Slope support construction device

By setting up grouting pipes and adjustment components in the anchor rod, the structure of the disc and flip plates ensures accurate installation and strength improvement of the anchor rod, the problem of inaccurate positioning of the anchor rod is solved and the construction quality of slope support is improved and security.

CN221941393UActive Publication Date: 2024-11-01CHINA COMM GUANGHANG BUREAU FIFTH ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420546139.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-01
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

Inaccurate installation and positioning of the anchor rod leads to limited construction strength of slope support and inconvenient operation.

Method used

A device including an anchor rod and an anchor head is designed. The anchor rod is equipped with a grouting tube and an adjustment component. The position adjustment of the disc is used to ensure the precise installation and strength of the anchor rod. The flap of the anchor head is passed through the hinge structure. It can be stretched to stabilize the anchor position and improve the overall structural strength after grouting.

Benefits of technology

The accuracy and construction strength of anchor rod installation are improved, the stability and construction quality of slope support are ensured, and the safety of the overall structure is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941393U_ABST
    Figure CN221941393U_ABST
Patent Text Reader

Abstract

The utility model provides a slope support construction device which comprises an anchor rod and an anchor head, a grouting pipe is arranged in the anchor rod in a penetrating mode, one side of the grouting pipe is detachably connected with an adjusting assembly, the anchor head comprises a sleeve, turning plates are symmetrically hinged to the lower side of the sleeve, and a disc is arranged on the lower portion of the adjusting assembly. The opening state of the turning plate is adjusted by changing the position of the disc. The anchor rod is compact in structure and convenient to operate, the installation accuracy of the anchor rod is greatly improved, meanwhile, the construction strength of the anchor rod can be guaranteed, and good economic benefits are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of civil engineering construction, in particular to a device for slope support construction. Background Art

[0002] Slope support is a common engineering technology in construction. Necessary engineering measures are taken on soil or rock slopes to ensure their stability and safety, and to prevent slope instability, landslides, collapses and other disasters. Safety and stability are the top priority in the construction process. Slope support technology covers a variety of methods, each of which has its own technical characteristics. Anchor support, as a temporary support suitable for engineering slopes, is widely used in the construction of different projects. When using anchor rods for support, it is necessary to place anchor rods in the drilled holes, then grouting, and tensioning operations after the curing strength is reached. The position accuracy of the anchor rod installation directly affects the overall structural strength, so it is necessary to ensure the position accuracy of the anchor rod installation during construction. Utility Model Content

[0003] The utility model provides a device for slope support construction, which solves the problems of inaccurate anchor rod installation positioning, limited overall construction strength and inconvenient operation.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a device for slope support construction, including an anchor rod and an anchor head, a grouting pipe is passed through the anchor rod, one side of the grouting pipe is detachably connected with an adjustment component, the anchor head includes a sleeve, the lower side of the sleeve is symmetrically hinged with a flap, and the lower part of the adjustment component is provided with a disc, and the opening state of the flap is adjusted by changing the position of the disc.

[0005] In the preferred solution, a first through hole is passed through the middle of the anchor rod, the grouting pipe is located in the first through hole, a support plate is provided at the lower part of the sleeve, the flap is hinged to the support plate through the shaft rod, and the adjustment assembly includes a round tube, which is passed through the first through hole, the sleeve and the support plate.

[0006] In a preferred solution, a first locking hole is provided on one side of the first through hole, a second through hole is provided in the middle of the sleeve, a third through hole is provided in the second through hole, and the screw is passed through the third through hole and the first locking hole.

[0007] In a preferred solution, a second locking hole is provided through the middle of the support plate, the inner diameter of the second locking hole is smaller than the inner diameter of the second through hole, the adjustment component comprises a round tube, the round tube is passed through the second locking hole, and the round plate is arranged at the bottom of the round tube.

[0008] In the preferred solution, an adapter sleeve is provided on the side of the round tube close to the disc, the adapter sleeve is threadedly connected to the second lock hole, the disc sleeve is arranged on the round tube, one side of the disc is fitted on the adapter sleeve, a sixth through hole is penetrated on the round tube, a seventh through hole is penetrated on the disc, and the shaft rod is passed through the seventh through hole and the sixth through hole.

[0009] In the preferred solution, mudguards are symmetrically provided on both sides of the support plate, a notch is provided on the outer side of the support plate, a fourth through hole is provided in the notch, the shaft rod is inserted in the fourth through hole, and a slope is provided on the inner side of the flap.

[0010] In the preferred solution, a second thread is provided on the lower side of the grouting pipe, a first thread is provided on the lower part of the first through hole, the second thread is the same as the first thread, a cross bar is provided on the side of the grouting pipe close to the second thread, and two locking grooves are provided on one side of the circular tube, and the cross bar is detachably arranged in the locking groove.

[0011] In a preferred solution, hooks are provided on the outside of the flap, and two opposite hooks are connected via an elastic band and a disc, the ends of the elastic band are wound inside the hooks, and the disc is pressed onto the elastic band.

[0012] In a preferred solution, a cover plate is detachably provided on the anchor rod, a plug is threadedly connected to the cover plate, two sides of the cover plate are connected to the anchor rod via nuts, and the nuts are threadedly connected to the anchor rod.

[0013] In a preferred embodiment, a fifth through hole is provided in the middle of the cover plate, and third locking holes are symmetrically provided on both sides of the fifth through hole. The anchor rod is passed through the fifth through hole, and the inserting drill is threadedly connected to the third locking hole. The inserting drill includes a pointed head and a holding rod, and the holding rod is inserted on the inserting drill.

[0014] The beneficial effects of the utility model are as follows: by installing the anchor head on one side of the anchor rod and arranging the grouting pipe and the adjusting component inside the anchor rod, it can be ensured that in the initial state, the disc on the adjusting component is used as the positioning reference to ensure the high accuracy of the anchor rod installation; then, after the position of the anchor rod is positioned and locked, the position of the disc is changed, and the anchor head is supported by the disc, and the supporting angle is symmetrical and the structure is stable; after pouring through the grouting pipe, the overall strength is higher, the construction effect is good, the construction quality of different anchor rods is consistent, and the effect of slope support is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0016] Figure 1 It is a schematic diagram of the closed state of the utility model;

[0017] Figure 2 yes Figure 1 A front view schematic diagram of

[0018] Figure 3 yes Figure 1 Schematic diagram of the left side;

[0019] Figure 4 This is the opening state diagram of the utility model. Figure 1 ;

[0020] Figure 5 This is the opening state diagram of the utility model. Figure 2 ;

[0021] Figure 6 yes Figure 4 Schematic diagram of the left side;

[0022] Figure 7 yes Figure 1 Schematic diagram of the explosion structure Figure 1 ;

[0023] Figure 8 yes Figure 1 Schematic diagram of the explosion structure Figure 2 ;

[0024] Fig. 9 It is a schematic diagram of the anchor head structure of the utility model;

[0025] Fig.10 yes Fig. 9 The internal structure of Figure 1 ;

[0026] Fig.11 yes Fig. 9 The internal structure of Figure 2 ;

[0027] Fig.12 This is a schematic diagram of the internal structure of the anchor rod installation grouting pipe and adjustment component of the utility model Figure 1 ;

[0028] Fig.13 yes Fig.12 A magnified image of point A;

[0029] Fig.14 This is a schematic diagram of the internal structure of the anchor rod installation grouting pipe and adjustment component of the utility model Figure 2 ;

[0030] Fig.15 yes Fig.14 Enlarged view of point B.

[0031] In the figure: anchor rod 1; first locking hole 101; first thread 102; first through hole 103; anchor head 2; flap 201; mudguard 202; sleeve 203; second through hole 204; third through hole 205; notch 206; fourth through hole 207; second locking hole 208; inclined surface 209; hook 210; support plate 211; cover plate 3; fifth through hole 301; third locking hole 302; insert 4; pointed head 401; holding rod 402; grouting pipe 5; second thread 501; cross bar 502; adjustment assembly 6; round tube 601; round disk 602; adapter sleeve 603; locking groove 604; sixth through hole 605; seventh through hole 606; shaft rod 7; elastic band 8; screw 9; nut 10. DETAILED DESCRIPTION

[0032] like Figure 1-6 In the invention, a device for slope support construction includes an anchor rod 1 and an anchor head 2. A grouting pipe 5 is inserted into the anchor rod 1. An adjusting component 6 is detachably connected to one side of the grouting pipe 5. The anchor head 2 includes a sleeve 203. A flap 201 is symmetrically hinged on the lower side of the sleeve 203. A disc 602 is provided at the lower part of the adjusting component 6. The opening state of the flap 201 is adjusted by changing the position of the disc 602. After the hole is drilled and cleaned, the device is put in. Generally, it is necessary to ensure that a distance is maintained between the anchor head 2 at the bottom of the anchor 1 and the bottom of the hole. During the construction of this scheme, after the components are installed on the anchor 1 outside the drill hole, the position of the disc 602 is adjusted to ensure that the end distance between the disc 602 and the anchor head 2 meets the design requirements. When the disc 602 is completely fitted to the bottom of the drill hole, the anchor 1 is fixed at this time, and then the adjustment component 6 is lifted to move the disc 602 away from the bottom of the drill hole. At this time, the disc 602 opens the two flaps 201 on the anchor head 2, so that the flaps 201 are against the side wall of the drill hole, ensuring the stability of the state of the anchor 1. At the same time, after the grouting and curing are completed, the flaps 201 on the anchor head 2 can further improve the structural strength of the anchor 1 and ensure the construction quality of the anchor 1. With this structure, the construction accuracy of the anchor 1 is high, the effect is good, and the overall construction efficiency is guaranteed.

[0033] like Figure 7-8In the preferred solution, the middle of the anchor rod 1 is penetrated by a first through hole 103, the grouting pipe 5 is located in the first through hole 103, the lower part of the sleeve 203 is provided with a support plate 211, the flap 201 is hinged with the support plate 211 through the shaft 7, and the adjustment component 6 includes a round tube 601, which is penetrated through the first through hole 103, the sleeve 203 and the support plate 211. With this structure, the grouting pipe 5 and the round tube 601 are easy to install and do not occupy more space. During installation, the grouting pipe 5 is inserted into the first through hole 103 in the anchor rod 1, and then the sleeve 203 is installed, and then the adjustment component 6 is installed. The overall installation is convenient, and the flap 201 can be kept closed or opened as needed, so that the anchor rod 1 is conveniently placed in the drilled hole, and the construction is convenient.

[0034] like Figure 9-11 In the preferred solution, a first locking hole 101 is provided on one side of the first through hole 103, a second through hole 204 is provided in the middle of the sleeve 203, a third through hole 205 is provided in the second through hole 204, and the screw 9 is passed through the third through hole 205 and the first locking hole 101. With this structure, the sleeve 203 is convenient to install, has a good fixing effect, and has strong overall structural stability.

[0035] In the preferred solution, a second locking hole 208 is provided through the middle of the support plate 211, the inner diameter of the second locking hole 208 is smaller than the inner diameter of the second through hole 204, and the adjustment component 6 includes a round tube 601, which is inserted into the second locking hole 208, and the disc 602 is arranged at the bottom of the round tube 601. With this structure, the second locking hole 208 and the second through hole 204 are interlinked, and a step is formed between the two, which serves as a stop point for the disc 602 to be adjusted into place, so that an external operator can accurately judge whether the disc 602 is adjusted into place during operation.

[0036] like Figure 12-15 In the preferred embodiment, a transfer sleeve 603 is provided on one side of the circular tube 601 close to the circular disc 602, the transfer sleeve 603 is threadedly connected to the second lock hole 208, the circular disc 602 is sleeved on the circular tube 601, one side of the circular disc 602 is attached to the transfer sleeve 603, a sixth through hole 605 is penetrated on the circular tube 601, a seventh through hole 606 is penetrated on the circular disc 602, and the shaft rod 7 is passed through the seventh through hole 606 and the sixth through hole 605. With this structure, the disc 602 can be conveniently fixed on the circular tube 601, and the grouting pipe 5 and the circular tube 601 are interconnected, ensuring a stable flow rate during grouting and a good grouting effect. At the same time, when the grouting pipe 5 drives the circular tube 601 to move outside the borehole along the axis of the anchor rod 1, the adapter sleeve 603 is gradually fixed to the second locking hole 208. When the top of the adapter sleeve 603 fits against the end of the second locking hole 208, the whole is locked, and the disc 602 reaches the designed position. At the same time, the position of the disc 602 is stable at this time and will not change, ensuring the opening effect of the flap 201. The design is ingenious.

[0037] In the preferred solution, mud guards 202 are symmetrically arranged on both sides of the support plate 211, a notch 206 is arranged on the outside of the support plate 211, a fourth through hole 207 is arranged in the notch 206, the shaft 7 is inserted in the fourth through hole 207, and an inclined surface 209 is arranged on the inside of the flap 201. With this structure, the mud guard 202 can reduce the influence of mud on the anchor head 2, the flap 201 is convenient to install, and the inclined surface 209 on the flap 201 can better cooperate with the disc 602 to rotate and open, avoiding the problem of jamming and insensitive reaction.

[0038] In the preferred solution, the lower side of the grouting pipe 5 is provided with a second thread 501, the lower part of the first through hole 103 is provided with a first thread 102, the second thread 501 and the first thread 102 have the same thread, a cross bar 502 is provided on one side of the grouting pipe 5 close to the second thread 501, and two locking grooves 604 are provided on one side of the round tube 601, and the cross bar 502 is detachably arranged in the locking groove 604. With this structure, when the movement of each component is formed and the state is formed during the design, when the adapter sleeve 603 gradually enters the second locking hole 208, the second thread 501 on the grouting pipe 5 gradually disengages from the first thread 102, and when the adapter sleeve 603 is completely entered into the second locking hole 208 and fixed, the second thread on the grouting pipe 5 is completely disengaged from the first thread 102, and the grouting pipe 5 and the adapter sleeve 603 cooperate with each other to form a relay effect, which is convenient and efficient to operate.

[0039] In a preferred embodiment, a hook 210 is provided on the outside of the flap 201 , and two opposite hooks 210 are connected via an elastic band 8 and a disc 602 , an end of the elastic band 8 is wound inside the hook 210 , and the disc 602 is pressed onto the elastic band 8 . The elastic band 8 is made of rubber band, which has good elastic effect and overall sensitive response. With this structure, the flap 201 can be kept in a closed state during installation, and under the extrusion of the disc 602, the elastic band 8 is stretched and deformed, thereby better applying force to the flap 201 to ensure that the flap 201 is fully locked. After the anchor rod 1 is placed in the drill hole as a whole, the disc 1 is moved upward. At this time, the elastic band 8 gradually returns to its initial state, and then gradually detaches from the bottom of the disc 602. When the disc 602 applies a lateral thrust to the flap 201, the flap 201 opens. At this time, whether the elastic band 8 is mounted on the hook 210 or not will not affect the opening of the flap 201, and the use effect is good.

[0040] In the preferred solution, the anchor rod 1 is also provided with a detachable cover plate 3, and the cover plate 3 is threadedly connected with a plug 4. The two sides of the cover plate 3 are respectively connected to the anchor rod 1 by nuts 10, and the nuts 10 are threadedly connected to the anchor rod 1. During construction, a corresponding grout stopper can be set as needed. The grout stopper is sleeved on the anchor rod 1 and is located on the lower side of the cover plate 3. During construction of this solution, when the anchor rod 1 is initially installed in place, it is fixed by the plug 4 with the help of the soil outside the borehole, thereby ensuring that the anchor rod 1 does not move, and it is convenient to use.

[0041] In a preferred solution, a fifth through hole 301 is provided in the middle of the cover plate 3, and third locking holes 302 are symmetrically provided on both sides of the fifth through hole 301. The anchor rod 1 is inserted into the fifth through hole 301, and the inserting drill 4 is threadedly connected with the third locking hole 302. The inserting drill 4 includes a pointed head 401 and a holding rod 402, and the holding rod 402 is inserted on the inserting drill 4. With this structure, the cover plate 3 can be conveniently installed and removed, and the installation depth of the inserting drill 4 can be ensured by adjusting the position of the inserting drill 4, thereby changing the locking effect.

[0042] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A device for slope support construction, Its characteristics are: The invention comprises an anchor rod (1) and an anchor head (2); a grouting pipe (5) is inserted into the anchor rod (1); an adjusting component (6) is detachably connected to one side of the grouting pipe (5); the anchor head (2) comprises a sleeve (203); a flap (201) is symmetrically hingedly connected to the lower side of the sleeve (203); a disc (602) is provided at the lower part of the adjusting component (6); and the opening state of the flap (201) is adjusted by changing the position of the disc (602).

2. A device for slope support construction according to claim 1, Its characteristics are: A first through hole (103) is passed through the middle of the anchor rod (1), a grouting pipe (5) is located in the first through hole (103), a support plate (211) is provided at the lower part of the sleeve (203), the flap (201) is hingedly connected to the support plate (211) through the shaft rod (7), and the adjustment component (6) comprises a round tube (601), which is passed through the first through hole (103), the sleeve (203) and the support plate (211).

3. A device for slope support construction according to claim 2, Its characteristics are: A first locking hole (101) is provided through one side of the first through hole (103), a second through hole (204) is provided in the middle of the sleeve (203), a third through hole (205) is provided through the second through hole (204), and a screw (9) is inserted into the third through hole (205) and the first locking hole (101).

4. A device for slope support construction according to claim 2, Its characteristics are: A second locking hole (208) is provided through the middle of the support plate (211), the inner diameter of the second locking hole (208) is smaller than the inner diameter of the second through hole (204), the adjustment component (6) comprises a circular tube (601), the circular tube (601) is passed through the second locking hole (208), and the circular plate (602) is arranged at the bottom of the circular tube (601).

5. A device for slope support construction according to claim 4, Its characteristics are: A transfer sleeve (603) is provided on one side of the circular tube (601) close to the circular disk (602), the transfer sleeve (603) and the second lock hole (208) are threadedly connected, the circular disk (602) is sleeved on the circular tube (601), one side of the circular disk (602) is fitted on the transfer sleeve (603), a sixth through hole (605) is penetrated on the circular tube (601), a seventh through hole (606) is penetrated on the circular disk (602), and the shaft (7) is penetrated on the seventh through hole (606) and the sixth through hole (605).

6. A device for slope support construction according to claim 2, Its characteristics are: Mud guards (202) are symmetrically provided on both sides of the support plate (211), a notch (206) is provided on the outside of the support plate (211), a fourth through hole (207) is provided in the notch (206), the shaft (7) is inserted in the fourth through hole (207), and an inclined surface (209) is provided on the inside of the flap (201).

7. A device for slope support construction according to claim 2, Its characteristics are: A second thread (501) is provided at the lower side of the grouting pipe (5), a first thread (102) is provided at the lower part of the first through hole (103), the second thread (501) and the first thread (102) are identical, a cross bar (502) is provided at one side of the grouting pipe (5) close to the second thread (501), two locking grooves (604) are provided at one side of the circular tube (601) opposite to each other, and the cross bar (502) is detachably arranged in the locking groove (604).

8. A device for slope support construction according to claim 1, Its characteristics are: A hook (210) is provided on the outside of the flap (201), and two opposing hooks (210) are connected via an elastic band (8) and a disc (602), the end of the elastic band (8) is wound inside the hook (210), and the disc (602) is pressed onto the elastic band (8).

9. A device for slope support construction according to claim 1, Its characteristics are: A cover plate (3) is detachably provided on the anchor rod (1), and a plug (4) is threadedly connected to the cover plate (3). Both sides of the cover plate (3) are connected to the anchor rod (1) via nuts (10), and the nuts (10) are threadedly connected to the anchor rod (1).

10. A device for slope support construction according to claim 9, Its characteristics are: A fifth through hole (301) is provided in the middle of the cover plate (3), and third locking holes (302) are symmetrically provided on both sides of the fifth through hole (301). The anchor rod (1) is inserted into the fifth through hole (301), and the inserting drill (4) and the third locking hole (302) are threadedly connected. The inserting drill (4) comprises a pointed head (401) and a holding rod (402), and the holding rod (402) is inserted into the inserting drill (4).