Building climbing frame convenient to assemble

By setting small balls and sliding grooves on the building climbing frame assembly and using external forces to connect the limit and nuts, the bolt slip problem is solved, and the stable assembly and convenient installation of the building climbing frame is achieved.

CN221972961UActive Publication Date: 2024-11-08SHANDONG CHENGSEN CONSTR ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420241390.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-08
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

The existing building climbing frames are prone to rust at the bolt connections after long-term use, resulting in bolt slippage and affecting the normal disassembly and installation of the climbing frames.

Method used

A building climbing frame is designed for easy assembly. By setting small balls and sliding grooves on the surface of the building climbing frame assembly, the ball movement is used to drive the ball movement to stabilize the connection between the limit and the nut, avoiding the slip wire of the nut sleeve, and providing replacement The nut sleeve solves the problem of slippers.

Benefits of technology

It effectively avoids the phenomenon of slippery thread of nut sleeves, ensures the stable assembly and disassembly of building climbing frames, and improves the stability and convenience of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972961U_ABST
    Figure CN221972961U_ABST
Patent Text Reader

Abstract

The utility model discloses a building climbing frame convenient to assemble, and relates to the technical field of scaffolds with movable platforms. The building climbing frame convenient to assemble comprises a first building climbing frame assembly, a second building climbing frame assembly is arranged on the lower surface of the first building climbing frame assembly, and the lower surface of the first building climbing frame assembly makes contact with the upper surface of the second building climbing frame assembly; four grooves are formed in the surface of each of the first building climbing frame assembly and the second building climbing frame assembly, and four nuts corresponding to the second building climbing frame assembly are tightened by external force, so that the four nuts can stably limit the position relation of the first building climbing frame assembly and the second building climbing frame assembly; when the corresponding nut of the second building climbing frame assembly slips, an external force pulls open the groove corresponding to the slips and replaces the corresponding nut sleeve, the groove is loosened after replacement, the groove resets to limit the threaded sleeve, and the situation that assembling of the first building climbing frame assembly and the second building climbing frame assembly is affected by the slips is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of scaffolds with movable platforms, in particular to a building climbing frame which is easy to assemble. Background Art

[0002] When constructing a building, there are often areas where construction workers cannot carry out construction due to height restrictions. Usually, a building climbing frame is used to carry out construction at high places. A Chinese utility model patent, authorization announcement number "CN219654230U", discloses an easy-to-assemble building climbing frame, including multiple groups of support frames, the top surface of the support frame is provided with limit columns near the front and rear ends, the outer surface of the limit column is provided with a fixing groove near the center, the inner wall of the fixing groove is provided with a partition near the center, the front and rear side surfaces of the partition are provided with a first spring near the center, and the end of the first spring away from the partition is provided with a limit block.

[0003] The above technical scheme makes the assembly of the building climbing frame very light, fast and stable through the setting of limit columns, fixing grooves, partitions, first springs, limit blocks, limit grooves, second springs, abutment plates, card plates, slide bars, slide grooves, as well as protective nets, safety hooks, ladders and load-bearing plates. When multiple climbing frames are spliced, the climbing frames are connected by bolts. Since the climbing frames are generally set outdoors, the bolt connections may rust due to long-term use, which may cause the bolts to slip, thereby affecting the normal disassembly and installation of the climbing frames. Utility Model Content

[0004] The purpose of the utility model is to solve at least one of the technical problems existing in the prior art, and to provide a building climbing frame that is easy to assemble and can solve the problem of scaffolding with a movable platform.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a building climbing frame that is easy to assemble, comprising a first building climbing frame assembly, a second building climbing frame assembly is arranged on the lower surface of the first building climbing frame assembly, the lower surface of the first building climbing frame assembly is in contact with the upper surface of the second building climbing frame assembly, four grooves are provided on the surface of the first building climbing frame assembly and the second building climbing frame assembly, nut sleeves are arranged inside the eight grooves, and nuts are threadedly connected inside the eight nut sleeves;

[0006] The surfaces of the first building climbing frame assembly and the second building climbing frame assembly are each provided with four sliding grooves, and small ball springs are fixedly connected inside the eight sliding grooves;

[0007] Among them, one end of the eight small ball springs away from the corresponding sliding groove is fixedly connected with a small ball, and the surfaces of the eight small balls are slidably connected with the inside of the corresponding sliding groove;

[0008] Wherein, the upper surfaces of the first building climbing frame assembly and the second building climbing frame assembly are each provided with four connection holes, and the insides of the corresponding connection holes of the second building climbing frame assembly are in contact with the surfaces of the corresponding connection columns;

[0009] Wherein, four sliding holes are provided on the surfaces of the first building climbing frame assembly and the second building climbing frame assembly.

[0010] Preferably, the interiors of the eight sliding holes are slidably connected with button bodies, the four button bodies corresponding to the second building climbing frame assembly are in contact with the surfaces of the corresponding small balls, and the surfaces of the eight button bodies are fixedly connected with buttons.

[0011] Preferably, the surfaces of the eight buttons are fixedly connected with button springs, and one end of the eight button springs away from the corresponding button is fixedly connected to the surface of the corresponding first building climbing frame assembly or the second building climbing frame assembly;

[0012] Among them, six steps are fixedly connected on the surfaces of the first building climbing frame assembly and the second building climbing frame assembly.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] (1) The easy-to-assemble building climbing frame is provided with a first building climbing frame component, and the first building climbing frame component is driven by an external force, thereby driving the four small balls corresponding to the first building climbing frame component to move. When the four small balls corresponding to the first building climbing frame component move to the position of the corresponding sliding holes, the four small ball springs corresponding to the first building climbing frame component are reset to drive the corresponding small balls to enter the corresponding sliding holes for limiting, and then the four nuts corresponding to the second building climbing frame component are tightened by an external force, so that the four nuts can stably limit the positional relationship between the first building climbing frame component and the second building climbing frame component. At the same time, a nut sleeve is provided. When the corresponding nut of the second building climbing frame component is stripped, the corresponding groove of the stripped thread is torn open by an external force, and the corresponding nut sleeve is replaced. After replacement, the groove is loosened, and the groove resets and limits the thread sleeve, thereby avoiding the stripped thread phenomenon that affects the assembly of the first building climbing frame component and the second building climbing frame component.

[0015] (2) The easy-to-assemble building climbing frame has four small balls corresponding to the first building climbing frame component, and uses external force to drive the small balls corresponding to the first building climbing frame component to move to the inside of the corresponding sliding holes to limit the position between the first building climbing frame component and the second building climbing frame component, thereby avoiding the external force affecting the stability of the first building climbing frame component before installing the nut, thereby ensuring the stability of the corresponding nut of the second building climbing frame component during installation, and more conveniently installing the second building climbing frame component. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the position relationship between the first building climbing frame assembly and the nut sleeve of the utility model;

[0019] Figure 3 This is a schematic diagram of the position relationship between the first building climbing frame assembly and the sliding hole of the utility model;

[0020] Figure 4 This is a schematic diagram of the interior of the connecting column of the utility model.

[0021] Figure numerals: 1. connecting hole; 2. first building climbing frame assembly; 3. button spring; 4. button body; 5. button; 6. groove; 7. nut sleeve; 8. nut; 9. second building climbing frame assembly; 10. small ball; 11. connecting column; 12. ladder; 13. sliding hole; 14. small ball spring; 15. sliding groove. DETAILED DESCRIPTION

[0022] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0023] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0024] In the description of the present utility model, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0025] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0026] See also Figure 1-4 The utility model provides a technical solution: a building climbing frame that is easy to assemble, including a first building climbing frame assembly 2, a second building climbing frame assembly 9 is arranged on the lower surface of the first building climbing frame assembly 2, the lower surface of the first building climbing frame assembly 2 is in contact with the upper surface of the second building climbing frame assembly 9, the surfaces of the first building climbing frame assembly 2 and the second building climbing frame assembly 9 are each provided with four grooves 6, the interiors of the eight grooves 6 are each provided with nut sleeves 7, and the interiors of the eight nut sleeves 7 are each threadedly connected with nuts 8.

[0027] Four sliding grooves 15 are provided on the surfaces of the first building climbing frame assembly 2 and the second building climbing frame assembly 9 , and small ball springs 14 are fixedly connected inside the eight sliding grooves 15 .

[0028] One end of the eight small ball springs 14 away from the corresponding sliding groove 15 is fixedly connected with a small ball 10 , and the surfaces of the eight small balls 10 are slidably connected to the inside of the corresponding sliding groove 15 .

[0029] The upper surfaces of the first building climbing frame assembly 2 and the second building climbing frame assembly 9 are both provided with four connecting holes 1, and the corresponding connecting holes 1 of the second building climbing frame assembly 9 are in contact with the surfaces of the corresponding connecting columns 11;

[0030] Among them, four sliding holes 13 are opened on the surface of the first building climbing frame assembly 2 and the second building climbing frame assembly 9.

[0031] The interiors of the eight sliding holes 13 are all slidably connected with button bodies 4, the four button bodies 4 corresponding to the second building climbing frame assembly 9 are all in contact with the surfaces of the corresponding small balls 10, and the surfaces of the eight button bodies 4 are all fixedly connected with buttons 5.

[0032] The surfaces of the eight buttons 5 are all fixedly connected with button springs 3, and one end of the eight button springs 3 away from the corresponding button 5 is fixedly connected to the surface of the corresponding first building climbing frame assembly 2 or the second building climbing frame assembly 9;

[0033] Among them, six steps 12 are fixedly connected to the surfaces of the first building climbing frame assembly 2 and the second building climbing frame assembly 9.

[0034] When it is necessary to install the first building climbing frame assembly 2 and the second building climbing frame assembly 9, the first building climbing frame assembly 2 is driven to move by an external force, and the movement of the first building climbing frame assembly 2 drives the four corresponding connecting columns 11 of the first building climbing frame assembly 2 to move, and the movement of the four corresponding connecting columns 11 of the first building climbing frame assembly 2 drives the corresponding sliding grooves 15 to move, and the movement of the four corresponding sliding grooves 15 of the first building climbing frame assembly 2 drives the corresponding small balls 10 to move, and when the four corresponding small balls 10 of the first building climbing frame assembly 2 move to the position of the corresponding sliding holes 13 of the second building climbing frame assembly 9, the four corresponding small ball springs 14 of the first building climbing frame assembly 2 are reset, and the reset of the four corresponding small ball springs 14 of the first building climbing frame assembly 2 drives the corresponding small balls 10 to move, and then the four corresponding nuts 8 of the second building climbing frame assembly 9 are driven by an external force to be installed into the corresponding nut sleeves 7.

[0035] When it is necessary to disassemble the first building climbing frame assembly 2 and the second building climbing frame assembly 9, the four nuts 8 corresponding to the second building climbing frame assembly 9 are twisted by external force. When the four nuts 8 corresponding to the second building climbing frame assembly 9 are completely separated from the corresponding nut sleeves 7, the four buttons 5 corresponding to the second building climbing frame assembly 9 are pressed by external force. The movement of the four buttons 5 corresponding to the second building climbing frame assembly 9 drives the corresponding button body 4 to move. The movement of the four button bodies 4 corresponding to the second building climbing frame assembly 9 drives the corresponding small balls 10 to move. When the four small balls 10 corresponding to the first building climbing frame assembly 2 move to completely separate from the corresponding sliding holes 13, the first building climbing frame assembly 2 and the second building climbing frame assembly 9 are separated by external force.

[0036] By setting the first building climbing frame component 2, the first building climbing frame component 2 is driven by external force, thereby driving the four small balls 10 corresponding to the first building climbing frame component 2 to move. When the four small balls 10 corresponding to the first building climbing frame component 2 move to the position of the corresponding sliding hole 13, the four small ball springs 14 corresponding to the first building climbing frame component 2 are reset to drive the corresponding small balls 10 to enter the corresponding sliding hole 13 for limiting, and then the four nuts 8 corresponding to the second building climbing frame component 9 are tightened by external force, so that the four nuts 8 can stably limit the positional relationship between the first building climbing frame component 2 and the second building climbing frame component 9. At the same time, a nut sleeve 7 is set. When the corresponding nut 8 of the second building climbing frame component 9 has a slipping phenomenon, the corresponding groove 6 of the slipping is torn open by external force, and the corresponding nut sleeve 7 is replaced. After replacement, the groove 6 is loosened, and the groove 6 resets and limits the thread sleeve 7, thereby avoiding the slipping phenomenon that affects the assembly of the first building climbing frame component 2 and the second building climbing frame component 9.

[0037] By setting four small balls 10 corresponding to the first building climbing frame component 2, the small balls 10 corresponding to the first building climbing frame component 2 are driven by external force to move to the inside of the corresponding sliding hole 13 to limit the position between the first building climbing frame component 2 and the second building climbing frame component 9, thereby avoiding the external force affecting the stability of the first building climbing frame component 2 before installing the nut 8, thereby ensuring the stability of the corresponding nut 8 of the second building climbing frame component 9 during installation, and more conveniently installing the second building climbing frame component 9.

[0038] Working principle: When it is necessary to install the first building climbing frame assembly 2 and the second building climbing frame assembly 9, the first building climbing frame assembly 2 is driven to move by an external force, and the movement of the first building climbing frame assembly 2 drives the four corresponding connecting columns 11 of the first building climbing frame assembly 2 to move, and the movement of the four corresponding connecting columns 11 of the first building climbing frame assembly 2 drives the corresponding sliding grooves 15 to move, and the movement of the four corresponding sliding grooves 15 of the first building climbing frame assembly 2 drives the corresponding small balls 10 to move, and when the four corresponding small balls 10 of the first building climbing frame assembly 2 move to the position of the corresponding sliding holes 13 of the second building climbing frame assembly 9, the four corresponding small ball springs 14 of the first building climbing frame assembly 2 are reset, and the reset of the four corresponding small ball springs 14 of the first building climbing frame assembly 2 drives the corresponding small balls 10 to move, and then the four corresponding nuts 8 of the second building climbing frame assembly 9 are driven by external force to be installed to the inside of the corresponding nut sleeves 7.

[0039] When it is necessary to disassemble the first building climbing frame assembly 2 and the second building climbing frame assembly 9, the four nuts 8 corresponding to the second building climbing frame assembly 9 are twisted by external force. When the four nuts 8 corresponding to the second building climbing frame assembly 9 are completely separated from the corresponding nut sleeves 7, the four buttons 5 corresponding to the second building climbing frame assembly 9 are pressed by external force. The movement of the four buttons 5 corresponding to the second building climbing frame assembly 9 drives the corresponding button body 4 to move. The movement of the four button bodies 4 corresponding to the second building climbing frame assembly 9 drives the corresponding small balls 10 to move. When the four small balls 10 corresponding to the first building climbing frame assembly 2 move to completely separate from the corresponding sliding holes 13, the first building climbing frame assembly 2 and the second building climbing frame assembly 9 are separated by external force.

[0040] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A building climbing frame that is easy to assemble, comprising a first building climbing frame assembly (2), characterized in that: The lower surface of the first building climbing frame assembly (2) is provided with a second building climbing frame assembly (9), the lower surface of the first building climbing frame assembly (2) is in contact with the upper surface of the second building climbing frame assembly (9), the surfaces of the first building climbing frame assembly (2) and the second building climbing frame assembly (9) are both provided with four grooves (6), the interiors of the eight grooves (6) are each provided with a nut sleeve (7), and the interiors of the eight nut sleeves (7) are each threadedly connected with a nut (8); Wherein, the surfaces of the first building climbing frame assembly (2) and the second building climbing frame assembly (9) are each provided with four sliding grooves (15), and the interiors of the eight sliding grooves (15) are each fixedly connected with a small ball spring (14); The ends of the small ball springs (14) away from the corresponding sliding grooves (15) are fixedly connected with small balls (10), and the surfaces of the eight small balls (10) are slidably connected with the inside of the corresponding sliding grooves (15); Wherein, the upper surfaces of the first building climbing frame assembly (2) and the second building climbing frame assembly (9) are each provided with four connection holes (1), and the insides of the corresponding connection holes (1) of the second building climbing frame assembly (9) are in contact with the surfaces of the corresponding connection columns (11); Wherein, four sliding holes (13) are provided on the surfaces of the first building climbing frame assembly (2) and the second building climbing frame assembly (9).

2. The easy-to-assemble building climbing frame according to claim 1 is characterized in that: The interiors of the eight sliding holes (13) are all slidably connected with button bodies (4), the four button bodies (4) corresponding to the second building climbing frame assembly (9) are all in contact with the surfaces of the corresponding small balls (10), and the surfaces of the eight button bodies (4) are all fixedly connected with buttons (5).

3. The easy-to-assemble building climbing frame according to claim 2 is characterized in that: The surfaces of the eight buttons (5) are all fixedly connected with button springs (3), and one end of the eight button springs (3) away from the corresponding button (5) is fixedly connected to the surface of the corresponding first building climbing frame assembly (2) or the second building climbing frame assembly (9); Wherein, six steps (12) are fixedly connected to the surfaces of the first building climbing frame assembly (2) and the second building climbing frame assembly (9).

Citation Information

Cited By

  • Building climbing frame convenient to assemble

    CN223497523U

  • Building climbing frame structure

    CN224244397U