Lead zinc ore beneficiation wastewater pumpback device

By using high-level water storage tanks and support brackets in the lead-zinc ore ore wastewater extraction device, the centrifugal pump is always filled with water, which solves the problem of "dry rotation", improves the simplicity and efficiency of operation, and extends the equipment life.

CN221942732UActive Publication Date: 2024-11-01YUNNAN YONGCHANG LEAD & ZINC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420672630.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-01
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

In lead-zinc ore ore production, centrifugal pumps are prone to 'dry rotation' after stopping the pump, resulting in cumbersome operation and high labor intensity, and are prone to pump damage, increasing production costs and delaying production.

Method used

A lead-zinc ore ore wastewater extraction device was designed to continuously supply the centrifugal pump with gravity through a high-level water storage tank, avoiding 'dry rotation', and improving operation ease and efficiency through support brackets and filter mesh covers. .

Benefits of technology

It effectively avoids the "dry rotation" of the centrifugal pump, reduces the failure rate and maintenance costs, simplifies the operation process, and improves the operating efficiency and the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221942732U_ABST
    Figure CN221942732U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of beneficiation wastewater pumping equipment, and discloses a lead zinc ore beneficiation wastewater pumping-back device which comprises a water storage tank, a supporting bracket, a water tank water inlet pipe, a filter screen cover, a water tank water outlet pipe, a centrifugal pump and a water adding pipe. The top of the water storage tank is communicated with a water tank water inlet pipe, the water inlet end of the water tank water inlet pipe is provided with a filter screen cover and extends below the water surface of the sewage pool, the bottom of the water storage tank is communicated with a water tank water outlet pipe, the water outlet end of the water tank water outlet pipe is communicated with the water inlet end of the centrifugal pump, and the highest point of the water inlet end of the water tank water outlet pipe is higher than that of the centrifugal pump; according to the water supply device, water can be continuously supplied to the centrifugal pump through the water storage tank arranged at the high position under the action of gravity, it can be ensured that the centrifugal pump is full of water all the time in the running and stopping periods, the situation of dry rotation of the centrifugal pump is effectively avoided, the centrifugal pump can be effectively protected, operation is easy, time and labor are saved, and operation efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of ore dressing wastewater pumping equipment, and specifically relates to a lead-zinc ore dressing wastewater re-pumping device. Background Art

[0002] Flotation is an important and efficient method for separating useful minerals from useless minerals in mineral processing. Among them, foam flotation is a method for separating minerals from impurities or one mineral from another. Foam flotation is widely used in the beneficiation production of lead and zinc ores. The beneficiation wastewater discharged during the beneficiation production process includes beneficiation process drainage, tailings pond overflow water, concentrate thickening overflow water, concentrate dehydration workshop filter filtrate, main plant floor and equipment washing wastewater, etc. These beneficiation wastewaters contain agents such as foaming agents, activators, inhibitors, dispersants and flocculants, as well as some metal ions, suspended matter, crushed ore particles, wood chips, etc., so they cannot be directly discharged. In the beneficiation production of lead and zinc ores, beneficiation wastewater is usually concentrated and discharged into a sewage pool for purification or sedimentation treatment, and then pumped back to the production water pool of the beneficiation plant for beneficiation operations.

[0003] At present, for the pumping back of lead-zinc ore dressing wastewater, a centrifugal pump is usually installed beside the sewage pool to directly pump water. In order to prevent the water in the water inlet pipe from flowing back after the centrifugal pump stops, causing the centrifugal pump to "run dry" when it is restarted, a check valve such as a seabed valve needs to be installed at the inlet of the water inlet pipe. However, since the sewage pool contains broken ore particles, gravel falling from the ground into the sewage pool, and solid impurities such as sawdust brought by washing the ground, when impurities with larger particle sizes enter the seabed valve, the valve core is easily stuck. At this time, the check effect of the seabed valve decreases or fails. When the centrifugal pump stops, the water in the water inlet pipe will flow back out of the water inlet pipe and the centrifugal pump. This requires cleaning or replacing the seabed valve before restarting the centrifugal pump, and the centrifugal pump needs to be refilled with water. The operation is very cumbersome, labor-intensive, time-consuming and labor-intensive. Sometimes, the centrifugal pump is started directly without inspection, causing the centrifugal pump to "run dry" for a long time, which is very likely to cause damage to the centrifugal pump. Replacing or repairing the centrifugal pump is not only time-consuming and labor-intensive, but also increases production costs, delays production, and has low operating efficiency. Utility Model Content

[0004] In order to solve or partially solve the problems existing in the related technology, the utility model provides a lead-zinc ore beneficiation wastewater pumping device, which can use gravity to continuously supply water to the centrifugal pump through a high-positioned water storage tank, thereby ensuring that the centrifugal pump is always full of water during operation and shutdown, effectively avoiding the "dry running" of the centrifugal pump, effectively protecting the centrifugal pump, replacing the use of the check valve, and having simple operation, time-saving and labor-saving, and high operating efficiency.

[0005] The present application provides a lead-zinc ore dressing wastewater recovery device, comprising a water storage tank, a support bracket, a water tank inlet pipe, a filter screen cover, a water tank outlet pipe, a centrifugal pump, and a water filling pipe. The support bracket is fixedly installed at the corner of the top of the sewage pool wall, and the water storage tank is installed above the sewage pool and away from the sewage pool wall through the support bracket. The top of the water storage tank is connected with a water tank inlet pipe, and the water inlet end of the water tank inlet pipe is installed with a filter screen cover and extends below the water surface of the sewage pool. The bottom of the water storage tank is connected with a water tank outlet pipe, and the water outlet end of the water tank outlet pipe is connected with the water inlet end of the centrifugal pump. The centrifugal pump is installed on the ground at the top of the sewage pool, and the highest point of the water inlet end of the water tank outlet pipe is higher than the highest point of the centrifugal pump. The top of the water storage tank is also installed with a water filling pipe, and a valve is installed on the water filling pipe.

[0006] Optionally, in one scheme, the support bracket includes a base frame, support rods, and legs, the base frame is a right-angled triangle structure that matches the top corner of the sewage pool wall, the two right-angled sides of the base frame are fixedly installed on the top of the pool wall on both sides of the sewage pool corner by bolts, and at least two support rods are horizontally installed between the hypotenuse and the right-angled side of the base frame, the support rods are obliquely installed with legs, and the water tank is fixedly installed on the legs.

[0007] Optionally, in one scheme, the water tank inlet pipe includes a straight pipe section, a curved pipe section, and an extended section, the straight pipe section is vertically arranged on a side of the water tank away from the sewage tank wall, the extended section vertically penetrates the top of the water tank and extends into the water tank, the curved pipe section is a 180° curved pipe, one end of the curved pipe section is connected to the upper end of the straight pipe section, and the other end is connected to the upper end of the extended section.

[0008] Optionally, in one solution, the height of the water outlet end of the extended section of the water tank inlet pipe is not higher than two-thirds of the water storage height of the water tank.

[0009] Optionally, in one embodiment, a water shortage alarm for detecting the water level in the water tank is installed in the water tank, and the water shortage alarm sounds an alarm when the water level in the tank is lower than three quarters of the water storage height of the water tank or below.

[0010] Optionally, in one embodiment, the highest point of the water filling pipe is not lower than the highest point of the curved section of the water tank inlet pipe, and the installation height of the valve on the water filling pipe is not lower than the highest water storage height of the curved section and the extended section of the water tank inlet pipe.

[0011] Optionally, in one embodiment, the filter screen cover is a columnar screen structure, and the water inlet end of the water tank inlet pipe extends into the columnar screen.

[0012] Beneficial effects of the utility model:

[0013] The utility model installs the water storage tank to a position where the highest point of the water inlet end of the water outlet pipe of the water tank is higher than the highest point of the centrifugal pump through the support bracket, so that the water outlet position of the water storage tank is always higher than the centrifugal pump, thereby utilizing the gravity to continuously supply water to the centrifugal pump through the high-positioned water storage tank, which can ensure that the centrifugal pump is always full of water during operation and shutdown, effectively avoiding the centrifugal pump from "dry running" and effectively protecting the centrifugal pump.

[0014] The secondary start-up of the centrifugal pump only requires filling the water tank with water through the water filling pipe, eliminating the steps of checking, repairing, replacing the check valve, and refilling the centrifugal pump in the existing pumping operation mode. It is simple to operate, easy to use, time-saving and labor-saving, and has high operating efficiency.

[0015] By using a supporting bracket to install the water tank above the sewage pool and away from the pool wall, the water inlet end of the water tank inlet pipe can be placed away from the pool wall without extending the length of the water tank inlet pipe, effectively increasing the distance between the water inlet end of the water tank inlet pipe and impurities near the pool wall, which can effectively prevent impurities from clogging the filter cover to ensure the water inlet efficiency of the water tank inlet pipe.

[0016] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. It is obvious that the drawings described below are only some embodiments of the utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 It is a schematic diagram of the overall structure and installation position in one embodiment of the present application;

[0019] Figure 2 It is a schematic diagram of the overall structure and installation position in one embodiment of the present application;

[0020] Figure 3 It is a right side view of a water storage tank in one embodiment of the present application;

[0021] Figure 4 This is a right side view of a water tank filled with water in one embodiment of the present application.

[0022] Reference numerals in the figure: 100, sewage tank; 1, water storage tank; 2, support bracket; 3, water tank inlet pipe; 4, filter screen; 5, water tank outlet pipe; 6, centrifugal pump; 7, water filling pipe; 8, valve; 9, water shortage alarm; 21, base frame; 22, support rod; 23, support leg; 24, bolt; 31, straight pipe section; 32, curved pipe section; 33, extension section. DETAILED DESCRIPTION

[0023] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application, but are not intended to limit the scope of the present application. Similarly, the following examples are only some embodiments of the present application rather than all embodiments, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0024] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0025] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0026] In the present application, the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0027] In the prior art, when a centrifugal pump is used in conjunction with a check valve to directly pump back the lead-zinc ore dressing wastewater, when the valve core of the check valve is stuck, the centrifugal pump needs to be refilled with water or the check valve needs to be repaired to restart the centrifugal pump. If the centrifugal pump is not properly inspected, it is easy for the centrifugal pump to "run dry". Therefore, the existing pumping method has the problems of cumbersome operation, high labor intensity, time-consuming and labor-intensive, easy to cause damage to the centrifugal pump, and low operating efficiency.

[0028] In view of the above problems, the present application makes improvements and innovations and proposes the following embodiments.

[0029] In some embodiments, see Figure 1-Figure 4 , a lead-zinc ore dressing wastewater recovery device is provided, comprising a water storage tank 1, a support bracket 2, a water tank inlet pipe 3, a filter screen cover 4, a water tank outlet pipe 5, a centrifugal pump 6, and a water filling pipe 7. The support bracket 2 is fixedly installed at the corner of the top of the sewage pool 100 wall, and the water storage tank 1 is installed above the sewage pool 100 and away from the sewage pool 100 wall through the support bracket 2. The top of the water storage tank 1 is connected with a water tank inlet pipe 3, and the water inlet end of the water tank inlet pipe 3 is installed with a filter screen cover 4 and extends below the water surface of the sewage pool 100. The bottom of the water storage tank 1 is connected with a water tank outlet pipe 5, and the water outlet end of the water tank outlet pipe 5 is connected with the water inlet end of the centrifugal pump 6. The centrifugal pump 6 is installed on the top ground of the sewage pool 100, and the highest point of the water inlet end of the water tank outlet pipe 5 is higher than the highest point of the centrifugal pump 6. The top of the water storage tank 1 is also installed with a water filling pipe 7, and the water filling pipe 7 is installed with a valve 8.

[0030] In this way, the purified or directly re-pumped mineral processing wastewater is discharged into the sewage pool 100. When the lead-zinc ore processing wastewater needs to be re-pumped, first open the valve 8 and inject clean water or mineral processing wastewater into the water tank 1 through the water filling pipe 7 until it is full. The air in the water tank 1 is discharged from the water tank 1 as the water level in the water tank 1 rises. At this time, the water tank 1 and the centrifugal pump 6 are both filled with water. Close the valve 8 and start the centrifugal pump 6. The centrifugal pump 6 can operate normally without causing any In the case of "dry running", the water in the water tank 1 is pumped away from the bottom of the water tank 1 by the centrifugal pump 6 through the water tank outlet pipe 5, and the water inlet end of the water tank inlet pipe 3 is located below the water surface of the sewage pool 100, so a vacuum is generated at the top of the water tank 1, which will cause the mineral processing wastewater in the sewage pool 100 to be pumped into the water tank 1 under the action of atmospheric pressure. Subsequently, the water pumped into the water tank 1 refills the water tank 1, so that the water tank 1 is continuously replenished with water, thereby ensuring that the centrifugal pump 6 continues to operate normally.

[0031] After the centrifugal pump 6 stops pumping once, the water in the water tank inlet pipe 3 and above the outlet end of the water tank inlet pipe 3 in the water storage tank 1 flows back to the sewage pool 100 under the action of gravity and siphon, and the remaining water is stored in the water storage tank 1, so that the centrifugal pump 6 is always full of water, which is convenient for the next start of the centrifugal pump 6. In this embodiment, in order to avoid the water storage tank 1 being unable to be filled with water due to siphoning during the water addition process before the second start, the valve 8 on the water addition pipe 7 needs to be opened in time after the centrifugal pump 6 stops pumping, and the water above the outlet end of the water tank inlet pipe 3 in the water storage tank 1 is discharged in advance, so that the remaining water in the water storage tank 1 is sufficient to keep the centrifugal pump 6 full of water.

[0032] In this embodiment, the water tank 1 is installed at a position where the highest point of the water inlet end of the water tank outlet pipe 5 is higher than the highest point of the centrifugal pump 6 through the support bracket 2, so that the water outlet position of the water tank 1 is always higher than the centrifugal pump 6, so that the centrifugal pump 6 is continuously supplied with water through the high-positioned water tank 1 by gravity, which can ensure that the centrifugal pump 6 is always full of water during operation and shutdown, so that the centrifugal pump 6 can operate normally every time it is started, effectively avoiding the "dry running" of the centrifugal pump 6, protecting the centrifugal pump 6, and effectively reducing the failure rate of the centrifugal pump 6 and extending the service life of the centrifugal pump 6; instead of using the check valve, the secondary start-up of the centrifugal pump 6 only needs to fill the water tank 1 with water through the water filling pipe 7, eliminating the steps in the existing back-pumping operation method such as checking, repairing and replacing the check valve, and refilling the centrifugal pump 6 with water. The operation is simple, easy to use, time-saving and labor-saving, and the operation efficiency is high.

[0033] In this embodiment, by installing a valve 8 on the water filling pipe 7, the water tank 1 can be placed in a closed state by closing the valve 8 after the water tank 1 is filled with water, so that after the water in the water tank 1 is pumped away by the centrifugal pump 6, a vacuum will be generated at the top of the water tank 1, and then the mineral processing wastewater in the sewage pool 100 will be pumped into the water tank 1 under the action of atmospheric pressure, so that the water tank 1 can always be filled with water during the pumping process, which can ensure that the centrifugal pump 6 can continuously and stably perform the mineral processing wastewater recovery operation.

[0034] In this embodiment, by installing a filter screen cover 4 at the water inlet end of the water tank inlet pipe 3, impurities in the sewage pool 100 can be effectively prevented from entering the water tank inlet pipe 3. Optionally, the filter screen cover 4 is a columnar mesh tube structure, and the water inlet end of the water tank inlet pipe 3 extends into the columnar mesh tube, thereby effectively increasing the filtering area of ​​the filter screen cover 4 for the mineral processing wastewater in the sewage pool 100, and effectively reducing the interference of impurities clogging part of the mesh holes of the filter screen cover 4 on the water inlet efficiency of the water tank inlet pipe 3.

[0035] Since the sewage pool 100 is usually set below the ground, the top of the sewage pool 100 wall is flush with the ground or slightly higher than the ground, so the area near the pool wall in the sewage pool 100 is prone to accumulate large particles of impurities that fall from the ground. In this embodiment, by using the support bracket 2 to install the water storage tank 1 above the sewage pool 100 at a position away from the pool wall of the sewage pool 100, the water inlet end of the water tank inlet pipe 3 can be placed at a position away from the pool wall of the sewage pool 100 without extending the length of the water tank inlet pipe 3, thereby effectively increasing the distance between the water inlet end of the water tank inlet pipe 3 and the impurities near the pool wall, effectively reducing the disturbance of the accumulated impurities during the pumping process, effectively reducing the contact between the filter screen cover 4 and the impurities, effectively preventing the impurities from clogging the filter screen cover 4, and further avoiding the impurities from entering the water tank inlet pipe 3, so as to ensure the water inlet efficiency of the water tank inlet pipe 3 and ensure the continuous and stable operation of the centrifugal pump 6.

[0036] In some embodiments, see Figure 1-Figure 2The support bracket 2 includes a base frame 21, a support rod 22, and a support leg 23. The base frame 21 is a right-angled triangle structure that matches the top corner of the sewage pool 100. The two right-angled sides of the base frame 21 are fixedly installed on the top of the pool wall on both sides of the corner of the sewage pool 100 by bolts 24, and at least two support rods 22 are horizontally installed between the hypotenuse and the right-angled side of the base frame 21. The support rod 22 is obliquely installed with a support leg 23, and the water tank 1 is fixedly installed on the support leg 23. In this way, by fixing the two right-angled sides of the base frame 21 of the right-angled triangle structure to the top of the wall of the sewage pool 100, and making the two ends of the long side of the base frame 21 overlap and fix on the top of the wall on both sides of the corner of the sewage pool 100, the base frame 21 is easy to install and has a stable structure. On the one hand, it ensures the structural stability of the support bracket 2 to ensure the stable installation of the water tank 1; on the other hand, it avoids direct contact between the support bracket 2 and the mineral processing wastewater in the sewage pool 100, thereby avoiding the support bracket 2 from being corroded by the mineral processing wastewater, which can effectively extend the service life of the support bracket 2 and improve the support reliability; in addition, by adopting the above-mentioned support bracket 2, the water storage tank 1 can be installed above the sewage pool 100 at a position away from the wall of the sewage pool 100, so as to increase the distance between the water inlet end of the water tank inlet pipe 3 and the impurities near the pool wall.

[0037] In some embodiments, see Figure 1-Figure 4 The water tank inlet pipe 3 includes a straight pipe section 31, a curved pipe section 32, and an extension section 33. The straight pipe section 31 is vertically arranged on the side of the water tank 1 away from the wall of the sewage pool 100 to increase the distance between the water inlet end of the water tank inlet pipe 3 and the impurities near the pool wall. The extension section 33 vertically passes through the top of the water tank 1 and extends into the water tank 1. The curved pipe section 32 is a 180° curved pipe. One end of the curved pipe section 32 is connected to the upper end of the straight pipe section 31, and the other end is connected to the upper end of the extension section 33. In this way, while satisfying the requirement that the water tank inlet pipe 3 inlets water from the top of the water tank 1, the overall length of the water tank inlet pipe 3 can be shortened as much as possible, so as to shorten the length of the waterless pipeline between the water tank 1 and the sewage pool 100 when the centrifugal pump 6 starts to pump water, thereby shortening the time for the mineral processing wastewater in the sewage pool 100 to fill the water tank 1, thereby improving the pumping efficiency.

[0038] In some embodiments, see Figure 3-Figure 4 , the height of the outlet end of the extension section 33 of the water tank inlet pipe 3 is not higher than two-thirds of the water storage height of the water tank 1. In this way, by extending the outlet end of the extension section 33 of the water tank inlet pipe 3 into the water tank 1 for a certain distance, it can be ensured that at the initial stage of the centrifugal pump 6 starting to pump water, before the mineral processing wastewater in the sewage pool 100 enters the water tank 1, the water level in the water tank 1 is kept higher than the height of the outlet end of the water tank inlet pipe 3, thereby ensuring that the mineral processing wastewater in the sewage pool 100 can be smoothly pumped into the water tank 1 under the action of atmospheric pressure.

[0039] In some embodiments, see Figure 3-Figure 4 The water tank 1 is also equipped with a water shortage alarm 9 for detecting the water level in the tank. The water shortage alarm 9 will sound an alarm when the water level in the tank is lower than three quarters of the water storage height of the water tank 1 or below. During the period when the centrifugal pump 6 is turned on, if the filter screen cover 4 is seriously blocked, the water inflow of the water tank water inlet pipe 3 will decrease. At this time, the water outflow in the water tank 1 is greater than the water inflow, and the water level in the tank will gradually decrease. Therefore, during the period when the centrifugal pump 6 is turned on, the water shortage alarm 9 is turned on to monitor the water level in the water tank 1, and the alarm will continue to sound after the water level in the tank is lower than three quarters of the water storage height of the water tank 1 or below, and the operator is reminded of the water level drop, so as to clean the filter screen cover 4 in time and refill the water tank 1 with water, which can effectively avoid the centrifugal pump 6 "dry running" due to the water in the water tank 1 being completely pumped out when the filter screen cover 4 is seriously blocked.

[0040] In some embodiments, see Figure 4 The highest point of the water adding pipe 7 is not lower than the highest point of the curved pipe section 32 of the water tank water inlet pipe 3, so that when adding water before starting, the water level in the water storage tank 1 can be judged by observing the water level in the water adding pipe 7. Specifically, when the water storage tank 1 is filled with water, continuous water addition will raise the water level to the highest point of the inner bottom of the curved pipe section 32 of the water tank water inlet pipe 3, and then flow from the water tank water inlet pipe 3 to the sewage pool 100. After that, if water is added again, the water level in the water adding pipe 7 will be maintained at a height between the highest point of the inner bottom and the highest point of the inner top of the curved pipe section 32, and then the water addition to the water storage tank 1 can be stopped.

[0041] The installation height of the valve 8 on the water adding pipe 7 is not lower than the highest water storage height of the curved pipe section 32 and the extended section 33 of the water tank water inlet pipe 3, that is, the installation height of the valve 8 is not lower than the height of the highest point of the inner bottom of the curved pipe section 32. In this way, when the water storage tank 1 is filled with water and the valve 8 is closed, before the centrifugal pump 6 is turned on, the water level in the water tank water inlet pipe 3 can be maximized to shorten the length of the dry pipeline between the water storage tank 1 and the sewage pool 100 when the centrifugal pump 6 starts to pump water, thereby shortening the time for the mineral processing wastewater in the sewage pool 100 to fill the water storage tank 1, thereby improving the pumping efficiency.

[0042] Finally, it should be noted that although the embodiments of the utility model have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the utility model. Ordinary technicians in the field can make changes, modifications, substitutions and variations to the above embodiments within the scope of the utility model, which should all be included in the scope of protection of this application.

Claims

1. A lead-zinc ore dressing wastewater extraction device, characterized in that: The lead-zinc ore dressing wastewater recovery device comprises a water storage tank (1), a support bracket (2), a water tank water inlet pipe (3), a filter screen cover (4), a water tank water outlet pipe (5), a centrifugal pump (6), and a water supply pipe (7). The support bracket (2) is fixedly installed at the corner of the top of the sewage pool (100) wall. The water storage tank (1) is installed above the sewage pool (100) and away from the sewage pool (100) wall through the support bracket (2). The top of the water storage tank (1) is connected to the water tank water inlet pipe (3). The water inlet end of the pipe (3) is provided with a filter screen (4) and extends below the water surface of the sewage pool (100); the bottom of the water storage tank (1) is connected with a water tank outlet pipe (5); the water outlet end of the water tank outlet pipe (5) is connected with the water inlet end of a centrifugal pump (6); the centrifugal pump (6) is installed on the top ground of the sewage pool (100); and the highest point of the water inlet end of the water tank outlet pipe (5) is higher than the highest point of the centrifugal pump (6); the top of the water storage tank (1) is also provided with a water supply pipe (7); and a valve (8) is installed on the water supply pipe (7).

2. A lead-zinc ore dressing wastewater recovery device according to claim 1, characterized in that: The support bracket (2) comprises a base frame (21), a support rod (22), and a support leg (23); the base frame (21) is a right-angled triangle structure matching the top corner of the sewage pool (100); two right-angled sides of the base frame (21) are respectively fixedly mounted on the top of the pool wall on both sides of the corner of the sewage pool (100) by bolts (24); at least two support rods (22) are horizontally mounted between the hypotenuse and the right-angled side of the base frame (21); the support rod (22) is obliquely mounted with a support leg (23); and the water storage tank (1) is fixedly mounted on the support leg (23).

3. A lead-zinc ore dressing wastewater extraction device according to claim 1 or 2, characterized in that: The water tank water inlet pipe (3) comprises a straight pipe section (31), a curved pipe section (32), and an extension section (33); the straight pipe section (31) is vertically arranged on a side of the water tank (1) away from the wall of the sewage tank (100); the extension section (33) vertically penetrates the top of the water tank (1) and extends into the water tank (1); the curved pipe section (32) is a 180° curved pipe; one end of the curved pipe section (32) is connected to the upper end of the straight pipe section (31), and the other end is connected to the upper end of the extension section (33).

4. A lead-zinc ore dressing wastewater extraction device according to claim 3, characterized in that: The height position of the water outlet end of the extended section (33) of the water tank water inlet pipe (3) is no higher than two-thirds of the water storage height of the water storage tank (1).

5. A lead-zinc ore dressing wastewater recovery device according to claim 4, characterized in that: The water storage tank (1) is also provided with a water shortage alarm (9) for detecting the water level in the tank. The water shortage alarm (9) sounds an alarm when the water level in the tank is lower than three quarters of the water storage height of the water storage tank (1) or less.

6. A lead-zinc ore dressing wastewater extraction device according to claim 3, characterized in that: The highest point of the water adding pipe (7) is not lower than the highest point of the curved pipe section (32) of the water tank water inlet pipe (3), and the installation height of the valve (8) on the water adding pipe (7) is not lower than the highest water storage height of the curved pipe section (32) and the extended section (33) of the water tank water inlet pipe (3).

7. A lead-zinc ore dressing wastewater extraction device according to claim 1, characterized in that: The filter screen cover (4) is a columnar mesh tube structure, and the water inlet end of the water tank water inlet pipe (3) extends into the columnar mesh tube.