Waste heat recovery device for efficient energy-saving boiler

By introducing a brushing mechanism into the boiler flue gas recovery device to clean up dust, the problems of blockage and heat absorption capacity reduction caused by dust in the boiler flue gas recovery device are solved, and the heat recovery efficiency is improved.

CN221944257UActive Publication Date: 2024-11-01JIANGSU MINGLIAN MECHANICAL & ELECTRICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323565653.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-01
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The existing boiler flue gas heat recovery device is prone to adsorbing dust on the surface of the filter plate, resulting in clogging, and the surface of the thermally conductive water pipe is contaminated with dust impurities, reducing the heat absorption capacity and affecting the heat recovery and utilization rate.

Method used

A waste heat recovery device for high-efficiency energy-saving boiler is designed, including the first and second brush cleaning mechanisms, and the surface of the filter plate and the heat-absorbing water pipe is cleaned by the motor to improve dust cleaning efficiency, extend service life and Improve heat absorption capacity.

Benefits of technology

Effectively clean up dust, improve the service life and heat absorption efficiency of the filter plate and heat absorption pipe, and improve the recycling rate of the flue gas heat.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221944257U_ABST
    Figure CN221944257U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of waste heat recycling, and discloses an efficient energy-saving boiler waste heat recovery device which comprises a base, a boiler is fixedly connected to one side of the top of the base, an installation box is fixedly connected to the side, away from the boiler, of the top of the base, and a first exhaust pipe is fixedly connected to the top of the boiler. The end, away from the boiler, of the first exhaust pipe is fixedly connected with a sucking pump, the output end of the sucking pump is fixedly connected with a connecting pipe, a second brushing mechanism is arranged at the bottom of the mounting box, the bottom of an inner cavity of the mounting box is fixedly connected with a second mounting plate, and the bottom of the inner cavity of the mounting box is fixedly connected with a first mounting plate. Through the arrangement of the first brushing mechanism and the second brushing mechanism, the speed of exhausted smoke entering the mounting box is increased, the service life of the filter plate is prolonged conveniently, and therefore the heat absorption capacity of the heat absorption water pipe is improved conveniently, and the waste heat recycling rate is increased advantageously.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of waste heat recovery and utilization, and specifically to a waste heat recovery device for a high-efficiency energy-saving boiler. Background Art

[0002] A boiler is an energy conversion device. The energy input into the boiler includes chemical energy and electrical energy in the fuel. The boiler outputs steam, high-temperature water or organic heat carrier with a certain amount of thermal energy. The original meaning of pot refers to a water container heated on fire, and furnace refers to a place where fuel is burned. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's lives, and can also be converted into mechanical energy through a steam power device, or the mechanical energy can be converted into electrical energy through a generator. A boiler that provides hot water is called a hot water boiler, which is mainly used for life and also has a small number of applications in industrial production.

[0003] The boiler will emit a large amount of flue gas in the process of burning and heating water. The flue gas generated by the combustion is discharged through the chimney. The temperature of the discharged flue gas is relatively high, which will lead to heat waste. However, when the general flue gas heat recovery device is working, the filter plate surface is easy to absorb and adhere to the dust in the flue gas, which makes the filter plate surface easy to be blocked. In addition, the surface of the hot water pipe is also easy to be contaminated with dust and impurities, which leads to the heat absorption capacity of the hot water pipe reduced, thus affecting the utilization rate of heat recovery. Utility Model Content

[0004] The purpose of the utility model is to provide a high-efficiency and energy-saving waste heat recovery device for a boiler, so as to solve the problem that when the general flue gas heat recovery device proposed in the above-mentioned background technology is working, the surface of the filter plate is easy to absorb and adhere to dust in the flue gas, resulting in easy clogging of the filter plate surface, and the surface of the hot water pipe is also easy to be contaminated with dust and impurities, thereby reducing the heat absorption capacity of the hot water pipe, thereby affecting the utilization rate of heat recovery.

[0005] The utility model provides the following technical solution: a high-efficiency and energy-saving waste heat recovery device for a boiler, comprising a base, a boiler is fixedly connected to one side of the top of the base, a mounting box is fixedly connected to the side of the top of the base away from the boiler, a first exhaust pipe is fixedly connected to the top of the boiler, an end of the first exhaust pipe away from the boiler is fixedly connected to an exhaust pump, an output end of the exhaust pump is fixedly connected to a connecting pipe, a second cleaning mechanism is arranged at the bottom of the mounting box, a second mounting plate is fixedly connected to the bottom of the inner cavity of the mounting box, a second mounting plate is fixedly connected to the bottom of the inner cavity of the mounting box, a second water tank is fixedly connected to the top of the second mounting plate, a plurality of evenly and equidistantly distributed hot water absorbing pipes are fixedly connected to the top of the second water tank, a first mounting plate is fixedly connected to the top of the inner cavity of the mounting box, a first water tank is fixedly connected to the top of the first mounting plate, and a first cleaning mechanism is arranged in the middle of the inner cavity of the mounting box.

[0006] As a preferred embodiment of the above technical solution, the second mounting plate is located directly above the filter plate, the top of the hot water absorption pipe passes through the first mounting plate and extends to the interior of the first water tank, and the end of the connecting pipe away from the vacuum pump passes through the mounting box and extends to the bottom end inside.

[0007] As a preferred embodiment of the above technical solution, the second brush cleaning mechanism includes a second motor fixedly installed on the top of the second brush cleaning mechanism, the output end of the second motor is fixedly connected to a rotating shaft, the rotating shaft passes through the installation box and extends to the bottom of the inner cavity of the installation box, the end of the rotating shaft away from the second motor is fixedly sleeved with a fixed sleeve, and brush rods are symmetrically fixedly connected on both sides of the fixed sleeve.

[0008] As a preferred embodiment of the above technical solution, the first brush cleaning mechanism includes a first motor fixedly installed on the top of the installation box, the output end of the first motor is fixedly connected to a threaded shaft, the end of the threaded shaft away from the first motor is threadedly connected to a moving block, one side of the moving block is fixedly connected to a brush cleaning plate, and the top of the brush cleaning plate is provided with a plurality of evenly and equidistantly distributed sockets.

[0009] As a preferred embodiment of the above technical solution, movable grooves are symmetrically opened on both sides of the inner cavity of the installation box, the threaded shaft passes through the installation box and extends to the inside of the movable groove, and the end of the threaded shaft away from the first motor is connected to the installation box bearing.

[0010] As a preferred embodiment of the above technical solution, a second exhaust pipe is fixedly connected to one side of the top of the installation box, a water injection pipe is fixedly connected to one side of the top of the first water tank, the water injection pipe passes through the installation box and extends to the outside, a water outlet pipe is fixedly connected to one side of the second water tank, the water outlet pipe passes through the installation box and extends to the outside, a first air outlet pipe is fixedly inserted into one side of the top of the first installation plate, a pressure valve is provided on the top of the first air outlet pipe, and a second air outlet pipe is fixedly inserted into one side of the bottom of the second installation plate.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The utility model is provided with a first cleaning mechanism and a second cleaning mechanism. When it is necessary to clean the dust and impurities on the bottom surface of the filter plate and the surface of the hot water absorption pipe, the second motor is then started, and the second motor drives the rotating shaft to rotate, the rotating shaft drives the fixed sleeve to rotate, and the fixed sleeve drives the brush rod to rotate, so as to facilitate cleaning the surface of the filter plate and the dust and impurities on the bottom of the filter plate, so as to increase the rate at which the exhausted flue gas enters the installation box, and to facilitate improving the service life of the filter plate. By starting the first motor, the first motor drives the threaded shaft to rotate, and the threaded shaft drives the moving block to move up and down along the moving groove, and then drives the cleaning brush plate to move up and down along the moving groove, so as to facilitate scraping and brushing the surface of the hot water absorption pipe, thereby facilitating improving the heat absorption capacity of the hot water absorption pipe, which is beneficial to improving the waste heat recovery rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of a high-efficiency and energy-saving waste heat recovery device for boilers;

[0014] Figure 2 It is a schematic diagram of the cross-sectional structure of a waste heat recovery device for a high-efficiency and energy-saving boiler;

[0015] Figure 3 It is a schematic diagram of the heat recovery mechanism structure of a waste heat recovery device for a high-efficiency and energy-saving boiler;

[0016] Figure 4 It is a structural schematic diagram of the second cleaning mechanism of a waste heat recovery device for a high-efficiency and energy-saving boiler;

[0017] Figure 5 The present invention is a schematic diagram of the structure of the first cleaning mechanism of a waste heat recovery device for a high-efficiency and energy-saving boiler.

[0018] In the figure: 1. base; 2. boiler; 3. installation box; 4. first exhaust pipe; 5. vacuum pump; 6. first cleaning mechanism; 61. first motor; 62. threaded shaft; 63. moving block; 64. cleaning plate; 65. socket; 7. second exhaust pipe; 8. water injection pipe; 9. second cleaning mechanism; 91. second motor; 92. rotating shaft; 93. fixing sleeve; 94. brush rod; 10. water outlet pipe; 11. first water tank; 12. moving groove; 13. first installation plate; 14. hot water absorption pipe; 15. second water tank; 16. second installation plate; 17. filter plate; 18. connecting pipe; 19. first outlet pipe; 20. second outlet pipe; 21. pressure valve. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0020] like Figure 1-3As shown, the utility model provides a technical solution: a high-efficiency and energy-saving waste heat recovery device for a boiler, comprising a base 1, a boiler 2 is fixedly connected to one side of the top of the base 1, a mounting box 3 is fixedly connected to the side of the top of the base 1 away from the boiler 2, a first exhaust pipe 4 is fixedly connected to the top of the boiler 2, an exhaust pump 5 is fixedly connected to the end of the first exhaust pipe 4 away from the boiler 2, a connecting pipe 18 is fixedly connected to the output end of the exhaust pump 5, a second cleaning mechanism 9 is arranged at the bottom of the mounting box 3, a second mounting plate 16 is fixedly connected to the bottom of the inner cavity of the mounting box 3, a second mounting plate 16 is fixedly connected to the bottom of the inner cavity of the mounting box 3, a second water tank 15 is fixedly connected to the top of the second mounting plate 16, a plurality of evenly and equidistantly distributed hot water absorbing pipes 14 are fixedly connected to the top of the second water tank 15, a first mounting plate 13 is fixedly connected to the top of the inner cavity of the mounting box 3, a first water tank 11 is fixedly connected to the top of the first mounting plate 13, a first cleaning mechanism 6 is arranged in the middle of the inner cavity of the mounting box 3, and the second mounting plate 16 is located directly above the filter plate 17 At the top, the top of the hot water absorption pipe 14 passes through the first mounting plate 13 and extends to the interior of the first water tank 11. The end of the connecting pipe 18 away from the suction pump 5 passes through the mounting box 3 and extends to the bottom of the interior. The hot flue gas exhausted by the boiler 2 is sucked in through the first exhaust pipe 4 through the provided suction pump 5 and then discharged into the bottom of the inner cavity of the mounting box 3 through the connecting pipe 18. It is preliminarily filtered through the filter plate 17. The provided second cleaning mechanism 9 facilitates the cleaning of dust and impurities at the bottom of the filter plate 17, which is convenient for improving the service life of the filter plate 17. The exhausted hot flue gas enters the middle part of the inner cavity of the mounting box 3 through the second exhaust pipe 20, and then fully contacts the surface of the hot water absorption pipe 14. The hot water absorption pipe 14 absorbs the residual heat, which is convenient for heating the water inside the first water tank 11 through the hot water absorption pipe 14 and entering the second water tank 15, and then flows out through the water outlet pipe 10 for use. The provided first cleaning mechanism 6 facilitates the cleaning of dust and impurities on the surface of the hot water absorption pipe 14, which is convenient for improving the heat absorption efficiency of the hot water absorption pipe 14.

[0021] As an implementation method in this embodiment, Figure 4 As shown, the second cleaning brush mechanism 9 includes a second motor 91 fixedly installed on the top of the second cleaning brush mechanism 9, and the output end of the second motor 91 is fixedly connected with a rotating shaft 92, and the rotating shaft 92 passes through the installation box 3 and extends along to the bottom of the inner cavity of the installation box 3. The end of the rotating shaft 92 away from the second motor 91 is fixedly sleeved with a fixed sleeve 93, and the two sides of the fixed sleeve 93 are symmetrically fixedly connected with brush rods 94. By starting the second motor 91, the second motor 91 drives the rotating shaft 92 to rotate, the rotating shaft 92 drives the fixed sleeve 93 to rotate, and the fixed sleeve 93 drives the brush rod 94 to rotate, thereby facilitating the cleaning of the surface of the filter plate 17.

[0022] As an implementation method in this embodiment, Figure 5As shown, the first cleaning mechanism 6 includes a first motor 61 fixedly installed on the top of the installation box 3, the output end of the first motor 61 is fixedly connected with a threaded shaft 62, the end of the threaded shaft 62 away from the first motor 61 is threadedly connected with a moving block 63, one side of the moving block 63 is fixedly connected with a cleaning plate 64, and a plurality of evenly and equidistantly distributed jacks 65 are provided on the top of the cleaning plate 64, and moving grooves 12 are symmetrically provided on both sides of the inner cavity of the installation box 3, the threaded shaft 62 passes through the installation box 3 and extends to the inside of the moving groove 12, and the end of the threaded shaft 62 away from the first motor 61 is connected to the bearing of the installation box 3, by starting the first motor 61, the first motor 61 drives the threaded shaft 62 to rotate, and the threaded shaft 62 drives the moving block 63 to move up and down along the moving groove 12, and then drives the cleaning plate 64 to move up and down along the moving groove 12, so as to facilitate the scraping of the surface of the hot water absorption pipe 14 to improve the heat absorption efficiency of the hot water absorption pipe 14.

[0023] As an implementation method in this embodiment, Figure 2-3 As shown, a second exhaust pipe 7 is fixedly connected to one side of the top of the installation box 3, a water injection pipe 8 is fixedly connected to one side of the top of the first water tank 11, and the water injection pipe 8 extends through the installation box 3 to the outside, a water outlet pipe 10 is fixedly connected to one side of the second water tank 15, and the water outlet pipe 10 extends through the installation box 3 to the outside, a first air outlet pipe 19 is fixedly inserted at one side of the top of the first installation plate 13, and a pressure valve 21 is provided at the top of the first air outlet pipe 19, and a second air outlet pipe 20 is fixedly inserted at one side of the bottom of the second installation plate 16. The second air outlet pipe 20 facilitates the introduction of hot flue gas and facilitates full contact with the hot water absorption pipe 14, and is discharged through the first air outlet pipe 19, and finally discharged through the second exhaust pipe 7. By setting the pressure valve 21, the speed at which the hot gas quickly passes through multiple hot water absorption pipes 14 can be slowed down, thereby increasing the contact time therewith.

[0024] Working principle: First, by starting the vacuum pump 5, the hot flue gas exhausted by the boiler 2 is sucked through the first exhaust pipe 4 and then discharged into the bottom of the inner cavity of the installation box 3 through the connecting pipe 18, and is initially filtered through the filter plate 17. The exhausted hot flue gas enters the middle of the inner cavity of the installation box 3 through the second exhaust pipe 20. Due to the setting of the pressure valve 21, the speed of the hot gas passing through the multiple hot water absorption pipes 14 can be slowed down, and the contact time with it can be increased, so that it can fully contact with the surface of the hot water absorption pipe 14. The hot water absorption pipe 14 absorbs the heat of the flue gas, so that the water inside the first water tank 11 is heated through the hot water absorption pipe 14 and enters the second water tank 15. It can be used by opening the outlet pipe 10 to flow out. When it is necessary to filter the bottom surface of the filter plate 17 and the hot water absorption pipe 14, the water inside the first water tank 11 is heated through the hot water absorption pipe 14 and enters the second water tank 15. When cleaning the dust and impurities on the surface, the second motor 91 is then started, the second motor 91 drives the rotating shaft 92 to rotate, the rotating shaft 92 drives the fixed sleeve 93 to rotate, and the fixed sleeve 93 drives the brush rod 94 to rotate, so as to facilitate cleaning the surface of the filter plate 17, and to facilitate cleaning the dust and impurities on the bottom of the filter plate 17, so as to facilitate improving the service life of the filter plate 17, and by starting the first motor 61, the first motor 61 drives the threaded shaft 62 to rotate, the threaded shaft 62 drives the moving block 63 to move up and down along the moving groove 12, and then drives the cleaning plate 64 to move up and down along the moving groove 12, so as to facilitate scraping and brushing the surface of the hot water absorption pipe 14, so as to facilitate improving the heat absorption capacity of the hot water absorption pipe 14 and improving the waste heat recovery rate.

[0025] The above embodiments are only used to illustrate the technical solution of the present invention, but not to limit it.

Claims

1. A waste heat recovery device for a high-efficiency energy-saving boiler, comprising a base (1), a boiler (2) being fixedly connected to one side of the top of the base (1), a mounting box (3) being fixedly connected to the side of the top of the base (1) away from the boiler (2), a first exhaust pipe (4) being fixedly connected to the top of the boiler (2), an exhaust pump (5) being fixedly connected to one end of the first exhaust pipe (4) away from the boiler (2), and a connecting pipe (18) being fixedly connected to the output end of the exhaust pump (5), characterized in that: A second cleaning mechanism (9) is provided at the bottom of the installation box (3); a second mounting plate (16) is fixedly connected to the bottom of the inner cavity of the installation box (3); a second water tank (15) is fixedly connected to the top of the second mounting plate (16); a plurality of evenly and equidistantly distributed hot water absorption pipes (14) are fixedly connected to the top of the second water tank (15); a first mounting plate (13) is fixedly connected to the top of the inner cavity of the installation box (3); a first water tank (11) is fixedly connected to the top of the first mounting plate (13); and a first cleaning mechanism (6) is provided in the middle of the inner cavity of the installation box (3).

2. The high-efficiency and energy-saving waste heat recovery device for a boiler according to claim 1, characterized in that: The second mounting plate (16) is located directly above the filter plate (17), the top of the hot water absorption pipe (14) passes through the first mounting plate (13) and extends to the interior of the first water tank (11), and the end of the connecting pipe (18) away from the vacuum pump (5) passes through the mounting box (3) and extends to the bottom end inside.

3. The high-efficiency and energy-saving waste heat recovery device for a boiler according to claim 1, characterized in that: The second brush cleaning mechanism (9) comprises a second motor (91) fixedly mounted on the top of the second brush cleaning mechanism (9); the output end of the second motor (91) is fixedly connected to a rotating shaft (92); the rotating shaft (92) passes through the installation box (3) and extends along to the bottom of the inner cavity of the installation box (3); one end of the rotating shaft (92) away from the second motor (91) is fixedly sleeved with a fixed sleeve (93); and brush rods (94) are symmetrically fixedly connected to both sides of the fixed sleeve (93).

4. The high-efficiency and energy-saving waste heat recovery device for a boiler according to claim 1, characterized in that: The first brush cleaning mechanism (6) comprises a first motor (61) fixedly mounted on the top of the installation box (3); the output end of the first motor (61) is fixedly connected to a threaded shaft (62); one end of the threaded shaft (62) away from the first motor (61) is threadedly connected to a moving block (63); one side of the moving block (63) is fixedly connected to a brush cleaning plate (64); and a plurality of evenly and equidistantly distributed plug holes (65) are provided on the top of the brush cleaning plate (64).

5. The high-efficiency and energy-saving waste heat recovery device for a boiler according to claim 4, characterized in that: The inner cavity of the installation box (3) is symmetrically provided with movable grooves (12), the threaded shaft (62) passes through the installation box (3) and extends to the inside of the movable groove (12), and the end of the threaded shaft (62) away from the first motor (61) is connected to the bearing of the installation box (3).

6. The high-efficiency and energy-saving waste heat recovery device for a boiler according to claim 1, characterized in that: A second exhaust pipe (7) is fixedly connected to one side of the top of the installation box (3); a water injection pipe (8) is fixedly connected to one side of the top of the first water tank (11), and the water injection pipe (8) passes through the installation box (3) and extends to the outside; a water outlet pipe (10) is fixedly connected to one side of the second water tank (15), and the water outlet pipe (10) passes through the installation box (3) and extends to the outside; a first air outlet pipe (19) is fixedly inserted into one side of the top of the first installation plate (13), and a pressure valve (21) is provided at the top of the first air outlet pipe (19); and a second air outlet pipe (20) is fixedly inserted into one side of the bottom of the second installation plate (16).