Fabricated superconducting magnetic levitation track structure
By adopting prefabricated superconducting magnetolev track structure with high-strength fiber concrete, the problems of large on-site casting and poor track smoothness in the existing technology are solved, the integrity and stable connection of the track are achieved, and the construction complexity is reduced and ferromagnetic effects.
Patent Information
- Application Number
- CN202420286424.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-06
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-02-06
AI Technical Summary
The existing superconducting magnetolev test line track structures have problems such as large on-site casting operations, steel bars and steel structures affecting the work of the magnetolev coil, and poor lateral smoothness of the tracks, resulting in vehicle shaking.
Prefabricated superconducting magnetolev track structure adopts prefabricated structure + cast-in-place assembly, using frame structure, non-ferromagnetic materials and high-strength fiber concrete through track segments arranged in sequence along the longitudinal direction, including horizontally spaced track units and connection parts. , reduce the amount of concrete pouring in construction, improve integrity and positioning accuracy.
The integrity and position limitation of the track structure are achieved, the amount of concrete pouring at the construction site is reduced, the impact of ferromagnetic structure on superconducting magnets is avoided, and the stable connection and high strength of the track are ensured.
Smart Images

Figure CN221940977U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of superconducting magnetic levitation, and in particular relates to an assembled superconducting magnetic levitation track structure. Background Art
[0002] The superconducting electric maglev train is a high-speed train that uses superconducting magnetic levitation technology and electric drive technology. It uses superconducting magnetic levitation technology to suspend the train on the track, eliminating the friction resistance of traditional rail trains, thereby achieving higher operating speeds and lower energy consumption. Superconducting electric maglev trains have the advantages of high operating speed, low energy consumption, environmental protection, and high safety. They are considered to be an important development direction for future inter-city high-speed transportation. At present, some countries have conducted research and experiments on superconducting electric maglev train technology and have made certain progress. With the continuous advancement of technology and the reduction of costs, superconducting electric maglev trains are expected to become one of the main means of transportation for inter-city high-speed transportation in the future.
[0003] The existing superconducting maglev test line track structure is cast on site, which requires a large amount of work. In addition, the steel bars, steel structures and other materials in the track structure will affect the operation of the maglev coil. At the same time, the existing maglev track structure also has poor lateral smoothness of the track, which causes vehicle shaking.
[0004] Therefore, there is an urgent need for a track structure with simple construction operation and good integrity of the left and right tracks. Utility Model Content
[0005] In view of one or more of the above defects or improvement needs in the prior art, the utility model provides an assembled superconducting maglev track structure, in which the integrity of the entire track structure is improved by adopting a prefabricated structure + cast-in-place assembly structure.
[0006] In order to achieve the above-mentioned object, the utility model provides an assembled superconducting maglev track structure, which comprises a plurality of track segments arranged in sequence along the longitudinal direction.
[0007] The track segment comprises two track units spaced apart in a lateral direction, and a connecting portion is provided between the two track units.
[0008] The track unit is an inverted T-shaped structure, including a base and a beam body arranged perpendicular to the base, a traction coil and a suspension guide coil are arranged on the side wall surface of the beam body close to the connecting part, and the base is fixedly connected to the connecting part.
[0009] As a further improvement of the present invention, the connecting portion is a frame structure, including two longitudinal beams arranged at intervals in the transverse direction, a transverse beam is arranged between the two longitudinal beams, and a plurality of transverse beams are arranged at intervals in the longitudinal direction.
[0010] As a further improvement of the utility model, a boss is provided on the top surface of the longitudinal beam, and the top surface of the boss is a running surface.
[0011] As a further improvement of the present invention, first anchoring steel bars are respectively arranged on both lateral sides of the connecting portion, and second anchoring steel bars are arranged on the side wall surface of the base close to the connecting portion.
[0012] A post-cast strip is provided between the connection part and the base, and the post-cast strip is respectively anchored and connected to two anchor steel bars to realize the connection between the connection part and the track unit.
[0013] As a further improvement of the utility model, the bottom surface of the base is provided with gate-shaped steel bars so that the track unit is fixedly connected to the foundation.
[0014] As a further improvement of the present invention, the longitudinal length of the longitudinal beam is the same as the longitudinal length of the track unit, and
[0015] The longitudinal beam and the track unit are arranged staggered.
[0016] As a further improvement of the present invention, a positioning portion is provided between two adjacent connecting portions, and the positioning portion includes a concave portion and a convex portion respectively provided on adjacent end surfaces of the two connecting portions.
[0017] As a further improvement of the present invention, the internal structural rib material of the track unit is non-ferromagnetic material and / or
[0018] The concrete material of the track unit is high-strength fiber concrete.
[0019] The above-mentioned improved technical features can be combined with each other as long as they do not conflict with each other.
[0020] In general, the above technical solution conceived by the utility model has the following beneficial effects compared with the prior art:
[0021] (1) The assembled superconducting maglev track structure of the utility model is divided into a plurality of track segments, wherein the track segments include track units arranged on the left and right sides in the lateral direction and a connecting portion arranged between the two track units. The connecting portion is connected to the track units on the left and right sides, thereby ensuring the integrity of the track structure and realizing the position limitation of the track units.
[0022] (2) The assembled superconducting maglev track structure of the utility model comprises a track unit including a base and a beam body arranged on the base, and a connecting part is a frame structure, which comprises two longitudinal beams arranged at intervals in the transverse direction and a cross beam arranged between the two longitudinal beams. The track unit and the connecting part are prefabricated parts, which can be prefabricated in a factory and transported to the construction site for installation, thereby reducing the amount of concrete pouring at the construction site;
[0023] (3) The assembled superconducting maglev track structure of the utility model is provided with a first anchor bolt on the side wall surface of the connecting part and a second anchor bolt on the side wall surface of the base, and high-strength concrete is poured between the connecting part and the base to form a post-cast strip, so that the post-cast strip is anchored with the two anchor bolts respectively, thereby connecting the track units and the connecting part on both sides in the lateral direction, and then forming the track segment and the track structure into a whole, and also realizing the position limitation of the track units on the left and right sides;
[0024] (4) The assembled superconducting maglev track structure of the utility model adopts non-ferromagnetic materials as the material of the internal structural ribs of the track unit, and / or adopts high-strength fiber concrete to prefabricate the track unit. Such an arrangement can avoid the presence of ferromagnetic structures inside the track unit, thereby preventing the adverse effects on the superconducting magnets;
[0025] (5) The assembled superconducting maglev track structure of the utility model is provided with gate-shaped steel bars at the bottom of the base, and the gate-shaped steel bars and the line foundation are connected by concrete, thereby realizing a fixed connection between the track unit and the line foundation, thereby ensuring a stable connection between the track structure and the line foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of the assembled superconducting maglev track structure in the embodiment of the utility model;
[0027] Figure 2 It is a front view of the assembled superconducting maglev track structure in the embodiment of the utility model;
[0028] In all the drawings, the same figure numbers represent the same technical features, specifically: 1. Track unit; 2. Connection part; 201. Crossbeam; 202. Longitudinal beam; 203. Vehicle running surface; 3. Post-cast strip; 4. Suspended guide coil; 5. Traction coil; 6. Gate-type steel bar. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the utility model. In addition, the technical features involved in each embodiment of the utility model described below can be combined with each other as long as they do not conflict with each other.
[0030] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0032] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0034] Example:
[0035] The assembled superconducting maglev track structure in the preferred embodiment of the utility model is as follows Figures 1-2As shown in . The maglev track structure includes a plurality of track segments arranged in sequence along the longitudinal direction, and the track segment includes two track units arranged at intervals along the transverse direction, and a connecting portion is provided between the two track units to achieve the connection between the two track units. Further explained, in the utility model, the longitudinal direction of the train is taken as the longitudinal direction, the height direction is taken as the vertical direction, and the directions perpendicular to the longitudinal direction and the vertical direction are taken as the transverse direction.
[0036] Furthermore, the track unit 1 is an inverted T-shaped structure, which includes a base and a beam body perpendicular to the base, a traction coil 5 and a suspension guide coil 4 are arranged on a side wall of the beam body close to the connection part 2, and the base is arranged at the bottom of the beam body and contacts the line foundation to support the beam body. Further preferably, the base is a plate-like structure, and is connected to the connection part 2 to achieve the connection between the track unit 1 and the connection part 2, and the beam body is a trapezoidal structure to enhance the structural strength of the track unit 1.
[0037] Further, the connection part 2 is arranged between the two bases, and the connection part 2 is a frame structure, including two longitudinal beams 202 arranged at intervals in the transverse direction, the longitudinal beams 202 extend in the longitudinal direction, and a cross beam 201 is arranged between the two longitudinal beams 202, the cross beam 201 is perpendicular to the longitudinal beams 202, and the two ends of the cross beam 201 are respectively connected to the longitudinal beams 202 on both sides. Further preferably, there are multiple cross beams 201 arranged at intervals in the longitudinal direction to enhance the overall structural strength of the connection part 2. In addition, the connection part 2 is a prefabricated reinforced concrete structure, and the longitudinal beams 202 and the cross beams 201 are integrally formed.
[0038] Furthermore, a boss is provided on the top surface of the longitudinal beam 202, and the boss is extended in the longitudinal direction, and its length is the same as the length of the longitudinal beam 202. The top surface of the boss is the vehicle running surface 203, so that the vehicle can run on the vehicle running surface 203 when in a non-suspended state.
[0039] In Example 1, the connection part 2 is connected to the base of the track unit 1 by anchor bolts, and a plurality of anchor bolts are arranged at intervals along the longitudinal direction on the side wall surface of the base near the connection part 2, and corresponding through holes penetrating the two side walls are opened in the longitudinal beam 202 of the connection part 2. During the assembly process, the anchor bolts can be inserted into the through holes of the longitudinal beam 202, and slurry is poured to achieve the anchor connection between the anchor bolts and the longitudinal beam 202, and then the connection between the connection part 2 and the track unit 1 is achieved. Further preferably, in actual applications, the connection part 2 can be provided with beams 201 of different lengths according to actual needs, so as to adapt to different track gauges (i.e., the distance between the two beams).
[0040] Furthermore, the connection method in Example 1 requires that each assembly (i.e., the connecting part 2 and the track units 1 arranged on both sides of the connecting part 2) be pre-assembled to form a track segment before the track structure is installed. This places high demands on the precision of the prefabricated structure, and it is difficult to adjust the precision during the construction phase. Therefore, in Example 2, the connecting part 2 and the base can be connected during construction.
[0041] In Example 2, a first anchoring steel bar is arranged on the side wall surface of the connection part 2 close to the base, and the first anchoring steel bar is arranged to extend in the transverse direction and is arranged in a plurality of intervals in the longitudinal direction, and a second anchoring steel bar is arranged on the side wall surface of the base close to the connection part 2, which is also arranged to extend in the transverse direction and is arranged in a plurality of intervals in the longitudinal direction, and a post-cast strip 3 is arranged between the base and the connection part 2, and the post-cast strip 3 is formed by pouring concrete, and the post-cast strip 3 is anchored and connected to the first anchoring steel bar and the second anchoring steel bar respectively, and then the fixed connection between the transverse part and the connection part 2 is realized, so that the beam body on both sides of the transverse direction and the connection part 2 located therein form a track unit 1. Further preferably, the connection part 2 is arranged in the middle, so that the formed post-cast strip 3 is arranged symmetrically.
[0042] Furthermore, the track unit 1 and the connection part 2 are prefabricated structures. After being produced in the factory, they are transported to the construction site for installation, thereby reducing the amount of concrete pouring during the construction process. During the on-site installation, the two track units 1 and the post-cast joints 3 are symmetrically arranged, and the post-cast joints 3 are formed by fine-tuning the positions of the left and right track units 1 and the connection part 2, and then pouring.
[0043] Furthermore, a gate-shaped steel bar 6 is provided at the bottom of the track unit 1 (i.e., the bottom of the base), one end of which is pre-buried inside the beam base and the other end is buried in the line foundation, thereby achieving a fixed connection between the track unit 1 and the line foundation.
[0044] Furthermore, a positioning part is also provided on the adjacent end faces of the two track segments, which is used to realize the positioning docking of the track segments, thereby ensuring the positioning accuracy of the track segments. Preferably, the positioning part is provided between two adjacent connecting parts 2, and includes a concave part and a convex part respectively provided on the adjacent end faces of the two connecting parts 2, and the matching docking between the two track segments is realized by matching and docking the concave part and the convex part. In addition, the top surface of the boss in the connecting part 2 is a running surface, which needs to form a continuous structure to allow vehicles to pass, therefore, the concave part and the convex part are provided on the two end faces of the longitudinal beam 202.
[0045] Furthermore, in the track segment, the length of the connecting portion 2 in the longitudinal direction (i.e., the length of the longitudinal beam 202) is the same as the length of the track unit 1, and the connecting portion 2 and the track unit 1 are staggered so that the longitudinal beam 202 of the connecting portion 2 protrudes in the longitudinal direction, so that the connecting portion 2 can be respectively connected to two longitudinally adjacent track units 1, thereby improving the overall structural strength of the track structure.
[0046] Furthermore, the structural reinforcement material arranged inside the track unit 1 is a non-ferromagnetic material. By replacing the ferromagnetic structural reinforcement with non-ferromagnetic structural reinforcement, it is avoided that the steel structure inside the track unit 1 has an adverse effect on the superconducting magnet. Alternatively, high-strength fiber concrete is directly used for casting to form the required track unit 1 structure, or the two can be combined for application.
[0047] Furthermore, a plurality of mounting positions are formed on the side of the beam body for mounting the traction coil 5 and the suspension guide coil 4, and the upper part of the side of the beam body is the contact surface of the vehicle guide wheel. Further preferably, a threaded sleeve is also embedded in the side of the beam body to realize the threaded connection between the coil and the beam body.
[0048] Further explained, the construction method of the assembled superconducting maglev track structure includes the following steps:
[0049] S1, select a suitable track unit 1 and connecting part 2;
[0050] S2, installing the traction coil 5 and the suspension guide coil 4 on the beam body;
[0051] S3, assembling the track segment, connecting the track unit 1 and the connecting part 2 to form a track segment;
[0052] S4. The track segments are sequentially installed on the offline foundation to form a track structure, and concrete is poured to form a line foundation, so that the gate-shaped steel bars 6 are anchored and connected to the line foundation, thereby completing the construction of the track structure.
[0053] Among them, in step S3, the relative positions of the left and right track units 1 are adjusted, the connecting part 2 is set, and the post-cast strip 3 is formed by pouring concrete to connect the connecting part 2 and the two track units 1 to form a track segment.
[0054] Furthermore, the track segments can be assembled on site, the relative positions of the left and right track units 1 on the line can be adjusted, the connecting parts 2 can be set on the foundation, and the multiple track units 1 and the connecting parts 2 can be connected in the longitudinal direction. Concrete can be poured to connect the connecting parts 2 to the two track units 1 respectively to form a track structure, and the gate-shaped steel bars 6 can be fixedly connected to the offline foundation during the pouring of concrete to enhance the integrity of the entire track structure.
[0055] The assembled superconducting maglev track structure in the utility model includes a plurality of track segments arranged in sequence along the longitudinal direction, the track segments include two track units arranged at intervals along the transverse direction and a connecting portion arranged between the track units, the connecting portions are respectively fixedly connected to the track units on both sides, so as to connect the track segments into a whole, further, anchor bolts are respectively arranged on the side wall surfaces adjacent to the connecting portions and the track units, and concrete is poured to form a post-casting strip to enhance the integrity of the entire track structure. The utility model decomposes the track structure into a plurality of track segments, and each track segment is composed of a plurality of prefabricated parts, and each prefabricated structure is connected by on-site casting. By adopting the structural form of prefabricated structure + cast-in-place assembly, the integrity and positioning accuracy of the entire track structure are improved, while the amount of concrete pouring at the construction site is reduced, and it has good application value.
[0056] It is easy for those skilled in the art to understand that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled superconducting maglev track structure, characterized in that: It includes a plurality of track segments arranged in sequence along the longitudinal direction, The track segment comprises two track units spaced apart in a lateral direction, and a connecting portion is provided between the two track units. The track unit is an inverted T-shaped structure, including a base and a beam body arranged perpendicular to the base, a traction coil and a suspension guide coil are arranged on the side wall surface of the beam body close to the connecting part, and the base is fixedly connected to the connecting part.
2. The assembled superconducting maglev track structure according to claim 1, wherein: The connecting part is a frame structure, including two longitudinal beams arranged at intervals in the transverse direction, a transverse beam is arranged between the two longitudinal beams, and a plurality of transverse beams are arranged at intervals in the longitudinal direction.
3. The assembled superconducting maglev track structure according to claim 2, wherein: The top surface of the longitudinal beam is provided with a boss, and the top surface of the boss is a running surface.
4. The assembled superconducting maglev track structure according to any one of claims 1 to 3, wherein: The first anchoring steel bars are respectively arranged on the lateral sides of the connecting portion, and the second anchoring steel bars are arranged on the side wall surface of the base close to the connecting portion. A post-cast strip is provided between the connection part and the base, and the post-cast strip is respectively anchored and connected to two anchor steel bars to realize the connection between the connection part and the track unit.
5. The assembled superconducting maglev track structure according to any one of claims 1 to 3, wherein: The bottom surface of the base is provided with gate-shaped steel bars so that the track unit is fixedly connected to the foundation.
6. The assembled superconducting maglev track structure according to claim 2 or 3, wherein: The longitudinal length of the longitudinal beam is the same as the longitudinal length of the track unit, and The longitudinal beam and the track unit are arranged staggered.
7. The assembled superconducting maglev track structure according to any one of claims 1 to 3, wherein: A positioning portion is arranged between two adjacent connecting portions, and the positioning portion comprises a concave portion and a convex portion which are respectively arranged on adjacent end surfaces of the two connecting portions.
8. The assembled superconducting maglev track structure according to any one of claims 1 to 3, wherein: The internal structural rib material of the track unit is a non-ferromagnetic material and / or The concrete material of the track unit is high-strength fiber concrete.
Citation Information
Cited By
Semi-assembly type high-speed maglev track beam and assembly method thereof
CN119145256A
Superconducting magnetic levitation U-shaped track beam and preparation method thereof
CN121066005A