Aluminum alloy climbing frame convenient to splice and install

By designing the sealing groove, fixing screw hole, convex groove and limit frame structure of the aluminum alloy climbing frame, the splicing and installation process is simplified, the problem of low installation efficiency of the aluminum alloy climbing frame in the existing technology is solved, and precise splicing and stability are achieved. Installation improves assembly efficiency and stability.

CN221920798UActive Publication Date: 2024-10-29SHANDONG JIAYEXING DECORATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323470641.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-29
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

Existing aluminum alloy climbing frames need to strictly ensure the accuracy of component positions during the splicing and installation process, and the installation process is complicated, resulting in low efficiency.

Method used

An aluminum alloy climbing frame is designed to facilitate splicing and installation. Through the combination of the lower vertical frame and the upper vertical frame, the splicing is simplified by using sealing grooves, fixing screw holes, convex grooves, positioning screw holes and limiting frames and other structures. process, and through the design of adjusting bolts and movable frames to ensure precise docking and stable installation of components.

Benefits of technology

It improves the assembly efficiency between the aluminum alloy climbing frame and the frame bed, ensuring the precise splicing and stability of the components. At the same time, the design of the limit frame reduces the sound and improves the flexibility and stability of the overall installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920798U_ABST
    Figure CN221920798U_ABST
Patent Text Reader

Abstract

The utility model discloses an aluminum alloy climbing frame convenient to splice and install, and relates to the technical field of aluminum alloy climbing frames, the aluminum alloy climbing frame comprises a lower vertical frame, the upper part of the lower vertical frame is movably connected with an upper vertical frame, the side ends of the lower vertical frame and the upper vertical frame are uniformly provided with grooves, and convex frames are inserted into the grooves; a transverse frame is fixedly connected to the end, away from the groove, of the convex frame, a movable groove and a traction groove are formed in the upper portion of the upper vertical frame, and a traction frame is movably connected into the traction groove. According to the utility model, the lower vertical frame and the upper vertical frame are combined, and the upper vertical frame and the lower vertical frame are firmly spliced, the convex frame is arranged in the groove, the transverse frames are uniformly and respectively arranged on the upper vertical frame and the lower vertical frame, and the transverse frames are firmly spliced with the upper vertical frame and the lower vertical frame after the positioning bolts are embedded in the positioning screw holes; in addition, the limiting frame is hung on the edge of the frame bed, and the assembling efficiency between the aluminum alloy climbing frame and the frame bed is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of aluminum alloy climbing frames, in particular to an aluminum alloy climbing frame which is convenient for splicing and installation. Background Art

[0002] The existing loft beds are divided into two berths, upper and lower berths. When a user uses the upper berth, an aluminum alloy climbing frame is required to achieve up and down.

[0003] In the prior art, the aluminum alloy climbing frame consists of two groups of columns, multiple groups of beams and loose screws. The multiple groups of beams are evenly distributed between the two groups of columns, and the two groups of columns are fixed to the elevated bed through the loose screws.

[0004] However, the columns and beams are connected by welding, and then connected to the elevated bed by loose screws. During the splicing and installation of the aluminum alloy climbing frame, the position docking accuracy of the aluminum alloy components needs to be strictly guaranteed, and the splicing and installation method is too complicated, which reduces the splicing and installation efficiency of the aluminum alloy bed frame. Utility Model Content

[0005] The purpose of the utility model is to solve the shortcomings of the prior art and propose an aluminum alloy climbing frame that is easy to splice and install. Its advantages are that the lower vertical frame and the upper vertical frame are combined, and the series frame only needs to be placed in the sealing groove, and then the fixing bolts are implanted in the fixing screw holes. The upper and lower vertical frames are firmly spliced, the protruding frame is placed in the groove, and the horizontal frame is evenly arranged on the upper and lower vertical frames. After the positioning bolts are implanted in the positioning screw holes, the horizontal frame and the upper and lower vertical frames are firmly spliced. In addition, the limit frame is hung at the edge of the bed, which improves the assembly efficiency between the aluminum alloy climbing frame and the bed.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] The invention discloses an aluminum alloy climbing frame which is convenient for splicing and installing, comprising a lower vertical frame, wherein the upper portion of the lower vertical frame is movably connected to the upper vertical frame, and the side ends of the lower vertical frame and the upper vertical frame are evenly provided with grooves, and the inside of the grooves are plugged with protrusions, and the protrusions are fixedly connected to a cross frame at one end away from the grooves, and the upper portion of the upper vertical frame is respectively provided with a movable groove and a traction groove, and the inside of the traction groove is movably connected to the traction frame, and the traction frame is fixedly connected to the movable frame at one end away from the traction groove.

[0008] Through the above technical scheme: it is combined between the lower vertical frame and the upper vertical frame, and the series frame only needs to be placed in the sealing groove, and then the fixing bolts are implanted in the fixing screw holes. The upper and lower vertical frames are firmly spliced, the protruding frame is placed in the groove, and the horizontal frame is evenly arranged on the upper and lower vertical frames. After the positioning bolts are implanted in the positioning screw holes, the horizontal frame and the upper and lower vertical frames are firmly spliced. In addition, the limit frame is hung on the edge of the frame bed to improve the assembly efficiency between the aluminum alloy climbing frame and the frame bed.

[0009] The utility model is further configured that the movable frame is movably connected to the inside of the movable groove at one end away from the traction frame, and the movable frame is fixedly connected to the limiting frame at one end away from the movable groove.

[0010] Through the above technical solution: the movement direction of the limit frame depends on the movable frame, and the movable frame is connected with the traction frame to ensure that the movable frame moves in the movable groove, thereby improving the stability of the upper and lower movement of the limit frame.

[0011] The utility model is further configured that an adjusting screw ring is fixedly connected to the center of the movable frame, and an adjusting bolt is threadedly connected to the inner wall of the adjusting screw ring.

[0012] Through the above technical solution: the adjusting bolt can control the movement direction of the movable frame in the movable groove, thereby controlling the up and down movement trajectory of the limit frame, so that the limit frame can be accurately hung on the edge position of the bed.

[0013] The utility model is further configured that positioning screw holes are provided at the matching positions of the convex frame, the lower vertical frame and the upper vertical frame, and the inner walls of the positioning screw holes are threadedly connected with positioning bolts.

[0014] Through the above technical solution: the horizontal frame is evenly arranged on the upper and lower vertical frames respectively, and after the positioning bolts are implanted into the positioning screw holes, the horizontal frame is firmly spliced ​​with the upper and lower vertical frames.

[0015] The utility model is further configured that sealing grooves are provided on the opposite surfaces of the lower vertical frame and the upper vertical frame, and the serial frame is clamped in the sealing groove.

[0016] Through the above technical solution: the series frame is placed in the sealing groove, and the lower vertical frame and the upper vertical frame are accurately combined and spliced.

[0017] The utility model is further configured that the matching positions of the series frame, the lower vertical frame and the upper vertical frame are all provided with fixing screw holes, and the internal threads of the fixing screw holes are connected with fixing bolts.

[0018] Through the above technical solution: the fixing bolts are implanted into the fixing screw holes, and the upper and lower vertical frames are firmly spliced.

[0019] The utility model is further configured that the position of the limit frame is arranged at the rear side of the upper vertical frame, and the lower part of the lower vertical frame is sleeved with a wear-resistant sleeve.

[0020] Through the above technical solution: the use of rubber material can greatly reduce the noise generated by the contact between the aluminum alloy bed frame and the ground.

[0021] The utility model is further configured such that the centers of the upper and lower ends of the movable groove are both rotatably connected to the outside of the adjusting bolt, and the spacing between the horizontal frames arranged on the lower vertical frame and the upper vertical frame is consistent.

[0022] Through the above technical solution: the stable operation of the adjusting bolt ensures that the upper and lower displacement of the limit frame can be flexibly and stably adjusted. In addition, the reasonable spacing design facilitates climbing.

[0023] The beneficial effects of the utility model are:

[0024] 1. The aluminum alloy climbing frame which is easy to splice and install is provided with a combination between a lower vertical frame and an upper vertical frame. It only needs to be connected in series and placed in a sealing groove. Then the fixing bolts are implanted in the fixing screw holes. The upper and lower vertical frames are firmly spliced ​​together. The protruding frame is placed in the groove. The horizontal frame is evenly arranged on the upper and lower vertical frames respectively. After the positioning bolts are implanted in the positioning screw holes, the horizontal frame and the upper and lower vertical frames are firmly spliced ​​together. In addition, the limit frame is hung on the edge of the frame bed to improve the assembly efficiency between the aluminum alloy climbing frame and the frame bed.

[0025] 2. The aluminum alloy climbing frame, which is easy to splice and install, has a limit frame whose moving direction depends on the movable frame. The movable frame is connected to the traction frame to ensure that the movable frame moves in the movable groove, thereby improving the up and down movement stability of the limit frame. The adjusting bolt can control the movement direction of the movable frame in the movable groove, thereby controlling the up and down movement trajectory of the limit frame, so that the limit frame can be accurately hung on the edge of the bed. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the three-dimensional structure of an aluminum alloy climbing frame that is convenient for splicing and installation proposed by the utility model;

[0027] Figure 2 This is a schematic diagram of the lower structure of an aluminum alloy climbing frame that is convenient for splicing and installation proposed by the utility model;

[0028] Figure 3 This is a schematic diagram of the lower vertical frame structure of an aluminum alloy climbing frame that is convenient for splicing and installation proposed by the utility model;

[0029] Figure 4 This is a schematic diagram of the horizontal frame structure of an aluminum alloy climbing frame that is easy to splice and install, as proposed by the utility model.

[0030] In the figure: 1. lower vertical frame; 2. upper vertical frame; 3. horizontal frame; 4. wear-resistant sleeve; 5. limit frame; 6. movable frame; 7. movable groove; 8. adjusting screw ring; 9. adjusting bolt; 10. traction groove; 11. traction frame; 12. positioning bolt; 13. convex frame; 14. series frame; 15. sealing groove; 16. groove; 17. fixing screw hole; 18. fixing bolt; 19. positioning screw hole. DETAILED DESCRIPTION

[0031] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.

[0032] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0033] Reference Figure 1-4 The invention discloses an aluminum alloy climbing frame which is convenient for splicing and installing, comprising a lower vertical frame 1, the upper part of the lower vertical frame 1 is movably connected with an upper vertical frame 2, and the side ends of the lower vertical frame 1 and the upper vertical frame 2 are evenly provided with grooves 16, and the inside of the groove 16 is plugged with a convex frame 13, and the convex frame 13 is fixedly connected with a cross frame 3 at one end away from the groove 16, and the upper part of the upper vertical frame 2 is respectively provided with a movable groove 7 and a traction groove 10, and the inside of the traction groove 10 is movably connected with a traction frame 11, and the traction frame 11 is at the end away from the traction groove 10. One end is fixedly connected with a movable frame 6, which is combined between the lower vertical frame 1 and the upper vertical frame 2. The serial frame 14 only needs to be placed in the sealing groove 15, and then the fixing bolts 18 are implanted in the fixing screw holes 17. The upper and lower vertical frames are firmly spliced, and the protrusions 13 are placed in the grooves 16. The cross frame 3 is evenly arranged on the upper and lower vertical frames, and after the positioning bolts 12 are implanted in the positioning screw holes 19, the cross frame 3 is firmly spliced ​​with the upper and lower vertical frames. In addition, the limit frame 5 is hung on the edge of the bed to improve the assembly efficiency between the aluminum alloy climbing frame and the bed.

[0034] Specifically, the movable frame 6 is movably connected to the inside of the movable groove 7 at the end away from the traction frame 11, and the movable frame 6 is fixedly connected to the limiting frame 5 at the end away from the movable groove 7. The movable direction of the limiting frame 5 depends on the movable frame 6. When the movable frame 6 is connected to the traction frame 11, it is ensured that the movable frame 6 moves in the movable groove 7, thereby improving the up and down movement stability of the limiting frame 5.

[0035] Specifically, an adjusting screw ring 8 is fixedly connected to the center of the movable frame 6, and an adjusting bolt 9 is threadedly connected to the inner wall of the adjusting screw ring 8. The adjusting bolt 9 can control the movement direction of the movable frame 6 in the movable groove 7, thereby controlling the up and down movement trajectory of the limit frame 5, so that the limit frame 5 can be accurately hung on the edge position of the bed.

[0036] Specifically, positioning screw holes 19 are provided at the matching parts of the protrusion 13, the lower vertical frame 1 and the upper vertical frame 2, and the inner wall of the positioning screw hole 19 is threadedly connected with a positioning bolt 12. The cross frame 3 is evenly arranged on the upper and lower vertical frames, and after the positioning bolts 12 are implanted in the positioning screw holes 19, the cross frame 3 is firmly spliced ​​with the upper and lower vertical frames.

[0037] Specifically, sealing grooves 15 are provided on the opposite surfaces of the lower vertical frame 1 and the upper vertical frame 2, and the serial frame 14 is inserted into the sealing groove 15. The serial frame 14 is placed in the sealing groove 15, and the lower vertical frame 1 and the upper vertical frame 2 are precisely assembled and spliced.

[0038] Specifically, fixing screw holes 17 are provided at the matching positions of the series frame 14, the lower vertical frame 1 and the upper vertical frame 2, and the internal threads of the fixing screw holes 17 are connected with fixing bolts 18, which are implanted in the fixing screw holes 17, and the upper and lower vertical frames are firmly spliced.

[0039] Specifically, the position limiting frame 5 is arranged at the rear side of the upper vertical frame 2, and the lower part of the lower vertical frame 1 is sleeved with a wear-resistant sleeve 4 made of rubber material, which can greatly reduce the noise generated by the contact between the aluminum alloy bed frame and the ground.

[0040] Specifically, the centers of the upper and lower ends of the movable groove 7 are connected to the outer rotation of the adjusting bolt 9, and the spacing between the horizontal frames 3 arranged on the lower vertical frame 1 and the upper vertical frame 2 is consistent. The stable operation of the adjusting bolt 9 ensures that the upper and lower displacement of the limit frame 5 is flexible and stable. In addition, the reasonable spacing design facilitates climbing.

[0041] Working principle: To combine the lower vertical frame 1 and the upper vertical frame 2, it is only necessary to place the series frame 14 into the sealing groove 15, and then insert the fixing bolt 18 into the fixing screw hole 17, the upper and lower vertical frames are firmly spliced, the protrusion 13 is placed in the groove 16, the cross frame 3 is evenly arranged on the upper and lower vertical frames, and after the positioning bolt 12 is implanted into the positioning screw hole 19, the cross frame 3 is firmly spliced ​​with the upper and lower vertical frames, the moving direction of the limit frame 5 depends on the movable frame 6, and the movable frame 6 is connected with the traction frame 11 to ensure that the movable frame 6 moves in the movable groove 7, and the adjusting bolt 9 can control the moving direction of the movable frame 6 in the movable groove 7, thereby controlling the up and down movement trajectory of the limit frame 5, so that the limit frame 5 can be accurately hung on the edge position of the bed.

[0042] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An aluminum alloy climbing frame that is easy to splice and install, comprising a lower vertical frame (1), It is characterized in that The upper part of the lower vertical frame (1) is movably connected to the upper vertical frame (2), and the side ends of the lower vertical frame (1) and the upper vertical frame (2) are evenly provided with grooves (16), and the inside of the groove (16) is plugged with a protrusion (13), and the protrusion (13) is fixedly connected to the cross frame (3) at the end away from the groove (16), and the upper part of the upper vertical frame (2) is respectively provided with a movable groove (7) and a traction groove (10), and the inside of the traction groove (10) is movably connected to a traction frame (11), and the traction frame (11) is fixedly connected to the movable frame (6) at the end away from the traction groove (10).

2. According to claim 1, an aluminum alloy climbing frame that is easy to splice and install, It is characterized in that The movable frame (6) is movably connected to the inside of the movable groove (7) at one end away from the traction frame (11), and the movable frame (6) is fixedly connected to the limiting frame (5) at one end away from the movable groove (7).

3. According to claim 1, an aluminum alloy climbing frame that is easy to splice and install, It is characterized in that An adjusting screw ring (8) is fixedly connected to the center of the movable frame (6), and an adjusting bolt (9) is threadedly connected to the inner wall of the adjusting screw ring (8).

4. According to claim 1, an aluminum alloy climbing frame that is easy to splice and install, It is characterized in that Positioning screw holes (19) are provided at the matching positions of the convex frame (13), the lower vertical frame (1) and the upper vertical frame (2), and the inner wall of the positioning screw hole (19) is threadedly connected with a positioning bolt (12).

5. According to claim 1, an aluminum alloy climbing frame that is easy to splice and install, It is characterized in that The opposite surfaces of the lower vertical frame (1) and the upper vertical frame (2) are both provided with sealing grooves (15), and the serial frame (14) is inserted into the sealing grooves (15).

6. According to claim 5, an aluminum alloy climbing frame that is easy to splice and install, It is characterized in that The matching positions of the series frame (14), the lower vertical frame (1) and the upper vertical frame (2) are all provided with fixing screw holes (17), and the internal threads of the fixing screw holes (17) are connected with fixing bolts (18).

7. The aluminum alloy climbing frame that is convenient for splicing and installation according to claim 2, It is characterized in that The position limiting frame (5) is arranged at the rear side of the upper vertical frame (2), and the lower part of the lower vertical frame (1) is sleeved with a wear-resistant sleeve (4).

8. The aluminum alloy climbing frame that is convenient for splicing and installation according to claim 1, It is characterized in that The centers of the upper and lower ends of the movable groove (7) are both rotatably connected to the outside of the adjusting bolt (9), and the spacing between the horizontal frames (3) arranged on the lower vertical frame (1) and the upper vertical frame (2) is consistent.