Permeable footpath concrete road structure
By using permeable concrete walkway structures, and incorporating components such as support walls and drainage ditches, the problems of poor permeability and heat island effect in sports fields have been solved. This has resulted in high permeability and anti-slip properties, alleviating rainwater accumulation and drainage pressure, and improving the ecological and environmental performance of sports fields.
Patent Information
- Application Number
- CN202420117664.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-17
AI Technical Summary
The flexible surface of traditional sports fields is impermeable to water, forming a moisture barrier layer that leads to a severe heat island effect and makes it difficult to achieve a sponge-like structure.
The permeable walkway concrete road structure consists of a support wall, a compacted soil layer, a graded crushed stone layer, a cement concrete base layer, a drainage ditch, and a permeable surface layer. It utilizes polymer cement and inorganic permeable nano-water-storage concrete reinforcing agent to improve the permeability, sets up drainage ditches to store and divert rainwater, and improves the anti-skid properties of the permeable surface layer and concrete layer.
It improves water permeability, alleviates the heat island effect, reduces rainwater accumulation, lowers temperature, enhances anti-slip properties, relieves the pressure on municipal pipe network discharge, and achieves an eco-friendly permeable function.
Smart Images

Figure CN221941009U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sponge cities, in particular to a permeable walking trail concrete road structure. Background Art
[0002] In the process of building a sponge city, some special pavement surfaces have poor water permeability and are difficult to meet the traditional sponge city construction indicators. For example, the surface of the sports field track in a sports venue needs to be soft to protect the body joints of the athletes. However, this soft surface is almost impermeable to water and will form a moisture barrier.
[0003] The traditional running track sports field is difficult to realize the sponge structure due to the existence of this moisture barrier layer, so that the traditional sports field has an obvious heat island effect. In order to solve the problem that the traditional sports field is difficult to realize the sponge structure, the utility model proposes a permeable walking trail concrete road structure. Utility Model Content
[0004] Based on this, it is necessary to address the drawback that traditional sports fields are difficult to achieve sponge structures, and the utility model proposes a permeable walking trail concrete road structure.
[0005] The utility model provides a permeable walking trail concrete road structure, comprising supporting walls, a rammed earth layer is arranged between the supporting walls, the thickness of the rammed earth layer is in a thickness range of greater than or equal to 30 cm and less than or equal to 100 cm, a graded crushed stone layer is also arranged on the top of the rammed earth layer, a cement concrete base layer is arranged on the side of the graded crushed stone layer away from the rammed earth layer, the thickness of the cement concrete base layer is in a thickness range of greater than or equal to 15 cm and less than or equal to 40 cm, the interface between the graded crushed stone layer and the cement concrete base layer is a first contact surface, a water diversion ditch is arranged on the side of the supporting wall away from the cement concrete base layer, and the water diversion ditch is connected to the cement concrete base layer.
[0006] A concrete layer is arranged on the side of the cement concrete base away from the rammed earth layer, a permeable surface layer is arranged on the side of the concrete layer away from the rammed earth layer, the end face of the top of the water diversion ditch is in the same horizontal plane as the end face of the permeable surface layer, and the water diversion ditch is connected to the atmosphere.
[0007] Preferably, a height of the concrete layer close to one end of the water diversion ditch is smaller than a height of the concrete layer away from one end of the water diversion ditch.
[0008] Preferably, the concrete layer is provided with a middle ridge, and the middle ridge is at an equal straight-line distance from the supporting walls on both sides.
[0009] Preferably, the angle between the plane passing through the middle ridge and the concrete layer close to one end of the water diversion ditch and the horizontal plane is in the angle range of greater than or equal to 0.8 degrees and less than or equal to 1.2 degrees.
[0010] Preferably, a water inlet hole is provided at the top of the water diversion ditch, and an end of the water inlet hole away from the rammed earth layer is larger than an end of the water inlet hole close to the rammed earth layer.
[0011] Preferably, the bottom end of the water diversion ditch is at the same horizontal plane as the first contact surface, the support wall is provided with a water diversion hole, and the water diversion ditch is connected to the cement concrete base through the water diversion hole.
[0012] Preferably, the water diversion hole is attached to the first contact surface.
[0013] Preferably, the thickness of the permeable surface layer is in a range of greater than or equal to 6 cm and less than or equal to 12 cm.
[0014] Preferably, the thickness of the graded crushed stone layer is in a range of greater than or equal to 10 cm and less than or equal to 35 cm.
[0015] Preferably, the thickness of the graded crushed stone layer is in a range of greater than or equal to 30 cm and less than or equal to 70 cm.
[0016] Technical advantages of this utility model:
[0017] 1. A supporting wall is set up. The supporting wall itself is polymer cement. The polymer cement uses inorganic permeable nano-water-storage concrete enhancer. The water permeability coefficient of the supporting wall reaches 2.38mm / S. The main water permeability is through the pores, and the water permeability is supplemented by the gaps. In the later maintenance process, water molecules evaporate to form a pore structure. The pores have the effect of breaking the surface tension of water molecules, thereby effectively improving the water permeability.
[0018] 2. A diversion ditch is set up to store rainwater and divert it to the cement concrete base. The diversion ditch has the function of retaining water and alleviating the heat island effect. When encountering severe weather such as heavy rain, it will first absorb and lock 44% of the water, and then discharge the excess rainwater, effectively alleviating the discharge pressure of the municipal pipe network.
[0019] 3. The permeable surface layer and concrete layer are set up with high anti-slip index. The anti-slip coefficient of the permeable surface layer is 62-65BPN, which is provided by the coarse structure of the permeable surface layer and the fine structure of the concrete layer. The structure is formed by the gaps in the permeable surface layer, which guides the rainfall to the diversion ditch through the slope on rainy days, eliminating the phenomenon of water accumulation on rainy days. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The drawings and descriptions of the exemplary embodiments of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0021] Figure 1 A schematic structural diagram of a permeable walking trail concrete road structure provided in one embodiment of the utility model.
[0022] Figure 2 A three-dimensional diagram of a permeable walking trail concrete road structure provided in one embodiment of the utility model.
[0023] Figure 3 A schematic structural diagram of a permeable walking trail concrete road structure provided for another embodiment of the utility model.
[0024] Figure 4 A three-dimensional diagram of a permeable walking trail concrete road structure provided in yet another embodiment of the utility model.
[0025] Figure 5 A schematic diagram of a permeable walking trail concrete road structure provided in one embodiment of the utility model.
[0026] Reference numerals: supporting wall 1 ; rammed earth layer 2 ; graded crushed stone layer 3 ; cement concrete base layer 4 ; first contact surface 41 ; water diversion ditch 5 ; water inlet hole 51 ; water diversion hole 52 ; concrete layer 6 ; middle ridge 61 ; permeable surface layer 7 . DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0029] In addition, in the present invention, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0030] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] The utility model provides a permeable walking trail concrete road structure.
[0032] like Figures 1 to 5 This embodiment proposes a permeable walking trail concrete road structure, including supporting walls 1, between which are arranged rammed earth layers 2, and the thickness of the rammed earth layers 2 is greater than or equal to 30 cm and less than or equal to 100 cm.
[0033] A graded crushed stone layer 3 is also provided on the top of the plain soil rammed layer 2. The plain soil rammed layer 2 is laid on the roadbed. In some embodiments, as a common laying method, the graded crushed stone layer 3 is laid on the plain soil rammed layer 2, and the compaction coefficient of the plain soil rammed layer is preferably above 90%. An impermeable geotextile is placed on the plain soil rammed layer 2, and a 50 blind pipe is placed in the graded crushed stone layer 3 to drain and connect to the drainage ditch.
[0034] The thickness of the graded crushed stone layer is 100 to 500 mm, preferably 150 to 250 mm; the thickness of the cement concrete base layer is 50 to 300 mm, preferably 70 to 180 mm; the thickness of the permeable concrete surface layer is any one of the following thicknesses: 35 to 80 mm, 80 mm to 100 mm, 100 to 150 mm, 150 to 180 mm, 180 mm to 300 mm; for the different uses of the outdoor ground, such as sports fields, square roads, community roads, fire passages, heavy-load roads, etc., those skilled in the art can choose to set the appropriate thickness according to actual needs. In this application, the term "heavy-load road" or "heavy-load road" has the same meaning, referring to a road with a compressive strength greater than 50 MPa and a flexural strength greater than 5.0 MPa measured according to the standard GB / T 50081-2002 for the mechanical properties of ordinary concrete, and the road does not freeze at temperatures above minus 20 degrees.
[0035] A cement concrete base layer 4 is arranged on the side of the graded gravel layer 3 away from the rammed earth layer 2, and the thickness of the cement concrete base layer 4 is in a range of greater than or equal to 15 cm and less than or equal to 40 cm. The interface between the graded gravel layer 3 and the cement concrete base layer 4 is a first contact surface 41. A water diversion ditch 5 is arranged on the side of the support wall 1 away from the cement concrete base layer 4, and the water diversion ditch 5 is connected to the cement concrete base layer 4. A concrete layer 6 is arranged on the side of the cement concrete base layer 4 away from the rammed earth layer 2, and a permeable surface layer 7 is arranged on the side of the concrete layer 6 away from the rammed earth layer 2. The end face of the top of the water diversion ditch 5 is on the same horizontal plane as the end face of the permeable surface layer 7, and the water diversion ditch 5 is connected to the atmosphere.
[0036] The cement concrete base layer 4 is made of cement concrete and can withstand the heavy pressure transmitted by the permeable surface layer 7. It is the foundation layer of the sports field and also serves as the drainage layer of the sports field.
[0037] The present embodiment relates to a permeable walking trail concrete road structure. A diversion ditch 5 is provided to store rainwater and divert the rainwater to the cement concrete base 4. The diversion ditch 5 has a water retention function and alleviates the heat island effect to achieve a "sponge-like" function, which does not drain light rain, drains light rain, and drains slowly in heavy rain. In case of severe weather such as heavy rain, 44% of the water will be absorbed and locked first, and then the excess rainwater will be discharged, effectively alleviating the discharge pressure of the municipal pipe network. Water absorbs heat from all sides during evaporation, and the permeable surface layer 7 will reduce the temperature.
[0038] like Figures 1 to 5This embodiment provides a permeable walking path concrete road structure, wherein the height of the concrete layer 6 close to the water diversion ditch 5 is less than the height of the concrete layer 6 away from the water diversion ditch 5. The concrete layer 6 is provided with a middle ridge 61, and the middle ridge 61 is at the same straight-line distance from the supporting walls 1 on both sides. The angle between the plane passing through the middle ridge 61 and the end of the concrete layer 6 close to the water diversion ditch 5 and the horizontal plane is in an angle range of greater than or equal to 0.8 degrees and less than or equal to 1.2 degrees.
[0039] This embodiment relates to a permeable walking trail concrete road structure. A permeable surface layer 7 and a concrete layer 6 are provided, and the anti-slip index is high. The anti-slip coefficient of the permeable surface layer 7 and the concrete layer 6 is 62-65BPN. The anti-slip coefficient is provided by the coarse structure of the permeable surface layer 7 and the fine structure of the concrete layer 6. The structure is formed by the gaps in the permeable surface layer 7, and the rainfall is guided to the diversion ditch 5 through the slope on rainy days, eliminating the phenomenon of water accumulation on rainy days.
[0040] like Figures 1 to 5 This embodiment provides a permeable walking path concrete road structure, wherein the top of the water diversion ditch 5 is provided with a water inlet hole 51, and the end of the water inlet hole 51 away from the rammed soil layer 2 is larger than the end of the water inlet hole 51 close to the rammed soil layer 2. The bottom end of the water diversion ditch 5 is in the same horizontal plane as the first contact surface 41, and the support wall 1 is provided with a water diversion hole 52, through which the water diversion ditch 5 is connected to the cement concrete base 4. The water diversion hole 52 is attached to the first contact surface 41.
[0041] The present embodiment relates to a permeable walking trail concrete road structure. A supporting wall 1 is provided, and the supporting wall 1 itself is polymerized cement. The polymerized cement uses an inorganic permeable nano-water-storage concrete reinforcing agent. The anions in the inorganic permeable nano-water-storage concrete reinforcing agent maximize the dispersion of cement particles and accelerate the hydration reaction of cement. Usually, 40% of cement does not participate in hydration during the cement hydration process. The inorganic type inorganic permeable nano-water-storage concrete reinforcing agent makes the cement hydration degree reach 99.6%. During the hydration process of cement, the cations in the inorganic permeable nano-water-storage concrete reinforcing agent undergo a replacement reaction with tricalcium silicate and dicalcium silicate, and the polymerized cement hydrolysis product calcium hydroxide forms a network-like crystal and is integrated with the stone material, achieving the purpose of cement molecules encapsulating water molecules. The permeability coefficient of the supporting wall 1 reaches 2.38mm / S. The permeable roads on the market all rely on gaps for water permeability. The permeable roads are mainly permeable through gross gaps, supplemented by gaps. In the early stage of cement hydration, the water-cement ratio is strictly controlled so that the cement molecules wrap the water molecules. In the later stage of curing, the water molecules evaporate to form a capillary pore structure. The capillary pores have the function of breaking the surface tension of water molecules, thereby effectively improving the water permeability.
[0042] like Figures 1 to 5 This embodiment provides a permeable walking trail concrete road structure, wherein the thickness of the permeable surface layer 7 is in a range of greater than or equal to 6 cm and less than or equal to 12 cm. The thickness of the graded crushed stone layer 3 is in a range of greater than or equal to 10 cm and less than or equal to 35 cm. The thickness of the graded crushed stone layer 3 is in a range of greater than or equal to 30 cm and less than or equal to 70 cm.
[0043] This embodiment relates to a permeable walking trail concrete road structure, which is provided with roadbeds of different thicknesses and is ecologically friendly. The rammed soil layer 2, the graded crushed stone layer 3 and the cement concrete base layer 4 have filtering and purification functions. At the same time, the inorganic permeable nano-water storage concrete enhancer contains the necessary raw materials for sewage treatment, which plays a role in purifying water quality.
[0044] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0045] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model shall be based on the attached claims.
Claims
1. A permeable walking trail concrete road structure, characterized in that: The invention comprises a supporting wall (1), a rammed earth layer (2) is arranged between the supporting walls (1), a graded crushed stone layer (3) is arranged on the top of the rammed earth layer (2), a cement concrete base layer (4) is arranged on the side of the graded crushed stone layer (3) away from the rammed earth layer (2), the interface between the graded crushed stone layer (3) and the cement concrete base layer (4) is a first contact surface (41), and the side of the supporting wall (1) away from the cement concrete base layer (4) is provided with a first contact surface (41). A water diversion ditch (5) is arranged on the side thereof, the water diversion ditch (5) is communicated with the cement concrete base layer (4), a concrete layer (6) is arranged on the side of the cement concrete base layer (4) away from the rammed earth layer (2), a permeable surface layer (7) is arranged on the side of the concrete layer (6) away from the rammed earth layer (2), the end surface of the top of the water diversion ditch (5) and the end surface of the permeable surface layer (7) are in the same horizontal plane, and the water diversion ditch (5) is communicated with the atmosphere.
2. The permeable walking trail concrete road structure according to claim 1 is characterized in that: The height of the concrete layer (6) at one end close to the water diversion ditch (5) is smaller than the height of the concrete layer (6) at one end away from the water diversion ditch (5).
3. The permeable walking trail concrete road structure according to claim 2 is characterized in that: The concrete layer (6) is provided with a middle ridge (61), and the middle ridge (61) is at the same straight-line distance from the supporting walls (1) on both sides.
4. The permeable walking trail concrete road structure according to claim 3 is characterized in that: The angle between a plane passing through the middle ridge (61) and the concrete layer (6) close to one end of the water diversion ditch (5) and a horizontal plane is within an angle range of greater than or equal to 0.8 degrees and less than or equal to 1.2 degrees.
5. The permeable walking trail concrete road structure according to claim 1 is characterized in that: A water inlet hole (51) is provided at the top of the water diversion ditch (5), and an end of the water inlet hole (51) away from the rammed earth layer (2) is larger than an end of the water inlet hole (51) close to the rammed earth layer (2).
6. The permeable walking trail concrete road structure according to claim 5 is characterized in that: The bottom end of the water diversion ditch (5) is in the same horizontal plane as the first contact surface (41); the support wall (1) is provided with a water diversion hole (52); and the water diversion ditch (5) is connected to the cement concrete base layer (4) through the water diversion hole (52).
7. The permeable walking path concrete road structure according to claim 6 is characterized in that: The water inlet (52) is attached to the first contact surface (41).
8. The permeable walking trail concrete road structure according to claim 1 is characterized in that: The thickness of the water-permeable surface layer (7) is within a range of greater than or equal to 6 cm and less than or equal to 12 cm.
9. The permeable walking trail concrete road structure according to claim 8 is characterized in that: The thickness of the graded crushed stone layer (3) is in the range of greater than or equal to 10 centimeters and less than or equal to 35 centimeters.
10. The permeable walking trail concrete road structure according to claim 9, characterized in that: The thickness of the graded crushed stone layer (3) is in the range of greater than or equal to 30 centimeters and less than or equal to 70 centimeters.