Prefabricated building component stress rib connection grouting sleeve
By using a combined structure of a sleeve, a sealing cover, a limiting pipe and a fastening bolt in the grouting sleeve, combined with the use of phosphorus-magnesium cement, the problem of insufficient bonding force between the stress-bearing ribs and the sleeve in the existing technology is solved, which significantly improves the performance of the grouting sleeve. Improved the tensile strength and stability of prefabricated components.
Patent Information
- Application Number
- CN202420496606.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The existing grouting sleeve has insufficient bonding force between the stress-bearing ribs and the sleeve, which causes the stress-bearing ribs to easily detach from the grouting material after tensile loading, affecting the stability and bearing capacity of the prefabricated components.
A grouting sleeve is designed to connect the stress-bearing tendons of prefabricated building components. It adopts a combined structure of a sleeve, a sealing cover, a limit pipe and a fastening bolt. Through the threaded connection of the fastening bolt with the sleeve and the limit pipe, the load-bearing capacity is increased. The fixing force of the force bars is maintained, and phosphorus magnesium cement is used as grouting material in the sleeve to ensure the bonding force and the overall firmness of the structure.
It effectively improves the firmness of the connection between the stress-bearing bars and the grouting sleeve, enhances the ability to withstand tensile force, reduces the risk of the stress-bearing bars being pulled out, and improves the overall stability and load-bearing capacity of the prefabricated components.
Smart Images

Figure CN221920022U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of grouting sleeves, in particular to a grouting sleeve for connecting stress reinforcements of prefabricated building components. Background Art
[0002] Prefabricated concrete components are concrete structures that are assembled and connected with prefabricated components as the main load-bearing components. During construction, it is necessary to connect the pre-embedded stress-bearing bars in the adjacent prefabricated components, and then pour concrete into the connection to wrap the stress-bearing bars in it, so as to connect the prefabricated building components together. The main methods of steel bar connection include binding lap joints, welding, etc., but the stress-bearing bars connected by these methods are insufficient in their ability to withstand longitudinal tension, which easily leads to insufficient bearing capacity of prefabricated buildings. In order to overcome the above problems, grouting sleeves are currently mainly used as steel bar connectors. When in use, the pre-embedded stress-bearing bars in the two prefabricated components are inserted into the grouting sleeves from both ends, and then grouting material is injected into the grouting sleeves, and the two stress-bearing bars are connected to the sleeves as a whole by relying on the bonding and bite action between the material and the sleeve and the stress-bearing bars. However, this method still has the problem of insufficient bonding and bite force between the stress-bearing bars and the grouting material in the sleeve. After being subjected to tensile loads, there is a risk that the stress-bearing bars will be separated from the grouting material or even pulled out, which will cause cracks between the prefabricated components and affect their stability. Utility Model Content
[0003] In view of the above problems, the utility model provides a grouting sleeve for connecting the stress reinforcement of prefabricated building components, which can further increase the connection firmness between the stress reinforcement and the grouting sleeve, and improve the ability of the prefabricated building components connected by the grouting sleeve to withstand tensile force. To achieve the above objectives, the technical solution of the utility model is as follows.
[0004] A grouting sleeve for connecting stress reinforcement of a prefabricated building component comprises: a sleeve, a sealing cover, a stopper tube and a fastening bolt. The sleeve has a grouting port and a grouting outlet on the side walls at both ends, and both ends of the sleeve are in a sealed state through the connected sealing cover, the stopper tube is vertically fixed to the center of the inner surface of the sealing cover, and the center of the sealing cover has a through hole concentrically arranged with the stopper tube. The side wall of the stopper tube has a stopper hole, one end of the fastening bolt passes through the side wall of the sleeve and the stopper hole, enters the stopper tube and is tightened against the side wall of the stress reinforcement of the prefabricated building component therein, and the fastening bolt and the sleeve are threadedly connected.
[0005] Furthermore, a threaded tube is fixed on the outer side wall of the sleeve, one end of the fastening bolt passes through the threaded tube and enters the sleeve, and the fastening bolt and the threaded tube are threadedly connected.
[0006] Furthermore, the inner wall of the sleeve is provided with an internal thread or the sleeve is a bellows, thereby increasing the bonding and biting force between the grouting material and the sleeve.
[0007] Furthermore, the grouting material filled in the sleeve is phosphate magnesium cement, which has the characteristics of early strength and fast hardening, no shrinkage after hardening, and strong bonding force.
[0008] Furthermore, the side wall of the sealing cover and the inner wall of the sleeve are threadedly connected.
[0009] Furthermore, one end of the fastening bolt passes through the side wall of the sleeve and the side wall of the sealing cover and then enters into the sleeve.
[0010] Furthermore, the inner wall of the limiting tube is provided with an internal thread, and the stress-bearing ribs in the limiting tube are threaded steel bars with a protruding structure on the outer wall, thereby increasing the resistance of the stress-bearing ribs being pulled out of the limiting tube.
[0011] Furthermore, it also includes a plug body or a sealing cover for sealing the grouting port and the grouting outlet to prevent the grouting material in the sleeve from flowing out after the grouting is completed.
[0012] Compared with the prior art, the utility model has the following beneficial effects: the prefabricated building component stress reinforcement connection grouting sleeve of the utility model is provided with a limiting tube on the inner side of the sealing cover of the sleeve, and the stress reinforcement therein is tightened by the fastening bolt passing through the side wall of the sleeve and the limiting tube. On the one hand, when the stress reinforcement is subjected to tension, the fastening bolt can increase the resistance of the stress reinforcement to be pulled out of the sleeve. On the other hand, the fastening bolt is wrapped in the grouting material in the fixed sleeve, thereby further ensuring the force of the fastening bolt on the stress reinforcement, making it more difficult for the stress reinforcement to be pulled out of the sleeve. On the other hand, the limiting tube also has the function of ensuring the concentricity of the two stress reinforcements entering from the two ends of the sleeve, thereby improving the firmness of the overall structure formed by the sleeve and the two stress reinforcements. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0014] Figure 1 It is a schematic diagram of the structure of the prefabricated building component stress reinforcement connection grouting sleeve in the following embodiments.
[0015] Figure 2 Schematic diagram of the structure of the sealing cover in the following embodiments.
[0016] The marks in the above drawings represent respectively: 1-sleeve, 2-sealing cover, 3-limiting tube, 4-fastening bolt, 5-limiting hole, 6-prefabricated building component, 7-stressed reinforcement, 8-threaded tube, 101-grouting port, 102-slurry outlet. DETAILED DESCRIPTION
[0017] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0018] For the convenience of description, if the words "up", "down", "left" and "right" appear in the present invention, they only indicate that they are consistent with the up, down, left and right directions of the drawings themselves, and do not limit the structure. They are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or component needs to have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0019] refer to Figure 1 and Figure 2 , an example of a grouting sleeve for connecting the stress reinforcement of a prefabricated building component is provided, comprising: a sleeve 1, a sealing cover 2, a limiting tube 3 and a fastening bolt 4. Specifically: the sleeve 1 is a cylindrical body, and has a grouting port 101 and a grouting outlet 102 on the side walls at both ends. The grouting port 101 is used to inject grouting material into the sleeve 1, and the grouting outlet 102 is used to discharge the excess grouting material inside the sleeve 1, so as to ensure that the sleeve 1 is filled with grouting material. The grouting port 101 and the grouting outlet 102 can also be closed with a plug or a sealing cover after the grouting is completed to prevent the grouting material of the sleeve 1 from flowing out.
[0020] Both ends of the sleeve 1 are connected to sealing covers 2, and the cylindrical side walls of the sealing covers 2 are threadedly connected to the inner wall of the sleeve 1 after entering the ports of the sleeve 1. One of the functions of the sealing covers 2 is to seal the ports of the sleeve 1 to prevent the grouting material injected into the sleeve 1 from flowing out. At the same time, the sealing covers 2 also play a role in restraining the hardened grouting material to prevent the hardened grouting material from being pulled out of the sleeve 1 after being subjected to tension.
[0021] The limiting tube 3 is vertically fixed at the center of the inner surface of the sealing cover 2, and the center of the sealing cover 2 has a through hole concentrically arranged with the limiting tube 3. The side wall of the limiting tube 3 has a limiting hole 5. When in use, the stress reinforcement 7 of the prefabricated building component 6 is inserted into the sleeve 1 through the limiting tube 3, and then one end of the fastening bolt 4 passes through the side wall of the sleeve 1 and enters the limiting tube 3 after obtaining the limiting hole 5. The fastening bolt 4 and the sleeve 1 are threadedly connected, and the end of the fastening bolt 4 is rotated to make it close to the side wall of the stress reinforcement 7, so that the stress reinforcement 7 is fastened in the limiting tube 3. Then, grouting material is injected into the sleeve 1 through the grouting port 101, and the connection is completed after the grouting material hardens. Through the cooperation between the limiting tube 3, the fastening bolt 4 and the stress reinforcement 7. On the one hand, when the stress reinforcement 7 is subjected to tension, the fastening bolt 4 can increase the resistance of the stress reinforcement 7 to be pulled out of the sleeve 1. On the other hand, the fastening bolt 4 is wrapped in the grouting material in the fixed sleeve 1, which further ensures the force of the fastening bolt 4 on the stress reinforcement 7, making it more difficult for the stress reinforcement 7 to be pulled out of the sleeve 1. On the other hand, the limiting tube 3 also has the function of ensuring the concentricity of the two stress reinforcements 7 entering from both ends of the sleeve 1, which is also one of the important factors for improving the gripping force between the stress reinforcement 7 and the grouting material, thereby helping to improve the firmness of the overall structure formed by the sleeve 1 and the two stress reinforcements 7.
[0022] In another embodiment, reference Figure 1 A threaded tube 8 is fixed on the outer side wall of the sleeve 1 of the prefabricated building component stress reinforcement connection grouting sleeve of the above embodiment, and one end of the fastening bolt 4 passes through the threaded tube 8 and enters the sleeve 1, and the fastening bolt 4 is threadedly connected with the threaded tube 8. The threaded tube 8 can better enable the fastening bolt 4 to be threadedly connected with the sleeve 1, preventing the fastening bolt 4 from being unstable in connection with the sleeve 1 due to insufficient wall thickness of the sleeve 1. The fastening bolt 4 is prone to deviation during the entry process, making it difficult to accurately align with the limiting hole 5 on the limiting tube 3, affecting the installation efficiency of the fastening bolt 4.
[0023] In another embodiment, the inner wall of the sleeve 1 of the prefabricated building component stress reinforcement connecting grouting sleeve of the above embodiment has internal threads or the sleeve 1 is a bellows, so as to increase the bonding and bite force between the grouting material and the sleeve 1, and improve the overall firmness of the connection structure formed by the grouting sleeve and the stress reinforcement. The grouting material filled in the sleeve 1 can be phosphate magnesium cement, which has the characteristics of early strength and fast hardening, no shrinkage after hardening, and strong bonding force, so as to better ensure the connection strength.
[0024] In another embodiment, reference Figure 1The sealing cover 2 of the prefabricated building component stress reinforcement connection grouting sleeve of the above embodiment includes a cover plate and the cylindrical side wall vertically fixedly connected to the cover plate, and the cylindrical side wall is located in the port of the sleeve 1 and the two are threadedly connected. One end of the fastening bolt 4 passes through the side wall of the sleeve 1 and the cylindrical side wall of the sealing cover 2 and then enters the sleeve 1, so that the sealing cover 2 is further constrained by the fastening bolt 4, and the sealing cover 2 can constrain the hardened grouting material in the sleeve 1 to prevent it from being pulled out of the sleeve 1.
[0025] In another embodiment, the stress-bearing reinforcement of the prefabricated building component of the above-mentioned embodiment is connected to the grouting sleeve, and the inner wall of the limiting tube 3 has an internal thread. Under the action of the fastening bolt 4, the side wall of the stress-bearing reinforcement 7 is in close contact with the inner wall of the limiting tube 3. In addition, the stress-bearing reinforcement 7 is generally threaded steel. When the stress-bearing reinforcement 7 is subjected to tension and has a tendency to be pulled out of the limiting tube 3, the internal thread on the inner wall of the limiting tube 3 helps to increase the friction resistance between the reinforcement and the protrusion on the side wall of the stress-bearing reinforcement 7, thereby increasing the resistance of the stress-bearing reinforcement 7 to be pulled out of the limiting tube 3.
[0026] Finally, it should be noted that any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model should be included in the protection scope of the utility model. Although the above describes the specific implementation of the utility model in conjunction with the drawings, it is not a limitation on the protection scope of the utility model. Those skilled in the art should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by those skilled in the art without creative labor are still within the protection scope of the utility model.
Claims
1. A grouting sleeve for connecting stress reinforcement of prefabricated building components, characterized in that: include: A sleeve, a sealing cover, a limiting tube and a fastening bolt; wherein: the side walls at both ends of the sleeve are respectively provided with a grouting port and a grouting outlet, and the two ends of the sleeve are in a sealed state through the connected sealing cover, the limiting tube is vertically fixed at the center of the inner surface of the sealing cover, and the center of the sealing cover has a through hole concentrically arranged with the limiting tube; the side wall of the limiting tube is provided with a limiting hole, one end of the fastening bolt passes through the side wall of the sleeve and the limiting hole and enters the limiting tube and is tightened on the side wall of the stress-bearing reinforcement of the prefabricated building component therein, and the fastening bolt and the sleeve are threadedly connected.
2. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to claim 1 is characterized in that: A threaded tube is fixed on the outer side wall of the sleeve, one end of the fastening bolt passes through the threaded tube and enters the sleeve, and the fastening bolt and the threaded tube are threadedly connected.
3. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to claim 1, characterized in that: The inner side wall of the sleeve is provided with an internal thread or the sleeve is a bellows.
4. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to claim 1, characterized in that: The side wall of the sealing cover and the inner wall of the sleeve are threadedly connected.
5. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to claim 4, characterized in that: One end of the fastening bolt passes through the side wall of the sleeve and the side wall of the sealing cover and then enters into the sleeve.
6. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to claim 1, characterized in that: The inner wall of the position-limiting tube is provided with an internal thread, and the stress-bearing ribs in the position-limiting tube are threaded steel bars with a convex structure on the outer wall.
7. The grouting sleeve for connecting the stress reinforcement of the prefabricated building component according to any one of claims 1 to 6, characterized in that: It also includes a plug body or a sealing cover for sealing the grouting port and the grouting outlet.
