Assembly part hoisting device for green building construction
By introducing adjustable support rod assembly and reinforcement assembly into the lifting device, the problem that the lifting device in the prior art cannot adapt to larger size objects and lacks stability, and the stable transportation of objects of different sizes and shapes is achieved. , reduces the risk of shedding.
Patent Information
- Application Number
- CN202420843645.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-23
AI Technical Summary
The existing lifting devices cannot adapt to the lifting of larger-sized objects, and the lack of stable components causes the risk of objects falling off during transportation, especially for pipe fittings that are prone to shaking.
An assembly lifting device including an adjustable support rod assembly, sliding block and down plate assembly, cogging and reinforcement assembly is designed to provide stability and wrapping by adjusting sidewall body spacing, sliding block spacing and winding rope length. Type limit, adapt to objects of different sizes and shapes.
It realizes flexible adaptation and stability of the lifting device, reduces the risk of objects shaking and falling off, and is suitable for the safe transportation of long and thick-substrate objects in green building construction.
Smart Images

Figure CN221971020U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of lifting devices, and in particular relates to an assembly lifting device used for green building construction. Background Art
[0002] Green building construction refers to high-quality buildings that can achieve the goal of energy conservation and emission reduction, further save resources, protect the environment, provide people with healthy, applicable and efficient use space, and maximize the harmonious coexistence of man and nature throughout their entire life cycle.
[0003] Among them, in the construction of green buildings, in order to facilitate the turnover of some assembly parts to high places, a lifting device is one of the indispensable devices. In the prior art 202122037003.0, a shock-absorbing lifting device for green building construction is disclosed, which mainly solves the problem that when the existing lifting equipment moves the components to the required position, the components are in contact with the ground. Because the components are too large and heavy, they have a huge impact force when they come into contact with the ground. This impact force will cause the components to crack or break. However, the following problems have arisen in the long-term practical process: 1. The size of the lifting device is fixed and cannot be further adjusted. When dealing with longer objects, there is more leakage and the risk of falling off during the lifting process increases; 2. The lifting device lacks effective stabilizing components. For easy-to-shake parts such as pipe fittings, the risk of falling off is further increased. In order to optimize this solution, practitioners have designed a lifting device for assembly parts for green building construction. Utility Model Content
[0004] The purpose of the utility model is to solve the problem that the existing lifting device cannot be further adjusted to adapt to the lifting of larger-sized objects and lacks a stabilizing part during the lifting process to prevent the objects from falling off.
[0005] The utility model achieves the above-mentioned purpose through the following technical solutions: a lifting device for assembly parts used in green building construction, comprising two groups of side wall bodies arranged opposite to each other, the two groups of side wall bodies being connected by a support rod assembly, a supporting plate being arranged on the upper part of the two groups of side wall bodies, the side wall bodies being matched with the supporting plates by a first adjusting bolt, two groups of sliding blocks being arranged opposite to each other on one of the supporting plates, the sliding blocks being arranged with a height adjusting plate, and a lower pressure plate assembly being arranged slidably between the two groups of height adjusting plates;
[0006] The support rod assembly includes an extension sleeve rod and an extension adjustment rod respectively arranged on two groups of side wall bodies, the extension adjustment rod is sleeved inside the extension sleeve rod, the extension sleeve rod and the extension adjustment rod are matched with each other through a second adjustment bolt, and a reinforcement assembly is arranged on the extension adjustment rod.
[0007] Furthermore, a placement frame is provided above the epitaxial sleeve rod and the epitaxial adjustment rod, and the bottom of the placement frame is made of a hollow steel mesh.
[0008] Furthermore, both ends of the front surface of the support plate are provided with limit bolts for limiting the position of the sliding block, and both ends of the upper surface of the support plate are provided with lifting rings, and a plurality of tooth grooves are evenly distributed between the two groups of lifting rings.
[0009] Furthermore, a gap is provided between the sliding block and the height adjustment plate.
[0010] Furthermore, the lower pressing plate assembly comprises a lower pressing bottom plate, the lower pressing bottom plate is sleeved with a lower pressing outer plate, and the ends of the lower pressing bottom plate and the lower pressing outer plate are respectively slidably disposed in the two groups of height adjustment plate cavities.
[0011] Furthermore, the reinforcement assembly includes a reinforcement base cylinder fixedly arranged above the extended adjustment rod, an extended reinforcement rod is slidably arranged in the cavity of the reinforcement base cylinder, the reinforcement base cylinder and the extended reinforcement rod are matched with each other through a third adjustment bolt, an auxiliary winding piece is arranged at the end of the extended reinforcement rod, and a winding rope is arranged on the auxiliary winding piece.
[0012] Beneficial effects: The utility model has reasonable design, simple and stable structure, strong practicality, and has the following beneficial effects:
[0013] 1. The setting of the support rod assembly can be adjusted to pre-set the distance between the two sets of side wall bodies, so that the lifting device can be practical for longer objects;
[0014] 2. The sliding block is set in conjunction with the lower pressure plate assembly. The sliding block can adjust the distance between the two groups, thereby limiting the shaking space from one end when transporting fewer objects, and the lower pressure plate assembly can adjust the height to adapt to the thick bottom of the object, thereby forming a wrapping type to limit shaking;
[0015] 3. The tooth grooves and the reinforcement components are arranged in coordination. The tooth grooves can be adapted to initially limit the shaking of some pipe fittings. The reinforcement components can limit the further shaking of the objects from the middle by adjusting the size of the winding rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the utility model;
[0017] Figure 2 This is a structural schematic diagram of the lower pressure plate assembly of the utility model;
[0018] Figure 3 It is a structural schematic diagram of the reinforcement component of the utility model.
[0019] In the figure: 1-side wall body, 2-support rod assembly, 3-support plate, 4-first adjustment bolt, 5-sliding block, 6-height adjustment plate, 7-lower pressure plate assembly;
[0020] 201-extension sleeve rod, 202-extension adjustment rod, 203-second adjustment bolt, 204-reinforcement assembly, 205-placement frame, 301-limiting bolt, 302-lifting ring, 303-tooth groove, 701-downward pressure bottom plate, 702-downward pressure extension plate;
[0021] 2041 - reinforced bottom tube, 2042 - extended reinforcement rod, 2043 - third adjustment bolt, 2044 - auxiliary winding member, 2045 - winding rope. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0023] Embodiment 1:
[0024] Combination Figure 1 The assembly lifting device for green building construction shown in the figure comprises two sets of side wall bodies 1 arranged opposite to each other, the bottom of the side wall bodies 1 is raised to ensure that the lifting device is effectively placed on the ground during the turnover process, the two sets of side wall bodies 1 are connected by a support rod assembly 2, and the support rod assembly 2 is an adjustable part, and the distance between the two sets of side wall bodies 1 can be effectively changed by adjustment, and a supporting plate 3 is extendedly arranged above the two sets of side wall bodies 1, and the side wall bodies 1 and the supporting plate 3 are matched by a first adjusting bolt 4, and this arrangement can adjust a height of the supporting plate 3. To avoid interference with the subsequent placement frame 205 when placing items inside, two sets of sliding blocks 5 are relatively arranged on one of the supporting plates 3, and height adjustment plates 6 are arranged on the sliding blocks 5. A lower pressing plate assembly 7 is slidably arranged between the two sets of height adjustment plates 6. The partially restricted sliding block 5 can adjust the distance between the two sets, so as to be used when transporting fewer objects. In addition, the lower pressing plate assembly 7 slides in the height adjustment plate 6 to adapt to the thickness of the object. Finally, the lower pressing plate assembly 7 is a follower, and its length can be changed during the adjustment of the sliding block 5.
[0025] The support rod assembly 2 includes an extension sleeve rod 201 and an extension adjustment rod 202 respectively arranged on the two sets of side wall bodies 1, the extension adjustment rod 202 is sleeved inside the extension sleeve rod 201, and the extension sleeve rod 201 and the extension adjustment rod 202 are matched by a second adjustment bolt 203. This arrangement can achieve the matching length between the extension adjustment rod 202 and the extension sleeve rod 201 by simply adjusting the first adjustment bolt 203, thereby adjusting the distance between the two sets of side wall bodies 1, and a reinforcement assembly 204 is arranged on the extension adjustment rod 202. The reinforcement assembly 204 is used to further reinforce the object from the middle at a later stage.
[0026] In this embodiment, a placement frame 205 is arranged above the extension sleeve rod 201 and the extension adjustment rod 202. The bottom of the placement frame 205 is made of a hollow steel mesh. The placement frame is used to prevent some smaller objects. In addition, the hollow mesh setting at the bottom can prevent some construction debris from entering the placement frame 205 during the construction process and causing it to be difficult to clean.
[0027] In this embodiment, both ends of the front surface of the support plate 3 are provided with limit bolts 301 for limiting the position of the sliding block 5. The limit bolts 301 are used to limit the adjustment position of the sliding block 5 to prevent collision at the end during the adjustment process. Both ends of the upper surface of the support plate 3 are provided with lifting rings 302. The lifting rings 302 are used to cooperate with extraction equipment such as tower cranes in the later stage to facilitate the extraction of the lifting device. A number of tooth grooves 303 are evenly distributed between the two groups of lifting rings 302. The tooth grooves 303 can initially limit some pipe fittings and reduce the shaking space.
[0028] In this embodiment, a gap is provided between the sliding block 5 and the height adjustment plate 6 , and the gap constitutes an avoidance space, thereby preventing the sliding block 5 from interfering with the tooth groove 303 during the adjustment process.
[0029] In this embodiment, refer to Figure 2 The lower pressure plate assembly 7 shown includes a lower pressure base plate 701, in which a lower pressure extension plate 702 is sleeved, and the ends of the lower pressure base plate 701 and the lower pressure extension plate 702 are respectively slidably arranged in the cavities of two groups of height adjustment plates 6, to ensure that the lower pressure plate assembly 7 can change its length during the adjustment of the sliding block 5, and its height can also be changed by sliding in the height adjustment plate 6.
[0030] In this embodiment, refer to Figure 3The reinforcement assembly 204 shown includes a reinforcement base cylinder 2041 fixedly arranged above the extension adjustment rod 202, and an extension reinforcement rod 2042 is slidably arranged in the cavity of the reinforcement base cylinder 2041. The reinforcement base cylinder 2041 and the extension reinforcement rod 2042 are matched with each other through a third adjusting bolt 2043. An auxiliary winding piece 2044 is arranged at the end of the extension reinforcement rod 2042, and a winding rope 2045 is arranged on the auxiliary winding piece 2044. This arrangement method can change the height of the extension reinforcement rod 2042 by adjusting the third adjusting bolt 2043, so that the auxiliary winding piece 2044 reaches the optimal winding position of the object, and then the winding rope 2045 is used to surround the object for one circle, so as to stabilize the object from the middle and further reduce the shaking of the object during lifting.
[0031] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0032] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A lifting device for assembly parts used in green building construction, comprising two sets of side wall bodies (1) arranged opposite to each other, characterized in that: The two groups of side wall bodies (1) are connected via a support rod assembly (2); a support plate (3) is provided on the upper part of the two groups of side wall bodies (1); the side wall bodies (1) and the support plates (3) are matched via a first adjustment bolt (4); two groups of sliding blocks (5) are provided on one of the support plates (3) in a relative manner; a height adjustment plate (6) is provided on each of the sliding blocks (5); and a lower pressure plate assembly (7) is slidably provided between the two groups of height adjustment plates (6); The support rod assembly (2) comprises an extension sleeve rod (201) and an extension adjustment rod (202) respectively arranged on two groups of side wall bodies (1); the extension adjustment rod (202) is sleeved inside the extension sleeve rod (201); the extension sleeve rod (201) and the extension adjustment rod (202) are matched via a second adjustment bolt (203); and a reinforcement assembly (204) is arranged on the extension adjustment rod (202).
2. The assembly lifting device for green building construction according to claim 1 is characterized by: A placement frame (205) is provided above the epitaxial sleeve rod (201) and the epitaxial adjustment rod (202), and the bottom of the placement frame (205) is made of a hollow steel mesh.
3. The assembly lifting device for green building construction according to claim 2 is characterized in that: Limit bolts (301) for limiting the position of the sliding block (5) are provided at both ends of the front surface of the support plate (3), and lifting rings (302) are provided at both ends of the upper surface of the support plate (3). A plurality of tooth grooves (303) are evenly distributed between two groups of the lifting rings (302).
4. The assembly lifting device for green building construction according to claim 3 is characterized by: A gap is provided between the sliding block (5) and the height adjustment plate (6).
5. The assembly lifting device for green building construction according to claim 4 is characterized in that: The lower pressing plate assembly (7) comprises a lower pressing bottom plate (701), a lower pressing outer plate (702) being sleeved inside the lower pressing bottom plate (701), and the ends of the lower pressing bottom plate (701) and the lower pressing outer plate (702) are respectively slidably disposed in the cavities of the two groups of height adjustment plates (6).
6. The assembly lifting device for green building construction according to claim 5, characterized in that: The reinforcement assembly (204) comprises a reinforcement base cylinder (2041) fixedly arranged above the extension adjustment rod (202); an extension reinforcement rod (2042) is slidably arranged in the cavity of the reinforcement base cylinder (2041); the reinforcement base cylinder (2041) and the extension reinforcement rod (2042) are matched via a third adjustment bolt (2043); an auxiliary winding piece (2044) is arranged at the end of the extension reinforcement rod (2042); and a winding rope (2045) is arranged on the auxiliary winding piece (2044).