Power supply transient test equipment controlled by PLC
By designing PLC-controlled power transient testing equipment, the problem of inflexible power time adjustment in the existing technology is solved, and the flexible setting of power effective time and interrupt time is realized, which meets the testing needs of various equipment and improves the testing equipment. Accuracy and reliability.
Patent Information
- Application Number
- CN202420130300.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-19
AI Technical Summary
The existing power transient testing equipment is inflexible when setting the power supply valid time and power interruption time, the time adjustment range is small and the accuracy is low, and it cannot meet the testing needs of various equipment.
Design a PLC-controlled power transient testing equipment, including input circuit breaker, power transient switching unit, output circuit breaker, control unit, feedback detection unit, auxiliary power supply and human-computer interactive interface, flexibly set the power supply through the human-computer interface to effectively set the power supply through the human-computer interface Time and power interruption time have a large time adjustment range, high accuracy and high reliability.
It realizes flexible settings of power supply effective time and power interruption time, meets the testing needs of various equipment, has large-scale adjustment and high precision, and improves the reliability of test equipment.
Smart Images

Figure CN221946149U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of testing instruments and equipment, in particular to a power supply transient testing device controlled by a PLC. Background Art
[0002] The design and production of power supplies involve quality testing of power supplies. The purpose of power transient testing is to verify the anti-interference ability of the equipment when there is a transient disturbance caused by the action of the power switch or the action of inductive loads such as relays in the circuit. At present, when testing the transient response performance of the power supply, there is a phenomenon that the setting of the power effective time and the power interruption time is not flexible, the time adjustment range is small, the accuracy is low, and the reliability is low, which cannot meet the testing requirements of various types of equipment. Summary of the invention
[0003] The purpose of the utility model is to overcome the defects of the above-mentioned prior art that the setting of the power effective time and the power interruption time is not flexible, the time adjustment range is small, the precision is low, the reliability is low, and the test requirements of various equipment cannot be met, and to provide a PLC-controlled power transient test device, so that the power effective time and the power interruption time can be flexibly set through the human-machine interface, and the time adjustment range is large, the precision is high, and the reliability is high, so as to meet the test requirements of various equipment.
[0004] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is a PLC-controlled power transient test equipment, including an input circuit breaker QF1, a power transient switching unit STS, an output circuit breaker QF2, a control unit PLC, a feedback detection unit, an auxiliary power supply UC, an output control contactor KM, a human-machine interaction interface HMI, and an equipment housing; the power input terminal is sequentially electrically connected to the input circuit breaker QF1, the power transient switching unit STS, the output control contactor KM, and the output circuit breaker QF2, and then electrically connected to the power output terminal, the power transient switching unit STS controls the rapid disconnection and conduction of the power supply of the tested equipment, the human-machine interaction interface HMI communicates with the control unit PLC, the control unit PLC detects the status of the input circuit breaker, the output circuit breaker, and the output control contactor KM, and controls the working status of the output control contactor KM and the power transient switching unit STS; the function of the auxiliary power supply UC is to provide working power for the control unit PLC and the human-machine interaction interface HMI.
[0005] Preferably, the states of the input circuit breaker QF1, the output circuit breaker QF2, and the output control contactor KM are fed back to the input end of the control unit PLC.
[0006] Preferably, the output control contactor KM and the power transient switching unit STS are connected to the output end of the control unit PLC.
[0007] Compared with the prior art, the beneficial effects of the utility model are:
[0008] The power effective time and power interruption time can be flexibly set through the human-machine interface, with a large time adjustment range, high precision and high reliability, meeting the testing needs of various equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 This is the principle diagram of the utility model system.
[0010] Figure 2 This is a diagram of the power supply equipment of the utility model.
[0011] Figure 3 This is the PLC control principle diagram of the utility model.
[0012] Figure 4 Output waveform diagram of the utility model DETAILED DESCRIPTION
[0013] In order to make the purpose, technical scheme and advantages of the embodiment of the utility model clearer, the technical scheme in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. The components of the embodiment of the utility model described and shown in the drawings here can be arranged and designed in various different configurations. The vertical direction described in the utility model is vertical up and down in the figure, and the horizontal direction is left and right in the figure.
[0014] The specific structure of the utility model is: a PLC-controlled power transient test equipment, including input circuit breaker QF1, power transient switching unit STS, output circuit breaker QF2, control unit PLC, feedback detection unit, auxiliary power supply UC, output control contactor KM, human-machine interaction interface HMI, and equipment housing; the power input terminal is electrically connected to the input circuit breaker QF1, power transient switching unit STS, output control contactor KM, and output circuit breaker QF2 in sequence, and then electrically connected to the power output terminal, the power transient switching unit STS controls the rapid disconnection and conduction of the power supply of the tested equipment, the human-machine interaction interface HMI communicates with the control unit PLC, the control unit PLC detects the input circuit breaker, the output circuit breaker, and the output control contactor KM status, and controls the working status of the output control contactor KM and the power transient switching unit STS; the function of the auxiliary power supply UC is to provide working power for the control unit PLC and the human-machine interaction interface HMI. The input circuit breaker QF1, the output circuit breaker QF2, and the output control contactor KM status are fed back to the input end of the control unit PLC. The output control contactor KM and the power supply transient switching unit STS are connected to the output end of the control unit PLC.
[0015] Specifically: the function of the input circuit breaker QF1 is to control the input power supply of the power transient test equipment, and protect the back-end equipment when the power transient test equipment is overloaded, short-circuited or other faults occur; the function of the output control contactor KM is to control the input or output of the power supply of the tested equipment, and the power interruption time can be adjusted arbitrarily from 0.01MS to 10S; the function of the power transient switching unit STS is to control the rapid disconnection and conduction of the power supply of the tested equipment to meet the power transient requirements of the tested equipment; the function of the output circuit breaker QF2 is to control the input or output of the power supply of the tested equipment, and protect the back-end equipment when the tested equipment is overloaded, short-circuited or other faults occur. In case of short circuit and other faults, the tested equipment is protected; the control unit PLC function is to detect the input circuit breaker, output circuit breaker, output control contactor KM status, control the output control contactor KM, power transient switching unit STS working status; the auxiliary power supply UC function is to provide working power for the control unit PLC and the human-machine interface HMI; the output control contactor KM function is to control whether the power transient test equipment is put into use; the human-machine interface HMI function is to preset the on and off time of the power transient test equipment, the number of repeated operations, the start of the power transient test equipment, and real-time recording of the working status of the equipment. The power interruption time can be controlled to be arbitrarily adjusted from 0.01MS to 10S. The PE line is the protection line, and the N line is the neutral line, providing zero potential, which is drawn from the neutral point of the transformer.
[0016] The utility model PLC-controlled power transient test equipment can flexibly set the power effective time and power interruption time through the human-machine interface, and has a large time adjustment range, high precision and high reliability, meeting the test requirements of various equipment.
[0017] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A PLC-controlled power transient test device, characterized in that: It includes an input circuit breaker QF1, a power transient switching unit STS, an output circuit breaker QF2, a control unit PLC, a feedback detection unit, an auxiliary power supply UC, an output control contactor KM, a human-machine interaction interface HMI, and an equipment housing; the power input terminal is electrically connected to the input circuit breaker QF1, the power transient switching unit STS, the output control contactor KM, and the output circuit breaker QF2 in sequence, and then electrically connected to the power output terminal, the power transient switching unit STS controls the rapid disconnection and conduction of the power supply of the tested equipment, the human-machine interaction interface HMI communicates with the control unit PLC, the control unit PLC detects the status of the input circuit breaker, the output circuit breaker, and the output control contactor KM, and controls the working status of the output control contactor KM and the power transient switching unit STS; the function of the auxiliary power supply UC is to provide working power for the control unit PLC and the human-machine interaction interface HMI.
2. A PLC-controlled power transient test device according to claim 1, characterized in that: The states of the input circuit breaker QF1, the output circuit breaker QF2 and the output control contactor KM are fed back to the input end of the control unit PLC.
3. The PLC-controlled power transient test device according to claim 1, characterized in that: The output control contactor KM and the power supply transient switching unit STS are connected to the output end of the control unit PLC.