Semi-grouting type steel bar joint for vertical steel bar connection
By designing a semi-grough steel bar joint with two-half connecting sleeves and fixed nuts, the problems of cumbersome installation and inconvenient disassembly are solved, and the grouting quality is improved through grouting holes and slurry outlets, achieving convenient installation and high-strength Rebar connection.
Patent Information
- Application Number
- CN202420472559.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The installation process of existing semi-groughed steel bar joints is cumbersome and cannot be disassembled and adjusted freely, and bubbles are easily generated during grouting, resulting in poor strength.
Designed as a two-half connecting sleeve, easy installation and disassembly through fastening and fixing nuts, grouting and gas discharge through grouting holes and slurry outlets, ensuring sealing and strength.
The installation and disassembly process is simplified, and the problem of inconvenient disassembly of traditional joints is solved. The grouting quality is improved through grouting holes and slurry outlets, reducing bubble generation, and improving the strength and convenience of the joints.
Smart Images

Figure CN221957065U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of steel bar joints, and in particular relates to a semi-grouting steel bar joint for vertical steel bar connection. Background Art
[0002] Semi-grouting steel bar joint is a commonly used vertical steel bar connection method, which is suitable for steel bar connection in concrete structure. Its main feature is that at the steel bar connection, only a part of the steel bar is grouting fixed, while the other part of the steel bar is exposed outside, so as to allow a certain length of steel bar to move in the sleeve when necessary, so as to adapt to the actual installation and construction requirements of the structure. For example, the Chinese utility model patent with announcement number CN209855053U discloses a semi-grouting steel bar joint for vertical steel bar connection, including a connecting sleeve, an inner joint, a first connecting steel bar, and a second connecting steel bar. The inner wall of the connecting sleeve is processed with an internal thread, and the lower end of the connecting sleeve is screwed into the inner joint. The inner joint includes a base, and the outer surface of one end of the base is processed with an external thread. The other end of the base is provided with an internal thread hole. The external thread of the inner joint is screwed with the internal thread hole at the lower end of the connecting sleeve, and the internal thread hole of the inner joint is screwed and tightened with the external thread processed at the end of the first connecting steel bar. One end of the second connecting steel bar is inserted from the upper end of the connecting sleeve and poured with grout downward. However, the installation process of the above-mentioned steel bar joint is relatively cumbersome, and the steel bar joint cannot be freely disassembled and adjusted during use.
[0003] Therefore, a semi-grouting steel bar joint that is easy to disassemble is currently needed. Utility Model Content
[0004] The utility model aims to provide a semi-grouting steel bar joint for vertical steel bar connection. The joint assembly is configured as two half-connection sleeves. When in use, the two half sleeves are buckled on the surface of the steel bar, and then the fixing nut below is screwed to fix the sleeve on the surface of the steel bar, making the installation and disassembly process more convenient.
[0005] The utility model adopts the technical solution to solve the above problems: a semi-grouting steel bar joint for vertical steel bar connection, comprising a first half sleeve, a grouting hole is opened on the side of the first half sleeve, and a first semicircular threaded pipe is fixedly connected to the bottom of the first half sleeve.
[0006] A further preferred technical solution is that a stopper is fixedly connected to the inner wall of the groove of the first half-sleeve, and a sealing block is fixedly connected to the side of the first half-sleeve.
[0007] A further preferred technical solution is that a second half sleeve is arranged on the side of the first half sleeve, and the first half sleeve and the second half sleeve have the same inner radius.
[0008] A further preferred technical solution is that a slurry outlet hole is opened on the side of the second half sleeve, and a stopper is fixedly connected to the inner wall of the groove of the second half sleeve.
[0009] A further preferred technical solution is that a second semicircular threaded tube is fixedly connected to the bottom of the second half sleeve, and a sealing groove is provided on the side of the second half sleeve.
[0010] A further preferred technical solution is that a first connecting steel bar is provided in the middle portion above the first half sleeve and the second half sleeve, and the radius of the first connecting steel bar is the same as the inner radius of the first half sleeve.
[0011] A further preferred technical solution is that a second connecting steel bar is provided in the middle portion below the first half sleeve and the second half sleeve, and the radius of the second connecting steel bar is the same as the inner radius of the first half sleeve.
[0012] A further preferred technical solution is that a fixing nut is arranged below the first semicircular threaded tube, an internal threaded hole is opened inside the fixing nut, and an inner radius of the internal threaded hole is the same as an outer radius of the first semicircular threaded tube.
[0013] A further preferred technical solution is that the outer ring surface of the fixing nut is provided with a friction assisting surface.
[0014] A further preferred technical solution is that the stopper is located below the grouting hole.
[0015] In summary, the utility model has the following benefits:
[0016] 1. Compared with the prior art, the semi-grouting steel bar joint for vertical steel bar connection is configured as two-half connecting sleeves. When in use, the two halves of the sleeves are buckled on the surface of the steel bar, and then the fixing nut below is screwed to fix the sleeve on the surface of the steel bar. This makes the subsequent installation process more convenient and easy to disassemble, solving the problem of inconvenient installation and disassembly of traditional devices.
[0017] 2. Compared with the prior art, the semi-grouting steel bar joint for vertical steel bar connection is provided with grouting holes and grouting holes. During the grouting operation, grouting is carried out through the grouting holes, and then the grouting holes can be used to discharge the internal air and display the grouting degree, which solves the problem that bubbles are easily generated during the grouting process of the traditional device, resulting in poor strength of the part. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model.
[0019] Figure 2 It is a schematic diagram of the three-dimensional segmented structure of the utility model.
[0020] Figure 3 It is a schematic diagram of the internal structure of the utility model.
[0021] Figure 4 It is a schematic diagram of the three-dimensional structure of the sleeve of the utility model.
[0022] In the accompanying drawings, the components represented by each number are as follows: 1. first half sleeve; 2. grouting hole; 3. first semicircular threaded pipe; 4. block; 5. sealing block; 6. second half sleeve; 7. grouting hole; 8. second semicircular threaded pipe; 9. sealing groove; 10. first connecting steel bar; 11. second connecting steel bar; 12. fixing nut; 13. internal threaded hole. DETAILED DESCRIPTION
[0023] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0024] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
[0025] Embodiment 1:
[0026] As attached Figure 2 and Figure 3 A semi-grouting steel bar joint for vertical steel bar connection shown in the figure comprises a first half sleeve 1 with a grouting hole 2 on the side, a first semicircular threaded pipe 3 fixedly connected to the bottom of the first half sleeve 1, a stopper 4 fixedly connected to the inner wall of the groove of the first half sleeve 1, a sealing block 5 fixedly connected to the side of the first half sleeve 1, a second half sleeve 6 is arranged on the side of the first half sleeve 1, and the first half sleeve 1 and the second half sleeve 6 have the same inner radius, a grouting hole 7 is opened on the side of the second half sleeve 6, a stopper 4 is fixedly connected to the inner wall of the groove of the second half sleeve 6, a second semicircular threaded pipe 8 is fixedly connected to the bottom of the second half sleeve 6, and a sealing groove 9 is opened on the side of the second half sleeve 6.
[0027] Wherein: during the use of the device, the inner walls of the first half sleeve 1 and the second half sleeve 6 are respectively fitted with the parts of the steel bars that need to be connected, and then the steel bars below are moved to fit with the block 4, and then the sealing block 5 is pushed to the inside of the sealing groove 9. When the two half sleeves are fitted, the first semi-circular threaded tube 3 and the second semi-circular threaded tube 8 below will also fit together. At this time, threaded fasteners are used to align and tighten. After the installation is completed, grouting is carried out through the position of the grouting hole 2, and then when the inside is full, it will flow out from the grouting hole 7. At this time, grouting is stopped and the vertical connection of the steel bars is completed after waiting for the internal solidification.
[0028] like Figures 1 to 4As shown, a first connecting steel bar 10 is arranged in the middle portion above the first half sleeve 1 and the second half sleeve 6, and the radius of the first connecting steel bar 10 is the same as the inner radius of the first half sleeve 1, and a second connecting steel bar 11 is arranged in the middle portion below the first half sleeve 1 and the second half sleeve 6, and the radius of the second connecting steel bar 11 is the same as the inner radius of the first half sleeve 1; further, since the radius of the first connecting steel bar 10 and the second connecting steel bar 11 are the same as the inner radius of the first half sleeve 1 and the second half sleeve 6, the sleeve can fit the steel bars tightly.
[0029] As a preferred embodiment, a fixing nut 12 is provided under the first semicircular threaded tube 3, an internal threaded hole 13 is opened inside the fixing nut 12, and the inner radius of the internal threaded hole 13 is the same as the outer radius of the first semicircular threaded tube 3; further, since the inner radius of the first semicircular threaded tube 3 is the same as the radius of the internal threaded hole 13 set inside the fixing nut 12, the threaded tube can be fixed by screwing the fixing nut 12.
[0030] The outer ring surface of the fixed nut is provided with a friction-assisting surface, wherein the friction-assisting surface refers to a special surface designed on the outer ring surface of a nut, knob or other tightening part. This surface design helps to increase the friction between the operator's fingers or tools and the contact surface of the nut when tightening or loosening the nut, thereby making the operation easier, reducing the possibility of slippage, and improving the efficiency of the operation.
[0031] The stopper 4 is located below the grouting hole 2 so that the second connecting steel bar 11 can also be located below the grouting hole 2 after installation, without hindering the grouting process of the grouting hole 2.
[0032] The working process of the utility model is as follows:
[0033] When it is necessary to connect the steel bars vertically, first fit the first connecting steel bar 10 and the second connecting steel bar 11 with the inner walls of the first half sleeve 1 and the second half sleeve 6, then fit the second connecting steel bar 11 with the block 4, and then move the first half sleeve 1 and the second half sleeve 6 to make the two sleeves fit together. During the fitting process, the sealing block 5 will move to the inside of the sealing groove 9, so that the sleeve as a whole has better sealing and tightness. At the same time, the first semi-circular threaded tube 3 and the second semi-circular threaded tube 8 will also fit together, and then the fixing nut 12 is put on the surface of the threaded tube, and then the fixing nut 12 is screwed. Through the action of the internal threaded hole 13, the fixing nut 12 can fix the threaded tube as a whole. When the sleeve is installed, grouting can be carried out through the position of the grouting hole 2. After the internal material is filled, it will flow out from the slurry outlet hole 7. At this time, stop grouting and wait for the internal solidification to complete the vertical connection of the steel bars.
[0034] In addition, the same or similar element symbols are used to refer to the same or similar parts or steps in the drawings and descriptions as much as possible. The drawings are presented in simplified form and are not drawn to exact scale. For convenience and clarity only, directional terms such as top, bottom, left, right, upward, above, above, below, below, behind, and in front may be used with respect to the drawings. These and similar directional terms should not be construed as limiting the scope of the present disclosure in any way.
Claims
1. A semi-grouted steel bar joint for vertical steel bar connection, comprising a first half sleeve (1), characterized in that; A grouting hole (2) is provided on the side of the first half sleeve (1), and a first semicircular threaded pipe (3) is fixedly connected to the bottom of the first half sleeve (1).
2. The semi-grouting steel bar joint for vertical steel bar connection according to claim 1, characterized in that: A stopper (4) is fixedly connected to the inner wall of the groove of the first half sleeve (1), and a sealing block (5) is fixedly connected to the side of the first half sleeve (1).
3. The semi-grouting steel bar joint for vertical steel bar connection according to claim 1, characterized in that: A second half sleeve (6) is arranged on the side of the first half sleeve (1), and the first half sleeve (1) and the second half sleeve (6) have the same inner radius.
4. The semi-grouting steel bar joint for vertical steel bar connection according to claim 3, characterized in that: A pulp outlet hole (7) is provided on the side of the second half sleeve (6), and a stopper (4) is fixedly connected to the inner wall of the groove of the second half sleeve (6).
5. The semi-grouting steel bar joint for vertical steel bar connection according to claim 3, characterized in that: A second semicircular threaded tube (8) is fixedly connected to the bottom of the second half sleeve (6), and a sealing groove (9) is provided on the side of the second half sleeve (6).
6. The semi-grouting steel bar joint for vertical steel bar connection according to claim 1, characterized in that: A first connecting steel bar (10) is provided at the middle portion above the first half sleeve (1) and the second half sleeve (6), and the radius of the first connecting steel bar (10) is the same as the inner radius of the first half sleeve (1).
7. The semi-grouting steel bar joint for vertical steel bar connection according to claim 1, characterized in that: A second connecting steel bar (11) is provided at the middle portion below the first half sleeve (1) and the second half sleeve (6), and the radius of the second connecting steel bar (11) is the same as the inner radius of the first half sleeve (1).
8. The semi-grouting steel bar joint for vertical steel bar connection according to claim 1, characterized in that: A fixing nut (12) is arranged below the first semicircular threaded tube (3), an internal threaded hole (13) is provided inside the fixing nut (12), and the inner radius of the internal threaded hole (13) is the same as the outer radius of the first semicircular threaded tube (3).
9. A semi-grouting steel bar joint for vertical steel bar connection according to claim 8, characterized in that: The outer ring surface of the fixing nut (12) is provided with a friction assisting surface.
10. The semi-grouting steel bar joint for vertical steel bar connection according to claim 2, characterized in that: The stopper (4) is located below the grouting hole (2).