Material sorting mechanism and appearance detection device

By designing a material sorting mechanism, and using lifting components and clamping components to automatically classify and transport materials, the problem of low material sorting efficiency in the existing technology is solved, efficient material classification and collection is achieved, and work efficiency is improved and costs are reduced. .

CN221966124UActive Publication Date: 2024-11-08WUXI AUTOVEC SEMICON TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420382279.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-08
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

After testing, the existing material sorting mechanism will carry the good and bad products inefficiently, resulting in low working efficiency.

Method used

A material sorting mechanism is designed, including a material collection assembly and a lifting assembly. It automatically classifies and transports materials through an empty box conveying line and a full box conveying line, and combines a clamping assembly to improve classification efficiency.

Benefits of technology

It realizes the automatic classification, transportation and collection of materials, significantly improves work efficiency, saves classification time, reduces costs and simplifies the assembly process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221966124U_ABST
    Figure CN221966124U_ABST
Patent Text Reader

Abstract

The utility model relates to a material sorting mechanism and an appearance detection device. The material sorting mechanism comprises a material collecting assembly and a lifting assembly. The material receiving assembly comprises an empty material box conveying line and a full material box conveying line. The empty material box conveying line conveys empty material boxes to the lifting assembly. The full material box conveying line is used for receiving and conveying material boxes filled with good product materials and material boxes filled with defective product materials; the lifting assembly comprises a lifting module, a first clamping assembly and a second clamping assembly; the lifting module drives the first clamping assembly and the second clamping assembly to clamp empty material boxes, drives the empty material boxes clamped by the first clamping assembly to receive good product materials and drives the empty material boxes clamped by the second clamping assembly to receive defective product materials. And the lifting module is also used for lifting a first clamping assembly for clamping the material box filled with the non-defective material and a second clamping assembly for clamping the material box filled with the defective material to the feeding end of the full material box conveying line. Materials can be automatically conveyed and collected in a classified mode, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to a material appearance inspection device, specifically a material sorting mechanism and an appearance inspection device. Background Technology

[0002] After the materials undergo visual inspection, good and defective products need to be stored separately in different boxes.

[0003] In existing technologies, the tested materials are typically delivered to their corresponding material boxes via a handling mechanism. However, this handling mechanism requires movement back and forth between the testing station and the receiving station, resulting in low work efficiency. Utility Model Content

[0004] This application addresses the problem of low efficiency in existing material sorting by providing a highly efficient material sorting mechanism and appearance inspection device.

[0005] In a first aspect, this application provides a material sorting mechanism, including a receiving component and a lifting component, wherein the lifting component is installed beside the receiving component; wherein:

[0006] The receiving assembly includes an empty box conveyor line and a full box conveyor line. The empty box conveyor line is configured to transport empty boxes to the lifting assembly. The full box conveyor line is used to receive and transport boxes filled with good products and boxes filled with defective products.

[0007] The lifting assembly includes a lifting module, a first clamping assembly, and a second clamping assembly, which are installed sequentially from bottom to top on the movable parts of the lifting module.

[0008] The lifting module is configured to move the first clamping component and the second clamping component to the discharge end of the empty material box conveyor line to clamp the empty material box, and to move the empty material box clamped by the first clamping component to the receiving position to receive good material, and to move the empty material box clamped by the second clamping component to the receiving position to receive defective material.

[0009] The lifting module is also configured to lift a first clamping assembly holding a box filled with good material to the feed end of the full box conveyor line, and to lift a second clamping assembly holding a box filled with defective material to the feed end of the full box conveyor line.

[0010] By configuring an empty box conveyor line to transport empty boxes and a full box conveyor line to transport boxes filled with good products and boxes filled with defective products, and by configuring two separate clamping components to clamp the empty boxes to collect good and defective products respectively, the sorting, conveying and collecting of materials can be automated, thus improving work efficiency.

[0011] Optionally, the full box conveyor line includes a first box conveyor line and a second box conveyor line in parallel. The first box conveyor line is used to receive and convey boxes filled with good products, and the second box conveyor line is used to receive and convey boxes filled with defective products.

[0012] The lifting module is configured to lift the first clamping assembly holding the material box filled with good material to the feed end of the first material box conveyor line;

[0013] The lifting module is also configured to lift the second clamping assembly holding the hopper filled with defective materials to the feed end of the second hopper conveyor line.

[0014] By setting up two full-box conveyor lines, one dedicated to conveying boxes filled with good products and the other to convey boxes filled with defective products, the materials are transported separately during unloading, which facilitates material sorting, saves sorting time, and improves sorting efficiency.

[0015] Optionally, the first clamping assembly and the second clamping assembly have the same structure;

[0016] The first clamping assembly includes a bracket, a lower support plate, an upper pressure plate, and a vertical moving mechanism. The lower support plate is installed at the lower part of the bracket, and the upper pressure plate is arranged above the lower support plate. The upper pressure plate is installed on the movable part of the vertical moving mechanism, and the vertical moving mechanism drives the upper pressure plate to move relative to the lower support plate to clamp or release the material box.

[0017] Setting the first clamping component and the second clamping component to have the same structure facilitates manufacturing and assembly, reduces costs, and improves assembly efficiency.

[0018] Optionally, the vertical moving mechanism includes a first cylinder and a first sliding assembly mounted on a bracket. The upper pressure plate is mounted on the movable end of the first cylinder and the slider of the first sliding assembly. The first cylinder drives the upper pressure plate to move up and down along the slide rail of the first sliding assembly.

[0019] The upper pressure plate is raised and lowered by the first cylinder, and the first sliding component guides the raising and lowering of the upper pressure plate, which ensures that the upper pressure plate can be raised and lowered smoothly, so that it can cooperate with the lower support plate to reliably clamp the material box.

[0020] Optionally, the first clamping assembly further includes a sliding seat, with the upper pressure plate rotatably connected to the sliding seat via a torsion spring. The sliding seat is mounted on the movable end of the first cylinder and the slider of the first sliding assembly.

[0021] The upper pressure plate is rotatably connected to the sliding seat via a torsion spring. The torsion spring applies a preload to the upper pressure plate, ensuring that the upper pressure plate can be reliably pressed against the material box.

[0022] Optionally, the first clamping assembly includes two lower support plates, two upper pressure plates, and two first sliding assemblies;

[0023] Two upper pressure plates are connected by a connecting plate, and each upper pressure plate is installed on the slider of one of the first sliding components. The movable end of the first cylinder is connected to one of the upper pressure plates.

[0024] The first cylinder simultaneously drives the two upper pressure plates to rise and fall along the slide rails of their respective first sliding components.

[0025] By arranging the lower support plate, upper pressure plate, and first sliding assembly in pairs, the first clamping assembly can more reliably clamp the material box.

[0026] Optionally, the first clamping assembly further includes a buffer assembly mounted on a bracket and located between an upper pressure plate and a lower support plate. The buffer assembly is used to contact the clamped hopper.

[0027] By configuring a buffer component on the first clamping assembly, damage caused by the material box impacting the support can be avoided.

[0028] Optionally, the empty box conveyor line, the first box conveyor line and the second box conveyor line have the same structure, and the empty box conveyor line includes a first drive assembly and a conveying unit;

[0029] The conveying unit is mounted on the movable part of the first drive assembly, which is configured to move the conveying unit closer to or away from the lifting assembly.

[0030] The conveying unit includes a drive unit and multiple parallel conveyor belts. The drive unit is configured to drive the multiple conveyor belts to carry and convey the material box.

[0031] Setting the three material box conveyor lines with identical structures facilitates manufacturing and assembly, reduces costs, and improves assembly efficiency. The first drive component drives the conveyor unit to approach the lifting component to deliver the material box to the clamping component for clamping. The first drive component also drives the conveyor unit away from the lifting component to avoid the lifting path of the clamping component. The conveyor unit uses multiple conveyor belts to jointly carry the material box, ensuring that the conveyor unit can stably and reliably carry and transport the material box.

[0032] Optionally, the first driving assembly includes a second cylinder and a second sliding assembly, and the conveying unit is mounted on the driving end of the second cylinder and the slider of the second sliding assembly; the second cylinder drives the conveying unit to move along the slide rail of the second sliding assembly.

[0033] The conveying unit is moved by driving the second cylinder and guided by the second sliding component, which ensures that the conveying unit can move smoothly.

[0034] In a second aspect, this application provides an appearance inspection device, including a material sorting mechanism as described in any of the first aspects, and the appearance inspection device further includes a feeding mechanism, an appearance inspection mechanism and a conveying mechanism.

[0035] The feeding mechanism is installed at the feeding end of the conveying mechanism and is used to transport the material to be tested to the conveying mechanism;

[0036] The appearance inspection mechanism is installed in the conveying path of the conveying mechanism to inspect the material to be inspected;

[0037] The material sorting mechanism is installed at the unloading end of the conveying mechanism to collect the tested material;

[0038] The conveying mechanism is configured to convey the material to be inspected from the feeding mechanism to the appearance inspection mechanism, and to convey the inspected material from the appearance inspection mechanism to the material sorting mechanism.

[0039] By configuring a material sorting mechanism that can efficiently classify, transport, and collect materials, the materials inspected by the appearance inspection device can be automatically classified and output, thereby improving the working efficiency of the appearance inspection device in unloading materials. Attached Figure Description

[0040] Figure 1 This is a three-dimensional structural diagram of an optional embodiment of the appearance inspection device of this application;

[0041] Figure 2 for Figure 1 A three-dimensional structural diagram of the material sorting mechanism in the diagram;

[0042] Figure 3 for Figure 2 A three-dimensional structural diagram of the first clamping component in the process;

[0043] Figure 4 for Figure 2 A three-dimensional structural diagram of the empty material box conveyor line.

[0044] Figures 1-4 Including:

[0045] Appearance inspection device 1;

[0046] Feeding mechanism 10;

[0047] Conveying mechanism 20;

[0048] 30 appearance inspection agencies;

[0049] Material sorting mechanism 40, receiving component 41, empty material box conveyor line 411, first drive component 451, second cylinder 471, second sliding component 472, conveying unit 452, drive component 461, conveyor belt 462, bearing plate 463, first material box conveyor line 412, second material box conveyor line 413, lifting component 42, lifting module 421, first clamping component 422, bracket 431, lower support plate 432, upper pressure plate 433, vertical moving mechanism 434, first cylinder 441, first sliding component 442, sliding seat 435, torsion spring 436, connecting plate 437, buffer component 438, second clamping component 423, mounting plate 424. Detailed Implementation

[0050] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, the application will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0051] like Figure 1 As shown, this application discloses an appearance inspection device 1, which is used for automated inspection of the appearance of materials.

[0052] The appearance inspection device 1 includes a feeding mechanism 10, a conveying mechanism 20, an appearance inspection mechanism 30, and a material sorting mechanism 40.

[0053] Wherein: the feeding mechanism 10 is installed at the feeding end of the conveying mechanism 20 and is used to convey the material to be tested to the conveying mechanism 20;

[0054] The appearance inspection mechanism 30 is installed in the conveying path of the conveying mechanism 20 and is used to inspect the material to be inspected;

[0055] The material sorting mechanism 40 is installed at the unloading end of the conveying mechanism 20 and is used to collect the tested material.

[0056] The conveying mechanism 20 is configured to convey the material to be inspected from the feeding mechanism 10 to the appearance inspection mechanism 30, and to convey the inspected material from the appearance inspection mechanism 30 to the material sorting mechanism 40.

[0057] Optionally, the feeding mechanism 10, the conveying mechanism 20, and the appearance inspection mechanism 30 can all adopt any of the existing structures.

[0058] This application mainly improves the material sorting mechanism 40. The specific structure of the material sorting mechanism 40 is described in detail below.

[0059] As an optional implementation method, such as Figure 1 , Figure 2As shown, the material sorting mechanism 40 includes a receiving component 41 and a lifting component 42, with the lifting component 42 installed beside the receiving component 41. A channel for the conveying mechanism 20 to transport materials is formed between the receiving component 41 and the lifting component 42.

[0060] Wherein: receiving component 41 includes empty box conveyor line 411 and full box conveyor line. Empty box conveyor line 411 is configured to convey empty boxes to lifting component 42; full box conveyor line is used to receive and convey boxes filled with good products and boxes filled with defective products.

[0061] The lifting assembly 42 includes a lifting module 421, a first clamping assembly 422 and a second clamping assembly 423, with the first clamping assembly 422 and the second clamping assembly 423 installed sequentially from bottom to top on the movable part of the lifting module 421;

[0062] The lifting module 421 is configured to move the first clamping component 422 and the second clamping component 423 to the discharge end of the empty material box conveyor line 411 to clamp the empty material box, and to move the empty material box clamped by the first clamping component 422 to the receiving position to receive good material, and to move the empty material box clamped by the second clamping component 423 to the receiving position to receive defective material.

[0063] The lifting module 421 is also configured to lift the first clamping assembly 422, which holds a box filled with good material, to the feed end of the full box conveyor line, and to lift the second clamping assembly 423, which holds a box filled with defective material, to the feed end of the full box conveyor line.

[0064] By configuring an empty material box conveyor line 411 to transport empty material boxes and a full material box conveyor line to transport material boxes filled with good materials and material boxes filled with defective materials, and by configuring two separate clamping components to clamp the empty material boxes to collect good materials and defective materials respectively, the sorting, conveying and collecting of materials can be automated, thereby improving work efficiency.

[0065] In this embodiment, the lifting module 421 can adopt any structure in the prior art, such as a linear module, a linear motor, etc.

[0066] In one embodiment, optionally, the full box conveyor line includes a first box conveyor line 412 and a second box conveyor line 413 in parallel, the first box conveyor line 412 being used to receive and convey boxes filled with good material, and the second box conveyor line 413 being used to receive and convey boxes filled with defective material.

[0067] The lifting module 421 is configured to lift the first clamping assembly 422, which holds a box filled with good material, to the feed end of the first box conveyor line 412;

[0068] The lifting module 421 is also configured to lift the second clamping assembly 423, which holds a box filled with defective materials, to the feed end of the second box conveyor line 413.

[0069] By setting up two full-box conveyor lines, one dedicated to conveying boxes filled with good products and the other to convey boxes filled with defective products, the materials are transported separately during unloading, which facilitates material sorting, saves sorting time, and improves sorting efficiency.

[0070] Optionally, the first clamping assembly 422 and the second clamping assembly 423 have the same structure. The first clamping assembly 422 and the second clamping assembly 423 are sequentially mounted on the mounting plate 424 from bottom to top, and the mounting plate 424 is mounted on the movable part of the lifting module 421.

[0071] The following description uses the first clamping component 422 as an example to illustrate its detailed structure.

[0072] like Figure 3 As shown, the first clamping assembly 422 includes a bracket 431, a lower support plate 432, an upper pressure plate 433, and a vertical moving mechanism 434. The lower support plate 432 is installed on the lower part of the bracket 431, and the upper pressure plate 433 is arranged above the lower support plate 432. The upper pressure plate 433 is installed on the movable part of the vertical moving mechanism 434. The vertical moving mechanism 434 drives the upper pressure plate 433 to move relative to the lower support plate 432 to clamp or release the material box.

[0073] Setting the first clamping component 422 and the second clamping component 423 to have the same structure facilitates manufacturing and assembly, reduces costs, and improves assembly efficiency.

[0074] Optionally, the vertical moving mechanism 434 includes a first cylinder 441 and a first sliding assembly 442 mounted on a bracket 431. The first sliding assembly 442 includes a slider and a slide rail that are slidably engaged. An upper pressure plate 433 is mounted on the movable end of the first cylinder 441 and on the slider of the first sliding assembly 442. The first cylinder 441 drives the upper pressure plate 433 to move up and down along the slide rail of the first sliding assembly 442.

[0075] The upper pressure plate 433 is driven to rise and fall by the first cylinder 441, and the first sliding component 442 guides the rise and fall of the upper pressure plate 433, which can ensure that the upper pressure plate 433 can rise and fall smoothly, so that it can cooperate with the lower support plate 432 to reliably clamp the material box.

[0076] Optionally, the first clamping assembly 422 further includes a sliding seat 435, with the upper pressure plate 433 rotatably connected to the sliding seat 435 via a torsion spring 436. The sliding seat 435 is mounted on the movable end of the first cylinder 441 and the slider of the first sliding assembly 442.

[0077] The upper pressure plate 433 is rotatably connected to the sliding seat 435 via a torsion spring 436. The torsion spring 436 applies a preload to the upper pressure plate 433, so that the upper pressure plate 433 can be reliably pressed onto the material box.

[0078] Optionally, the first clamping assembly 422 includes two lower support plates 432, two upper pressure plates 433, and two first sliding assemblies 442;

[0079] Two upper pressure plates 433 are connected by a connecting plate 437. Each upper pressure plate 433 is installed on the slider of one of the first sliding components 442. The movable end of the first cylinder 441 is connected to one of the upper pressure plates 433.

[0080] The first cylinder 441 simultaneously drives the two upper pressure plates 433 to rise and fall along the slide rails of their respective first sliding components 442.

[0081] By pairing the lower support plate 432, the upper pressure plate 433, and the first sliding assembly 442, the first clamping assembly 422 can clamp the material box more reliably.

[0082] Optionally, the first clamping assembly 422 further includes a buffer assembly 438, which is mounted on the bracket 431 and located between the upper pressure plate 433 and the lower support plate 432. The buffer assembly 438 is used to contact the clamped material box. The buffer assembly 438 can adopt any structure in the prior art, such as a rubber buffer block.

[0083] By configuring a buffer assembly 438 on the first clamping assembly 422, damage can be avoided due to the material box impacting the support 431.

[0084] like Figure 1 , Figure 2 As shown, in one embodiment, optionally, the empty box conveyor line 411, the first box conveyor line 412, and the second box conveyor line 413 have the same structure. The following description uses the empty box conveyor line 411 as an example to illustrate its detailed structure.

[0085] like Figure 4 As shown, the empty hopper conveyor line 411 includes a first drive assembly 451 and a conveying unit 452;

[0086] The conveying unit 452 is mounted on the movable part of the first drive assembly 451, which is configured to drive the conveying unit 452 to move closer to or away from the lifting assembly 42.

[0087] The conveying unit 452 includes a drive unit 461 and multiple parallel conveyor belts 462. The drive unit 461 is configured to drive the multiple conveyor belts 462 to carry and convey the material box.

[0088] Setting the three material box conveyor lines with the same structure facilitates production and assembly, reduces costs, and improves assembly efficiency. The first drive assembly 451 drives the conveying unit 452 to approach the lifting assembly 42 to deliver the material box to the clamping assembly for clamping. The first drive assembly 451 also drives the conveying unit 452 away from the lifting assembly 42 to avoid the lifting path of the clamping assembly. The conveying unit 452 uses multiple conveyor belts 462 to jointly carry the material box, ensuring that the conveying unit 452 can stably and reliably carry and transport the material box.

[0089] Optionally, the first drive assembly 451 includes a second cylinder 471 and a second sliding assembly 472, the second sliding assembly 472 including a slider and a slide rail that are slidably engaged. The conveying unit 452 is mounted on a support plate 463, the support plate 463 is mounted on the drive end of the second cylinder 471 and the slider of the second sliding assembly 472; the second cylinder 471 drives the conveying unit 452 to move along the slide rail of the second sliding assembly 472.

[0090] The conveying unit 452 is moved by the second cylinder 471 and guided by the second sliding component 472, which ensures that the conveying unit 452 can move smoothly.

[0091] Optionally, two sets of the second sliding assembly 472 are configured, respectively arranged on both sides of the second cylinder 471.

[0092] like Figure 1 , Figure 2 As shown, the working process of the material sorting mechanism 40 is as follows: First, the empty box conveyor line 411 conveys the empty boxes from right to left to the position of the clamping component near the lifting component 42. The lifting module 421 drives the first clamping component 422 to move to a position flush with the empty box conveyor line 411. The first clamping component 422 clamps the empty box on the empty box conveyor line 411. The lifting module 421 continues to descend, causing the second clamping component 423 to descend to a position flush with the empty box conveyor line 411. The second clamping component 423 clamps an empty box.

[0093] After the visual inspection unit 30 inspects the delivered material, if it is a good product, the first clamping component 422 is raised to a position level with the material, and the conveying mechanism 20 feeds the material into the material box held by the first clamping component 422; if it is a defective product, the second clamping component 423 is raised to a position level with the material, and the conveying mechanism 20 feeds the material into the material box held by the second clamping component 423. This cycle continues.

[0094] When one of the material boxes is full, the lifting module 421 drives the clamping assembly to lift the material box to a position flush with the corresponding material box conveyor line, and places the material box on the conveyor line. Then, a new empty material box is received from the empty material box conveyor line 411.

[0095] The appearance inspection device 1 of this application is equipped with a material sorting mechanism 40 that can efficiently classify, transport and collect materials, so that the materials after being inspected by the appearance inspection device 1 can be automatically classified and output, thereby improving the material unloading efficiency of the appearance inspection device 1.

[0096] The foregoing has provided a sufficiently detailed and specific description of this application. Those skilled in the art should understand that the descriptions in the embodiments are merely exemplary, and all changes made without departing from the true spirit and scope of this application should fall within the protection scope of this application. The scope of protection claimed in this application is defined by the claims, and not by the above descriptions in the embodiments.

Claims

1. A material sorting mechanism, It is characterized in that The material sorting mechanism includes a material receiving assembly and a lifting assembly, and the lifting assembly is installed beside the material receiving assembly; wherein: The material receiving assembly includes an empty material box conveying line and a full material box conveying line, wherein the empty material box conveying line is configured to convey the empty material box to the lifting assembly; the full material box conveying line is used to receive and convey material boxes filled with good material and material boxes filled with defective material; The lifting assembly includes a lifting module, a first clamping assembly and a second clamping assembly, wherein the first clamping assembly and the second clamping assembly are sequentially installed on the movable part of the lifting module from bottom to top; The lifting module is configured to respectively drive the first clamping assembly and the second clamping assembly to move to the discharge end of the empty material box conveyor line to clamp the empty material box, and to drive the empty material box clamped by the first clamping assembly to move to the material receiving position to receive good material, and to drive the empty material box clamped by the second clamping assembly to move to the material receiving position to receive defective material; The lifting module is also configured to lift the first clamping assembly that clamps a material box filled with good material to the feed end of the full material box conveyor line, and to lift the second clamping assembly that clamps a material box filled with defective material to the feed end of the full material box conveyor line.

2. The material sorting mechanism according to claim 1, It is characterized in that The full material box conveying line comprises a first material box conveying line and a second material box conveying line in parallel, wherein the first material box conveying line is used to receive and convey material boxes filled with good material, and the second material box conveying line is used to receive and convey material boxes filled with defective material; The lifting module is configured to lift the first clamping assembly that clamps the material box filled with good material to the feeding end of the first material box conveying line; The lifting module is also configured to lift the second clamping assembly that clamps the material box filled with defective materials to the feeding end of the second material box conveying line.

3. The material sorting mechanism according to claim 1, It is characterized in that The first clamping assembly and the second clamping assembly have the same structure; The first clamping assembly includes a bracket, a lower support plate, an upper pressure plate and a vertical moving mechanism; the lower support plate is installed at the lower part of the bracket, the upper pressure plate is arranged above the lower support plate, and the upper pressure plate is installed on the movable part of the vertical moving mechanism, and the vertical moving mechanism drives the upper pressure plate to move relative to the lower support plate to clamp or release the material box.

4. The material sorting mechanism according to claim 3, It is characterized in that The vertical moving mechanism includes a first cylinder and a first sliding assembly installed on the bracket, the upper pressure plate is installed on the movable end of the first cylinder and the slider of the first sliding assembly, and the first cylinder drives the upper pressure plate to rise and fall along the slide rail of the first sliding assembly.

5. The material sorting mechanism according to claim 4, It is characterized in that The first clamping assembly also includes a sliding seat, the upper pressure plate is rotatably connected to the sliding seat through a torsion spring, and the sliding seat is installed on the movable end of the first cylinder and the sliding block of the first sliding assembly.

6. The material sorting mechanism according to claim 4, It is characterized in that The first clamping assembly includes two lower supporting plates, two upper pressing plates and two first sliding assemblies; The two upper pressing plates are connected via a connecting plate, each of the upper pressing plates is respectively mounted on a slider of one of the first sliding assemblies, and the movable end of the first cylinder is connected to one of the upper pressing plates; The first cylinder simultaneously drives the two upper pressing plates to move up and down along the slide rails of their respective first sliding assemblies.

7. The material sorting mechanism according to claim 3, It is characterized in that The first clamping assembly also includes a buffer assembly, which is mounted on the bracket and located between the upper pressing plate and the lower supporting plate, and is used for contacting the clamped material box.

8. The material sorting mechanism according to claim 2, It is characterized in that The empty box conveying line, the first box conveying line and the second box conveying line have the same structure, and the empty box conveying line includes a first driving assembly and a conveying unit; The conveying unit is mounted on a movable component of the first driving assembly, and the first driving assembly is configured to drive the conveying unit to approach or move away from the lifting assembly; The conveying unit includes a driving member and a plurality of parallel conveying belts, and the driving member is configured to drive the plurality of conveying belts to operate so as to carry and convey the material box.

9. The material sorting mechanism according to claim 8, It is characterized in that The first driving assembly includes a second cylinder and a second sliding assembly, and the conveying unit is installed on the driving end of the second cylinder and the sliding block of the second sliding assembly; the second cylinder drives the conveying unit to move along the sliding rail of the second sliding assembly.

10. An appearance inspection device, It is characterized in that The appearance detection device comprises the material sorting mechanism according to any one of claims 1 to 9, and the appearance detection device further comprises a feeding mechanism, an appearance detection mechanism and a conveying mechanism; The feeding mechanism is installed at the feeding end of the conveying mechanism, and is used to convey the material to be detected to the conveying mechanism; The appearance detection mechanism is installed in the conveying path of the conveying mechanism and is used to detect the material to be detected; The material sorting mechanism is installed at the unloading end of the conveying mechanism and is used to collect the tested materials; The conveying mechanism is configured to convey the material to be inspected from the feeding mechanism to the appearance inspection mechanism, and to convey the inspected material from the appearance inspection mechanism to the material sorting mechanism.