Building settlement monitoring wall marking device
By arranging transverse and oblique rods on the building wall, a stable triangular structure is formed, which solves the problem of easy deformation of wall signs in the existing technology and achieves more reliable settlement monitoring data.
Patent Information
- Application Number
- CN202420562776.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-22
AI Technical Summary
Existing building settlement monitoring wall signs are easily deformed by force, resulting in inaccurate settlement monitoring data.
Design a wall marking device that includes transverse rods and oblique insertion rods. By setting transverse drillings and oblique drillings on the wall to be measured, fasteners are used to form a stable triangular structure to ensure the stability of the device.
It improves the stability of the wall marking device, avoids the problems of easy deformation and damage, and ensures the reliability and accuracy of settlement monitoring data.
Smart Images

Figure CN221925085U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a wall marking device for monitoring building settlement, belonging to the technical field of settlement monitoring. Background Art
[0002] At present, the wall signs used for settlement monitoring of buildings or structures such as factories, high-rise buildings, bridge piers, chimneys, etc. are mostly "L"-shaped or "I"-shaped. For details, see Figure 1 As shown, an electric drill is usually used to drill a hole on the wall 10 to be tested of a concrete building, and then a straight-shaped mark 11 or an L-shaped mark 12 is inserted and fixed into the drilled hole of the wall 10 to be tested. However, such a mark is easily deformed and damaged by force, resulting in inaccurate settlement monitoring data. Utility Model Content
[0003] The utility model provides a building settlement monitoring wall marking device, which can solve the problem that the existing wall markings are easily deformed and damaged under stress, thus causing inaccurate settlement monitoring data.
[0004] The utility model provides a wall marking device for monitoring building settlement, the device comprising:
[0005] A transverse rod, wherein the middle portion of the transverse rod has an oblique threaded hole; one end of the transverse rod is transversely fixed in the wall to be measured, and the other end of the transverse rod has a first external thread;
[0006] An oblique insertion rod, wherein the portion thereof has a second external thread, one end of the oblique insertion rod is passed through the oblique threaded hole and fixed in the wall to be measured, and the second external thread of the oblique insertion rod is threadedly connected with the oblique threaded hole;
[0007] The fastener is threadedly connected to the first external thread of the transverse rod and contacts the end of the oblique insertion rod away from the wall to be measured.
[0008] Optionally, the end of the oblique insertion rod away from the wall to be measured is spherical.
[0009] Optionally, the wall surface to be tested has a transverse drill hole and an oblique drill hole; the setting height of the oblique drill hole is lower than the setting height of the transverse drill hole;
[0010] The end of the transverse rod is fixed in the transverse drilled hole; the end of the oblique insertion rod is fixed in the oblique drilled hole.
[0011] Optionally, the end of the transverse rod is glued to the inner wall of the transverse drilled hole; the end of the oblique insertion rod is glued to the inner wall of the oblique drilled hole.
[0012] Optionally, a first connecting nut is fixed in the transverse drilled hole, and the end of the transverse rod is threadedly connected to the first connecting nut;
[0013] A second connecting nut is fixed in the oblique drilled hole, and the end of the oblique insertion rod is threadedly connected to the second connecting nut.
[0014] Optionally, the transverse rod and the oblique insertion rod are both made of stainless steel.
[0015] Optionally, contact portions between the fastener, the transverse rod and the obliquely inserted rod are glued or welded.
[0016] Optionally, the insertion depth of the transverse rod into the transverse drilled hole is 5 cm to 10 cm.
[0017] Optionally, the fastener is a stainless steel nut.
[0018] The beneficial effects that the utility model can produce include:
[0019] The building settlement monitoring wall marking device provided by the utility model is provided by inserting a transverse rod transversely on the wall to be measured, inserting an oblique rod obliquely on the transverse rod, and fixing the transverse rod and the oblique rod by fasteners. In this way, the transverse rod, the oblique rod and the wall to be measured form a stable triangular structure, thereby improving the stability of the wall marking device and avoiding the problem of the wall marking being changeable and easy to be damaged. The device has a simple structure, is stable, strong, durable, and is not easy to deform, so that the settlement monitoring data is reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 Schematic diagram of the settlement monitoring wall sign structure provided by the prior art;
[0021] Figure 2 A schematic structural diagram of a wall marking device for monitoring building settlement provided in an embodiment of the utility model.
[0022] Reference numerals:
[0023] 10. Wall to be tested; 11. I-shaped mark; 12. L-shaped mark; 21. Horizontal rod; 22. Oblique rod; 23. Fastener. DETAILED DESCRIPTION
[0024] The present invention is described in detail below in conjunction with embodiments, but the present invention is not limited to these embodiments.
[0025] The utility model provides a wall marking device for monitoring building settlement, such as Figure 2 As shown, the device comprises:
[0026] The transverse rod 21 has an oblique threaded hole in its middle. One end of the transverse rod 21 is transversely fixed in the wall surface 10 to be measured, and the other end has a first external thread.
[0027] In practical applications, a transverse drill hole is provided on the wall surface 10 to be tested, and the end of the transverse rod 21 is fixed in the transverse drill hole. The embodiment of the utility model does not limit the fixing method of the end of the transverse rod 21 and the transverse drill hole. For example, the end of the transverse rod 21 and the inner wall of the transverse drill hole can be glued; or a first connecting nut is fixed in the transverse drill hole, and the end of the transverse rod 21 is threadedly connected to the first connecting nut. After the threaded connection, glue can be filled in the gap between the transverse drill hole and the transverse rod 21 for further fixing.
[0028] Preferably, the insertion depth of the transverse rod 21 into the transverse borehole is 5 cm to 10 cm, so as to ensure the stability of the connection between the transverse rod 21 and the wall surface 10 to be measured.
[0029] The oblique rod 22 has a second external thread in its middle, one end of the oblique rod 22 passes through the oblique threaded hole and is fixed in the wall surface 10 to be measured, and the second external thread of the oblique rod 22 is threadedly connected with the oblique threaded hole.
[0030] In practical applications, an oblique drill hole is set on the wall surface 10 to be tested; the setting height of the oblique drill hole is lower than the setting height of the horizontal drill hole; the end of the oblique rod 22 is fixed in the oblique drill hole. The embodiment of the utility model does not limit the fixing method of the end of the oblique rod 22 and the oblique drill hole. For example, the end of the oblique rod 22 and the inner wall of the oblique drill hole can be glued; or, a second connecting nut is fixed in the oblique drill hole, and the end of the oblique rod 22 is threadedly connected to the second connecting nut. After the threaded connection, glue can be filled in the gap between the oblique drill hole and the oblique rod 22 for further fixation.
[0031] Preferably, the end of the oblique rod 22 away from the wall 10 to be measured is spherical. The spherical end is used to set up a leveling rod. The end of the oblique rod 22 away from the wall 10 to be measured is set to be spherical, which can ensure that the end of the oblique rod 22 is in point-surface contact with the leveling rod, thereby avoiding wear of the leveling rod during use. At the same time, the leveling rod is set on the top of the spherical end of the oblique rod 22. When the circular level of the leveling rod is centered, the rod is in a plumb state, and its bottom is in point-surface contact with the spherical end. The contact point of the spherical end is unique, which can ensure that the measurement position is unique during multiple periodic monitoring, thereby ensuring data accuracy.
[0032] In the embodiment of the utility model, the transverse rod 21 and the oblique rod 22 are both made of stainless steel. In this way, on the basis of ensuring the supporting strength, it is not easy to be corroded or deformed after being subjected to external wind and rain.
[0033] The fastener 23 is threadedly connected to the first external thread of the transverse rod 21 and contacts the end of the obliquely inserted rod 22 away from the wall surface 10 to be measured.
[0034] In practical applications, the fastener 23 may be a stainless steel nut.
[0035] Furthermore, in order to make the entire wall sign device more stable, the contact parts of the fastener 23, the transverse rod 21 and the oblique rod 22 can be glued or welded.
[0036] When using the building settlement monitoring wall marking device of the utility model, firstly, a hole is drilled on the wall surface 10 to be measured of a building such as a concrete bridge pier or a building column, and a horizontal rod section of the transverse rod 21 is placed in the transverse drilled hole using marble glue or other building fixing methods, and then the oblique rod 22 is screwed to the contact point with the wall surface 10 to be measured through the oblique threaded hole, and is fixed by drilling a hole, and finally the fastener 23 is screwed to the end of the transverse rod 21. For stability, the connection between the transverse rod 21, the oblique rod 22 and the fastener 23 can be welded or glued.
[0037] The wall marking device for monitoring building settlement provided by the utility model is achieved by horizontally inserting a transverse rod 21 on the wall 10 to be measured, obliquely inserting a rod 22 on the transverse rod 21, and fixing the transverse rod 21 and the obliquely inserted rod 22 with a fastener 23. In this way, the transverse rod 21, the obliquely inserted rod 22 and the wall 10 to be measured form a stable triangular structure, thereby improving the stability of the wall marking device and avoiding the problem of variability and easy damage of the wall marking. The wall marking device is more stable and durable than the original wall marking; and the marking has almost no deformation under normal force, and the monitoring data is more reliable; at the same time, the marking set has low cost and can be mass-produced; the wall marking device can be widely used for settlement monitoring of high-speed railway bridge piers, bridge abutments, highway bridge piers, water conservancy aqueducts, urban high-rise buildings, factories, etc.
[0038] The above are only a few embodiments of the present application and do not constitute any form of limitation to the present application. Although the present application is disclosed as above with preferred embodiments, it is not intended to limit the present application. Any technician familiar with the profession, without departing from the scope of the technical solution of the present application, using the technical content disclosed above to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.
Claims
1. A wall marking device for monitoring building settlement, characterized in that: The device comprises: A transverse rod, wherein the middle portion of the transverse rod has an oblique threaded hole; one end of the transverse rod is transversely fixed in the wall to be measured, and the other end of the transverse rod has a first external thread; An oblique insertion rod, wherein the portion thereof has a second external thread, one end of the oblique insertion rod is passed through the oblique threaded hole and fixed in the wall to be measured, and the second external thread of the oblique insertion rod is threadedly connected with the oblique threaded hole; The fastener is threadedly connected to the first external thread of the transverse rod and contacts the end of the oblique insertion rod away from the wall to be measured.
2. The device according to claim 1, characterized in that One end of the oblique insertion rod away from the wall to be measured is spherical.
3. The device according to claim 1, characterized in that The wall surface to be tested has a transverse drilling hole and an oblique drilling hole; the setting height of the oblique drilling hole is lower than the setting height of the transverse drilling hole; The end of the transverse rod is fixed in the transverse drilled hole; the end of the oblique insertion rod is fixed in the oblique drilled hole.
4. The device according to claim 3, characterized in that The end of the transverse rod is glued to the inner wall of the transverse drilled hole; the end of the oblique insertion rod is glued to the inner wall of the oblique drilled hole.
5. The device according to claim 3, characterized in that A first connecting nut is fixed in the transverse bore, and an end of the transverse rod is threadedly connected to the first connecting nut; A second connecting nut is fixed in the oblique drilled hole, and the end of the oblique insertion rod is threadedly connected to the second connecting nut.
6. The device according to claim 1, characterized in that The transverse rod and the oblique insertion rod are both made of stainless steel.
7. The device according to claim 1, characterized in that The contact parts of the fastener, the transverse rod and the oblique insertion rod are glued or welded.
8. The device according to claim 3, characterized in that The insertion depth of the transverse rod into the transverse borehole is 5 cm to 10 cm.
9. The device according to claim 1, characterized in that The fastener is a stainless steel nut.