Steel beam butt joint positioning auxiliary device
By designing the steel beam docking positioning auxiliary device, and using the matching structure of the docking components and positioning tooling, the problem of lack of positioning reference on the site is solved, the accurate and rapid installation of steel beam docking is achieved, and the operation process is simplified.
Patent Information
- Application Number
- CN202323644014.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During the steel beam construction process, the lack of positioning reference leads to difficulty in positioning the steel beam during on-site installation, resulting in long installation time.
Design a steel beam butt positioning auxiliary device, including docking components and positioning tools, through the ear-mount structure of the docking components and movable clamps, reference seats, lifting devices, etc., to assist in the alignment and fixing of the steel beams, providing accurate positioning references. .
By welding positioning references in the factory in advance, manual subjective judgments are reduced, the accuracy and installation efficiency of steel beam docking are improved, and operation is simplified.
Smart Images

Figure CN221935787U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of steel beam construction, in particular to a steel beam butt joint positioning auxiliary device. Background Art
[0002] With the development of my country's bridge industry, the span of bridges is getting larger and larger, and the use of steel beams in the main beams is becoming more and more common. During the construction process, steel beams are generally prefabricated and pre-assembled in the factory, and then disassembled and transported to the site for hoisting. However, the pre-assembly in the factory generally at least docks the steel beams and subjectively aligns them, and there are no corresponding measures reflected in the device. Therefore, when the steel beams arrive at the site, they still need to be aligned and installed again through subjective judgment. Due to the lack of positioning reference, it is difficult to locate the steel beams on site using traditional positioning methods, and the installation and positioning time is long. Utility Model Content
[0003] The utility model provides a steel beam butt joint positioning auxiliary device, which solves the problem that the installation and positioning time is long due to the lack of positioning reference when the segmented steel beam is installed and spliced on site.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a steel beam docking positioning auxiliary device, including a plurality of docking components arranged circumferentially at the docking position of steel beam A and steel beam B, the docking components including a first ear seat and a second ear seat, the first ear seat is connected to steel beam A, the second ear seat is connected to steel beam B, the first ear seat is provided with an inner recess, the second ear seat is provided with an outer protrusion, the inner recess and the outer protrusion are spliced to align the ends of steel beam A and steel beam B, and also includes a fixed platform, a positioning tool is provided on the fixed platform, the positioning tool includes a tooling bottom plate, at least two reference seats are provided on the tooling bottom plate, the reference seats are arranged at intervals, the two reference seats are used to abut against steel beam A and steel beam B respectively, each reference seat is flush with the abutting surface of steel beam A and steel beam B, and at least two movable clamps are also provided on the tooling bottom plate, the clamps are used to clamp the side walls of steel beam A and steel beam B.
[0005] In the preferred solution, a movable transverse platform is provided on the tooling base plate, one side of the clamp is connected to the transverse platform, an elbow clamp is provided on the tooling base plate, the elbow clamp is provided with a telescopic rod, a threaded connecting rod is provided at the end of the telescopic rod, and the connecting rod is threadedly connected to the transverse platform.
[0006] In the preferred solution, at least two base blocks are provided on the transverse moving platform, a movable first guide rod is provided in the base block, a clamp is connected to the end of the first guide rod, and a screw is provided, one end of the screw is threadedly connected to the base block, and a support block is provided at the other end of the base block, and the support block abuts against the clamp.
[0007] In a preferred solution, a threaded adjustment nut is sleeved on the screw rod, and one end of the adjustment nut abuts against the base block.
[0008] In a preferred solution, the abutting block is a magnetic block, and the abutting block adsorbs the splint.
[0009] In the preferred solution, a plurality of first rollers arranged in parallel and spaced apart are provided on the fixed platform, a gap portion is provided in the center of the fixed platform, a positioning tool is provided at the gap portion, transfer platforms are provided at both ends of the fixed platform, a plurality of second rollers arranged in parallel and spaced apart are provided on the transfer platform, and a plurality of casters are provided at the lower end of the transfer platform.
[0010] In the preferred solution, a lifting device is provided at the lower end of the positioning tooling, and the lifting device includes a base plate, a slidable second guide rod is provided on the base plate, a lifting plate is provided at the upper end of the second guide rod, a heightening block is provided at the upper end of the lifting plate, and the upper end of the heightening block supports the positioning tooling.
[0011] The beneficial effects of the utility model are as follows: after factory preparation, matching positioning datums are welded during pre-assembly to avoid lack of datums during subsequent on-site installation; the butt joints of the steel beams are aligned by positioning tooling to reduce manual subjective judgment and make the butt joint positioning more accurate; the matching structure on the positioning ear seat can assist manual quick alignment of the steel beams, and the operation is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0013] Figure 1 It is a schematic diagram of the layout of the utility model.
[0014] Figure 2 It is a schematic diagram of a fixed platform of the utility model.
[0015] Figure 3 It is a front view of the fixing platform of the utility model.
[0016] Figure 4 It is an end view of the transfer platform of the present utility model.
[0017] Figure 5 It is a top view of the fixing platform of the utility model.
[0018] Figure 6 It is a schematic diagram of a clamping plate of the present utility model.
[0019] Figure 7 It is a schematic diagram of a steel butt joint of the utility model.
[0020] In the figure: a fixed platform 1; a first roller 101; an idler portion 102; a transfer platform 2; a second roller 201; a caster 202; a positioning tool 3; a tool base plate 301; a traverse platform 302; a reference seat 303; a base block 304; a first guide rod 305; a clamping plate 306; abutment block 307; an adjustment nut 308; a screw rod 309; a lifting device 4; a base plate 401; a second guide rod 402; a top cylinder 403; a lifting plate 404; a heightening block 405; a steel beam A 5; a steel beam B 6; a docking assembly 7; a first ear seat 701; a second ear seat 702; an inner recess 703; an outer protrusion 704; an elbow clamp 8; a telescopic rod 801; and a connecting rod 802. DETAILED DESCRIPTION
[0021] Embodiment 1:
[0022] like Figure 1-7 In the invention, a steel beam docking positioning auxiliary device comprises a plurality of docking assemblies 7 arranged at the docking position of the A steel beam 5 and the B steel beam 6 along the circumferential direction, the docking assembly 7 comprises a first ear seat 701 and a second ear seat 702, the first ear seat 701 is connected to the A steel beam 5, the second ear seat 702 is connected to the B steel beam 6, the first ear seat 701 is provided with an inner concave portion 703, the second ear seat 702 is provided with an outer convex portion 704, the inner concave portion 703 and the outer convex portion 704 are spliced to align the ends of the A steel beam 5 and the B steel beam 6, and further It includes a fixed platform 1, on which a positioning tool 3 is provided. The positioning tool 3 includes a tool base plate 301. On the tool base plate 301, at least two reference seats 303 are provided. The reference seats 303 are arranged at intervals. The two reference seats 303 are used to abut against the A steel beam 5 and the B steel beam 6 respectively. Each reference seat 303 is flush with the abutting surface of the A steel beam 5 and the B steel beam 6. At least two movable clamps 306 are also provided on the tool base plate 301. The clamps 306 are used to clamp the side walls of the A steel beam 5 and the B steel beam 6.
[0023] The reference seat 303 is used as a reference for abutment and needs to be adjusted and leveled in advance.
[0024] In the preferred embodiment, a movable transverse platform 302 is provided on the tooling base plate 301, one side of the clamp 306 is connected to the transverse platform 302, an elbow clamp 8 is provided on the tooling base plate 301, the elbow clamp 8 is provided with a telescopic rod 801, and a threaded connecting rod 802 is provided at the end of the telescopic rod 801, and the connecting rod 802 is threadedly connected to the transverse platform 302.
[0025] A copper or ceramic sliding bushing is provided in the base block 304, and the first guide rod 305 is inserted in the bushing.
[0026] The lower end of the traverse platform 302 is slidably connected to the tooling base plate 301 through a guide rail device. The connecting rod 802 can adjust the relative position of the traverse platform 302 and the telescopic rod 801 and is locked by a nut. Pulling the handle of the toggle clamp 8 can achieve clamping and unlocking of the clamp 306.
[0027] In the preferred embodiment, at least two base blocks 304 are provided on the transverse moving platform 302, a movable first guide rod 305 is provided inside the base block 304, a clamping plate 306 is connected to the end of the first guide rod 305, and a screw rod 309 is provided, one end of the screw rod 309 is threadedly connected to the base block 304, and a supporting block 307 is provided at the other end of the base block 304, and the supporting block 307 abuts against the clamping plate 306.
[0028] The lateral shifting platform 302 is concave-shaped, and two base blocks 304 are installed at the forwardly extending end. The notch in the middle avoids interference with the docking assembly 7. Similarly, a hollow part is also provided in the center of the tooling bottom plate 301 to avoid interference with the docking assembly 7.
[0029] Since the two clamping plates 306 are clamped forward at the same time, the clamping plates 306 also need to be adjusted to be initially flush to ensure the same clamping force on the A steel beam 5 and the B steel beam 6.
[0030] In a preferred solution, a threaded adjustment nut 308 is sleeved on the screw rod 309 , and one end of the adjustment nut 308 abuts against the base block 304 .
[0031] In a preferred solution, the abutting block 307 is a magnetic block, and the abutting block 307 adsorbs the clamping plate 306 .
[0032] The extension length of the clamping plate 306 relative to the base block 304 can be adjusted according to the width specifications of the A steel beam 5 and the B steel beam 6, and the screw rod 309 is adjusted to the front end of the abutment block 307 to abut against the clamping plate 306, and then the adjustment nut 308 is locked.
[0033] When the abutting block 307 retreats, the abutting block 307 can suck the clamping plate 306 and retreat together.
[0034] In the preferred scheme, a plurality of first rollers 101 arranged in parallel and spaced apart are provided on the fixed platform 1, a gap portion 102 is provided in the center of the fixed platform 1, a positioning tool 3 is provided at the gap portion 102, transfer platforms 2 are provided at both ends of the fixed platform 1, a plurality of second rollers 201 arranged in parallel and spaced apart are provided on the transfer platform 2, and a plurality of casters 202 are provided at the lower end of the transfer platform 2.
[0035] In the preferred solution, a lifting device 4 is provided at the lower end of the positioning tool 3, and the lifting device 4 includes a base plate 401, a slidable second guide rod 402 is provided on the base plate 401, a lifting plate 404 is provided at the upper end of the second guide rod 402, and a heightening block 405 is provided at the upper end of the lifting plate 404, and the upper end of the heightening block 405 supports the positioning tool 3.
[0036] A top cylinder 403 is provided in the center of the base plate 401 . The top cylinder 403 is an electric cylinder that pushes the lifting plate 404 to move up and down. The heightening block 405 is provided at the interval of the first roller 101 .
[0037] When not in use, the lifting plate 404 is lowered, and the positioning tool 3 is under the first roller 101; when the A steel beam 5 and the B steel beam 6 are pre-joined, the A steel beam 5 and the B steel beam 6 are placed on the transfer platform 2 and transferred to the two ends of the fixed platform 1, and the A steel beam 5 and the B steel beam 6 are pushed to gather toward the fixed platform 1. When the end faces of the A steel beam 5 and the B steel beam 6 are attached, the lifting plate 404 rises to support the lower ends of the A steel beam 5 and the B steel beam 6; one side of the A steel beam 5 and the B steel beam 6 is attached to the reference seat 3 03, the other side is clamped by the clamping plate 306, at this time, the ends of the A steel beam 5 and the B steel beam 6 are aligned; the first ear seat 701 and the second ear seat 702 are pre-assembled, and the first ear seat 701 and the second ear seat 702 are welded to the A steel beam 5 and the B steel beam 6 respectively; the clamping plate 306 is loosened, and the A steel beam 5 and the B steel beam 6 are turned over ninety degrees. Similarly, the docking assembly 7 is welded to the other surfaces of the A steel beam 5 and the B steel beam 6 until the docking assembly 7 is welded to all four surfaces.
[0038] Embodiment 2:
[0039] A structure for installing and positioning a steel beam comprises a steel beam segment. The steel beam segment is connected end to end for trial assembly in a factory. A plurality of structures for positioning the steel beam are welded on the steel beam segment and arranged around the steel beam.
[0040] The positioning structure is cut into an upper positioning structure part and a lower positioning structure part by mechanical cutting.
[0041] The upper part of the positioning structure and the lower part of the positioning structure are respectively welded to the two sections of the trial-assembled steel beam section and are completely fitted.
[0042] Steps for using the steel beam positioning structure:
[0043] The steel beam segments are manufactured and pre-assembled on a scaffold in the processing plant;
[0044] Mechanical cutting is used to locate the upper and lower parts of the structure and make them fit perfectly;
[0045] Weld the upper and lower parts of the positioning structure to the two pre-assembled sections of the steel beam respectively and make the positioning structure fit completely;
[0046] The steel beams are split into sections and transported from the processing plant to the construction site for installation;
[0047] During the installation process at the construction site, the steel beam segments are aligned with the positioning structure so that they fit perfectly after installation, thus strengthening the connection of the steel beams.
[0048] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A steel beam docking positioning auxiliary device, Its characteristics are: The invention comprises a plurality of docking assemblies (7) arranged along the circumferential direction at the docking position of the A steel beam (5) and the B steel beam (6), wherein the docking assemblies (7) comprise a first ear seat (701) and a second ear seat (702), wherein the first ear seat (701) is connected to the A steel beam (5), and the second ear seat (702) is connected to the B steel beam (6), wherein the first ear seat (701) is provided with an inner concave portion (703), and the second ear seat (702) is provided with an outer convex portion (704), wherein the inner concave portion (703) and the outer convex portion (704) are spliced to align the ends of the A steel beam (5) and the B steel beam (6), and further comprises a fixing platform (1), A positioning tool (3) is provided on the fixed platform (1), the positioning tool (3) comprising a tool base plate (301), at least two reference seats (303) are provided on the tool base plate (301), the reference seats (303) are arranged at intervals, the two reference seats (303) are used to abut against the A steel beam (5) and the B steel beam (6), respectively, each reference seat (303) is flush with the abutting surface of the A steel beam (5) and the B steel beam (6), and at least two movable clamping plates (306) are also provided on the tool base plate (301), the clamping plates (306) are used to clamp the side walls of the A steel beam (5) and the B steel beam (6).
2. According to claim 1, the steel beam docking positioning auxiliary device, Its characteristics are: A movable traverse platform (302) is provided on the tooling base plate (301), one side of the clamping plate (306) is connected to the traverse platform (302), a toggle clamp (8) is provided on the tooling base plate (301), the toggle clamp (8) is provided with a telescopic rod (801), a threaded connecting rod (802) is provided at the end of the telescopic rod (801), and the connecting rod (802) is threadedly connected to the traverse platform (302).
3. According to the steel beam docking positioning auxiliary device of claim 2, Its characteristics are: At least two base blocks (304) are provided on the transverse moving platform (302), a movable first guide rod (305) is provided in the base block (304), a clamping plate (306) is connected to the end of the first guide rod (305), and a screw rod (309) is provided, one end of the screw rod (309) is threadedly connected to the base block (304), and a supporting block (307) is provided at the other end of the base block (304), and the supporting block (307) is against the clamping plate (306).
4. According to claim 3, the steel beam docking positioning auxiliary device, Its characteristics are: The screw rod (309) is sleeved with a threaded adjustment nut (308), and one end of the adjustment nut (308) abuts against the base block (304).
5. According to claim 3, the steel beam docking positioning auxiliary device, Its characteristics are: The abutting block (307) is a magnetic block, and the abutting block (307) adsorbs the clamping plate (306).
6. According to claim 1, the steel beam docking positioning auxiliary device, Its characteristics are: A plurality of first rollers (101) arranged in parallel and at intervals are provided on the fixed platform (1), a gap portion (102) is provided in the center of the fixed platform (1), a positioning tool (3) is provided at the gap portion (102), transfer platforms (2) are provided at both ends of the fixed platform (1), a plurality of second rollers (201) arranged in parallel and at intervals are provided on the transfer platform (2), and a plurality of casters (202) are provided at the lower end of the transfer platform (2).
7. According to claim 6, the steel beam docking positioning auxiliary device, Its characteristics are: A lifting device (4) is provided at the lower end of the positioning tool (3), the lifting device (4) comprising a base plate (401), a slidable second guide rod (402) is provided on the base plate (401), a lifting plate (404) is provided at the upper end of the second guide rod (402), a heightening block (405) is provided at the upper end of the lifting plate (404), and the upper end of the heightening block (405) supports the positioning tool (3).