Building construction sewage discharge control equipment
By combining a drive motor and a lifting mechanism, the structure of the construction wastewater discharge control equipment is simplified and maintenance is made more efficient. This solves the problem of easy valve clogging and improves the control efficiency and maintenance convenience of wastewater discharge.
Patent Information
- Application Number
- CN202421277353.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-06-06
AI Technical Summary
In existing construction wastewater treatment systems, valves have complex structures and are prone to clogging, resulting in long maintenance cycles and affecting wastewater discharge efficiency.
The valve core on the drive shaft is rotated by a drive motor, which, together with the lifting mechanism, controls the on/off state of the control tube. The lifting motor also drives the gear and rack structure to raise and lower the lifting box, facilitating the replacement and cleaning of internal parts.
The valve structure has been simplified, the control efficiency of sewage discharge has been improved, the workload of maintenance has been reduced, the tedious process of disassembling the entire valve has been avoided, and the pipeline's ability to quickly resume sewage discharge has been ensured.
Smart Images

Figure CN221943221U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage discharge control, in particular to sewage discharge control equipment used in construction. Background Art
[0002] With the acceleration of my country's urbanization process, the construction volume of construction projects has continued to increase, and sewage treatment during construction has become an important issue of environmental protection. The sewage generated in construction projects mainly includes construction wastewater and domestic sewage. If these sewages are discharged directly without treatment, they will have a serious impact on the surrounding environment. These sewages contain more impurities and are generally discharged through sewage pipes with larger diameters.
[0003] At present, sewage pipes are usually controlled by valves. These valves have complex structures and high construction costs. Because construction sewage contains a lot of impurities, it is easy to cause valves or even pipes to be blocked. In this case, since the valve is located inside the pipe, if it needs to be repaired and disassembled, it is often disassembled as a whole, which has a long working cycle and is not conducive to quickly restoring normal pipeline sewage operations. Summary of the invention
[0004] The purpose of the utility model is to provide a construction wastewater discharge control device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction sewage discharge control device, comprising two control pipes, a connecting box is installed between the two control pipes, a lifting box is movably installed inside the connecting box, lifting components are installed at both ends of the lifting box, a half ring one is fixedly installed at the bottom end of the lifting box, a half ring two is detachably installed on the upper end of the half ring one, a sealing plate is installed on the upper end of the lifting box, a driving shaft is installed through the upper end of the sealing plate through a sealing bearing, the lower end of the driving shaft extends to the interior of the half ring one, a valve core is installed on the surface of the driving shaft between the half ring one and the half ring two, and a driving motor is installed on the upper end of the driving shaft and on the top surface of the sealing plate.
[0006] Preferably, the valve core is circular, the half ring one and the half ring two are at the same center as the control tube, the valve core radius matches the inner diameter of the half ring one and the half ring two, a sealing ring is installed on the surface of the valve core, and sealing gaskets are installed on the relative inner walls of the half ring one and the half ring two.
[0007] Preferably, a control box is installed at one end of the connection box, and a control panel and a power supply are installed inside the control box.
[0008] Preferably, connecting bolts are installed between the two ends of the half ring two and the two ends of the half ring one through screw holes, and nuts are installed on the connecting bolts.
[0009] Preferably, the lifting assembly includes a lifting motor, a driving gear and a rack. Racks are installed on the left and right surfaces of the lifting box. The front end of the connecting box on one side of the rack is installed with a lifting motor. A driving gear is installed at the output end of the lifting motor, and the two driving gears are respectively meshed with the racks.
[0010] Preferably, connecting rings are installed at both ends of the control tube, and a plurality of connecting holes are arranged on the surface of the connecting rings.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The construction sewage discharge control device uses a driving motor to drive the valve core on the surface of the driving shaft to rotate. The valve core can block the interior composed of half ring one and half ring two to achieve control of the on-off of the control pipe, and the structure is simple.
[0013] The construction sewage discharge control equipment is provided with a lifting mechanism, and the lifting motor in the lifting mechanism is controlled to drive the driving gear to rotate, and the driving gear drives the rack on the lifting box to move upward, so as to realize the lifting of the lifting box, and facilitate the replacement and maintenance of the parts inside the lifting box. When the inside of the control pipe is blocked, it is convenient to clean the inside of the control pipe, avoiding the tedious work of disassembling the whole valve. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a cross-sectional view of the connection box of the utility model;
[0016] Figure 3 For this utility model Figure 2 The enlarged view of point A in the middle;
[0017] Figure 4 It is a schematic diagram of the combination of half ring one and half ring two of the utility model.
[0018] In the figure: 1. control tube; 2. connecting box; 3. half ring one; 4. half ring two; 5. sealing plate; 6. driving shaft; 7. valve core; 8. sealing ring; 9. sealing gasket; 10. control box; 12. connecting bolts; 13. connecting ring; 14. lifting box; 15. driving motor; 1101. lifting motor; 1102. driving gear; 1103. rack. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0021] like Figures 1 to 4 As shown, the construction sewage discharge control equipment of this embodiment includes two control pipes 1, a connecting box 2 is installed between the two control pipes 1, and a lifting box 14 is movably installed inside the connecting box 2. In actual use, the left and right ends of the lifting box 14 are installed with slide rails or guide rods at the contact parts of the connecting box 2, which play a guiding role in the lifting and lowering of the lifting box 14. The control pipe 1, the connecting box 2 and the interior of the lifting box 14 are connected, and lifting components are installed at both ends of the lifting box 14. The lifting components are used to drive the lifting box 14 to lift and lower, which is convenient for repairing the parts inside the lifting box 14 and cleaning up the debris. A semi-ring 1 3 is fixedly installed at the bottom end of the lifting box 14, and a semi-ring 2 4 is detachably installed on the upper end of the semi-ring 1 3. A sealing plate 5 is installed on the upper end of 14, and a driving shaft 6 is installed on the upper end of the sealing plate 5 through a sealing bearing. The lower end of the driving shaft 6 extends to the inside of the semi-ring 1 3, and a valve core 7 is installed on the surface of the driving shaft 6 between the semi-ring 1 3 and the semi-ring 2 4. A driving motor 15 is installed on the upper end of the driving shaft 6 and on the top surface of the sealing plate 5. The driving motor 15 has a locking function, and the driving motor 15 is connected to a forward and reverse circuit. The driving motor 15 can be reversed. The model of the driving motor 15 can be selected as 90ST-MST04025. The driving motor 15 drives the driving shaft 6 to rotate, and the driving shaft 6 drives the valve core 7 to block the inside of the semi-ring 1 3 and the semi-ring 2 4, thereby blocking the control tube 1 and controlling the on and off of the control tube 1.
[0022] Specifically, the valve core 7 is circular, and the half ring 1 3 and the half ring 2 4 are at the same center as the control pipe 1. The radius of the valve core 7 matches the inner diameter of the half ring 1 3 and the half ring 2 4. A sealing ring 8 is installed on the surface of the valve core 7, and sealing gaskets 9 are installed on the relative inner walls of the half ring 1 3 and the half ring 2 4. The sealing ring 8 and the sealing gasket 9 on the surface of the valve core 7 are in contact to fill the gap between the valve core 7 and the half ring 1 3 and the half ring 2 4, effectively preventing sewage from leaking from the gap between the valve core 7 and the half ring 1 3 and the half ring 2 4. The sealing ring 8 and the sealing gasket 9 are made of rubber material. In addition, in order to prevent water leakage caused by the gap between the lifting box 14 and the two control pipes 1, a sealing structure can also be installed at the gap between the lifting box 14 and the control pipe 1.
[0023] Furthermore, a control box 10 is installed at one end of the connection box 2. A control panel and a power supply are installed inside the control box 10. The control panel can control various electrical appliances, and the power supply is used to supply power to various electrical appliances.
[0024] Furthermore, connecting bolts 12 are installed between the two ends of half ring 2 4 and the two ends of half ring 1 3 through screw holes, and nuts are installed on the connecting bolts 12. By removing half ring 2 4, it is convenient to replace the sealing ring 8 on the surface of the valve core 7 and the sealing gaskets 9 on half ring 1 3 and half ring 2 4, thereby effectively ensuring the shielding sealing performance.
[0025] Furthermore, the lifting component includes a lifting motor 1101, a driving gear 1102 and a rack 1103. Racks 1103 are installed on the left and right surfaces of the lifting box 14. The front end of the connecting box 2 on one side of the rack 1103 is installed with a lifting motor 1101. The output end of the lifting motor 1101 is installed with a driving gear 1102. The two driving gears 1102 are respectively meshed with the rack 1103. The driving gear 1102 is driven to rotate by the lifting motor 1101, and the driving gear 1102 drives the rack 1103 on the lifting box 14 to move upward, so as to realize the lifting of the lifting box 14, facilitate the replacement and maintenance of the internal parts of the lifting box 14, and facilitate the cleaning of the debris inside the lifting box 14. The specific model of the lifting motor 1101 needs to be selected according to the specifications of the control tube 1, and ensure that the torque provided by the lifting motor 1101 can overcome the obstruction of the lifting movement of the lifting box 14 caused by impurities.
[0026] Furthermore, connecting rings 13 are installed at both ends of the control pipe 1 , and a plurality of connecting holes are arranged on the surface of the connecting rings 13 . The control pipe 1 is installed on the sewage pipe through the connecting rings 13 .
[0027] The method of using the present embodiment is as follows: when the device is in use, the control tube 1 is installed on the sewage pipe through the connecting ring 13. In daily use, the valve core 7 can adjust the rotation angle, and the flow speed of the sewage pipe can be adjusted. At the same time, the sewage flows through the gap between the valve core 7 and the half ring 1 3 and the half ring 2 4. When it is necessary to control the sewage to stop flowing, the valve core 7 on the surface of the driving shaft 6 is driven by the driving motor 15 to rotate, and the valve core 7 and the half ring 1 3 and the half ring 2 4 block the control tube 1. The valve core 7 blocks the sewage and controls the sewage to stop flowing. At the same time, the sealing ring 8 on the surface of the valve core 7 contacts with the sealing gasket 9 on the half ring 1 3 and the half ring 2 4, which effectively ensures the sealing of the shielding. When blockage occurs, in order to avoid the contact between the valve core 7 and the inner wall of the control tube 1 and cause obstruction to the movement of the lifting box 14, it is necessary to ensure that the valve core 7 is inside the semi-ring 3 (when the width of the lifting box 14 is greater than the diameter of the valve core 7, even if the valve core 7 is perpendicular to the lifting box 14, it will not affect the upward lifting movement of the lifting box 14). By controlling the rotation of the lifting motor 1101, the lifting motor 1101 drives the driving gear 1102 to rotate, and the driving gear 1102 drives the rack 1103 on the lifting box 14 to move upward, so as to realize the lifting of the lifting box 14. By removing the sealing plate 5 on the lifting box 14, the various components inside the lifting box 14 can be disassembled, which is convenient for cleaning the debris inside the control tube 1, and is very practical.
[0028] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A construction wastewater discharge control device, comprising two control pipes (1), characterized in that: A connection box (2) is installed between the two control tubes (1), a lifting box (14) is movably installed inside the connection box (2), lifting components are installed at both ends of the lifting box (14), a half ring (3) is fixedly installed at the bottom end of the lifting box (14), a half ring (4) is detachably installed at the upper end of the half ring (3), a sealing plate (5) is installed at the upper end of the lifting box (14), a driving shaft (6) is installed through the upper end of the sealing plate (5) through a sealing bearing, the lower end of the driving shaft (6) extends into the interior of the half ring (3), a valve core (7) is installed on the surface of the driving shaft (6) between the half ring (3) and the half ring (4), and a driving motor (15) is installed at the upper end of the driving shaft (6) and at the top end surface of the sealing plate (5).
2. The construction wastewater discharge control device according to claim 1 is characterized in that: The valve core (7) is circular, the half ring one (3) and the half ring two (4) are at the same center as the control tube (1), the radius of the valve core (7) matches the inner diameter of the half ring one (3) and the half ring two (4), a sealing ring (8) is installed on the surface of the valve core (7), and sealing pads (9) are installed on the inner walls of the half ring one (3) and the half ring two (4) relative to each other.
3. The construction wastewater discharge control device according to claim 1 is characterized in that: A control box (10) is installed at one end of the connection box (2), and a control panel and a power supply are installed inside the control box (10).
4. The construction wastewater discharge control device according to claim 1 is characterized in that: Connecting bolts (12) are installed between the two ends of the second half ring (4) and the two ends of the first half ring (3) through screw holes, and nuts are installed on the connecting bolts (12).
5. The construction wastewater discharge control device according to claim 1 is characterized in that: The lifting assembly comprises a lifting motor (1101), a driving gear (1102) and a rack (1103); the left and right surfaces of the lifting box (14) are both equipped with racks (1103); the front end of the connecting box (2) on one side of the rack (1103) is equipped with a lifting motor (1101); the output end of the lifting motor (1101) is equipped with a driving gear (1102); and the two driving gears (1102) are respectively meshed with the racks (1103).
6. The construction wastewater discharge control device according to claim 1 is characterized by: Both ends of the control tube (1) are provided with connecting rings (13), and the surface of the connecting rings (13) is provided with a plurality of connecting holes.