By adopting the design of water-stop continuous wall structure and reinforcement structure in the foundation pit, and using the connection method of water-stop plates, trusses and internal reinforcement strips, the problem of insufficient adjustment of water-stop mechanisms in the prior art is solved, and the foundation pit is realized Stability and adaptability of anti-seepage water structure.

CN221941404UActive Publication Date: 2024-11-01CHINA RAILWAY CONSTR ENG GRP FOURTH CONSTR CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323467562.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-11-01
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

In the prior art, the water stop mechanism and the second water stop mechanism of the foundation pit anti-seepage water structure are not convenient to adjust according to the length and width of the foundation pit, resulting in limitations in use.

Method used

The water-stop continuous wall structure is adopted, including water-stop plates and reinforced structures arranged at equal distances. The water-stop plates are fixed to the foundation, and are connected by chutes and bolts of the trusses and inner reinforcement strips to achieve flexible adjustment and stable fixation of the structure.

Benefits of technology

The stability and flexibility of the foundation pit water-stop continuous wall structure is achieved, and it can adapt to foundation pits of different lengths and widths to ensure anti-seepage effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941404U_ABST
    Figure CN221941404U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction foundation pit water seepage prevention structure, and belongs to the technical field of foundation pit water seepage prevention. Comprising a water stop continuous wall structure, a foundation and a reinforcing structure, the water stop continuous wall structure comprises water stop plates arranged at equal intervals, the upper surface of the foundation is fixedly connected with each water stop plate, and the water stop plates are fixed around the four walls of a foundation pit. According to the water-stopping continuous wall structure, the water-stopping plates, the reinforcing plates, the trussed beams and the inner reinforcing strips, when the water-stopping continuous wall structure is used, the water-stopping plates are arranged in order, then the trussed beams penetrate through the sliding grooves of the reinforcing plates, the reinforcing plates are connected in series through the trussed beams, and then the water-stopping plates are connected in series through the reinforcing plates; meanwhile, the four inner reinforcing strips fix and reinforce the two adjacent reinforcing plates at the four corners of the foundation pit, so that the four corners of the foundation pit are further reinforced, the trussed beams can be infinitely lengthened according to the length of the foundation pit, and the purposes that the water stop continuous wall structure can adapt to different sizes of the foundation pit and is stably fixed are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a water seepage prevention structure for a foundation pit in a building construction, belonging to the technical field of water seepage prevention for foundation pits. Background Art

[0002] The foundation pit is a pit dug at the foundation design location according to the base elevation and foundation plane dimensions. Before excavation, the excavation plan should be determined based on geological and hydrological data and the situation of nearby buildings on site, and waterproofing and drainage should be done. If the excavation is not deep, the slope can be stabilized by placing a side slope, and the slope size is determined according to relevant construction regulations. For deep excavations and nearby buildings, the foundation pit wall support method, shotcrete wall protection method, and large foundation pits can even use underground continuous walls and column-type bored pile interlocking methods to prevent the outer soil layer from collapsing.

[0003] After searching, a Chinese patent with publication number CN209412847U discloses a water-stop curtain, which is arranged on the outside of the foundation pit support piles, and includes a first water-stop mechanism and a second water-stop mechanism. The second water-stop mechanism is arranged between the first water-stop mechanism and the support column. The first water-stop mechanism includes a plurality of three-axis mixing piles, which are arranged in a row, and two adjacent three-axis mixing piles are overlapped with each other. The second water-stop mechanism is a steel plate. The water-stop curtain provided by the utility model effectively ensures the integrity of the first water-stop mechanism and avoids water seepage by arranging the plurality of three-axis mixing piles of the first water-stop mechanism in a row and overlapping the two adjacent three-axis mixing piles. At the same time, a second water-stop mechanism is arranged between the first water-stop mechanism and the support column to further ensure the water-proof ability of the water-stop curtain. The utility model has a simple structure, good use effect, and is easy to promote and use.

[0004] The above solution solves the problem that the integrity of the first water-stopping mechanism is effectively guaranteed by arranging the multiple three-axis mixing piles of the first water-stopping mechanism in a row and overlapping the two adjacent three-axis mixing piles, thereby avoiding water seepage. At the same time, a second water-stopping mechanism is arranged between the first water-stopping mechanism and the support column to further ensure the water-proof ability of the water-stopping curtain. However, due to the different lengths of the inner walls of the foundation pit, the first water-stopping mechanism and the second water-stopping mechanism are not convenient to adjust according to the length and width of the foundation pit, and there are limitations in use, which needs to be improved.

[0005] Therefore, a new solution needs to be proposed to solve this problem. Utility Model Content

[0006] The technical problem to be solved by the utility model is to provide a water seepage prevention structure for a construction foundation pit, which solves the problem in the prior art that the first water-stopping mechanism and the second water-stopping mechanism are not convenient to be adjusted according to the length and width of the foundation pit.

[0007] The technical problem to be solved by the utility model is achieved by adopting the following technical solutions:

[0008] A water seepage prevention structure for a foundation pit of a building construction, comprising a water-stop continuous wall structure, a foundation and a reinforcement structure, wherein the water-stop continuous wall structure comprises water-stop plates arranged at equal distances, the upper surface of the foundation is fixedly connected to each water-stop plate, the water-stop plates are fixed around the four walls of the foundation pit, the outer surface of each of the water-stop plates is fixedly connected to a reinforcement plate, and the outer surface of each of the reinforcement plates is provided with slide grooves arranged at equal distances;

[0009] The reinforcement structure includes trusses and four internal reinforcement strips arranged at equal distances. The outer surface of each internal reinforcement strip is fixedly connected to the corresponding reinforcement plate. The internal reinforcement strips are located at the four corners of the foundation pit. The water stop plates at the four corners of the foundation pit are reinforced and fixed, which makes it difficult for the entire water stop continuous wall structure to deform. The outer surface of each truss is slidably connected to the corresponding slide groove.

[0010] By adopting the above technical scheme, when in use, waterstop plates are arranged end to end on the four walls of the foundation pit, and the waterstop plates are fixed to the foundation, and then the trusses are passed through the corresponding slide grooves, so that the waterstop plates are not easily deformed in the vertical direction. The trusses can be extended according to the lengths of the four walls of the foundation pit to adapt to foundation pits of different lengths. The internal reinforcement strips are located at the four corners of the foundation pit and are fixed to the two adjacent reinforcement plates by bolts, so that the waterstop plates are not easily deformed in the horizontal direction, thereby making the entire foundation pit water-stop continuous wall structure more stable and less prone to deformation.

[0011] The utility model is further configured as follows: the fixing connection method between the inner reinforcement strip and the reinforcement plate is a bolt fixing method, the interior of each inner reinforcement strip is sleeved with bolts arranged at equal distances, and the outer surface of each bolt is threadedly connected to the corresponding reinforcement plate.

[0012] By adopting the above technical solution, the internal reinforcement strips are located at the four corners of the foundation pit, and the water stop plates at the four corners of the foundation pit are reinforced and fixed, which makes it difficult for the entire water stop continuous wall structure to deform.

[0013] The utility model is further configured as follows: the outer surface of each truss is fixedly connected with a plug plate, each of the plug plates is plugged into the corresponding truss, one end of the truss is fixed with a plug plate, and the other end is provided with a slot adapted to the plug plate.

[0014] By adopting the above technical solution, the truss beam can be infinitely extended according to the length of the foundation pit and fixed by plugging the plug plate into the truss beam.

[0015] The utility model is further configured as follows: each truss beam is sleeved with two bolts inside, and the outer surface of each bolt is threadedly connected with the corresponding plug plate.

[0016] By adopting the above technical solution, the plug plate and the truss are further fixed by bolt 2, so that the connection mode of the trusses being plugged into each other through the plug plate is more stable and firmer.

[0017] The utility model is further configured as follows: the outer surface of each water stop plate is fixedly connected with a guide rail 1 and a guide rail 2, and the outer surface of each water stop plate is provided with a guide groove 1 and a guide groove 2.

[0018] By adopting the above technical solution, guide rails 1 and 2 and guide grooves 1 and 2 can make the water stop plate mesh end to end, and can also mesh vertically at free corners.

[0019] The utility model is further configured as follows: every two of the water stop plates are meshed head to tail through guide rail one and guide groove, wherein the water stop plates at two corners are vertically meshed with the corresponding guide groove one through guide rail two, and the water stop plates at the other two corners are vertically meshed with the corresponding guide groove two through guide rail one.

[0020] By adopting the above technical scheme, when the water stop plates are arranged in a straight line and meshed end to end, this is achieved by meshing guide rail one with guide groove one. When the arrangement of the water stop plates changes direction, a closed space is formed, in which the water stop plates at two corners are vertically meshed with guide groove two through guide rail one, and the water stop plates at the other two corners are vertically meshed with guide groove one through guide rail two. During installation, the meshing methods at the corners can be freely combined, and the operation is convenient.

[0021] The beneficial effects of the utility model are:

[0022] 1. The utility model is provided with a water-stop continuous wall structure, a water-stop plate, a reinforcement plate, a truss, and an inner reinforcement strip. When the device is used, the water-stop plates are arranged in order, and then the truss passes through the slide groove of the reinforcement plate, so that the reinforcement plates are connected in series through the truss, and then the water-stop plates are connected in series through the reinforcement plate. At the same time, four inner reinforcement strips fix and reinforce two adjacent reinforcement plates at the four corners of the foundation pit, so that the four corners of the foundation pit are further strengthened. The truss can be infinitely extended according to the length of the foundation pit, so as to achieve the purpose that the water-stop continuous wall structure can adapt to different sizes of the foundation pit and be fixed and stable;

[0023] 2. The utility model is provided with a truss beam, a plug plate and bolt 2. When the device is used, the plug plate is inserted into the truss beam slot, so that the truss beam can be infinitely extended. The truss beam and the plug plate are further fixed by bolt 2, so that the connection of the truss beam is more stable, so that the device can adjust the truss beam according to the length of the foundation pit as needed. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model.

[0025] Figure 2 It is a front view structural schematic diagram of the utility model.

[0026] Figure 3 It is a schematic diagram of the three-dimensional structure of the truss beam of the utility model.

[0027] Figure 4 It is a three-dimensional structural schematic diagram of the water stop plate of the utility model.

[0028] In the figure: 1. water stop plate; 2. reinforcement plate; 3. truss; 4. bolt 2; 5. internal reinforcement strip; 6. bolt 1; 7. guide groove 1; 8. guide groove 2; 9. foundation; 10. guide rail 1; 11. guide rail 2; 12. slide groove; 13. plug plate. DETAILED DESCRIPTION

[0029] In order to make the technical means, creative features, objectives and effects of the present invention easier to understand, the present invention is further described below in conjunction with specific illustrations.

[0030] like Figure 1 - Figure 4 As shown, a water seepage prevention structure for a foundation pit of a building construction comprises a water-stop continuous wall structure, a foundation 9 and a reinforcement structure. The water-stop continuous wall structure comprises water-stop plates 1 arranged at equal distances. The upper surface of the foundation 9 is fixedly connected to each water-stop plate 1. The water-stop plates 1 are fixed around the four walls of the foundation pit. The outer surface of each water-stop plate 1 is fixedly connected to a reinforcement plate 2. The outer surface of each reinforcement plate 2 is provided with slide grooves 12 arranged at equal distances.

[0031] The reinforcement structure includes trusses 3 and four internal reinforcement strips 5 arranged at equal distances. The outer surface of each internal reinforcement strip 5 is fixedly connected to the corresponding reinforcement plate 2. The internal reinforcement strips 5 are located at the four corners of the foundation pit, and the waterstop plates 1 at the four corners of the foundation pit are reinforced and fixed, so that the entire water-stop continuous wall structure is not easily deformed. The outer surface of each truss 3 is slidably connected to the corresponding slide groove 12. When in use, the waterstop plates 1 are arranged end to end on the four walls of the foundation pit, and the waterstop plates 1 are fixed to the foundation 9, and then the trusses 3 pass through the corresponding slide grooves 12 to connect the reinforcement plates 2 in series, and then the waterstop plates 1 are connected in series, so that the waterstop plates 1 are not easily deformed in the vertical direction. The trusses 3 can be extended according to the length of the four walls of the foundation pit to adapt to foundation pits of different lengths. The internal reinforcement strips 5 are located at the four corners of the foundation pit and are fixed to the two adjacent reinforcement plates 2 by bolts, so that the waterstop plates 1 are not easily deformed in the horizontal direction, thereby making the entire foundation pit water-stop continuous wall structure more stable and not easily deformed.

[0032] The internal reinforcement strips 5 and the reinforcement plates 2 are fixedly connected by bolts. Each internal reinforcement strip 5 is sleeved with bolts 6 arranged at equal distances. The outer surface of each bolt 6 is threadedly connected to the corresponding reinforcement plate 2. The internal reinforcement strips 5 are located at the four corners of the foundation pit, and the water stop plates 1 at the four corners of the foundation pit are reinforced and fixed, which makes it difficult for the entire water stop continuous wall structure to deform.

[0033] The outer surface of each truss 3 is fixedly connected with an insertion plate 13, and each insertion plate 13 is plugged into the corresponding truss 3. The insertion plate 13 is fixed at one end of the truss 3, and a slot adapted to the insertion plate 13 is opened at the other end. The truss 3 can be infinitely extended according to the length of the foundation pit and is fixed by plugging the insertion plate 13 into the truss 3.

[0034] Each truss beam 3 is sleeved with a bolt 24, and the outer surface of each bolt 24 is threadedly connected to the corresponding plug plate 13. Furthermore, the plug plate 13 is fixed to the truss beam 3 by the bolt 24, so that the connection mode of the truss beams 3 connected to each other through the plug plates 13 is more stable and firm.

[0035] The outer surface of each water stop plate 1 is fixedly connected with guide rail 10 and guide rail 2 11, and the outer surface of each water stop plate 1 is provided with guide groove 1 7 and guide groove 2 8. Guide rail 10 and guide rail 2 11 and guide groove 1 7 and guide groove 2 8 can make the water stop plate 1 meshed end to end, and can also mesh freely at the corners vertically.

[0036] Every two waterstop plates 1 are meshed end to end through guide rail 10 and guide groove 7, wherein the waterstop plates 1 at two corners are vertically meshed with the corresponding guide groove 7 through guide rail 2 11, and the waterstop plates 1 at the other two corners are vertically meshed with the corresponding guide groove 2 8 through guide rail 10. When the waterstop plates 1 are arranged in a straight line and meshed end to end, this is achieved by meshing guide rail 10 with guide groove 7. When the arrangement of the waterstop plates 1 changes direction, a closed space is formed, wherein the waterstop plates 1 at two corners are vertically meshed with guide groove 2 8 through guide rail 10, and the waterstop plates 1 at the other two corners are vertically meshed with guide groove 7 through guide rail 2 11. During installation, the meshing methods at the corners can be freely combined, and the operation is convenient.

[0037] The implementation principle of the utility model is: when in use, the waterstop plates 1 are arranged end to end on the four walls of the foundation pit, and the waterstop plates 1 are fixed to the foundation 9, and then the trusses 3 pass through the corresponding slide grooves 12 to connect the reinforcement plates 2 in series, and then the waterstop plates 1 are connected in series, so that the waterstop plates 1 are not easily deformed in the vertical direction. The trusses 3 can be extended according to the length of the four walls of the foundation pit to adapt to foundation pits of different lengths. The internal reinforcement strips 5 are located at the four corners of the foundation pit and are fixed to the two adjacent reinforcement plates 2 by bolts, so that the waterstop plates 1 are not easily deformed in the horizontal direction, thereby making the entire foundation pit water-stop continuous wall structure more stable and not easy to deform.

[0038] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited to the above embodiments. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of protection claimed by the utility model. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A water seepage prevention structure for a foundation pit of a building construction, comprising a water-stop continuous wall structure, a foundation (9) and a reinforcement structure, characterized in that: The waterproof continuous wall structure comprises waterproof plates (1) arranged at equal distances, the upper surface of the foundation (9) is fixedly connected to each waterproof plate (1), the outer surface of each waterproof plate (1) is fixedly connected to a reinforcing plate (2), and the outer surface of each reinforcing plate (2) is provided with sliding grooves (12) arranged at equal distances; The reinforcement structure comprises equidistantly arranged trusses (3) and four inner reinforcement strips (5), the outer surface of each inner reinforcement strip (5) being fixedly connected to the corresponding reinforcement plate (2), and the outer surface of each truss (3) being slidably connected to the corresponding slide groove (12).

2. The anti-seepage structure for foundation pit of construction according to claim 1, characterized in that: The inner reinforcement strip (5) and the reinforcement plate (2) are fixedly connected by bolts, and each inner reinforcement strip (5) is provided with bolts (6) arranged at equal distances inside, and the outer surface of each bolt (6) is threadedly connected to the corresponding reinforcement plate (2).

3. The anti-seepage structure for foundation pit of construction according to claim 1, characterized in that: The outer surface of each truss beam (3) is fixedly connected with an insert plate (13), and each insert plate (13) is inserted into the corresponding truss beam (3).

4. The anti-seepage structure for foundation pit of construction according to claim 3, characterized in that: A second bolt (4) is sleeved inside each of the trusses (3), and an outer surface of each of the second bolts (4) is threadedly connected to a corresponding plug plate (13).

5. The anti-seepage structure for foundation pit of construction according to claim 1, characterized in that: The outer surface of each water stop plate (1) is fixedly connected with a guide rail 1 (10) and a guide rail 2 (11), and the outer surface of each water stop plate (1) is provided with a guide groove 1 (7) and a guide groove 2 (8).

6. The anti-seepage structure for foundation pit of construction according to claim 5, characterized in that: Every two of the water stop plates (1) are meshed end to end through guide rail one (10) and guide groove one (7), wherein the water stop plates (1) at two corners are vertically meshed with the corresponding guide groove one (7) through guide rail two (11), and the water stop plates (1) at the other two corners are vertically meshed with the corresponding guide groove two (8) through guide rail one (10).

Citation Information

Cited By

  • Air-pressure seepage-stopping water-saving device for layered excavation of deep foundation pit

    CN120401564A

  • A pneumatic seepage-blocking and water-saving device for layered excavation of deep foundation pits

    CN120401564B