Composite beam assembly

By using combined beam components in the building structure and using hot-rolled H-shaped steel beams and bolts to connect with concrete floor slabs, the problems of complex and safety risks of concrete beam construction are solved, and efficient, safe and environmentally friendly building renovations are achieved. Reinforce.

CN221941754UActive Publication Date: 2024-11-01SHANGHAI SUNYAT ARCHITECTURE DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420202064.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-01
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

In the renovation of existing building structures, the construction of concrete beams is complex, has a long cycle, has a large environmental impact, high safety risks, high costs, and poses risks to structural integrity.

Method used

Combined beam components are adopted, including hot-rolled H-shaped steel beams and multiple bolts. By opening grouting holes on the concrete floor, the bolting nails are connected to the steel beams and pouring grouting materials, the steel beams and the concrete floors are formed into a nail-buckle connection. Improve construction efficiency and structural stability.

Benefits of technology

It greatly improves construction efficiency, reduces environmental impact and safety risks, reduces material costs, enhances structural stability and safety, has a wide range of applications and is suitable for building renovation and reinforcement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941754U_ABST
    Figure CN221941754U_ABST
Patent Text Reader

Abstract

The utility model discloses a composite beam assembly which is applied to a concrete floor, the composite beam assembly comprises a steel beam and a plurality of studs, a plurality of grouting holes are formed in the concrete floor, the studs are all connected to the top face of the steel beam, and the other ends of the studs extend outwards in the direction close to the concrete floor and extend into the grouting holes respectively. Grouting materials are poured into the grouting holes so that the studs can be connected into the concrete floor. The multiple studs are installed and connected to the steel beam and inserted into the grouting holes, and the grouting materials are poured into the grouting holes, so that the steel beam and the multiple studs are connected with the concrete floor, the concrete floor and the steel beam jointly act to form the composite beam, the construction efficiency is greatly improved, the influence on an original structure is small, the connection quality is stable, and the precision is higher; compared with the prior art, better structural stability and safety can be guaranteed, meanwhile, the application range is wide, and greater possibility and convenience are provided for building transformation and reinforcement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a composite beam component. Background Art

[0002] With the rapid progress of society, the rapid development of science and technology, and the rapid advancement of urbanization, people's demand for the diversity of architectural space has become increasingly prominent. In this era, many old buildings appear outdated because their internal layouts cannot meet the current space usage needs. Therefore, in order to meet the diverse needs of modern society for architectural space and functions, strengthening, renovating and updating the original buildings has not only become a necessary means to extend the service life of buildings, but also an important measure to reduce the waste of social resources and promote sustainable development. Such measures help ensure that while our cities develop and progress, the original buildings can continue to play their value and create more possibilities for modern society and the future.

[0003] The current building structure renovation includes reconfiguring internal partition walls, adding floor openings, and adjusting the local structural layout of the original structure. Such structural renovation will basically adjust the original structural beam system layout. Therefore, in the reinforcement and renovation project, the problems of adding new concrete beams or replacing structural concrete beams mainly include the following aspects:

[0004] (1) Complex construction and long construction period: Cast-in-place construction is tedious and complex, with a long construction period, including formwork construction, steel bar binding and concrete pouring.

[0005] (2) Wet work and environmental impact: Concrete pouring is a wet work process, which may have an impact on the surrounding environment, such as noise, dust and water pollution.

[0006] (3) Structural Integrity: Cutting and removing the existing structure to accommodate the new beams may pose a risk to the structural integrity of the entire building.

[0007] (4) Construction safety risks: The construction of concrete beams usually involves high-altitude work and heavy equipment, which may increase the safety risks on the construction site.

[0008] (5) Construction costs: The construction and material costs of concrete beams may be high, especially if special designs or concrete qualities are required. Utility Model Content

[0009] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art, and the utility model provides a composite beam assembly.

[0010] The utility model is realized by the following technical solutions:

[0011] A composite beam assembly is applied to a concrete floor slab. The composite beam assembly includes a steel beam and a plurality of bolts. The concrete floor slab is provided with a plurality of grouting holes. The plurality of bolts are connected to the top surface of the steel beam. The other ends of the plurality of bolts extend outward in a direction close to the concrete floor slab and extend into the grouting holes respectively. Grouting material is poured in the grouting holes so that the bolts are connected to the concrete floor slab.

[0012] Furthermore, the steel beam includes a web, a first flange plate and a second flange plate, the first flange plate and the second flange plate are respectively connected to the two ends of the web, and the first flange plate and the second flange plate both extend to both sides of the web along the thickness direction of the web, and the plurality of bolts are connected to the side of the first flange plate facing away from the web.

[0013] Furthermore, the steel beam is a hot-rolled H-shaped steel beam.

[0014] Furthermore, there is a gap between the first flange plate and the concrete floor slab, so that the gap is filled with the grouting material, and the gap is not less than 20 mm.

[0015] Furthermore, the composite beam assembly also includes a plurality of sealing tapes, which are respectively located at both ends of the first flange plate, and the sealing tapes are connected to the first flange plate and the concrete floor slab and are used to seal the gap.

[0016] Furthermore, the plurality of bolts are arranged at intervals, and the plurality of bolts are respectively connected to two ends of the first flange plate.

[0017] Furthermore, the bolt is made of steel and is welded to the steel beam.

[0018] Furthermore, the diameter of the bolt is 19 mm, and the length of the bolt is 90 to 120 mm.

[0019] Furthermore, a ceramic ring is sleeved on the outer surface of the bolt.

[0020] Furthermore, the grouting material is a cement-based grouting material.

[0021] The beneficial effects of the utility model are:

[0022] The composite beam assembly of the utility model connects the steel beam and the multiple bolts to the concrete floor slab by installing multiple bolts on the steel beam and inserting them into the grouting holes, and the grouting material is poured in the grouting holes, so that the steel beam and the multiple bolts are connected to the concrete floor slab, thereby realizing the concrete floor slab and the steel beam to work together to form a composite beam, which greatly improves the construction efficiency, has little impact on the original structure, has stable connection quality, and has higher precision, can ensure better structural stability and safety, and at the same time, has a wide range of applications, providing greater possibilities and convenience for building renovation and reinforcement. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic structural diagram of the composite beam assembly of an embodiment of the utility model when in use.

[0024] Figure 2 for Figure 1 Sectional view along line AA.

[0025] Figure 3 for Figure 1 Sectional view along line BB.

[0026] Description of reference numerals:

[0027] Steel beam 1

[0028] First flange plate 11

[0029] Second flange plate 12

[0030] Belly 13

[0031] Peg 2

[0032] Grouting material 3

[0033] Sealing tape 4

[0034] Concrete floor 10

[0035] Grouting Holes 101 DETAILED DESCRIPTION

[0036] The following descriptions of the embodiments refer to the accompanying drawings to illustrate specific embodiments in which the present invention can be implemented.

[0037] like Figure 1 , Figure 2 and Figure 3 As shown, this embodiment discloses a composite beam assembly, which is applied to a concrete floor 10. The composite beam assembly includes a steel beam 1 and a plurality of studs 2. A plurality of grouting holes 101 are opened on the concrete floor 10. The plurality of studs 2 are connected to the top surface of the steel beam 1. The other ends of the plurality of studs 2 extend outward in a direction close to the concrete floor 10 and extend into the grouting holes 101 respectively. Grouting material 3 is poured in the grouting holes 101 so that the studs 2 are connected to the concrete floor 10.

[0038] A grouting hole 101 is opened on the concrete floor 10 by using a water drill tool, and then the bevel hole is expanded. By installing and connecting multiple bolts 2 on the steel beam 1 and inserting them into the grouting hole 101, the grouting material 3 is poured into the grouting hole 101, so that the steel beam 1 and the multiple bolts 2 are connected to the concrete floor 10, so that the concrete floor 10 and the steel beam 1 work together to form a composite beam. The steel beam 1 is connected to the existing concrete floor 10 by a nail-button connection through multiple bolts 2. Compared with the traditional cast-in-place concrete reinforcement and reconstruction, the composite beam assembly of this embodiment has many advantages for reinforcement and reconstruction projects, showing many advantages.

[0039] High material strength: Steel has high strength characteristics and is light in weight, which is conducive to the optimization of structural design and efficient construction. Fast construction speed: Steel structure has the advantage of industrialized processing, which can achieve rapid on-site installation and improve construction efficiency. Wide range of applications: Steel structure has a wide range of applications, providing greater possibilities and convenience for building renovation and reinforcement. Sustainability: Steel can be used sustainably, and can be effectively recycled and reused when the building is demolished or renovated, showing the advantages of recycling. High precision: Compared with concrete structures cast on site, prefabricated steel structures have higher precision and can ensure better structural stability and safety. It has a higher degree of industrialization, a shorter construction period, a lower project cost, and is in line with the concept of green energy saving.

[0040] In this embodiment, the steel beam 1 includes a web 13, a first flange plate 11 and a second flange plate 12, the first flange plate 11 and the second flange plate 12 are respectively connected to the two ends of the web 13, and the first flange plate 11 and the second flange plate 12 are both extended to the two sides of the web 13 along the thickness direction of the web 13, and a plurality of bolts 2 are all connected to the side of the first flange plate 11 facing away from the web 13. The first flange plate 11 and the second flange plate 12 are respectively connected to the two ends of the web 13, so that the overall structural strength of the steel beam 1 is high, the structure is simple, and the processing and manufacturing are convenient. Among them, the steel beam 1 is a hot-rolled H-shaped steel beam. Preferably, a hot-rolled H-shaped steel beam of model HN650x300 is used.

[0041] The material of the stud 2 is steel, and the stud 2 is welded to the steel beam 1. When the stud 2 is welded, a triangular positioning energy storage stud special welding gun is used to weld the stud 2, which ensures the accuracy and quality of welding, effectively strengthens the connection strength between the stud 2 and the steel beam 1, and has high stability.

[0042] Among them, the welding between the stud 2 and the steel beam 1 adopts capacitor energy storage arc stud welding. The basic principle is to ignite an arc between the stud 2 to be welded and the upper flange of the steel beam 1. When the stud 2 and the upper flange of the steel beam 1 are heated to a suitable temperature, under the action of external force, the stud is sent into the welding pool on the workpiece to form a welded joint. The energy storage stud welding machine uses a large-capacity capacitor as the source of welding energy. The discharge time is precisely controlled by the thyristor, and the tip of the stud is quickly melted in an instantaneous low voltage-high current mode, so that the gap between the stud and the working surface is quickly merged, and the stud is firmly welded to the working surface. The whole process lasts about 1-3ms. The capacitor energy storage arc stud welding process is mature, with high welding efficiency and good welding quality, which meets the requirements of the welding process for this research and development.

[0043] The diameter of the stud 2 is 19 mm, and the length of the stud 2 is 90 to 120 mm. Preferably, the outer surface of the stud 2 is sleeved with a ceramic ring.

[0044] A plurality of bolts 2 are arranged at intervals, and the plurality of bolts 2 are respectively connected to the two ends of the first flange plate 11. By welding the bolts 2 on the first flange plate 11 of the steel beam 1, and extending the bolts 2 into the grouting holes 101 of the concrete floor 10, and then pouring the grouting material 3 in the grouting hole 101, after the grouting material 3 solidifies, the bolts 2 are locked to form a nail-button connection, thereby realizing a reliable connection between the composite beam assembly and the concrete floor 10, and the steel beam 1 and the concrete floor 10 form a whole. This connection method effectively prevents the relative slip between the concrete floor 10 and the steel beam 1, so that the two coordinate to bear the load together. Under the action of load, the cross section of the composite beam assembly has only one neutral axis, the concrete floor 10 mainly bears pressure, and the steel beam 1 mainly bears tension, thereby making full use of the advantages of their respective materials.

[0045] There is a gap between the first flange plate 11 and the concrete floor 10, so that the gap is filled with grouting material 3, and the gap is not less than 20mm. The steel beam 1 is installed according to the specification to ensure that the minimum distance between the first flange plate 11 of the steel beam 1 and the concrete floor 10 is not less than 20mm, and the gap is filled with grouting material 3, which effectively strengthens the connection contact area between the steel beam 1 and the concrete floor 10, and has higher stability.

[0046] The grouting material 3 is a cement-based grouting material 3. During pouring, the cement-based grouting material is poured into the holes on the surface of the concrete floor 10, ensuring that every four holes are poured to ensure that all holes are filled without omission. Preferably, the grouting material 3 is a C40 high-strength non-shrinkage cement-based grouting material.

[0047] The composite beam assembly further includes a plurality of sealing tapes 4, which are respectively located at both ends of the first flange plate 11, and the sealing tapes 4 are connected to the first flange plate 11 and the concrete floor 10 and are used to seal the gap. The sealing tapes 4 are used to seal the grouting material 3 on both sides of the gap, thereby preventing the grouting material 3 from overflowing and ensuring a tight seal.

[0048] For the structural stress analysis of the connection working condition of the composite beam assembly and the concrete floor slab 10 of this embodiment, the calculation conditions are as follows: the strength grade of the concrete floor slab 10 is C30, the steel beam 1 is made of Q355B grade steel with a cross section of HN650x300, and the bolt 2 has a diameter of 19mm. The thickness of the concrete floor slab 10 is 120mm, and it is equipped with double-layer bidirectional φ8@200 third-grade steel bars. At the same time, the strength grade of the concrete grouting material 3 is C40 to ensure the stability and reliability of the structure.

[0049] The calculation results show that the number of studs 2 welded on the flange of the steel beam 1 fully meets the shear calculation requirements, ensuring the shear resistance and safety of the studs 2. The bending bearing capacity of the composite beam assembly not only meets the calculation requirements, but also has a certain bearing capacity reserve, thereby ensuring its structural safety and reliability.

[0050] In this embodiment, compared with the traditional reinforcement and reconstruction technology, the composite beam technology of the steel beam 1 and the existing concrete floor slab nailing connection has great advantages:

[0051] (1) The composite beam technology of nailing and fastening the steel beam 1 to the existing concrete floor slab breaks through the technical limitations of traditional cast-in-place composite beams. This technology provides new possibilities for the renovation of existing buildings.

[0052] (2) The application of the composite beam technology of nailing and fastening the steel beam 1 to the existing concrete floor slab can improve the bearing capacity of the steel beam 1, effectively reduce the cross-sectional height of the steel beam 1, increase the indoor net height by 150 to 250 mm, and significantly improve the indoor quality.

[0053] (3) Compared with the construction technology, the application of the composite beam technology of the nail-button connection between the steel beam 1 and the existing concrete floor slab can reduce the material consumption by up to 70%, and no formwork is required on site.

[0054] (4) Compared with the construction technology, the application of the composite beam technology of the steel beam 1 and the existing concrete floor slab nailing connection can improve the construction efficiency and shorten the construction period. The construction period can be shortened by up to 50%.

[0055] (5) The application of composite beam technology in which the steel beam 1 is connected to the existing concrete floor slab by nailing, and a large amount of mechanical and dry operations are adopted to reduce material consumption, noise and environmental pollution, and wet operations on the construction site can be reduced by about 80%.

[0056] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope covered by the present invention.

Claims

1. A composite beam assembly, applied to a concrete floor, characterized in that: The composite beam assembly includes a steel beam and a plurality of bolts. The concrete floor slab is provided with a plurality of grouting holes. The plurality of bolts are connected to the top surface of the steel beam. The other ends of the plurality of bolts extend outward in a direction close to the concrete floor slab and extend into the grouting holes respectively. Grouting material is poured into the grouting holes so that the bolts are connected to the concrete floor slab.

2. The composite beam assembly according to claim 1, characterized in that: The steel beam includes a web, a first flange plate, and a second flange plate. The first flange plate and the second flange plate are respectively connected to two ends of the web, and the first flange plate and the second flange plate both extend toward both sides of the web along the thickness direction of the web. The plurality of bolts are all connected to a side of the first flange plate that is away from the web.

3. The composite beam assembly according to claim 2, characterized in that: The steel beam is a hot-rolled H-shaped steel beam.

4. The composite beam assembly according to claim 2, characterized in that: There is a gap between the first flange plate and the concrete floor slab, so that the gap is filled with the grouting material, and the gap is not less than 20 mm.

5. The composite beam assembly according to claim 4, characterized in that: The composite beam assembly further includes a plurality of sealing tapes, which are respectively located at two ends of the first flange plate, and the sealing tapes are connected to the first flange plate and the concrete floor slab and are used to seal the gap.

6. The composite beam assembly according to claim 2, wherein: The plurality of studs are arranged at intervals, and the plurality of studs are respectively connected to two ends of the first flange plate.

7. The composite beam assembly according to claim 1, wherein: The bolt is made of steel and is welded to the steel beam.

8. The composite beam assembly according to claim 1, wherein: The diameter of the bolt is 19 mm, and the length of the bolt is 90 to 120 mm.

9. The composite beam assembly according to claim 1, wherein: The outer surface of the stud is sleeved with a ceramic ring.

10. The composite beam assembly according to claim 1, wherein: The grouting material is a cement-based grouting material.