Temporary storage rack for pitched roof construction
By designing a temporary storage rack for sloped roofs, using the structure of fixing feet and anti-rope removal, the problem of inconvenient material placement in sloped roof construction is solved, and the stable placement of materials and the improvement of construction efficiency is achieved.
Patent Information
- Application Number
- CN202420113700.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-17
AI Technical Summary
During the construction of slope roofs, traditional materials stacking methods are labor-intensive and cannot be effectively placed on the roof, resulting in cumbersome construction and safety hazards. The existing technology cannot be applied to single-sided inclined roofs and the middle of the roof.
A temporary storage rack is designed, including legs and placement rack. The legs are stuck on the purlins of the slope roof by clamping feet. The legs are L-shaped structures. The placement rack can be set horizontally to prevent disconnection for fixing. Suitable for single-sided slope roofs and can be placed in any position.
It realizes stable placement of materials, simplifies the construction process, reduces the frequency of lifting, and improves construction efficiency and safety.
Smart Images

Figure CN221954752U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction auxiliary devices, in particular to a temporary storage rack used for slope roof construction. Background Art
[0002] In the process of roofing engineering, sloping roofs are increasingly used in various types of buildings due to their beautiful shape, flexible combination methods, good drainage, and thermal insulation properties. However, the traditional simple wooden sloping roofs are no longer suitable for the safety requirements of modern buildings, and the sloping roof steel purlin structure that came into being has also been widely used.
[0003] In the prior art, during the construction of a sloped roof, after the materials arrive at the site, they are usually piled up in a ground material yard. When the roofing project is ready for construction, the materials are sent to the sloped roof for construction by a crane and personnel. This method is labor-intensive and time-consuming, and has certain requirements for the area of the ground material yard. At the same time, since the roof cannot be piled with materials, frequent lifting operations are required, which greatly increases the complexity of construction. Among them, CN203334683U discloses a material unloading platform for sloped roof decoration construction, which can be placed on the sloped roof and realize temporary placement of materials, but it is only suitable for symmetrical roofs and needs to be placed on the roof. It cannot be applied to single-sided sloped roofs, and it cannot be placed in the middle of the roof, so it has poor applicability. The utility model provides a temporary rack for sloped roof construction to solve the above problems. Utility Model Content
[0004] The utility model provides a temporary storage rack for slope roof construction, which is suitable for single-side slope roofs and can be placed at any position on the roof, facilitating temporary placement of materials.
[0005] The technical solution adopted by the utility model to solve the above technical problems is:
[0006] A temporary storage rack for slope roof construction, which is arranged on the slope roof and used for temporarily placing materials, comprises legs and a storage rack, wherein the legs are vertically arranged on the slope roof, and the storage rack is arranged on the paired legs and is in a horizontal state;
[0007] The supporting leg comprises a supporting leg frame and a fixing foot. The fixing foot is arranged at two ends of the supporting leg frame and is fixed on the purlin of the slope roof.
[0008] Furthermore, the leg frame includes a vertical rod, a horizontal rod and an oblique rod, the vertical rod and the horizontal rod are connected to form an L-shaped structure, the oblique rod is arranged between the vertical rod and the horizontal rod, and the fixing feet are respectively arranged at the bottom end of the vertical rod and the outer end of the horizontal rod, and the two fixing feet are arranged parallel to each other.
[0009] Furthermore, the fixing foot is arranged obliquely and has the same slope as the slope of the slope roof, and the fixing foot is fixed on the edge of the purlin of the slope roof.
[0010] Furthermore, an anti-slip rope is provided on the supporting leg, one end of the anti-slip rope is connected to the inclined rod, and the other end of the anti-slip rope is connected to the placement frame by passing around the purlin of the slope roof.
[0011] Preferably, the placement rack is detachably connected to the supporting legs.
[0012] Preferably, the vertical rods, horizontal rods and diagonal rods are square tubes, and the fixing feet are angle steels.
[0013] Preferably, the clamping feet are welded to the leg frames, and the placement frame is welded with square tubes into a rectangular frame structure.
[0014] The beneficial effects of the utility model are as follows:
[0015] The device is fixed on the sloping roof by means of the fixing feet, so it is suitable for the placement environment of the single-sided sloping roof and can be placed at any position on the roof; the horizontal setting of the placement frame is achieved by means of the supporting legs, so that the stable placement of the construction materials is achieved; the utility model has a simple structure, is convenient to hoist and place, and has good stability, which can effectively reduce the tediousness of the construction work and improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the working condition of the utility model;
[0017] Figure 2 It is a side view schematic diagram of the use state of the utility model;
[0018] Figure 3 This is a schematic diagram of the connection between the placement frame and the supporting legs of the utility model;
[0019] Figure 4 It is a schematic diagram of the outriggers of the utility model.
[0020] Figure numerals: 1-leg, 11-leg frame, 12-fixed foot, 2-placing frame, 3-anti-fall rope. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings of the specification to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0023] like Figure 1 , 2 3, a temporary rack for slope roof construction, arranged on the slope roof, for temporarily placing materials, comprising a leg 1 and a rack 2, wherein the leg 1 is arranged vertically on the slope roof, and the rack 2 is arranged on the paired legs 1 and is in a horizontal state.
[0024] The utility model can be applied to a single-sided or double-sided sloping roof. The specific working condition of this embodiment is a single-sided steel frame sloping roof. The legs 1 of the rack are clamped on the steel purlins of the sloping roof. The two clamping feet 12 of the legs 1 are clamped on the two steel purlins respectively to realize the placement of the rack on the sloping roof. The rack 2 is in a horizontal state, and can stack construction materials and maintain stability. When performing construction work on the roof, after the rack is hoisted onto the sloping roof and placed stably, the construction materials are hoisted again and placed on the rack, so that more construction materials can be temporarily piled up without hoisting as needed. The frequency of hoisting operations and the corresponding workload can be effectively reduced, and the safety of aerial operations can be improved.
[0025] In a specific embodiment of the utility model, the placement rack 2 is a square tube frame, and the two legs 1 are detachably connected to the bottom surface of the placement rack 2 by bolts, and are respectively located on the left and right sides of the placement rack 2. The legs 1 are L-shaped structures, and the placement rack 2 is in a horizontal state when placed with the opening facing the roof. The two fixing feet 12 are respectively arranged on the two outer ends of the legs 1, and are used to be fixed on the steel purlins of the sloping roof, so that the whole device is in a stable state. The anti-fall rope 3 is used as a safety rope to prevent the storage rack from falling off the sloping roof and causing safety accidents.
[0026] like Figure 4 As shown, the leg 1 includes a leg frame 11 and a fixing foot 12. The fixing foot 12 is arranged at both ends of the leg frame 11 and is fixed on the purlin of the slope roof.
[0027] like Figure 4 As shown, further, the leg frame 11 includes a vertical rod, a horizontal rod and an oblique rod, the vertical rod and the horizontal rod are connected to form an L-shaped structure, the oblique rod is arranged between the vertical rod and the horizontal rod, and the fixing feet 12 are respectively arranged at the bottom end of the vertical rod and the outer end of the horizontal rod, and the two fixing feet 12 are arranged parallel to each other.
[0028] Furthermore, the fixing foot 12 is arranged obliquely and has the same slope as the slope of the slope roof, so that the fixing foot 12 can be stably fixed on the edge of the purlin of the slope roof, thereby ensuring the stability of the entire device.
[0029] like Figure 1 , 2 As shown, further, an anti-slip rope 3 is provided on the supporting leg 1, one end of the anti-slip rope 3 is connected to the diagonal rod, and the other end of the anti-slip rope 3 is connected to the placement frame 2 by passing through the purlin of the slope roof.
[0030] Preferably, one end of the anti-drop rope 3 is fixedly connected to the diagonal rod of the leg frame 11, and the other end is a hook. When placing the shelf, one end of the hook is passed around the steel purlin and then hung on the placement rack 2, and the rope is tightened, which can play an auxiliary fixing role, and will not cause the clamping foot 12 to be detached from the steel purlin in the event of a slight collision, and prevent the shelf from falling when it is detached from the roof.
[0031] Preferably, the placement rack 2 is detachably connected to the support leg 1 by bolts, and the distance between the two support legs 1 can be adjusted as needed, and different types of placement racks 2 can be selected according to different construction materials. When stacking tubular or plate profiles, a frame-type placement rack 2 can be used, and when stacking mud or small parts, a plate-type placement rack 2 can be used.
[0032] Preferably, the vertical rods, horizontal rods and diagonal rods are square tubes, and the fixing feet 12 are angle steels.
[0033] Preferably, the fixing feet 12 are welded to the leg frame 11, and the placement frame 2 is welded into a rectangular frame structure using square tubes.
[0034] When the utility model is used, it is assembled into a suitable size according to the construction situation, and then hoisted onto the sloping roof by a crane. The operator places the storage rack at a suitable position on the sloping roof, fastens the anti-falling rope 3, and then hoists the construction materials and places them on the storage rack, and finally performs the sloping roof construction operation.
[0035] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
Claims
1. A temporary rack for slope roof construction, which is arranged on the slope roof and is used for temporarily placing materials, and is characterized in that: It comprises a support leg (1) and a placement frame (2), wherein the support leg (1) is vertically arranged on a sloping roof, and the placement frame (2) is arranged on a pair of support legs (1) and is in a horizontal state; The support leg (1) comprises a support leg frame (11) and a fixing foot (12); the fixing foot (12) is arranged at both ends of the support leg frame (11) and is fixed on a purlin of a sloping roof.
2. A temporary rack for slope roof construction according to claim 1, characterized in that: The leg support frame (11) comprises a vertical rod, a horizontal rod and an oblique rod, wherein the vertical rod and the horizontal rod are connected to form an L-shaped structure, the oblique rod is arranged between the vertical rod and the horizontal rod, and the fixing feet (12) are respectively arranged at the bottom end of the vertical rod and the outer end of the horizontal rod, and the two fixing feet (12) are arranged parallel to each other.
3. The temporary rack for slope roof construction according to claim 1 is characterized in that: The fixing foot (12) is arranged obliquely and has the same slope as the slope of the slope roof; the fixing foot (12) is fixed on the edge of the purlin of the slope roof.
4. The temporary storage rack for slope roof construction according to claim 1 is characterized in that: The supporting leg (1) is provided with an anti-slip rope (3), one end of the anti-slip rope (3) is connected to the inclined rod, and the other end of the anti-slip rope (3) is connected to the placement frame (2) by passing around the purlin of the slope roof.
5. The temporary storage rack for slope roof construction according to claim 1 is characterized by: The placement rack (2) is detachably connected to the supporting leg (1).
6. The temporary storage rack for slope roof construction according to claim 2 is characterized by: The vertical rod, the horizontal rod and the diagonal rod are square tubes, and the clamping foot (12) is an angle steel.
7. The temporary rack for slope roof construction according to claim 1 is characterized by: The clamping foot (12) is welded to the leg support frame (11), and the placement frame (2) is made of square tubes welded into a rectangular frame structure.