Concrete filled steel tube reinforcing device
Through the alternate arrangement and connection of segmented reinforced outer steel pipes and hoop-type positioning connection rings, the problem of inconsistent spacing between the new steel pipes and the original steel pipes is solved, ensuring uniform strength and construction accuracy of the reinforced structure, and achieving the desired wall thickness of the cement grouting material. consistency.
Patent Information
- Application Number
- CN202420377541.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The existing steel tube concrete column reinforcement device lacks a structure to limit the distance between the new steel pipe and the original steel pipe, resulting in inconsistent strength and inconsistent wall thickness of the cement grouting material after reinforcement.
Segment-type reinforced outer steel pipes and hoop-type positioning connection rings are alternately arranged and connected. The positioning connection rings are fixed on the outer wall of the concrete-filled steel tube body to ensure that the distance between the new steel pipe and the original steel pipe is consistent. The reinforcement is formed by arc-shaped connectors and arc-shaped steel plates. The outer steel pipe is fitted and fixed and a reinforced concrete layer is poured to form an annular gap.
It ensures that the distance between each position of the new steel pipe is the same as that of the original steel pipe, and the wall thickness of the cement grouting material is consistent, ensuring that the strength of each position of the reinforced structure is uniform, reducing the installation difficulty and improving the construction accuracy.
Smart Images

Figure CN221920409U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a steel tube concrete reinforcement device, belonging to the technical field of building construction. Background Art
[0002] The failure of steel tube concrete columns is divided into compression failure and tension failure. The compression failure is small eccentric compression failure and axial compression failure. The failure performance is not obvious. Vertical cracks appear in the column, and the concrete is crushed and peeled off. The tension failure is large eccentric tension failure, which has a more obvious appearance. The column shows transverse cracks first. With the increase of load, the cracks develop and extend, vertical cracks appear, and the concrete is crushed. The reasons for the failure of steel tube concrete columns include the following aspects: wrong design, poor construction quality, improper use, material aging in harsh environments and accidental natural damage, which damage the structure and reduce the reliability of the structure; due to changes in function, the structure needs to be reinforced. Functional changes may occur in the use stage or in the construction stage, and the building structure is adjusted during the construction process; the building is over-serviced and overloaded, and reinforcement is needed to extend the service life.
[0003] After patent search, it was found that relevant technologies such as a steel tube concrete column reinforcement device disclosed in a Chinese patent with authorization announcement number CN217205543U, the steel tube concrete column reinforcement device includes a plurality of new steel tubes wrapped outside the original steel tube and arranged along the axial direction, the new steel tube is formed by welding at least two arc-shaped steel plates end to end, two adjacent new steel tubes are welded and fixed along an annular gap, and the gap between the new steel tube and the original steel tube is filled with multiple sections of cement grouting material.
[0004] In the above-mentioned related technologies, after the new steel pipe is installed, it is necessary to fill the gap between the new steel pipe and the original steel pipe with cement grouting material to effectively reinforce the original steel tube concrete column and improve the bearing capacity of the steel tube concrete column.
[0005] Among them, in order to ensure the uniform strength of various parts of the reinforced steel tube concrete column reinforcement structure, the wall thickness of the cement grouting material needs to be set to the same. Before filling the cement grouting material, the new steel pipe needs to be installed first, and the spacing between various parts of the inner wall of the new steel pipe and the original steel pipe needs to be kept the same. In the above-mentioned related technologies, there is a lack of structure to limit the spacing between the new steel pipe and the original steel pipe at various positions, which may cause the spacing between the new steel pipe and the original steel pipe at various positions to change, and therefore needs to be improved. Utility Model Content
[0006] In order to solve the above problems existing in the prior art, the utility model provides a steel tube concrete reinforcement device.
[0007] The technical solution of the utility model is as follows:
[0008] A steel tube concrete reinforcement device comprises a steel tube concrete body, a positioning connection ring, a reinforced outer steel tube and a reinforced concrete layer, the positioning connection ring and the reinforced outer steel tube are respectively provided with a plurality of sections, the positioning connection ring and the reinforced outer steel tube are alternately distributed and connected, the positioning connection ring is fixed to the outer wall of the steel tube concrete body, the two ends of the reinforced outer steel tube are embedded and fixed between two adjacent sections of the positioning connection ring, and the reinforced concrete layer is cast in the annular gap between the reinforced outer steel tube and the steel tube concrete body.
[0009] Wherein, the positioning connecting ring is composed of at least two or more arc-shaped connecting pieces.
[0010] Among them, the arc-shaped connecting member includes an inner hoop plate and an outer positioning plate which are concentrically distributed. The inner hoop plate and the outer positioning plate are fixed by a connecting plate to determine the spacing. Connecting ear plates are provided at both ends of the inner hoop plate, and the upper and lower end surfaces of the outer positioning plate are respectively provided with positioning grooves adapted to the wall thickness of the reinforced outer steel pipe.
[0011] Wherein, the connecting ear plates of two adjacent arc-shaped connecting members are locked and connected by a plurality of bolts.
[0012] Wherein, the reinforced outer steel pipe is composed of at least two or more arc-shaped steel plates.
[0013] The steel tube concrete body comprises a main body steel tube and a concrete column cast in the main body steel tube.
[0014] The utility model has the following beneficial effects:
[0015] The utility model discloses a steel tube concrete reinforcement device, which can ensure that the spacing between each position of a new steel tube and an original steel tube is the same, so as to ensure that the wall thickness of each position of cement grouting material is the same, and ensure that the strength of each position of the reinforcement device is uniform.
[0016] The utility model discloses a steel tube concrete reinforcement device, in which the outer steel tube part for reinforcement adopts segmented reinforced outer steel tubes and clamp-type positioning connection rings which are alternately arranged and connected. During installation, the positioning connection ring is responsible for connecting and installing with the outer wall of the original steel tube to determine the spacing, and at the same time provides installation positioning and a mosaic connection structure for the reinforced outer steel tube, thereby ensuring installation accuracy and reducing the difficulty of installation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of a steel tube concrete reinforcement device of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of a steel tube concrete reinforcement device in a separated state according to the utility model;
[0019] Figure 3 The utility model is a schematic diagram of the structure of an arc-shaped connecting piece of a steel tube concrete reinforcement device.
[0020] The reference numerals in the figure represent:
[0021] 10. Steel tube concrete body; 11. Body steel tube; 12. Concrete column; 20. Positioning connection ring; 21. Arc-shaped receiving part; 211. Inner hoop plate; 212. Outer positioning plate; 213. Connecting plate; 214. Connecting ear plate; 215. Positioning groove; 30. Reinforced outer steel tube; 31. Arc-shaped steel plate; 40. Reinforced concrete layer. DETAILED DESCRIPTION
[0022] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0023] See also Figure 1-3 A steel tube concrete reinforcement device includes a steel tube concrete body 10, a positioning connection ring 20, a reinforced outer steel tube 30 and a reinforced concrete layer 40.
[0024] The steel tube concrete body 10 is the original structure before the device is reinforced. The steel tube concrete body 10 includes a main body steel tube 11 and a concrete column 12 cast in the main body steel tube 11 .
[0025] The positioning connection ring 20 and the reinforcing outer steel pipe 30 are respectively provided with a plurality of sections, and the positioning connection ring 20 and the reinforcing outer steel pipe 30 are alternately distributed and connected, the positioning connection ring 20 is fixed to the outer wall of the steel tube concrete body 10, and the two ends of the reinforcing outer steel pipe 30 are embedded and fixed between two adjacent sections of the positioning connection ring 20, and the reinforced concrete layer 40 is cast in the annular gap between the reinforcing outer steel pipe 30 and the steel tube concrete body 10.
[0026] Specifically, the reinforced outer steel pipe 30 is composed of at least two arc-shaped steel plates 31. In this embodiment, there are two arc-shaped steel plates 31, and the two arc-shaped steel plates 31 are connected and assembled to form a cylindrical structure.
[0027] Specifically, the positioning connection ring 20 is composed of at least two arc-shaped connection members 21. In this embodiment, the number of the arc-shaped connection members 21 is three, and the central angle corresponding to each arc-shaped connection member 21 is 120°; the three arc-shaped connection members 21 are connected and assembled to form a hoop ring surrounding the outer wall of the steel tube concrete body 10;
[0028] Furthermore, the arc-shaped connector 21 includes an inner hoop plate 211 and an outer positioning plate 212 which are concentrically distributed. The inner hoop plate 211 and the outer positioning plate 212 are fixed by a connecting plate 213 to determine the spacing, and the space on both sides of the connecting plate 213 is used as a filling space for pouring the reinforced concrete layer 40; connecting ear plates 214 are provided at both ends of the inner hoop plate 211, and bolt holes are provided on the connecting ear plates 214. The connecting ear plates 214 of two adjacent arc-shaped connectors 21 are locked and connected by a number of bolts 22; the upper and lower end surfaces of the outer positioning plate 212 are respectively provided with positioning grooves 215 adapted to the wall thickness of the reinforced outer steel pipe 30, the lower positioning groove 215 is embedded and fixed with the lower reinforced outer steel pipe 30, and the upper positioning groove 215 is embedded and fixed with the upper reinforced outer steel pipe 30.
[0029] The working principle of this utility model:
[0030] A set of positioning connection rings 20 are pre-installed at the lower end of the outer wall of the original steel tube concrete body 10. When installing the positioning connection ring 20, three arc-shaped connecting parts 21 are used to enclose and connect, and a number of bolts 22 are used to lock them in sequence to determine the height position of the positioning connection ring 20 on the outer wall of the steel tube concrete body 10. Then, two arc-shaped steel plates 31 are respectively installed above the positioning connection ring 20 to form a reinforced outer steel pipe 30. The connecting seams of the arc-shaped steel plates 31 are welded and sealed according to specific construction needs. Then, a second layer of positioning connection rings 20 and reinforced outer steel pipes 30 are installed in sequence above the reinforced outer steel pipe 30 until the original steel tube concrete body 10 is completely covered. Finally, a reinforced concrete layer 40 is poured and filled in the annular gap between the reinforced outer steel pipe 30 and the steel tube concrete body 10.
[0031] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A steel tube concrete reinforcement device, characterized in that: The invention comprises a steel tube concrete body (10), a positioning connection ring (20), a reinforcement outer steel tube (30) and a reinforcement concrete layer (40), wherein the positioning connection ring (20) and the reinforcement outer steel tube (30) are respectively provided with a plurality of sections, the positioning connection ring (20) and the reinforcement outer steel tube (30) are alternately distributed and connected, the positioning connection ring (20) is fixed to the outer wall of the steel tube concrete body (10), the two ends of the reinforcement outer steel tube (30) are embedded and fixed between two adjacent sections of the positioning connection ring (20), and the reinforcement concrete layer (40) is cast in the annular gap between the reinforcement outer steel tube (30) and the steel tube concrete body (10).
2. A steel tube concrete reinforcement device as claimed in claim 1, characterized in that: The positioning connection ring (20) is composed of at least two arc-shaped connection pieces (21) assembled together.
3. A steel tube concrete reinforcement device as claimed in claim 2, characterized in that: The arc-shaped connecting member (21) comprises an inner hoop plate (211) and an outer positioning plate (212) which are arranged concentrically. The inner hoop plate (211) and the outer positioning plate (212) are fixed to each other via a connecting plate (213) to determine the spacing between them. Connecting ear plates (214) are provided at both ends of the inner hoop plate (211). Positioning grooves (215) adapted to the wall thickness of the reinforced outer steel pipe (30) are respectively provided on the upper and lower end surfaces of the outer positioning plate (212).
4. A steel tube concrete reinforcement device as claimed in claim 3, characterized in that: The connecting ear plates (214) of two adjacent arc-shaped connecting members (21) are locked and connected by a plurality of bolts (22).
5. A steel tube concrete reinforcement device as claimed in claim 1, characterized in that: The reinforced outer steel pipe (30) is composed of at least two or more arc-shaped steel plates (31) spliced together.