Coking gas desulfurization device
By designing winding passages and water spray systems in the coking gas desulfurization device, the gas flow time and the number of contacts with the drug liquid are increased, the problem of poor desulfurization effect in the existing devices is solved, and the desulfurization effect is significantly improved.
Patent Information
- Application Number
- CN202420111461.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing coking gas desulfurization device, the gas stays in the tower for a short time, resulting in poor desulfurization effect.
A coking gas desulfurization device is designed, including a purification tower, multiple partitions, water spray pipes, nozzles, filling layers and water supply mechanisms. By staggering partitions in the purification tower, the gas flow time is extended. The drug liquid is sprayed through the nozzle, and the gas is repeatedly in contact with the drug liquid, and further contacts with the filling layer to enhance the desulfurization effect.
By extending the flow time of the coal gas and increasing the number of contacts with the medicinal liquid, the desulfurization effect is significantly improved and the desulfurization effect of existing devices is improved.
Smart Images

Figure CN221940392U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of desulfurization, in particular to a coking coal gas desulfurization device. Background Art
[0002] Coal is used as raw material and heated to about 950°C in an airtight condition. Coke is produced through high-temperature dry distillation. At the same time, coal gas and coal tar are obtained. After the coal gas from the coking plant is produced, it needs to be desulfurized.
[0003] The prior art (CN205295261U) discloses a coke oven gas desulfurization device, in which two filling layers and two spray layers are arranged inside the tower body; water is supplied to the spray layer through a water tank at the bottom, and medicine can be added into the water tank to form a medicine liquid. When the gas passes through the tower body, it contacts and reacts with the medicine liquid and the filling layer, and desulfurization is carried out through the medicine liquid and the filling layer.
[0004] However, with the above method, after the coal gas enters from the bottom of the tower body, it will quickly rise and be discharged in the tower body. The coal gas residence time is short and there is no sufficient contact with the chemical solution, resulting in poor desulfurization effect. Utility Model Content
[0005] The utility model aims to provide a coking coal gas desulfurization device, aiming to solve the problem of poor desulfurization effect of the existing coal gas desulfurization device.
[0006] To achieve the above-mentioned purpose, the utility model provides a coking coal gas desulfurization device, comprising an air intake pipe and a desulfurization component;
[0007] The desulfurization component includes a purification tower, multiple partitions, multiple water spray pipes, multiple nozzles, a filling layer and a water supply mechanism; the purification tower is connected to the air intake pipe and is located on one side of the air intake pipe; the multiple partitions are respectively fixedly connected to the purification tower and are respectively located inside the purification tower; the multiple water spray pipes are respectively fixedly connected to the multiple partitions and are respectively located at the bottom of the multiple partitions; multiple nozzles are arranged on each water spray pipe; the filling layer is arranged inside the purification tower; the water supply mechanism is arranged on the top of the purification tower.
[0008] Wherein, the desulfurization component also includes a drain valve; the drain valve is connected to the purification tower and is located on one side of the purification tower.
[0009] Among them, the filling layer includes a perforated drawer, a sealing plate and a desulfurizer; the perforated drawer is slidably connected to the purification tower and is located inside the purification tower; the sealing plate is fixedly connected to the perforated drawer and is located on one side of the perforated drawer; the desulfurizer is laid in the perforated drawer.
[0010] Wherein, the water supply mechanism includes a water tank, a booster pump and a water supply pipe; the water tank is fixedly connected to the purification tower and is located at the top of the purification tower; the booster pump is connected to the water tank and is located at the top of the water tank; the water supply pipe is connected to the booster pump and is respectively connected to multiple water spray pipes and is located on the side of the purification tower.
[0011] Wherein, the desulfurization component also includes a support rod and a locking plate; the support rod is fixedly connected to the purification tower and is located on one side of the purification tower; the locking plate is rotatably connected to the support rod and is located on one side of the support rod.
[0012] The utility model discloses a coking coal gas desulfurization device, wherein a plurality of partitions are staggeredly arranged in the purification tower to form a winding upward passage, so that the flow time of the coal gas in the purification tower is increased, and the water supply mechanism is used to provide liquid medicine to the plurality of water spray pipes, which is then sprayed out from the nozzles; when in use, the coal gas enters the purification tower from the air inlet pipe, and then flows along the winding passage, and when passing through the winding passage, a plurality of nozzles spray liquid medicine, and the coal gas fully and repeatedly contacts and reacts with the liquid medicine, and then enters the filling layer, further removing sulfur-containing compounds, and finally is discharged from the purification tower, and when the coal gas flows in the winding passage, it repeatedly contacts with the liquid medicine, and finally contacts with the filling layer, thereby improving the desulfurization effect, thereby solving the problem of poor desulfurization effect of the existing coal gas desulfurization device. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0014] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model.
[0015] Figure 2 It is an overall cross-sectional view of the first embodiment of the utility model.
[0016] Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model.
[0017] 101-intake pipe, 102-desulfurization component, 103-purification tower, 104-partition, 105-water spray pipe, 106-nozzle, 107-filling layer, 108-water supply mechanism, 109-drain valve, 110-perforated drawer, 111-sealing plate, 112-desulfurizer, 113-water tank, 114-boosting pump, 115-water supply pipe, 201-support rod, 202-locking plate. DETAILED DESCRIPTION
[0018] The first embodiment of the present application is:
[0019] See also Figure 1-Figure 2 ,in, Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model. Figure 2 It is an overall cross-sectional view of the first embodiment of the utility model.
[0020] The utility model provides a coking coal gas desulfurization device: comprising an air intake pipe 101 and a desulfurization component 102; the desulfurization component 102 comprises a purification tower 103, a plurality of partitions 104, a plurality of water spray pipes 105, a plurality of nozzles 106, a filling layer 107, a water supply mechanism 108 and a sewage valve 109; the filling layer 107 comprises a drawer with holes 110, a sealing plate 111 and a desulfurizer 112; the water supply mechanism 108 comprises a water tank 113, a booster pump 114 and a water supply pipe 115; the above-mentioned scheme solves the problem of poor desulfurization effect of the existing coal gas desulfurization device.
[0021] According to this specific embodiment, the air inlet pipe 101 is used to introduce coal gas into the desulfurization component 102 .
[0022] Among them, the purification tower 103 is connected to the air inlet pipe 101 and is located on one side of the air inlet pipe 101; the multiple partitions 104 are respectively fixedly connected to the purification tower 103 and are respectively located inside the purification tower 103; the multiple water spray pipes 105 are respectively fixedly connected to the multiple partitions 104 and are respectively located at the bottom of the multiple partitions 104; each of the water spray pipes 105 is provided with multiple nozzles 106; the filling layer 107 is arranged inside the purification tower 103; the water supply mechanism 108 is arranged at the top of the purification tower 103. There is a pipe at the back of the purification tower 103 to discharge the desulfurized coal gas. Multiple baffles 104 are staggered in the purification tower 103 to form a winding upward passage, so that the flow time of the coal gas in the purification tower 103 is increased. The water supply mechanism 108 is used to provide liquid medicine to the multiple water spray pipes 105, and then spray it out from the nozzles 106. When in use, the coal gas enters the purification tower 103 from the air inlet pipe 101, and then flows along the winding passage. When passing through the winding passage, multiple nozzles 106 spray liquid medicine, and the coal gas fully and repeatedly contacts and reacts with the liquid medicine, and then enters the filling layer 107 to further remove sulfur-containing compounds, and finally is discharged from the purification tower 103. When the coal gas flows in the winding passage, it repeatedly contacts with the liquid medicine, and finally contacts with the filling layer 107, which improves the desulfurization effect, thereby solving the problem of poor desulfurization effect of the existing coal gas desulfurization device.
[0023] Secondly, the drain valve 109 is connected to the purification tower 103 and is located at one side of the purification tower 103. The drain valve 109 is used to discharge the waste liquid collected at the bottom of the purification tower 103.
[0024] At the same time, the perforated drawer 110 is slidably connected to the purification tower 103 and is located in the purification tower 103; the sealing plate 111 is fixedly connected to the perforated drawer 110 and is located on one side of the perforated drawer 110; the desulfurizer 112 is laid in the perforated drawer 110. The bottom of the perforated drawer 110 is evenly provided with a plurality of air holes for gas to pass through, and the desulfurizer 112 is loaded inside. The desulfurizer 112 can be an iron oxide desulfurizer 112, etc. The sealing plate 111 has a sealing ring on the side to seal the gap between the perforated drawer 110 and the purification tower 103. When the desulfurizer 112 fails after long-term use, the perforated drawer 110 can be slid out for replacement.
[0025] In addition, the water tank 113 is fixedly connected to the purification tower 103 and is located at the top of the purification tower 103; the booster pump 114 is connected to the water tank 113 and is located at the top of the water tank 113; the water supply pipe 115 is connected to the booster pump 114 and is respectively connected to the multiple water spray pipes 105 and is located at the side of the purification tower 103. The water tank 113 is loaded with liquid medicine, and the booster pump 114 is used to increase the water pressure of the liquid medicine, supply it to the multiple water spray pipes 105 through the water supply pipe 115, and then spray it out from the multiple nozzles 106.
[0026] In the coking coal gas desulfurization device described in this embodiment, a plurality of baffles 104 are staggered in the purification tower 103 to form a winding upward passage, so that the flow time of the coal gas in the purification tower 103 is increased, and the water supply mechanism 108 is used to provide liquid medicine to the plurality of water spray pipes 105, and then spray it out from the nozzle 106; when in use, the coal gas enters the purification tower 103 from the air inlet pipe 101, and then flows along the winding passage. When passing through the winding passage, the plurality of nozzles 106 spray liquid medicine, and the coal gas fully and repeatedly contacts and reacts with the liquid medicine, and then enters the filling layer 107 to further remove the sulfur-containing compounds, and finally is discharged from the purification tower 103. The coal gas in the winding When flowing in the passage, it repeatedly contacts with the chemical solution and finally contacts with the filling layer 107, which improves the desulfurization effect, thereby solving the problem of poor desulfurization effect of the existing coal gas desulfurization device; the drain valve 109 is used to discharge the waste liquid collected at the bottom of the purification tower 103; a plurality of air holes are evenly arranged at the bottom of the perforated drawer 110 for the passage of coal gas, and the desulfurizer 112 is loaded inside, and the desulfurizer 112 can be an iron oxide desulfurizer 112, etc., and a sealing ring is provided on the side of the sealing plate 111 for sealing the gap between the perforated drawer 110 and the purification tower 103. When the desulfurizer 112 fails after long-term use, the perforated drawer 110 can be slid out for replacement.
[0027] The second embodiment of the present application is:
[0028] Based on the first embodiment, please refer to Figure 3 ,in, Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model.
[0029] The desulfurization assembly 102 of the coking coal gas desulfurization device provided by the utility model further includes a support rod 201 and a locking plate 202 .
[0030] According to this specific embodiment, the support rod 201 is fixedly connected to the purification tower 103 and is located on one side of the purification tower 103; the locking plate 202 is rotatably connected to the support rod 201 and is located on one side of the support rod 201. One end of the locking plate 202 is rotatably mounted on the support rod 201, and the other end blocks the side of the sealing plate 111 under the action of gravity, thereby locking the perforated drawer 110.
[0031] In the coking gas desulfurization device described in this embodiment, one end of the locking plate 202 is rotatably mounted on the support rod 201, and the other end is blocked by the side of the sealing plate 111 under the action of gravity to lock the drawer 110 with holes.
[0032] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A coking coal gas desulfurization device, comprising an air intake pipe; characterized in that: Also included are desulfurization components; The desulfurization assembly includes a purification tower, a plurality of baffles, a plurality of water spray pipes, a plurality of nozzles, a filling layer and a water supply mechanism; The purification tower is connected to the air inlet pipe and is located on one side of the air inlet pipe; the plurality of partitions are respectively fixedly connected to the purification tower and are respectively located inside the purification tower; the plurality of water spray pipes are respectively fixedly connected to the plurality of partitions and are respectively located at the bottom of the plurality of partitions; a plurality of nozzles are arranged on each of the water spray pipes; the filling layer is arranged inside the purification tower; and the water supply mechanism is arranged on the top of the purification tower.
2. A coking coal gas desulfurization device as claimed in claim 1, characterized in that: The desulfurization component also includes a drain valve; the drain valve is connected to the purification tower and is located on one side of the purification tower.
3. A coking coal gas desulfurization device as claimed in claim 2, characterized in that: The filling layer includes a perforated drawer, a sealing plate and a desulfurizer; the perforated drawer is slidably connected to the purification tower and is located inside the purification tower; the sealing plate is fixedly connected to the perforated drawer and is located on one side of the perforated drawer; the desulfurizer is laid inside the perforated drawer.
4. A coking coal gas desulfurization device as claimed in claim 3, characterized in that: The water supply mechanism includes a water tank, a booster pump and a water supply pipe; the water tank is fixedly connected to the purification tower and is located at the top of the purification tower; the booster pump is connected to the water tank and is located at the top of the water tank; the water supply pipe is connected to the booster pump and is respectively connected to multiple water spray pipes and is located on the side of the purification tower.
5. A coking coal gas desulfurization device as claimed in claim 4, characterized in that: The desulfurization assembly also includes a support rod and a locking plate; the support rod is fixedly connected to the purification tower and is located on one side of the purification tower; the locking plate is rotatably connected to the support rod and is located on one side of the support rod.