Basement outer wall construction joint waterproof structure

By adopting step joint structures and multi-layer waterproofing measures in the construction joints of the basement exterior wall, the problem of waterproof structure damage caused by temperature changes in the existing technology is solved, and more efficient watertightness and stability are achieved, ensuring dryness in the basement .

CN221941644UActive Publication Date: 2024-11-01HUAIBEI HUAIHAI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323629963.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-01
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The waterproof structure of the existing basement exterior wall construction joint is easily affected by temperature changes, which leads to changes in the expansion stress of the water-stop steel plate and causes damage to the water-proof structure. The single easily causes the seepage to penetrate through the construction joint and bypass the water-stop steel plate to penetrate to the backwater surface, thereby causing the seepage. Easy to leak into the basement.

Method used

The step joint is formed between the first cast wall and the rear cast wall, and the water stop steel frame is installed, including the bent plate body and the C-shaped plate, and the thermal conduction frame is installed outside the bent plate body, through the expansion rubber water stop bar and The rubber belt further enhances the waterproof effect, disperse temperature changes, and reduces local temperature concentration.

Benefits of technology

Through the stepped joint structure and multi-layer waterproofing measures, the water barrier effect is significantly improved, the risk of seepage is reduced, the leakage of seepage into the basement is avoided, and the stability and durability of the waterproof structure are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941644U_ABST
    Figure CN221941644U_ABST
Patent Text Reader

Abstract

The utility model relates to a basement exterior wall construction joint waterproof structure, and relates to the field of exterior wall waterproof structures. The structure comprises a pre-cast wall body and a post-cast wall body, the pre-cast wall body is fixedly arranged on the upper end face of the post-cast wall body, a step seam is formed between the pre-cast wall body and the post-cast wall body, a water stop steel frame is installed in the step seam, the upper end of the water stop steel frame extends into the post-cast wall body, the lower end of the water stop steel frame extends into the pre-cast wall body, and the pre-cast wall body is fixedly arranged on the post-cast wall body. The water stop steel frame comprises a bent plate body and a C-shaped plate. The pre-cast wall body is designed into the structure of the bottom plate part and the step part, so that the pre-cast wall body can easily form a step seam with the post-cast wall body through the step part, when water seepage occurs in the construction seam, the water seepage can penetrate through the seam to enter the wall body by climbing the step for multiple times, and the water seepage prevention effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of exterior wall waterproof structures, and in particular to a basement exterior wall construction joint waterproof structure. Background Art

[0002] Construction joints refer to the joints formed between the first and last poured concrete during the concrete pouring process due to design requirements or construction needs. Construction joints are not real "joints". They are just a bonding surface between the first poured concrete and the last poured concrete because the first poured concrete exceeds the initial setting time. This bonding surface is called a construction joint.

[0003] The existing Chinese patent with publication number CN104264714A discloses a waterproof construction joint structure for the exterior wall of a basement, including a cast-in-place concrete wall and a post-cast concrete wall formed by segmented and layered pouring, a horizontal construction joint is formed between the cast-in-place concrete wall and the post-cast concrete wall, and a waterstop steel plate partially extending upward and bent toward the water-facing side is pre-embedded in the middle position of the cast-in-place concrete wall, and the waterstop steel plate is arranged along the casting direction of the cast-in-place concrete wall and the post-cast concrete wall.

[0004] Regarding the above-mentioned related technologies, it is found that most of the existing construction methods use the method of installing waterstop steel plates at the construction joint position as a waterproof structure. However, in actual use, it is found that since the waterstop steel plates are easily affected by the outdoor temperature, the local temperature changes of the waterstop steel plates are likely to cause changes in expansion stress, which will cause damage to the waterproof structure. A single structure can easily allow water to seep through the construction joints and bypass the waterstop steel plates to penetrate to the back water surface, making it easy for water to seep into the basement. Utility Model Content

[0005] In order to avoid the situation where the waterproof structure is damaged due to temperature changes, the present application provides a basement exterior wall construction joint waterproof structure.

[0006] The present application provides a basement exterior wall construction joint waterproof structure that adopts the following technical solutions:

[0007] A waterproof structure for construction joints on the exterior wall of a basement comprises a pre-cast wall and a post-cast wall, wherein the pre-cast wall is fixedly arranged on the upper end surface of the post-cast wall, a step joint is formed between the pre-cast wall and the post-cast wall, a water-stop steel frame is installed in the step joint, the upper end of the water-stop steel frame extends into the post-cast wall, and the lower end of the water-stop steel frame extends into the pre-cast wall, the water-stop steel frame comprises a bent plate body and a C-shaped plate, the C-shaped plate is integrally formed and arranged in the middle of the inner side of the bent plate body, a heat-conducting frame is also installed on the outer side of the bent plate body, and the heat-conducting frame is fixedly connected to the bent plate body.

[0008] By adopting the above technical scheme, the structure of the first poured wall and the later poured wall is set to ensure that a step joint is formed between the two. Compared with the traditional straight joint, it has a better water-blocking effect and reduces the risk of water seepage. At the same time, the step joint is blocked by installing a water-stop steel frame in the step joint, and the structure of the water-stop steel frame is set to ensure that a C-shaped plate is set in the middle of the side of the water-facing surface of the bent plate body, so that the C-shaped plate can be used to cooperate with the bent plate body to further increase the blocking effect. By installing a heat-conducting frame on the outside of the bent plate body, it is convenient to extend the heat-conducting frame to the first poured wall and the later poured wall, so that the temperature on the water-stop steel frame can be better dispersed to avoid local temperature concentration.

[0009] Optionally, the first cast wall includes a bottom plate portion and a stepped portion, the stepped portion is arranged on the upper end surface of the bottom plate portion, and the stepped portion and the bottom plate portion are cast and formed in one piece.

[0010] By adopting the above technical solution, the first poured wall is designed to have a structure of a bottom plate portion and a stepped portion, so that when the second poured wall is poured on the first poured wall, the second poured wall can be formed on the stepped portion to form a stepped seam between the first poured wall and the second poured wall. In this way, when water seeps through the gap from the outside, it cannot climb to the higher step when the amount of water seepage is small, thereby achieving the purpose of blocking water seepage.

[0011] Optionally, the bent plate body includes a vertical plate portion and an inner bent plate, the inner bent plate is disposed at both ends of the vertical plate portion, and the inner bent plate and the vertical plate portion are integrally formed.

[0012] By adopting the above technical solution, the inner curved plates are arranged at both ends of the vertical plate part through the structural arrangement of the curved plate body, so as to form a curved structure as a whole and facilitate better pouring of water.

[0013] Optionally, a plurality of engaging grooves are provided on a side of the inner curved plate facing the C-shaped plate, and expansion rubber water stop strips are fixedly installed in the engaging grooves.

[0014] By adopting the above technical solution, a snap-fit ​​groove is set on the inner curved plate, and an expansion rubber waterstop strip is fixedly installed in the snap-fit ​​groove. When water seepage occurs, the water source will spread along the surface of the bent plate body. Once it contacts the expansion rubber waterstop strip, the expansion rubber waterstop strip will expand to prevent the water source from spreading to the other side of the bent plate body, thereby achieving timely water stopping.

[0015] Optionally, a plurality of reinforcing plates are provided between the C-shaped plate and the inner curved plate, and two ends of the reinforcing plates are fixedly connected to the C-shaped plate and the inner curved plate respectively.

[0016] By adopting the above technical solution, the overall strength of the bent plate can be guaranteed by setting the reinforcing plate, ensuring that it can be stably fixed in the wall during the casting process.

[0017] Optionally, the heat-conducting frame includes a middle plate, a dispersion strip and an insertion rod, the dispersion strip is evenly arranged on the upper end surface of the middle plate, and the insertion rod is fixedly installed on the lower end surface of the middle plate.

[0018] By adopting the above technical solution, the structure of the heat-conducting frame is set to ensure that the dispersion strips and the insertion rods are installed through the middle plate, so that the heat-conducting frame can be fixed in the first-cast wall through the insertion rods for subsequent casting, and the dispersion strips can be cast in the later-cast wall, so as to achieve the purpose of heat conduction from all places through the dispersion strips.

[0019] Optionally, a retaining wall is built on the outer side of the post-cast wall body, and a waterproof membrane for covering the step joints is laid between the post-cast wall bodies of the retaining wall.

[0020] By adopting the above technical solution, the gap between the first poured wall and the later poured wall can be shielded from the outside by setting the retaining wall and the waterproof membrane.

[0021] Optionally, a plurality of rubber belts are arranged in the stepped seam.

[0022] By adopting the above technical solution, the water seepage in the step seam can be further reduced by laying a rubber belt in the step seam.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. By designing the first poured wall into a structure of a bottom plate and a stepped portion, it is easy for the first poured wall to form a stepped joint with the later poured wall through the stepped portion. When there is water seepage in the construction joint, the seepage water needs to climb the steps several times to pass through the gap and enter the interior of the wall, thereby increasing the effect of water penetration prevention;

[0025] 2. By arranging a C-shaped plate on the bent plate body, it is ensured that the seepage water needs to bypass the C-shaped plate before continuing to bypass the bent plate body to seep into the wall. At the same time, by arranging a connected heat conduction frame on the bent plate body, it is easy for the water-stop steel frame to better disperse the temperature to the wall, thereby reducing local temperature changes;

[0026] 3. Further waterproofing effect is achieved by expanding rubber water stop strips and rubber belts to reduce the ability of water seepage to spread into the interior of the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure in the embodiment of the present application.

[0028] Figure 2 It is a three-dimensional diagram of the water-stop steel frame in the embodiment of the present application.

[0029] Figure 3 yes Figure 2 Right side view of the device shown.

[0030] Figure 4 yes Figure 3 A partial enlarged view of device A is shown.

[0031] Figure 5 yes Figure 2 Rear view of the device shown.

[0032] Explanation of the reference numerals in the accompanying drawings: 1. First cast wall; 11. Bottom plate; 12. Stepped portion; 2. Post-cast wall; 21. Water retaining wall; 22. Waterproof membrane; 3. Stepped seam; 31. Rubber belt; 4. Water-stop steel frame; 41. Bent plate; 411. Vertical plate; 412. Inner bent plate; 413. Engaging groove; 414. Expandable rubber water-stop strip; 42. C-shaped plate; 421. Reinforcement plate; 5. Heat-conducting frame; 51. Middle plate; 52. Dispersion strip; 53. Insert rod. DETAILED DESCRIPTION

[0033] The present application is further described in detail below in conjunction with the accompanying drawings.

[0034] The present application embodiment discloses a waterproof structure for construction joints of basement exterior walls. Figure 1 , Figure 2 and Figure 3 As shown, a waterproof structure for construction joints of basement exterior walls includes a precast wall 1 and a postcast wall 2. The precast wall 1 is fixedly arranged on the upper end surface of the postcast wall 2. A step joint 3 is formed between the precast wall 1 and the postcast wall 2. A plurality of rubber belts 31 are arranged in the step joint 3. The rubber belts 31 are arranged in the step joint 3 to further reduce water seepage in the step joint 3. A water-stop steel frame 4 is installed in the step joint 3. The upper end of the water-stop steel frame 4 extends into the postcast wall 2, and the lower end of the water-stop steel frame 4 extends into the precast wall 1. The water-stop steel frame 4 includes a bent plate 41 and a C-shaped plate 42. The C-shaped plate 42 is integrally formed and arranged in the middle of the inner side of the bent plate 41. A heat-conducting frame 5 is also installed on the outer side of the bent plate 41. The heat-conducting frame 5 is fixedly connected to the bent plate 41. By setting the structure of the first poured wall 1 and the second poured wall 2, a step joint 3 is formed between the two. Compared with the traditional straight joint, it has a better water-blocking effect and reduces the risk of water seepage. At the same time, a water-stop steel frame 4 is installed in the step joint 3 to block the step joint 3. The structure of the water-stop steel frame 4 ensures that a C-shaped plate 42 is set in the middle of the side of the water-facing surface of the bent plate 41, so that the C-shaped plate 42 cooperates with the bent plate 41 to further increase the blocking effect. By installing a heat-conducting frame 5 on the outside of the bent plate 41, it is convenient to extend the heat-conducting frame 5 to the first poured wall 1 and the second poured wall 2, so that the temperature on the water-stop steel frame 4 can be better dispersed to avoid local temperature concentration.

[0035] Reference Figure 1 As shown, the first cast wall 1 includes a bottom plate portion 11 and a step portion 12, the step portion 12 is arranged on the upper end surface of the bottom plate portion 11, and the step portion 12 and the bottom plate portion 11 are cast and formed in one piece. By designing the first cast wall 1 to have a structure of the bottom plate portion 11 and the step portion 12, when casting on the first cast wall 1, the second cast wall 2 can be formed on the step portion 12, so that a step seam 3 is formed between the first cast wall 1 and the second cast wall 2, so that when water seeps from the outside through the gap, it cannot climb to the higher step when the amount of water seepage is small, thereby achieving the purpose of blocking water seepage.

[0036] Reference Figure 1 As shown, a retaining wall 21 is built on the outer side of the post-cast wall 2, and a waterproofing membrane 22 for covering the step joint 3 is laid between the retaining wall 21 and the post-cast wall 2. The retaining wall 21 and the waterproofing membrane 22 are arranged to cover the gap between the first cast wall 1 and the post-cast wall 2 from the outside.

[0037] Reference Figure 2 and Figure 3 As shown, the bent plate body 41 includes a vertical plate portion 411 and an inner curved plate 412. The inner curved plate 412 is disposed at both ends of the vertical plate portion 411, and the inner curved plate 412 is integrally formed with the vertical plate portion 411. By setting the structure of the bent plate body 41, it is ensured that the inner curved plates 412 are disposed at both ends of the vertical plate portion 411, so that the overall bent structure is formed conveniently, and it is easy to pour water. A plurality of engaging grooves 413 are provided on the side of the inner curved plate 412 facing the C-shaped plate 42, and an expansion rubber water stop strip 414 is fixedly installed in the engaging groove 413. By setting a snap-fit ​​groove 413 on the inner curved plate 412, and fixing an expansion rubber water stop strip 414 in the snap-fit ​​groove 413, when water seepage occurs, the water source will spread along the surface of the bending plate body 41. Once it contacts the expansion rubber water stop strip 414, the expansion rubber water stop strip 414 will expand to prevent the water source from spreading to the other side of the bending plate body 41, thereby achieving timely water stopping. A plurality of reinforcing plates 421 are arranged between the C-shaped plate 42 and the inner curved plate 412, and the two ends of the reinforcing plates 421 are fixedly connected to the C-shaped plate 42 and the inner curved plate 412, respectively. By setting the reinforcing plates 421, the overall use strength of the bending plate body 41 is ensured, and it is ensured that it can be stably fixed in the wall during the pouring process.

[0038] Reference Figure 5As shown, the heat conducting frame 5 includes a middle plate 51, a dispersion strip 52 and an insertion rod 53. The dispersion strip 52 is evenly arranged on the upper end surface of the middle plate 51, and the insertion rod 53 is fixedly installed on the lower end surface of the middle plate 51. The structure of the heat conducting frame 5 is set to ensure that the dispersion strip 52 and the insertion rod 53 are installed through the middle plate 51, so that the heat conducting frame 5 can be fixed in the first cast wall 1 through the insertion rod 53 and then cast, and the dispersion strip 52 can be cast in the later cast wall 2, so that the purpose of heat conduction from all places is achieved through the dispersion strip 52.

[0039] The implementation principle of the waterproof structure of the construction joint of the basement exterior wall in the embodiment of the present application is: when pouring the first wall 1, a step portion 12 is formed through a corresponding mold, and the water-stop steel frame 4 and the rubber belt 31 are buried, both of which are half buried, and then the subsequent wall 2 is poured. After the pouring is completed, the waterproof membrane 22 can be laid on the outer surface, so that the waterproof membrane 22 can cover the step joint 3 well, and finally the retaining wall 21 can be built.

[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A waterproof structure for construction joints of a basement exterior wall, comprising a pre-cast wall (1) and a post-cast wall (2), wherein the pre-cast wall (1) is fixedly arranged on the upper end surface of the post-cast wall (2), Features: A stepped joint (3) is formed between the first cast wall (1) and the second cast wall (2), a water-stop steel frame (4) is installed in the stepped joint (3), the upper end of the water-stop steel frame (4) extends into the second cast wall (2), and the lower end of the water-stop steel frame (4) extends into the first cast wall (1), the water-stop steel frame (4) comprises a bent plate (41) and a C-shaped plate (42), the C-shaped plate (42) is integrally formed and arranged in the middle of the inner side of the bent plate (41), and a heat-conducting frame (5) is also installed on the outer side of the bent plate (41), and the heat-conducting frame (5) is fixedly connected to the bent plate (41).

2. A basement exterior wall construction joint waterproof structure according to claim 1, Features: The precast wall (1) comprises a bottom plate portion (11) and a stepped portion (12); the stepped portion (12) is arranged on the upper end surface of the bottom plate portion (11), and the stepped portion (12) and the bottom plate portion (11) are integrally cast and formed.

3. A basement exterior wall construction joint waterproof structure according to claim 2, Features: The bent plate body (41) comprises a vertical plate portion (411) and an inner curved plate (412), wherein the inner curved plate (412) is disposed at both ends of the vertical plate portion (411), and the inner curved plate (412) and the vertical plate portion (411) are integrally formed.

4. A basement exterior wall construction joint waterproof structure according to claim 3, Features: A plurality of engaging grooves (413) are provided on one side of the inner curved plate (412) facing the C-shaped plate (42), and an expansion rubber water stop strip (414) is fixedly installed in the engaging groove (413).

5. A basement exterior wall construction joint waterproof structure according to claim 4, Features: A plurality of reinforcing plates (421) are provided between the C-shaped plate (42) and the inner curved plate (412), and two ends of the reinforcing plates (421) are fixedly connected to the C-shaped plate (42) and the inner curved plate (412), respectively.

6. A basement exterior wall construction joint waterproof structure according to claim 5, Features: The heat-conducting frame (5) comprises a middle plate (51), a dispersion strip (52) and an insertion rod (53); the dispersion strip (52) is evenly arranged on the upper end surface of the middle plate (51), and the insertion rod (53) is fixedly mounted on the lower end surface of the middle plate (51).

7. A basement exterior wall construction joint waterproof structure according to claim 6, Features: A water retaining wall (21) is built on the outer side surface of the post-cast wall body (2), and a waterproof roll material (22) for covering the step joint (3) is laid between the water retaining wall (21) and the post-cast wall body (2).

8. A basement exterior wall construction joint waterproof structure according to claim 7, Features: A plurality of rubber belts (31) are arranged in the stepped seam (3).