a tongue-and-groove shape; the bottom and top of the side wall of the second precast concrete standard unit cylinder are both in a tongue-and-groove shape; the top of the third precast concrete standard unit cylinder is provided with a concrete top plate, the bottom is hollow, and the bottom of the side wall of the third precast concrete standard unit cylinder is in a tongue-and-groove shape.

[0008] Preferably, the first precast concrete standard unit cylinder, the second precast concrete standard unit cylinder and the third precast concrete standard unit cylinder are cubes or cylinders; a reserved hole is provided on the side wall of the first precast concrete standard unit cylinder for connecting a flushing pipe; a reserved hole is provided on the side wall of the third precast concrete standard unit cylinder for connecting an overflow pipe.

[0009] Preferably, a sealing manhole cover is provided on the top of the third precast concrete standard unit cylinder.

[0010] Preferably, the flushing gate valve is a buried gate valve, a flushing valve extension rod is provided on the top of the flushing gate valve, and a concrete cover plate is provided around the periphery of the flushing valve extension rod close to the bottom end for covering.

[0011] Preferably, the outer walls of the first precast concrete standard unit cylinder, the second precast concrete standard unit cylinder and the third precast concrete standard unit cylinder are provided with hanging holes.

[0012] Preferably, the flushing pipeline is provided with a gravity one-way check valve in the overflow well.

[0013] Preferably, the top of the overflow well is -mm above the ground.

[0014] In a second aspect, a construction method of a prefabricated flushing valve overflow well as described in any one of the first aspects is provided, comprising:

[0015] Step 1, excavate pipelines and overflow well trenches; after the excavation is completed, install the water supply pipeline, and connect the water supply pipeline to the tee pipe through a rigid joint;

[0016] Step 2: Connect one end of the flushing gate valve to the tee pipe with a flange, and the other end to the flushing pipe; and install the flushing valve extension rod on the top of the flushing gate valve;

[0017] Step 3: pour the plain concrete cushion layer, and after the strength reaches the requirement, install the first precast concrete standard unit cylinder on the plain concrete cushion layer by means of a hoisting device; and then install the second precast concrete standard unit cylinder and the third precast concrete standard unit cylinder in sequence by means of a hoisting device;

[0018] Step 4: After the overflow well is installed, install the flushing pipe and extend it into the first precast concrete standard unit cylinder through the reserved hole, and set a gravity one-way check valve at the end of the overflow well flushing pipe;

[0019] Step 5: compact the backfill soil layer by layer. When the backfill height is flush with the bottom of the reserved hole of the third precast concrete standard unit cylinder, install the overflow pipe and extend it into the third precast concrete standard unit cylinder through the reserved hole, and seal it with water mortar;

[0020] Step 6: Backfill the soil to the designed elevation and cast a concrete cover around the ground around the flushing valve extension rod.

[0021] Preferably, in step 3, when assembling the prefabricated concrete standard unit cylinders, cement mortar (12) is used to seal the tongue and groove.

[0022] The beneficial effects of the utility model are:

[0023] 1. This application adopts a modular design of prefabricated concrete standard unit cylinders, which simplifies the construction process of the overflow well. This design allows the overflow well to be prefabricated in the factory and quickly assembled on site, improving construction efficiency; and by connecting each prefabricated concrete standard unit cylinder using a tongue-and-groove shape, the stability and sealing of the structure are enhanced. At the same time, the design of the reserved holes facilitates the connection of the pipeline and can ensure the accuracy of the pipeline position.

[0024] 2. The design of the flushing gate valve of the present application includes a buried gate valve and a flushing valve extension rod, making the valve easier to operate and maintain. In addition, by setting a gravity one-way check valve, the safety performance of the system is increased.

[0025] 3. The present application provides a sealed manhole cover at the top of the overflow well to prevent people or objects from accidentally falling in, thereby improving safety during use; and the top of the overflow well is 200-300mm above the ground, which helps prevent surface water from flowing into the well and also facilitates the discharge of surface water. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic cross-sectional view of the overflow well of the prefabricated flushing valve;

[0027] Figure 2 This is a top view of the prefabricated flushing valve overflow well;

[0028] Figure 3 It is a structural schematic diagram of the first precast concrete standard unit cylinder;

[0029] Figure 4 It is a structural schematic diagram of the second precast concrete standard unit cylinder;

[0030] Figure 5 It is a structural schematic diagram of the third precast concrete standard unit cylinder;

[0031] Explanation of the reference numerals in the accompanying drawings: 1. first precast concrete standard unit cylinder; 2. second precast concrete standard unit cylinder; 3. third precast concrete standard unit cylinder; 4. water supply pipeline; 5. three-way pipe; 6. flushing gate valve; 7. flushing valve extension rod; 8. flushing pipeline; 9. gravity one-way check valve; 10. overflow pipe; 11. sealing manhole cover; 12. cement mortar; 13. plain concrete cushion layer; 14. concrete cover plate; 15. reserved hole; 16. hanger rod. DETAILED DESCRIPTION

[0032] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

[0033] Embodiment 1:

[0034] Embodiment 1 of the present application provides a prefabricated flushing valve overflow well, including: an overflow well, a water supply pipeline 4, a tee pipe 5, a flushing gate valve 6, a flushing pipeline 8 and an overflow pipe 10;

[0035] Wherein, the water supply pipeline 4 is connected to the tee pipe 5 through a rigid joint; one end of the flushing gate valve 6 is connected to the tee pipe 5, and the other end of the flushing gate valve 6 is connected to the flushing pipe 8; the end of the flushing pipe 8 away from the flushing gate valve 6 is connected to the bottom of the overflow well; the top of the overflow well is connected to the overflow pipe 10; the overflow well is composed of a first precast concrete standard unit cylinder 1, a second precast concrete standard unit cylinder 2 and a third precast concrete standard unit cylinder 3 from bottom to top; the bottom of the first precast concrete standard unit cylinder 1 is provided with a concrete bottom plate, the top is hollow, and the top of the side wall of the first precast concrete standard unit cylinder 1 is in a tongue-and-groove shape; the bottom and top of the side wall of the second precast concrete standard unit cylinder 2 are both in a tongue-and-groove shape; the top of the third precast concrete standard unit cylinder 3 is provided with a concrete top plate, the bottom is hollow, and the bottom of the side wall of the third precast concrete standard unit cylinder 3 is in a tongue-and-groove shape.

[0036] Embodiment 2:

[0037] Based on Example 1, Example 2 of the present application provides a more specific prefabricated flushing valve overflow well, including: an overflow well, a water supply pipeline 4, a three-way pipe 5, a flushing gate valve 6, a flushing pipe 8 and an overflow pipe 10; the overflow well is composed of a first prefabricated concrete standard unit cylinder 1, a second prefabricated concrete standard unit cylinder 2 and a third prefabricated concrete standard unit cylinder 3 from bottom to top.

[0038] The first precast concrete standard unit cylinder 1, the second precast concrete standard unit cylinder 2 and the third precast concrete standard unit cylinder 3 are cubes or cylinders; the side wall of the first precast concrete standard unit cylinder 1 is provided with a reserved hole 15 for connecting the flushing pipe 8; the side wall of the third precast concrete standard unit cylinder 3 is provided with a reserved hole 15 for connecting the overflow pipe 10, through which the water flows into the drainage ditch, culvert or river. The bottom plate of the first precast concrete standard unit cylinder 1 is arranged on the plain concrete cushion layer 13. Specifically, the standard length of each precast concrete standard unit cylinder can be selected from 1.0m, 1.2, 1.5m, 1.8m, the standard width can be selected from 1.0m, 1.2, 1.5m, 1.8m, and the height can be selected from 0.8-1.5m.

[0039] A sealing manhole cover 11 is provided on the top of the third precast concrete standard unit cylinder 3 .

[0040] The flushing gate valve 6 is a buried gate valve. A flushing valve extension rod 7 is provided on the top of the flushing gate valve 6. A concrete cover plate 14 is provided around the bottom end of the flushing valve extension rod 7 for covering.

[0041] The outer walls of the first precast concrete standard unit cylinder 1, the second precast concrete standard unit cylinder 2 and the third precast concrete standard unit cylinder 3 are provided with hanging holes for installation.

[0042] The flushing pipeline 8 is provided with a gravity one-way check valve 9 in the overflow well.

[0043] The top of the overflow well is 200-300 mm above the ground.

[0044] It should be noted that the parts in this embodiment that are the same or similar to those in Embodiment 1 can be referenced to each other and will not be described in detail in this application.

[0045] Embodiment 3:

[0046] Based on Examples 1 and 2, Example 3 of the present application provides a construction method for a prefabricated flushing valve overflow well, including:

[0047] Step 1, excavate pipelines and overflow well trenches; after the excavation is completed, install the water supply pipeline 4, and connect the water supply pipeline 4 to the tee pipe 5 through a rigid joint.

[0048] Step 2: Connect one end of the flushing gate valve 6 to the three-way pipe 5 with a flange, and connect the other end to the flushing pipe 8; and install the flushing valve extension rod 7 on the top of the flushing gate valve 6.

[0049] Step 3, pouring the plain concrete cushion layer 13, after the strength reaches the requirement, then installing the first precast concrete standard unit cylinder 1 on the plain concrete cushion layer 13 by means of hoisting equipment; then installing the second precast concrete standard unit cylinder 2 and the third precast concrete standard unit cylinder 3 in sequence by means of hoisting equipment.

[0050] In step 3, when the prefabricated concrete standard unit cylinders are assembled, cement mortar 12 is used to seal the shaft joints, i.e. the tongue and groove.

[0051] Step 4: After the overflow well is installed, the flushing pipe 8 is installed and extends into the first precast concrete standard unit cylinder 1 through the reserved hole 15, and a gravity one-way check valve 9 is set at the end of the overflow well flushing pipe 8.

[0052] Step 5: compact the backfill soil layer by layer. When the backfill height is flush with the bottom of the reserved hole 15 of the third precast concrete standard unit cylinder 3, install the overflow pipe 10 and extend it into the third precast concrete standard unit cylinder 3 through the reserved hole 15, and seal it with water mortar.

[0053] Step 6: Backfill the soil to the designed elevation, and cast a concrete cover plate 14 around the ground of the flushing valve extension rod 7 to cover it.

[0054] Specifically, the method provided in this embodiment is a method corresponding to the device provided in Embodiments 1 and 2. Therefore, the parts in this embodiment that are the same or similar to Embodiment 1 can be referenced to each other and will not be repeated in this application.

Claims

1. A prefabricated flushing valve overflow well, characterized in that: include: An overflow well, a water supply pipeline (4), a tee pipe (5), a flushing gate valve (6), a flushing pipeline (8) and an overflow pipe (10); The water supply pipeline (4) is connected to the three-way pipe (5) through a rigid joint; one end of the flushing gate valve (6) is connected to the three-way pipe (5), and the other end of the flushing gate valve (6) is connected to the flushing pipeline (8); the end of the flushing pipeline (8) away from the flushing gate valve (6) is connected to the bottom of the overflow well; the top of the overflow well is connected to the overflow pipe (10); the overflow well is composed of a first precast concrete standard unit cylinder (1), a second precast concrete standard unit cylinder (2) and a third precast concrete standard cylinder (10) from bottom to top. The first precast concrete standard unit cylinder (1) is composed of a concrete bottom plate at the bottom and a hollow top, and the top of the side wall of the first precast concrete standard unit cylinder (1) is in a tongue-and-groove shape; the bottom and top of the side wall of the second precast concrete standard unit cylinder (2) are both in a tongue-and-groove shape; the top of the third precast concrete standard unit cylinder (3) is provided with a concrete top plate at the top and a hollow bottom, and the bottom of the side wall of the third precast concrete standard unit cylinder (3) is in a tongue-and-groove shape.

2. The prefabricated flushing valve overflow well according to claim 1, characterized in that: The first precast concrete standard unit cylinder (1), the second precast concrete standard unit cylinder (2) and the third precast concrete standard unit cylinder (3) are cubes or cylinders; the side wall of the first precast concrete standard unit cylinder (1) is provided with a reserved hole (15) for connecting a flushing pipe (8); the side wall of the third precast concrete standard unit cylinder (3) is provided with a reserved hole (15) for connecting an overflow pipe (10).

3. The prefabricated flushing valve overflow well according to claim 2, characterized in that: A sealing manhole cover (11) is provided on the top of the third precast concrete standard unit cylinder (3).

4. The prefabricated flushing valve overflow well according to claim 3, characterized in that: The flushing gate valve (6) is a buried gate valve. A flushing valve extension rod (7) is provided on the top of the flushing gate valve (6). A concrete cover plate (14) is provided around the bottom end of the flushing valve extension rod (7) for covering.

5. The prefabricated flushing valve overflow well according to claim 4, characterized in that: The outer walls of the first precast concrete standard unit cylinder (1), the second precast concrete standard unit cylinder (2) and the third precast concrete standard unit cylinder (3) are provided with hanging holes.

6. The prefabricated flushing valve overflow well according to claim 5, characterized in that: The flushing pipeline (8) is provided with a gravity-type one-way check valve (9) in the overflow well.

7. The prefabricated flushing valve overflow well according to claim 6, characterized in that: The top of the overflow well is 200-300 mm above the ground.