Auxiliary device for construction of lower steel support of ultra-deep narrow pit trestle
By designing the lifting platform and winch system in an ultra-deep narrow foundation pit, the safety and convenience of steel support during installation and disassembly under the trestle is solved, and more stable and efficient operation is achieved, reducing operation risks.
Patent Information
- Application Number
- CN202323428174.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-14
AI Technical Summary
In ultra-deep narrow foundation pits, especially the steel support located below the trest, it is difficult to install and disassemble the steel support located below the trest, which poses safety hazards and inconvenient operation, including inconvenient crane lifting, difficulty in driving forklifts, risk of overturning and high-altitude operations.
A steel support construction auxiliary device under the ultra-deep narrow pit trest bridge was designed, including a lifting platform, which is located directly below the trest bridge, convex on both sides to accommodate forklift driving, and is equipped with a hoist and traction rope for stable installation and Disassemble the steel support to avoid high-altitude operations.
This device makes the installation and disassembly of steel support safer, convenient and quicker, reduces the risks of overturning and high-altitude operations, improves operating efficiency, and combines the reasonable structural design with existing lattice columns to provide stable support and guide.
Smart Images

Figure CN221941350U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation pit construction, in particular to a construction auxiliary device for a steel support located below a trestle in an ultra-deep and narrow foundation pit. Background Art
[0002] The underground space of the subway station is constructed along the direction of the subway track, so a strip-shaped ultra-deep foundation pit support system will be formed; or when constructing a pipe gallery, a strip-shaped ultra-deep foundation pit support system will also be formed. Technical personnel in the industry are accustomed to referring to the above-mentioned strip-shaped ultra-deep foundation pit as an ultra-deep narrow pit.
[0003] The above-mentioned ultra-deep narrow pit support system includes two front and rear side walls, which are ground-connected walls or retaining pile walls; the top of the two side walls are cast with capping beams, and multiple internal supports are arranged between the two side walls to balance the water and soil pressure on both sides of the foundation pit; among them, the concrete internal supports are located at the elevation of the capping beam, and the other elevations below are steel pipe internal supports, i.e. steel supports. Since the present application is for ultra-deep narrow pits with a digging depth of more than 10 meters, it is necessary to lay 3 or more steel supports of different heights; the narrow pit generally refers to a pit where the ratio of the horizontal span to the longitudinal side length is less than 1:5.
[0004] The installation steps of steel supports in general areas are standardized and mature: after pouring the capping beam and concrete supports of the same elevation, dig the foundation pit layer by layer. After digging to the first steel support elevation below the capping beam, use the ground crane to lift the steel supports to the bottom of the pit, and then use the digging arm of the excavator at the bottom of the pit to lift the steel supports to the installation height. Workers then screw or weld the ends of the steel supports to the side walls. After all the steel supports of that elevation are installed, continue to dig down to the next elevation, and then use the same steps to install each steel support of the next elevation, and repeat this process.
[0005] However, in order to ensure the objective need of traffic, a concrete trestle is usually cast across the ultra-deep and narrow pit. The two ends of the concrete trestle are supported by the front and rear side walls; and to ensure support, multiple bored piles are constructed at the bottom of the foundation pit below the concrete trestle. A lattice column is anchored at the upper part of each bored pile, and the middle section of the concrete trestle bears the load on each lattice column.
[0006] However, the existence of the concrete trestle makes it difficult to install the steel supports in the area below it. Specifically, after the crane vertically lowers the steel supports from the ground to both sides of the trestle, it is necessary to move the steel supports horizontally to the installation point below the trestle. However, the unevenness of the bottom of the foundation pit does not meet the driving conditions of the forklift, so the on-site workers can only use the excavator to support and transport the steel supports. However, the excavator is not equipped with a counterweight, which is an illegal operation. In addition, the unevenness of the bottom of the foundation pit increases the probability of overturning and instability.
[0007] Moreover, after the foundation pit is excavated to the set bottom elevation and the basement concrete floor is poured, the basement exterior walls will be poured layer by layer from bottom to top and the steel supports at different heights will be removed layer by layer. During this process, the steel supports located under the pier are also difficult to dismantle. If the trestle is blocked, the steel support can only be pulled up by the crane's rope, and then the connection between the end of the steel support and the side wall can be removed. At this time, the obliquely pulled heavy steel support swings, which can easily injure personnel and equipment and damage the support system. Alternatively, a forklift on the basement floor or floor can be used to first drive the forklift arm to support the steel support, then remove the end connector of the steel support, and then place it on the floor or floor. However, in this process, the height difference between the basement floor or floor and the corresponding steel support is too large, generally 3 to 5 meters, which exceeds the normal forklift's top support safety distance, such as 2 meters, causing the forklift to easily overturn. In addition, when removing each steel support, it is necessary to set up a scaffolding of about 3 meters from the floor or floor, which is time-consuming and labor-intensive. In actual operation, workers often risk climbing to the height of the steel support to screw the screws. There is a risk of falling people or objects working at high altitude. Utility Model Content
[0008] The technical problem to be solved by the utility model is to provide an auxiliary construction device for steel supports under ultra-deep narrow pit trestle, which has the advantages that the process of installing and disassembling the steel supports is convenient, fast and safe.
[0009] The technical solution of the utility model is to provide an auxiliary device for steel support construction under an ultra-deep narrow pit trestle, which includes a concrete trestle spanning a foundation pit and lattice column columns for supporting the concrete trestle, the lower end of each lattice column column is anchored in a bored cast-in-place pile and the bored cast-in-place pile is cast at the bottom of the foundation pit; the auxiliary device also includes a lifting platform for a forklift to travel, the main body of the lifting platform is located directly below the trestle and the left and right sides of the lifting platform protrude outward from the concrete trestle to form a convex portion; the platform is hollowed out with a plurality of guide holes corresponding to the lattice column columns, and each guide hole of the lifting platform is fitted with a gap between the corresponding lattice column columns; the concrete trestle is fixed with a plurality of winches, and the above-mentioned winches are connected to the lifting platform via traction ropes.
[0010] After adopting the above structure, the utility model of the auxiliary device for construction of steel support under the ultra-deep narrow pit trestle has the following advantages.
[0011] First of all, the lifting platform solves the problem that the steel support under the concrete trestle is difficult to install in the prior art. Specifically, since the main body of the platform is located directly below the concrete trestle and the outer convex parts on both sides protrude from the concrete trestle, and the surface of the platform is flat and meets the driving conditions of the forklift, workers can easily use a crane to vertically lift the steel support from the ground to the outer convex part of the platform, and then use a forklift to transport the steel support from the outer convex part to the installation point directly below the trestle; the forklift travels smoothly on the platform, and the process of transporting the steel support is stable and not easy to overturn, ensuring that the installation process of the steel support under the concrete trestle is safe, convenient and fast; when the forklift installs the first steel support above the platform, the excavator continues to dig below the platform. When digging to below the elevation of the second steel support, the platform continues to descend and the next steel support is installed using the same steps... and so on until the excavation reaches the bottom elevation of the foundation pit.
[0012] After the construction of the basement floor, the outer walls of the basement are poured upward layer by layer, and the steel supports are removed upward layer by layer, the lifting platform can also play a huge role: the lifting platform reaches 1.5 meters below the lowest steel support, drives the forklift to support the steel support that needs to be removed, and then the workers remove the connecting parts at the end of the steel support, and then the forklift moves the steel support horizontally to the outer protrusion of the platform side, and finally the crane lifts it to the ground, and so on... Since the above-mentioned removed steel support is lifted vertically from the side of the platform, the steps of the prior art of using a crane and a steel wire rope for oblique lifting are avoided, and the hidden danger of the oblique heavy object swinging and hitting people or equipment is eliminated; and because the platform lifts the forklift close to the steel support, it ensures that the distance of the forklift arm supporting the steel support is within the safe supporting range, avoiding the forklift from overturning due to illegal operation; furthermore, the rise of the platform also sends the operator to the vicinity of the height of the steel support, and the connecting parts at the end of the steel support can be screwed without setting up a scaffold, turning the high-altitude operation of loosening the bolts into a routine operation, avoiding falling people and falling objects.
[0013] In summary, the auxiliary platform makes the process of installing or removing steel supports under the concrete trestle safer, more convenient and faster. Moreover, the structural design of the platform itself is also very reasonable, making rational use of the existing lattice columns of the trestle to provide stable and reliable guidance and support for the lifting of the platform.
[0014] Preferably, each winch is placed on a steel support, which is fixed to the bottom surface of the concrete trestle by high-strength screws, and the upper section of each high-strength screw is anchored in the concrete of the concrete trestle, and the upper section of each high-strength screw is overlapped and fixed to the main reinforcement of the concrete trestle steel cage; in this way, the winch is successfully and firmly fixed to the bottom of the concrete trestle, and the high-strength screw is overlapped and anchored to the main reinforcement of the concrete trestle concrete cage; thereby ensuring that each winch can carry a load of more than 3 tons; ensuring the reliability and safety of the platform construction; and the winch is fixed to the bottom surface of the concrete trestle instead of the top surface, to avoid interfering with the top surface traffic.
[0015] As a further preferred embodiment, a winch, a traction rope and a lifting ring constitute a lifting assembly, the number of lifting assemblies corresponds to the number of lattice column columns, each lifting assembly is close to the corresponding lattice column column and there is a gap between the traction rope of the lifting assembly and the lattice column column; the distance between the traction rope of each lifting assembly and the lattice column column is as small as possible but not close to the lattice column column. Therefore, the traction rope is not interfered with or scratched by the lattice column column during movement, ensuring smooth and stable lifting of the platform, and the traction rope is brought as close to the lattice column column as possible. In this way, when the platform transports the steel support, the traction rope is naturally avoided while avoiding the lattice column, and the operation is convenient; otherwise, if the two are not close, then when transporting the steel support, both the traction rope and the lattice column must be avoided, and the obstacles are doubled, which is inconvenient.
[0016] The platform structure is preferably that the lifting platform includes a steel frame and wooden boards placed on the steel frame; the steel frame is welded from longitudinal and transverse I-steel main beams, the steel frame includes a plurality of frame units, each frame unit has steel pipe secondary ribs welded therein; in this way, the basic frame is formed by welding the longitudinal and transverse I-steel main beams, and auxiliary steel pipe secondary ribs are welded therein, which not only ensures that the platform has sufficient strength and bearing capacity, but also reduces the amount of consumables as much as possible; and laying wooden boards on top can further improve the flatness of the platform, making it convenient for people and vehicles to pass by. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 The utility model is a structural schematic diagram of a steel support construction auxiliary device under an ultra-deep narrow pit trestle.
[0018] Figure 2 The utility model is a structural schematic diagram of a steel support construction auxiliary device under an ultra-deep narrow pit trestle with one side wall removed.
[0019] Figure 3 yes Figure 2 Schematic diagram of the structure after deflection at a certain angle.
[0020] Figure 4 yes Figure 2 Schematic diagram of the enlarged structure of part A.
[0021] Figure 5 yes Figure 3 Schematic diagram of the enlarged structure of part B.
[0022] Figure 6 yes Figure 3 Schematic diagram of the enlarged structure of part C.
[0023] As shown in the figure: 1. Concrete trestle, 2. Lattice column, 3. Bored piles, 4. Side wall, 5. Top beam, 6. Concrete support, 7. Steel support, 8. Lifting platform, 8.1. Wooden board, 8.2. I-beam main beam, 8.3. Steel pipe secondary rib, 9. Winch, 10. Towing rope, 11. Lifting ring, 12. Steel support, 13. High-strength screw, 14. Bottom of foundation pit. DETAILED DESCRIPTION
[0024] like Figures 1 to 6 As shown, the utility model of the steel support construction auxiliary device under the ultra-deep narrow pit trestle includes a concrete trestle 1 across the foundation pit and lattice column columns 2 for supporting the concrete trestle 1. More specifically, the upper end of each lattice column column 2 supports the concrete trestle 1 and the lower end of each lattice column column 2 is anchored in a bored pile 3, and the bored pile 3 is cast at the bottom of the foundation pit. The foundation pit support system includes two side walls 4 located at the front and rear sides of the foundation pit; the top of the two side walls 4 are cast with a capping beam 5, and a multi-top elevation concrete support 6 is cast between the two capping beams 5, and other elevations between the two side walls 4 are provided with multiple steel supports 7, and each steel support 7 includes multiple steel supports 7 with the same elevation.
[0025] The auxiliary device also includes a lifting platform 8 for the forklift to travel, the lifting platform 8 includes a steel frame and a wooden board 8.1 placed on the steel frame; the steel frame is welded by longitudinal and transverse I-beam main beams 8.2, and the steel frame includes a plurality of frame units, each of which is composed of two adjacent longitudinal I-beam main beams 8.2 and two adjacent transverse I-beam main beams 8.2, and a plurality of steel pipe secondary ribs 8.3 are welded in each frame unit. The main body of the lifting platform 8 is located directly below the trestle, and the left and right sides of the lifting platform 8 protrude from the concrete trestle 1 to form a protruding portion.
[0026] The platform is hollowed out with a plurality of guide holes 8.4 corresponding to each lattice column column 2, and each guide hole 8.4 of the lifting platform 8 is loosely fitted with a corresponding lattice column column 2.
[0027] The concrete trestle 1 is fixed with a plurality of winches 9, which are connected to the lifting platform 8 via a traction rope 10. Specifically, a winch 9, a traction rope 10 and a lifting ring 11 constitute a lifting assembly, and the number of lifting assemblies corresponds to the number of lattice column columns 2. Each lifting assembly is close to the corresponding lattice column column 2, and there is a gap between the traction rope 10 of the lifting assembly and the lattice column column 2. The lifting ring 11 of each lifting assembly is welded to the transverse I-beam main beam 8.2 next to the corresponding lattice column column 2 to ensure load bearing. More specifically, the platform wooden board 8.1 is provided with through holes corresponding to the lifting rings 11, and each lifting ring 11 is welded to the transverse I-beam main beam 8.2 below the wooden board 8.1 after passing through the corresponding through hole.
[0028] Each winch 9 is placed on a steel support 12, which includes a steel plate at the top and a steel support beam welded to the lower surface of the steel plate. The steel support beam is composed of I-beam, channel steel or angle steel. The steel support beam can be four channel steel support beams welded end to end into a rectangular side frame, and longitudinal or transverse channel steel secondary ribs are welded inside the rectangular side frame. The steel support 12 is fixed to the bottom surface of the concrete trestle 1 through four high-strength screws 13 located at the four corners, and the upper section of each high-strength screw 13 is anchored in the concrete of the concrete trestle 1, and the upper section of each vertical high-strength screw 13 is fixed to the horizontal main reinforcement of the steel cage of the concrete trestle 1 through an L-shaped transition steel bar.
[0029] Finally, the erection process of the lifting platform 8 is explained. First, the two side walls 4 before and after the ultra-deep narrow pit are constructed; then the concrete parts such as the top beam 5, concrete internal support and concrete trestle 1 on the top of the foundation pit are poured; then the excavator is used to dig down layer by layer. When the excavation reaches the elevation of the first steel support 7 below the top beam 5, continue to dig down two or three meters, and then build the lifting platform 8, and fix the winch 9 on the concrete trestle 1, and fix the traction rope 10 of the winch 9 to the lifting platform 8; then, raise the platform by one or two meters to make it close to the elevation of the first steel support 7. This has two advantages. First, making the platform close to the elevation of the first steel support 7 is convenient for workers to assemble the steel support 7. Second, after the platform is lifted, the height for accommodating the excavator is vacated. In this way, when the forklift assembles the steel support 7 on the platform, the excavator continues to dig downward under the platform.
Claims
1. An auxiliary device for the construction of steel support under an ultra-deep narrow pit trestle, comprising a concrete trestle spanning a foundation pit and lattice columns for supporting the concrete trestle, wherein the lower end of each lattice column is anchored in a bored pile and the bored pile is cast at the bottom of the foundation pit; characterized in that: The auxiliary device also includes a lifting platform for a forklift to travel. The main body of the lifting platform is located directly below the trestle, and the left and right sides of the lifting platform protrude from the concrete trestle to form a convex portion; the platform is hollowed out with a plurality of guide holes corresponding to each lattice column, and each guide hole of the lifting platform fits into the gap of the corresponding lattice column; the concrete trestle is fixed with a plurality of winches, and the above winches are connected to the lifting platform via traction ropes.
2. The auxiliary device for construction of steel support under ultra-deep narrow pit trestle according to claim 1 is characterized by: Each winch is placed on a steel support, which is fixed to the bottom surface of the concrete trestle by high-strength screws. The upper section of each high-strength screw is anchored in the concrete of the concrete trestle, and the upper section of each high-strength screw is overlapped and fixed to the main reinforcement of the concrete trestle steel cage.
3. The auxiliary device for construction of steel support under ultra-deep narrow pit trestle according to claim 1 is characterized by: A winch, a traction rope and a lifting ring constitute a lifting assembly, the number of the lifting assemblies corresponds to the number of the lattice column columns, each lifting assembly is close to the corresponding lattice column column and there is a gap between the traction rope of the lifting assembly and the lattice column column.
4. The auxiliary device for construction of steel support under ultra-deep narrow pit trestle according to claim 1 is characterized by: The lifting platform includes a steel frame and a wooden board placed on the steel frame; the steel frame is welded by longitudinal and transverse I-steel main beams, and the steel frame includes a plurality of frame units, and steel pipe secondary ribs are welded in each frame unit.