Built-in backwashing sewage lifting equipment

By introducing transparent anti-fouling partitions, water level sensors and built-in pump bodies into the backwash sewage lifting equipment, the problem that the equipment cannot monitor water level and sludge accumulation is solved, real-time monitoring and convenient cleaning are achieved, and the reliability of the equipment is improved. and space utilization.

CN221972646UActive Publication Date: 2024-11-08SHANGHAI OUBOZHOU MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323567276.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-08
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The existing backwash sewage lifting equipment cannot monitor the water level of the sewage tank in real time, resulting in excessive sewage overflow, and the four corners of the sewage tank are prone to accumulation of sludge, which is difficult to clean, and is less practical.

Method used

A built-in backwash sewage lifting equipment is designed, including a transparent anti-fouling compartment, a water level sensor, a rotatable cover plate and a built-in pump body. It is easy to monitor the water level through the observation port, prevent sludge accumulation, and passes through the spring. Reduce vibration and set up dual pipe fittings to improve system reliability.

Benefits of technology

Real-time monitoring of the water level of the sewage tank is achieved, sewage overflow and sludge accumulation is avoided, equipment cleaning convenience and space utilization are improved, and system reliability and operation stability are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972646U_ABST
    Figure CN221972646U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sewage treatment, and discloses built-in backwashing sewage lifting equipment which comprises a base, a sewage tank is fixedly mounted at the top of the base, an observation opening is formed in the outer side of the sewage tank, an antifouling interlayer is fixedly mounted in the sewage tank, a plurality of cover plates are arranged at the top of the sewage tank, and the cover plates are arranged on the bottom of the sewage tank. A first water inlet is formed in the outer side of the sewage tank, a water level sensor is arranged on the outer side of the sewage tank, a first pipeline is arranged on the top of the sewage tank, a second water inlet is formed in the top of the first pipeline, and a second pipeline is arranged on the outer side of the first pipeline. According to the built-in backwashing sewage lifting equipment, through the design of the anti-fouling interlayer made of a transparent material, the situation that a user is prevented from penetrating through the internal water level from an observation opening due to the design of the anti-fouling interlayer can be avoided, and the contact surfaces of the anti-fouling interlayer and the sewage tank are all arranged to be smooth round corners, so that sludge is not prone to remaining at the four corners when the sewage tank is used; and later cleaning is not convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage treatment, in particular to a built-in backwash sewage lifting device. Background Art

[0002] With the development of science and technology, when sanitary sewage is discharged in basements and places far away from drainage risers that do not have gravity discharge of sewage, an automatic sewage lifting equipment will be used to discharge sewage, thereby replacing the "one pit and two pumps" basement drainage method. The automatic sewage lifting equipment is a system composed of a sewage pump, a water collection tank, a control device, and related pipe fittings and valves. It has a simple and bright appearance and a more scientific and reasonable internal structure.

[0003] The Chinese utility model with patent announcement number CN213572326U discloses a backwash sewage lifting device, which allows the sewage to be lifted to enter the device directly and can operate normally without prior slag removal. The backwash sewage lifting device with such a structure cannot realize real-time monitoring of the water level in the sewage tank, which easily causes excessive sewage to overflow. In addition, the backwash sewage lifting device has no design for the four corners inside the sewage tank. Long-term use will easily cause sludge to accumulate in the four corners inside the sewage tank, which is not only difficult to clean but also easy to cause bad smell, and has poor practicality. Utility Model Content

[0004] In view of the problem that existing backwash sewage lifting solutions are prone to dirt accumulation, the purpose of the utility model is to provide a built-in backwash sewage lifting device to solve the problems existing in the existing backwash sewage lifting solutions.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A built-in backwash sewage lifting device comprises a base, a sewage tank is fixedly installed on the top of the base, an observation port is opened on the outside of the sewage tank, an anti-fouling barrier is fixedly installed inside the sewage tank, a plurality of cover plates are arranged on the top of the sewage tank, a water inlet 1 is arranged on the outside of the sewage tank, a water level sensor is arranged on the outside of the sewage tank, a pipe 1 is arranged on the top of the sewage tank, a water inlet 2 is arranged on the top of the pipe 1, a pipe 2 is arranged on the outside of the pipe 1, a shunt pipe is arranged on the other end of the pipe 2 away from the pipe 1, a pipe 3 is arranged on the outside of the shunt pipe, a connecting pipe 1 is arranged on the other end of the pipe 3 away from the shunt pipe, a supporting column is fixedly installed on the top of the supporting column, a fixing frame is fixedly installed on the outside of the fixing frame, a plurality of springs are fixedly installed on the outside of the fixing frame, a connecting end is arranged on the outside of the connecting pipe 1, a pump body is arranged on the outside of the connecting end, a pipe fitting is arranged on the other end of the connecting pipe 1, a connecting pipe 2 is arranged on the outside of the pipe fitting, a valve is arranged on the outside of the pipe fitting, and a water outlet is arranged on the top of the pipe fitting.

[0007] Preferably, the observation port is located on the right side of the sewage tank, and the water level sensor is located on the right side of the sewage tank.

[0008] Through the above technical solution, through the design of the observation port, it is easier for the staff to observe the water level inside the sewage tank, and with the water level sensor located on the right side of the sewage tank, the water level of the sewage tank can be understood in time, thereby facilitating the next step of work.

[0009] Preferably, the anti-fouling barrier is made of a transparent material, and the contact surface between the anti-fouling barrier and the sewage tank is configured with smooth rounded corners.

[0010] Through the above technical solution, the design of the anti-fouling partition made of transparent material can avoid blocking the user from observing the internal water level through the observation port due to the design of the anti-fouling partition, and the contact surface between the anti-fouling partition and the sewage tank is set to smooth rounded corners, which can prevent sludge from remaining in the four corners of the sewage tank during use, making it inconvenient to clean it later.

[0011] Preferably, two identical cover plates are provided, the cover plates are rotatably connected to the sewage tank, and the water inlet 1 is located at the top of the sewage tank.

[0012] Through the above technical scheme, the cover plate is rotatably connected to the sewage tank. During maintenance, the cover plate can be opened to facilitate staff to enter the interior for maintenance, and the water inlet 1 is located at the top of the sewage tank. When cleaning the sewage tank, clean water can be poured in through the water inlet 1 for flushing.

[0013] Preferably, the pump body is located inside the sewage tank, and the connecting pipe 1, the connecting end and the pump body are connected to each other.

[0014] Through the above technical solution, the built-in pump body can better seal and isolate sewage, help reduce the spread of odor and environmental pollution, provide a healthier environment, and the pump body is placed in the sewage tank. This design can save space and improve space utilization.

[0015] Preferably, the fixing frame is a "circular" structure, the plurality of springs are distributed in a ring shape, and the other end of the spring is fixedly mounted to the connecting pipe.

[0016] Through the above technical solution, when the connecting pipe 1 vibrates, the vibration can be transmitted to the spring by fixing the other end of the spring to the connecting pipe 1, which can effectively reduce the shaking of the connecting pipe 1.

[0017] Preferably, two identical pipe fittings are provided, and the second connecting pipe is connected to the two pipe fittings.

[0018] Through the above technical solution, two identical pipe fittings are provided. If one pipe fitting fails or needs maintenance, the system can still rely on the other one, thereby improving the reliability of the system. When maintenance is required, one of them can be maintained while keeping the system running, and then switched to the other pipe fitting for maintenance, reducing the downtime of the system.

[0019] The built-in backwash sewage lifting equipment provided by the utility model can avoid blocking the user from observing the internal water level through the observation port due to the design of the anti-fouling partition layer made of transparent material, and the contact surface between the anti-fouling partition layer and the sewage tank is set to smooth rounded corners, which can prevent sludge from remaining in the four corners of the sewage tank when in use, making it inconvenient to clean it later.

[0020] The built-in backwash sewage lifting equipment provided by the utility model can transmit the vibration to the spring through the other end of the spring being fixedly installed with the connecting pipe one when the connecting pipe one vibrates, thereby effectively reducing the shaking of the connecting pipe one. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the built-in backwash sewage lifting equipment in the utility model from the first perspective;

[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the built-in backwash sewage lifting equipment in the utility model from a second viewing angle;

[0023] Figure 3 This is a schematic diagram of the installation structure of the sewage tank and the anti-fouling barrier in the utility model;

[0024] Figure 4 This is a schematic diagram of the cover flipping structure in the utility model;

[0025] Figure 5 for Figure 2 Enlarged structural diagram at A in the middle.

[0026] Among them: 1. Base; 2. Sewage tank; 3. Observation port; 4. Anti-fouling barrier; 5. Cover; 6. Water inlet 1; 7. Water level sensor; 8. Pipe 1; 9. Water inlet 2; 10. Pipe 2; 11. Diverter pipe; 12. Pipe 3; 13. Connecting pipe 1; 14. Support column; 15. Fixed frame; 16. Spring; 17. Connecting end; 18. Pump body; 19. Pipe fittings; 20. Connecting pipe 2; 21. Valve; 22. Water outlet. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] Embodiment 1:

[0029] See also Figure 1-5 , which shows an example of the structure of the built-in backwash sewage lifting equipment given in this example.

[0030] As can be seen from the figure, the built-in backwash sewage lifting equipment is specifically composed of a base 1, a sewage tank 2 is fixedly installed on the top of the base 1, an observation port 3 is opened on the outside of the sewage tank 2, an anti-fouling partition 4 is fixedly installed inside the sewage tank 2, a plurality of cover plates 5 are arranged on the top of the sewage tank 2, a water inlet 6 is arranged on the outside of the sewage tank 2, and a water level sensor 7 is arranged on the outside of the sewage tank 2.

[0031] Furthermore, in this example, a pipe 1 8 is arranged on the top of the sewage tank 2, a water inlet 2 9 is arranged on the top of the pipe 1 8, a pipe 2 10 is arranged on the outside of the pipe 1 8, a diversion pipe 11 is arranged on the other end of the pipe 2 10 away from the pipe 1 8, a pipe 3 12 is arranged on the outside of the diversion pipe 11, and a connecting pipe 13 is arranged on the other end of the pipe 3 12 away from the diversion pipe 11.

[0032] Furthermore, in this embodiment, a support column 14 is fixedly installed on the top of the base 1 , and a fixing frame 15 is fixedly installed on the top of the support column 14 .

[0033] Further, see Figure 4 and 5In this example, a plurality of springs 16 are fixedly installed on the outside of the fixed frame 15, a connecting end 17 is provided on the outside of the connecting pipe 13, a pump body 18 is provided on the outside of the connecting end 17, a pipe fitting 19 is provided on the other end of the connecting pipe 13, a connecting pipe 20 is provided on the outside of the pipe fitting 19, a valve 21 is provided on the outside of the pipe fitting 19, and a water outlet 22 is provided on the top of the pipe fitting 19.

[0034] In some implementations of this example, the observation port 3 in this solution is specifically located on the right side of the sewage tank 2, and the water level sensor 7 is located on the right side of the sewage tank 2. Through the design of such an observation port 3, it is more convenient for the staff to observe the water level inside the sewage tank 2, and with the water level sensor 7 being located on the right side of the sewage tank 2, the height of the water level in the sewage tank 2 can be timely understood, thereby facilitating the next step of work.

[0035] In some embodiments of this example, the anti-fouling barrier 4 in this scheme is made of a transparent material, and the contact surfaces between the anti-fouling barrier 4 and the sewage tank 2 are set to smooth rounded corners. In this way, the design of the anti-fouling barrier 4 made of transparent material can avoid blocking the user from observing the internal water level through the observation port 3 due to the design of the anti-fouling barrier 4, and the contact surfaces between the anti-fouling barrier 4 and the sewage tank 2 are set to smooth rounded corners, which can prevent sludge from remaining in the four corners of the sewage tank 2 during use, making it inconvenient to clean it later.

[0036] In some embodiments of this example, the cover plate 5 in this solution is provided with two identical ones, the cover plate 5 is rotatably connected to the sewage tank 2, and the water inlet 16 is located at the top of the sewage tank 2. Through the rotatable connection between the cover plate 5 and the sewage tank 2, the cover plate 5 can be opened during maintenance, so that the staff can enter the interior for maintenance, and the water inlet 16 is located at the top of the sewage tank 2. When cleaning the sewage tank 2, clean water can be put in through the water inlet 16 for flushing.

[0037] Embodiment 2:

[0038] This example further provides an optimization solution for the solution given in Example 1.

[0039] See also Figure 3 and Figure 4 In this example, the pump body 18 is arranged inside the sewage tank 2, and the connecting pipe 13, the connecting end 17 and the pump body 18 are connected to each other. The built-in pump body 18 can better seal and isolate the sewage, help reduce the spread of odor and environmental pollution, and provide a healthier environment. In addition, the pump body 18 is built into the sewage tank 2, which can save space and improve space utilization.

[0040] In some implementations of this example, see Figure 4 and Figure 5The fixing frame 15 is a "circular" structure, and a plurality of springs 16 are distributed in an annular shape, and the other end of the spring 16 is fixedly installed with the connecting pipe 13. In this way, when the connecting pipe 13 vibrates, the other end of the spring 16 is fixedly installed with the connecting pipe 13, and the vibration can be transmitted to the spring 16, which can effectively reduce the shaking of the connecting pipe 13.

[0041] In some implementations of this example, see Figure 1 and Figure 3 The pipe fittings 19 are provided with two identical ones, and the connecting pipe 20 is connected to the two pipe fittings 19. By providing the pipe fittings 19 with two identical ones, if one pipe fitting 19 fails or needs maintenance, the system can still rely on the other one, thereby improving the reliability of the system, and when maintenance is required, one of them is maintained while keeping the system running, and then switched to the other pipe fitting 19 for maintenance, reducing the downtime of the system.

[0042] In order to further illustrate the composition and technical features of this built-in backwash sewage lifting equipment, the following example illustrates its operation process.

[0043] When the built-in backwash sewage lifting equipment is in use, the design of the observation port 3 makes it easier for the staff to observe the water level inside the sewage tank 2, and the water level sensor 7 is located on the right side of the sewage tank 2, so that the water level of the sewage tank 2 can be timely understood, thereby facilitating the next step of work; the design of the anti-fouling partition 4 made of transparent material can avoid blocking the user from observing the internal water level through the observation port 3 due to the design of the anti-fouling partition 4, and the contact surface between the anti-fouling partition 4 and the sewage tank 2 is set to smooth rounded corners, so that it is not easy for sludge to remain at the four corners of the sewage tank 2 when in use, which is not convenient for cleaning later, and the cover plate 5 is rotatably connected to the sewage tank 2.

[0044] During maintenance, the cover 5 can be opened to facilitate the staff to enter the interior for maintenance, and the water inlet 6 is located at the top of the sewage tank 2. When cleaning the sewage tank 2, clean water can be put in through the water inlet 6 for flushing. The built-in pump body 18 can better seal and isolate the sewage, which helps to reduce the spread of odor and environmental pollution and provide a healthier environment. The pump body 18 is built into the sewage tank 2. This design can save space and improve space utilization. When the connecting pipe 13 vibrates, the other end of the spring 16 is fixedly installed with the connecting pipe 13, so that the vibration can be transmitted to the spring 16, which can effectively reduce the shaking of the connecting pipe 13. The pipe fittings 19 are provided with two identical ones. If one pipe fitting 19 fails or needs maintenance, the system can still rely on the other one, thereby improving the reliability of the system, and when maintenance is needed, one of them can be maintained while keeping the system running, and then switch to the other pipe fitting 19 for maintenance, reducing the downtime of the system.

[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A built-in backwash sewage lifting device, comprising a base (1), Features: A sewage tank (2) is fixedly mounted on the top of the base (1), an observation port (3) is provided on the outside of the sewage tank (2), an anti-fouling barrier (4) is fixedly mounted inside the sewage tank (2), a plurality of cover plates (5) are arranged on the top of the sewage tank (2), a water inlet (1) (6) is arranged on the outside of the sewage tank (2), a water level sensor (7) is arranged on the outside of the sewage tank (2), a pipe (1) (8) is arranged on the top of the sewage tank (2), a water inlet (2) (9) is arranged on the top of the pipe (8), a pipe (2) (10) is arranged on the outside of the pipe (8), a shunt pipe (11) is arranged on the other end of the pipe (10) away from the pipe (8), and a pipe (3) (12) is arranged on the outside of the shunt pipe (11), A connecting pipe (13) is provided at the other end of the pipe (12) away from the shunt pipe (11); a support column (14) is fixedly installed on the top of the base (1); a fixing frame (15) is fixedly installed on the top of the support column (14); a plurality of springs (16) are fixedly installed on the outside of the fixing frame (15); a connecting end (17) is provided on the outside of the connecting pipe (13); a pump body (18) is provided on the outside of the connecting end (17); a pipe fitting (19) is provided at the other end of the connecting pipe (13); a connecting pipe (20) is provided on the outside of the pipe fitting (19); a valve (21) is provided on the outside of the pipe fitting (19); and a water outlet (22) is provided on the top of the pipe fitting (19).

2. A built-in backwash sewage lifting equipment according to claim 1, Features: The observation port (3) is located on the right side of the sewage tank (2), and the water level sensor (7) is located on the right side of the sewage tank (2).

3. A built-in backwash sewage lifting equipment according to claim 1, Features: The anti-fouling barrier (4) is made of a transparent material, and the contact surfaces between the anti-fouling barrier (4) and the sewage tank (2) are both configured with smooth rounded corners.

4. A built-in backwash sewage lifting equipment according to claim 1, Features: The cover plates (5) are provided with two identical ones, the cover plates (5) are rotatably connected to the sewage tank (2), and the water inlet 1 (6) is located at the top of the sewage tank (2).

5. A built-in backwash sewage lifting device according to claim 1, Features: The pump body (18) is located inside the sewage tank (2), and the connecting pipe (13), the connecting end (17) and the pump body (18) are connected to each other.

6. A built-in backwash sewage lifting device according to claim 1, Features: The fixing frame (15) is a "circular" structure, and the plurality of springs (16) are distributed in a ring shape. The other end of the spring (16) is fixedly mounted on the connecting pipe (13).

7. The built-in backwash sewage lifting equipment according to claim 1, Features: The pipeline fittings (19) are provided with two identical ones, and the second connecting pipe (20) is connected to the two pipeline fittings (19).