Prefabricated wall body facilitating wet curtain installation
By setting up structures such as card slots, card blocks, extension slots and reinforcement ribs on the prefabricated wall, the problem of slow assembly speed of existing prefabricated walls is solved, rapid splicing and structural strengthening is achieved, and the self-luminous path nails are lifted Night safety.
CN221972734UActive Publication Date: 2024-11-08HUNAN HAIYUAN AGRICULTURE & ANIMAL HUSBANDRY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202420347549.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-26
Smart Images

Figure CN221972734U_ABST
Abstract
The prefabricated wall facilitating wet curtain installation comprises a base, first clamping grooves are formed in the two sides of the upper surface of the base, first clamping blocks are inserted into the first clamping grooves, and side plates are fixedly connected to the upper surfaces of the first clamping blocks; first extending grooves are formed in the upper surfaces of the side plates, and second clamping grooves are formed in the other two sides of the upper surface of the base. According to the prefabricated wall body facilitating wet curtain installation, through the arrangement of side plates, first extending grooves, connecting plates and second extending grooves, first clamping blocks are inserted into first clamping grooves, the side plates at the bottom are installed, and the connecting plates are inserted into second clamping grooves in the surface of the base through second clamping blocks at the bottom; and then through the first extending grooves and the second extending grooves, the side plates and the connecting plates can be upwards overlapped and assembled according to the height of the wall body, the splicing speed between the prefabricated wall bodies is increased, the wall bodies are assembled and formed, the construction period is shortened, and the splicing efficiency of the prefabricated wall bodies is improved.
Need to check novelty before this filing date? Find Prior Art
